8.d) Engineering Activity Report �.d�
�, .
�; � ���-. .
� : J•�,��� ,�
SCANDIA �
City of Scandia
Engineering Updates 7/16/2013
En�ineerin�
• Bolton & Menk, Inc. will be in attendance at the workshop on the river for Community
Leaders, Wednesday,July 17th. At this workshop phosphorus reduction will be
discussed, implemented actions completed to date, and an opportunity to collaborate
with your neighboring communities.
• Attended the City Council Work Session on July 9th. Presented the preliminary report for
Pilar, Paris, Perkins, Penfield improvements to the City Council and invited residents.
• 2013 Gravel Project has been completed. Work included placing 4" of aggregate
material on Old Marine Trail (Oxboro Ave N/Old Marine Trail N to County Road 4),
Parade Ave N (Old Marine Trail to south City limits), and on 185th Street N (Old Marine
Trail N to the West).
• Chloride application is scheduled to begin the week of luly 15tn
• 2013 Seal Coat Project will begin in August after the roadway patching work has been
completed.
• Pavement Road Ratings have all been completed. Next step would be to update the
Road Rating Map.
• Received electronic base map information from previous Engineering Firm. This
information will be reviewed and incorporated into the GIS mapping system we have
proposed to build with the existing data and deployment for the City of Scandia. Public
Works has borrowed one of our hand held GPS devices to obtain coordinates on
additional infrastructure that can be included in the GIS mapping system.
• June 26th completed a small road tour with Public Works to discuss scope of work for
future street maintenance projects.
• Working with Contractor to complete remaining punch list items on the Uptown Sewer
System Improvements so project closeout and final acceptance can be approved. New
casting has been ordered for sanitary sewer manhole and will switch out the one
currently onsite now, silt fence has been removed, additional topsoil/seed was placed in
washed out areas.