Loading...
8.d) Engineering Activity Report �.d� �, . �; � ���-. . � : J•�,��� ,� SCANDIA � City of Scandia Engineering Updates 7/16/2013 En�ineerin� • Bolton & Menk, Inc. will be in attendance at the workshop on the river for Community Leaders, Wednesday,July 17th. At this workshop phosphorus reduction will be discussed, implemented actions completed to date, and an opportunity to collaborate with your neighboring communities. • Attended the City Council Work Session on July 9th. Presented the preliminary report for Pilar, Paris, Perkins, Penfield improvements to the City Council and invited residents. • 2013 Gravel Project has been completed. Work included placing 4" of aggregate material on Old Marine Trail (Oxboro Ave N/Old Marine Trail N to County Road 4), Parade Ave N (Old Marine Trail to south City limits), and on 185th Street N (Old Marine Trail N to the West). • Chloride application is scheduled to begin the week of luly 15tn • 2013 Seal Coat Project will begin in August after the roadway patching work has been completed. • Pavement Road Ratings have all been completed. Next step would be to update the Road Rating Map. • Received electronic base map information from previous Engineering Firm. This information will be reviewed and incorporated into the GIS mapping system we have proposed to build with the existing data and deployment for the City of Scandia. Public Works has borrowed one of our hand held GPS devices to obtain coordinates on additional infrastructure that can be included in the GIS mapping system. • June 26th completed a small road tour with Public Works to discuss scope of work for future street maintenance projects. • Working with Contractor to complete remaining punch list items on the Uptown Sewer System Improvements so project closeout and final acceptance can be approved. New casting has been ordered for sanitary sewer manhole and will switch out the one currently onsite now, silt fence has been removed, additional topsoil/seed was placed in washed out areas.