4.a) Capital Improvement Program (2014-2018) , �� �/
SCANDIA
City of Scandia
Capital Improvement Program
2014 — 2018
Draft for Budget Work Sessions
CONTENTS
Introduction
Whatis a CIP? .................................................................................................................1
Scopeof the Draft CIP.....................................................................................................1
FundingSources ..............................................................................................................2
ProjectPriorities ..............................................................................................................2
2014-2018 CIP Overview
StreetProjects..................................................................................................................3
EquipmentReplacement Fund.........................................................................................3
Project Highlights by Department...................................................................................4
CIP Summary Data
Project Listing by Department(All Years)......................................................................6
Projects by Year, 2014 thru 2018 ....................................................................................8
Sources and Departments Summary, 2014 thru 2018 .....................................................10
Projects by Year, 2019 thru 2023 ....................................................................................11
Sources and Departments Summary, 2019 thru 2023 .....................................................12
Projects by Department, 2014 thru 2023.........................................................................13
Projects by Source, 2014 thru 2023.................................................................................15
Equipment Replacement Fund, Replacements by Department .......................................18
Equipment Replacement Fund Cash Flow, 2014-2023...................................................19
Appendix
Project Details, All Projects.............................................................................................20
INTRODUCTION
The Capital Improvement Program (CIP) for the five-year period of 2014 through 2018 is the
seventh such document prepared by the City of Scandia. It would amend the CIP included in the
March,2009 Comprehensive Plan (as amended through December 18, 2012)replacing Appendix F
of the plan in its entirety.
What is a CIP?
A Capital Improvement Program, or CIP,is a multi-year(typically 5 years) capital expenditure plan
for a City's infrastructure(such as streets,parks and utility systems), vehicles, equipment and public
buildings. It identifies the major projects needed and desired by the community, their potential
costs and how they would be financed. Including a project in a CIP does not commit the city to that
project. The City Council must specifically authorize each one, and the associated funding,before
any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the
budgeting process)projects may go forward as planned, advance ahead of schedule, be removed
entirely, or new projects may be added, depending upon changes in circumstances and priorities.
The Minnesota Land Planning Act requires that the implementation plan portion of the
Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater,water
supply, pazks and open space) for a five-year time period. Cities often expand the scope of their
CIPs to include other capital needs (major equipment replacements, for example) and sometimes
look beyond the five-year time period,up to 20 years in the future for some projects. Such projects
represent more of a"wish-list"that can be evaluated each time the plan is updated.
As a part of the Comprehensive Plan,the CIP has some legal standing. Minnesota Statutes Chapter
473.865 provides that "a local governmental unit shall not adopt any official control or fiscal device
which is in conflict with its comprehensive plan." A fiscal device includes a budget or bond issue;
so it is important that the plan and CIP be kept up to date and in synch with city budgets.
The primary benefit of a CIP is as a financial planning tool, to help the city plan for the impact of
capital needs on future budgets and property taxes, and to help forecast the need for borrowing to
undertake major projects. The information developed as part of the capital planning process can
help document the need for various projects and help the City Council sort out competing priorities.
Scope of the CIP
Scandia's CIP includes all capital projects that cost at least$10,000 and have a useful life span of
five years or longer. Projects include all capital needs including major repairs to buildings and
equipment purchases and replacements. Any projects not meeting these parameters would be
reviewed as part of the annual operating budget,but would not be included in the CIP.
Funding Sources
The CIP identifies a possible funding source(s) for each project listed. The various funding sources
are as follows:
Capital Improvement Fund Existing City fund,primarily,from property tax levy, set aside
for capital projects.
Debt Service Fund Pro�jects financed by borrowing, later to be repaid with
property taxes, and potentially special assessments
depending upon the characteristics of the project.
Equipment Replacement Fund Internal service fund used to segregate funds set aside for
planned replacements of existing major equipment. Funds
are transferred from operating budgets (primarily property
tcrx revenues.) The fund may also receive funds realized
through debt,�nancing.
General Fund Annual operating budget,primarily funded by property tax
revenues.
Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park
dedication fees paid by developers and others who subdivide
their land.
In addition to these sources, it is possible that future projects could be funded from donations,
grants,user fees or other sources not listed. Projects benefiting an enterprise or utility fund could
be paid from the appropriate fund.
Project Priorities
Capital improvement projects should be prioritized in some way so that limited funding can be allocated
to those which are most important. Ttuis is dif�icult because the varying nature of the projects and their
benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have
developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may
have some disadvantages because they may give a false sense of objectivity or precision to the priority
setting process. Others use simpler systems,or simply do not try to compare projects that are like"apples
and oranges:' There is no accepted system or"industry standard"for prioritizing projects.
The Capital Improvement Committee developed the following priority rating system in 2008,which was
also used for the 2009 and subsequent updates:
A Critical or urgent,high-priority projects that should be done if at all
possible; a special effort should be made to find sufficient funding for a11
of the projects in this group.
B Very important,high-priority projects that should be done as funding
becomes available.
C Important and worthwhile projects to be considered if funding is
available;may be deferred to a subsequent year.
2
D Less important,low-priority pmjects;desirable but not essential.
N/A Used for replacements of existing equipment.
2014-2018 CIP OVERVIEW
For 2014 through 2018,the draft CIP inciudes 27 separate projects with a total estimated cost of
nearly$5.6 million. All cost estimates are preliminary and based on current dollars. No
assumptions have been made about inflation. It will be important to refine and update costs when
the plan is reviewed, especially for projects in the first year or two of the plan.
Some projects beyond the five-year planning period are also included in the CIP. Most of these
projects are replacements for equipment and vehicles (such as fire trucks)which may have a life
span of 10, 15 to 20 years or even more. The plan also includes"pending"projects for which
timelines (and in most cases, cost estimates)have not yet been identified. As more information is
developed about the need for, cost and possible funding sources for these projects, they will be
included in future CIP updates.
Street Projects
The draft update includes the following two street projects in the CIP :
• PW-002, Street Maintenance Program. The current funding level ($300,000 per year)has
been maintained,with the addition of a$2,000,000 project in 2015. The cost, funding
sources and specific roads to be included will be refined after an update of the Pavement
Management Plan, and Council decision on financing policies (i.e. assessment policy,
franchise fees).
• PW-027, Quinell Ave. Estimated costs are based on the engineer report received earlier this
year. Funding sources are the funds from the County when the road was turned back to the
township and the remainder to be determined after Council decision on financing policies.
The goal of the 2008 Pavement Management Plan was to extend the life of city streets and to reduce
the lifecycle costs for maintaining them in good condition. Each year the city has endeavored to
increase the budget for contractual road maintenance and repairs. However,the city has yet to
develop a policy and funding strategy for dealing with roads needing reconstruction.
The update of the Pavement Management Plan is underway. Street conditions will be updated and
more emphasis will be placed on the"reclaim and replace"option as a strategy for extending
roadway life. The update will help the city identify the streets to be included in the 2015 project,
and further refine the cost and funding sources. An assessment policy will also need to be put in
place if the City will pursue debt financing.
Equipment Replacement Fund
The city created the Equipment Replacement Fund in 2007 to set aside funds on an annual basis for
planned replacement of vehicles and major pieces of operating equipment. The fund receives
transfers from the operating budget of each departrnent depending on its equipment needs. This
allows the departmental budgets for each major function to accurately show the costs of funding
3
t]Zat function, including equipment, while segregating the funds from the operating budgets. Any
revenues from the sale of old equipment being replaced are also deposited into the fund. Ideally,
over time the fund would receive enough funds to be on a pay-as-you-go basis. At a minimum,
accuinulating funds for future replacement needs will reduce need for borrowing, and flatten spikes
in the annual tax levy needed to pay for major purchases.
,--------------- ,
lust as for other capital projects, the decision ; Equipment Replacment Fund 2414-2023 �
whether or not to replace a particular piece of � ;
equipment, and what to replace it with, will <.soo,o�o
need to be made by the City Cauncil at the ���,o�
time of the purchase. The City could decide
to keep some equipment longer than planned. s3o��,0+� � --
Or, equipment could wear out more quickly � �Ex���
than ex ected. It is likel that some items 20�'0�0 !
P Y �F.e�er ue �
will not be replaced, or that new technology ;loo,�oo �
or equipment could alter plans to replace a —6alance
particular item. The imtial purchase of new ; so - -
2014 2015 �O:E 101? 2 8 ' .: 2.�20 2021 Oi2 �23
equipment will be considered as part of the �lo���
annual operating budget, and once purchased,
future replacements are added to the -szoo,o,�o �
schedule.
In 2013,the City transferred $100,000 to the fund. The draft 2014 budget and CIP show proposed
transfers of$100,000 in 2014 and subsequent years. The chart above shows the cash flow in the
Equip�nent Replacement fund from 2014-2023 assutning a $100,000 per year contribution.
With a $100,000 annual contribution added to the projected 20l 3 year-end balance($322,000) the
fund would be close to cash flowing for the years 2014 through 2018, assuming$70,000 would be
realized from the sale of old equipment. (Any income from the sale of old equipment is not
included in the chart.)
Project Highlights by Department
Adminis�tration—An Electronic Data Storage system has been added to the CIP for 2014 at Council
direction. This system will help address storage space needs in the city offices as well as improve
efficiency in locating City documents.
Commu►uty Ceizter—There are no Community Center projects in the 2014-2018 time frame. .
Fi�•e—Most of the Fire Department projects are replacements of equipment and Fire Hall
components (HVAC, generator, etc.). Tanker 5177 (F-01 l) is scheduled for replacement in 2015
and Grass Rig 5175 (F-013) is scheduled for replacement in 2017. Radio replacement (F-003) is
scheduled for 20]8 and SCBA Compressor replacement (F-022) has been added for 2014. Civil
Defense Sirens have been eliminated for all years except 2018. Two items have been moved from
pending to active: Chief's Car (F-004) for$50,000 in 2018 and a Second Fire Station on Manning
Ave for$125,000 in 2017.
4
Ice Rink—The Zamboni will need to be replaced at some time. The year for replacement remains
the same, 201b, at the recommendation of the Park and Recreation Committee.
Parks and Recreation—Lilleskogen Park Restoration continues to be the top priority of the Park
and Recreation Committee. Availability of funds from the Park Capital Improvement Fund
continues to be a major limiting factor. In 2012 and 2013, a small amount of cash was allocated to
the project, assuming that and/or donated labor and materials can be obtained for remaining costs.
For 2014,the draft CIP assumes a11 funding to come from grants or donations.
The two trail projects added to the CIP in 2011 (PR-Ol 5, Sidewalk,209th to South Ball Field and
PR-016, Sidewalk, Ballfield to Olinda Lane)have been moved to pending at Council direction. The
Park and Recreation Committee recommended PR-015 be funded in 2014. The timing of a
management plan for Wind in the Pines Park (PR-002) was also moved from 2014 to 2015 at the
Committee's request. ,
PR-018,Tennis Court Reconstruction ($60,000)has been moved from pending to active in 2018 in
the draft CIP.
A new project, Log House Landing Improvements (PR-019), has been added to the CIP. The project
is broken down into two phases. Improvements to the landing are scheduled for 2014 and the
paving of the access road and other stormwater improvements for 2015. The draft CIP assumes a
50% cost share with the Carnelian-Marine-St. Croix Watershed District.
Public Works—The largest street projects in the plan are discussed above. At Council direction,
the plan moves Ozark Avenue Extension(PW-003)to pending. It is unlikely that this road would
be constructed until some of the land that it would serve is developed.
In addition to the Quinell Ave project discussed above, the other new project added to the CIP is a
Wood Chipper(PW-026)which has been pushed back to 2015 following discussion at the June
work session.
Project PW-006 would maintain a third dump truck/plow in the city's fleet. Getting the snow off
the roads more quickly will enhance the overall effectiveness of snow and ice control. The city
purchased its last new dump truck in late 2011. It was intended as a replacement for a 1997 Ford
plow truck however the Public Work Director recommended keeping it until a replacement could be
purchased in 2014 to maintain the three routes. The Council included funding in the 2013
Equipment Certificate Issue to allow for the purchase of the dump truck with plow. The next
replacement(PW-010, the 2002 Sterling)is scheduled for 2016. After that replacement,the
replacement schedule is set at 10 years for a113 plow trucks.
The remaining Public Works projects are equipment replacements. Changes to the expected useful
life and cost estimates for several items have been made but do not have a significant impact on the
first 5 years of the plan.
5
City of Scandia, Minnesota
Capital Improvement Program
PROJECT LISTING
Includes Projects from All Years
Administration
Status P o' Proiect Name
Active A-0O6 Electronic Data Storage
Communi Center
Status Pro ect# Proiect Name
Aciive CC-002 Corrnnunity Center HVAC Replacement
Active CC-003 Corrxnunity Cerrier Roof Replacemer�
Fire
Status Proiect# Prolect Name
Active F-001 Fire Stadon HVAC Replacement
Active F-002 Replaoement ot Fire Dept.Ak Compressor
Active F-003 Fire Department Radio Replacement
Adive F-004 Fire ChiePs Car
Active F-006 SCBA Afr Pac Replacements
Active F-007 Fire Hall Roof
Active F-008 Fire Hall Well Pump Replaoement
Ac6ve F-009 Civil Defense Sirens
Active F-010 Rescue 5179 Replacement
Acfive F-011 Tanker 5177 Replacement
Active F-012 Engine 5180 Reptacement
Ac6ve F-013 Grass Rig 5175 Replacement
Active F-014 Tanker 5178 Replac�ment
Active F-015 Engine 5176 Replacement
Adive F-016 Sec�nd Fire Station
Active F-018 Back-up Generator for Frce Hall
Active F-022 SCBA Cort�ressor Replacement
Ice Rink
Status Proiect# Proiect Name
Adive IR-UO2 Zamboni Replacement
Parks and Recreation
Status Pro ect# Proiect Name
Active PR-001 Ulleskogen Park Improvemenls
Ac6ve PR-002 Wind in the Plnes Park
Adive PR-018 Tennis Court Reconstruc6on
Active PR-019 Log House Landttg Improvements
Public Works
Status Proiect�! Prolect Name
Active PW-002 Street Maintenance Program
Active PW-004 Pickup wlPlow Replaoemeni 2008 Ford F350(102-08)
Acfive PW-005 John Deere Tradw Mower wBroom&Blower(303-09)
Active PW-0O6 New Dump Tn�ck/Pbw(Replace 201-97)
Active PW-007 Tiger Ditch Rear Mower ReplacemeM
Active PW-008 Tiger Boom Mower Attachment Replacement
Active PW-009 1999 JD-6410 Trador Replacemem(302-99)
DRAFTfor 2014-2018 Update Wednesday,August 07,10I3
W
AcGve PW-010 2002 Steriing Dump Truck/Plow Replacement(202-02)
Active PW-012 Asphaft Patching Equipment(312)
Acctivve PW-014 Pidcup wlPlow Replacement 2011 Ford F250 (103-11)
Acbve PW-015 Skid Loader and Trailer
Active PW-016 1998 John Deere Motor Grader Replacemeni(301-98)
Ac6ve PW-017 2011 Madc Dump TrucklPlow Replaoement(203-11)
Active PW-019 2008 Ford Ranger Replacement(101-05)
Active PW-020 Power Washer
ACtive PW-021 Lift for Public Works Gerage
Active PW-022 One-Ton F-550 Work Tnxk
Active PW-024 Utility Trudc with Crane
Active PW-026 Wood Chipper
Active PW-027 QuineA Ave
DRAFT jor�014-1018 Update Wednesday,August 07,2013
�
City of Scandia, Minnesota
Capital Improvement Prograrrc
2014 thn, 2018
PROJECTS BY YEAR
Project Name Department Project# Priority Project Cost
2014
Elec�ronic Data Storage Administration A-006 2 12,250
Badc-up Generator for Fre Hall Fire F-018 3 38,000
Lilleskogen Park Improvements Parks and ReaeaUon PR-001 2 47,500
Log House Landirg Improvements Parks and Reaeaian PR-0i9 Na 40,000
Street Maintenance Program Public Works PW-002 1 30D,000
New Dump Trudc!Plow(Replace 201-97) Public Wo►ks PW-006 1 200.000
Total for 2014 635,750
2015
Tanker 5177 Replacement Fire F-011 3 200,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 36,000
Wind in the Pines Park Parlcs and Recxeation PR-002 3 10,000
Log House Landing Improvements Parks and Reaeation PR-079 nla 200,000
SVeet Maintenance Program Pub6c Works PW-002 1 2,300,000
Utility TNdc with Crane PubNc Wo�Cs PW-024 3 70,000
Wood Chipper Public WoAcs PW-026 2 37,500
Quinell Ave Pub�Works PW-027 n!a 185,000
Total for 2015 3,038,500
2016
Flre Station HVAC Replacement Fire F-001 2 20,000
SCBA Compressor Replacement Fire F-022 2 17,000
Zamboni Replecxment Ice Rlnk 1R-002 n!a 40,000
Street Maintenance Program PubYc Works PW-002 1 340,000
John Deere Tractior Mower w/Broan 8 Bbwer(303-09) Pubkc Works PW-005 3 25,000
2002 Sterling Dump TrudJPbw Replacement(202-02) Pubqc Works PW-010 3 2U0,000
Totai for 2016 602.000
2017
Grass Rig 5175 Replacement Frcee F-013 3 85,000
Second F'uee StaCan Firee F-018 3 125,000
Street Meinlenanoe Program Public Works PW-002 1 300,000
Total for 2017 510,000
2018
Fire Departrnent Radio Reptacemerri Fire F-003 1 75,000
Fire Chiefs Car Fire F-004 3 50,000
Cwil Defense Sirens Fire F-009 2 30,000
Tennis Court ReconsWction Parks and Reaeation PR-018 3 60,000
Street Maintenance Program Publ'�c Works PW-002 1 300,000
P�kup wlPbw Replacement 2008 Ford F350(102-08) Public Works PW-004 3 25,500
1998 John Deere Motor Grader Replacement(301-98) Public Works PW-096 n/a 225,�0
DR,9FTjor 2014-2018 Update Wednesday,August 07.2013
�
Project Name Department Project# Priority Project Cost
2008 Ford Rarger Replacemem(101-08) PuWic Works PW-019 3 25,500
Total for 2018 791,000
GRAND TOTAL 5,sn,2�o
DRAF7 for 1014-1018 Updale Wednesday.August 07,2013
�
City of Scandia, Minnesota
Capital Improvement Program
2014 �1„�, 2018
EXPENDITURES AND SOURCES SUMMARY
Department 2014 2015 2016 2017 2018 Total
Admin�sVaafion 12,250 12,250
Fire 36,OOU 200,000 37,000 210,000 155,000 638,000
Ice Rink 4Q,000 40,000
Parks and Recxeation 87,500 246,000 60,00� 393,500
Public Works 500,000 2,592,500 525,006 300,000 576,00� 4,493,500
EXPENDITURE TOTAL �5,750 3,038,500 802,000 510,000 791,000 5,5T7,250
Source 2014 2015 2016 2017 2018 Total
Capital Improvement Fund 68,250 177,560 30,000 275,750
Debt Service Fund 200,000 2,000,000 125,000 2,325,000
Equipment Repl�ement Fund 200,000 242,000 85,000 351,000 878,000
General Fund 300,000 300,000 320,000 300,000 490,000 1,630,000
Grantsl Donations 67,500 256,000 40,000 363,500
Othed TBD 65,p00 65,000
Park Improverr�nt Fund 10,000 10,000
Sewer Fund(201) 30,000 30,000
SOURCE TOTAL 635,750 3,038,500 602,000 510,000 791,000 5,577,250
DRAPT for 2014-2018 Update Wednesday,Augus�07.2013
' "
City of Scandia, Minnesota
Capital Improvement Program
2019 thru 2023
PROJECTS BY YEAR
Project Name Department Project# Priority Project Cost
2019
Communily Center Roof Replacern�t Community Center CC-00.? 2 22,000
SVeet Maintenance Program Pubbc Works PW-002 1 300,000
Tiger Ditch Rear Mower Reptacement Public Works PW-007 3 15,000
Tiger Boom Mower Aifachment Replacement Pub�ic Works PW-00$ 3 12,000
1999 JD-6410 Tractor Replecement(302-99) PubGc Worics PW-009 3 60,000
Total for 2019 409,000
2U2U
Fire Hall Roof Firee F-007 2 80,000
Street Maintena�e Program Public Worics PW-002 1 300,000
Total for 2020 380,000
2021
Replacement of Fire Dept.Air Compressor F�ee F-002 1 30,000
Street Maintenance Program Public Works PW-002 1 300,000
Pickup w/Piow Replacement 2011 Ford F250 (103-11) Public Works PW-014 3 25,500
Total for 2021 355,500
2022
Communiry Center HVAC Replacement Community Center CG002 2 30,OD0
SCBA Air Pac Replacements Fire F-008 1 70,000
Skid Loader and Trailer Public Works PW-Oi5 3 40,000
2D11 Madc Dump TruddPbw Replacement(203-11) Public Worics PW-017 3 200,000
Total for 2022 340,000
2023
Tanker 5178 Replacement Fire F-044 3 180,000
John Deere Tractor Nbwer wlBroom&Bbwer(303-09) Public Waks PW-0OS 3 25,000
One-Ton F�50 Work Tnx:k Public Wwks PW-022 2 50,000
Total for 2023 255,000
GRAND TOTAL 1,739,500
DRAFTfor 2014-2018 Update Wednesday,Augus107,1013
1,
City of Scandia, Minnesota
Capital Improvement Program
2019 t1,n, 2023
EXPENDITURES AND SOURCES SUMMARY
Department 2019 2020 2021 2022 2023 Total
Community Center 22,000 30,000 52,000
FKe 80,000 3D,000 70,000 180,000 360,000
Pubfic Works 387,000 300,000 325,500 240,000 75,000 1,3D,500
EXPENDITURE TOTAL 409,000 380,000 355,500 340,000 255,000 1,738,500
Source 2019 2020 2021 2022 2023 Total
Equipment Replacement Fund 87,000 55,500 310,000 255,000 707,500
General Fund 322,000 380,000 300,000 30,000 1,032,000
SOURCE TOTAL ��� ��� 355,500 340,000 255,000 1,739,500
DR9FTfor2014-1018 Update Wednesday,Augus107,lDl3
1 �
� � � � � gg $ gg � � gggogg g � �
N N O O O O O O O O O O O O p
� N N O N N O O uj � O � O g 4� O k'! t0 f� b O N
f M N M! N M !� 1� try � N ^ M O! C
p N t- q 1�
F �
�
c� s
N g v �
O a
N °.� � �
v
b
�
� � � S
o � N3 � �
N
$ o
� o
O M �
N
O O_ 4
N $ o
O °D
N
� � � p
O
N
� � � 5�
�
� a M a N � � 25 �
o � $ � �
� .,�, N �
� N a
� W
� � � q r � 8 � �3
� o � N ° � � �
� � � �
�' o
`��-' `� N ('�'' � 8 S S
o ti � � p
� � W N N � M Q
O
•,.�
v � O
v a � � $
o Q �
N c'Ci N
�,�.i � ��`! o 0
N � � `� �
�
M"� N N N N e- � ^'a r- N N M t7 ln 1'1 t�f N N
� y� Y r 2
QH H H ' N
L d
� � � � � � � � � � � � � ssssss w �
� U
� � �
� � � _ �
� � E � � �3 � � i
d � � a � � � a � � ° � '� � � �
O L�° � i � U � �' � $ y E m � LL c
d c N
(� � � P3 n 43 � � � v
+.+ � � P: � Q iL � m � n � � � � � a' o
��+ �+ N m 7 � C W � C� d' A a' � � � � ~
�G+ .y.� O •'� C� U � C� tVa O �` a0 � C G .'i�i m O
7�+ •� � � .� � � � O. � � � � 1A � � LL � � � � �
� � o � � � � �� � � m = � � � � � � � a � �
A Q � V � � w LL �� � LL � � � � � � � � � � N �
0 Q Q 0 0 s Q 0 0 0 0 0 0 0 0 0 o g � «,
0o g g gO � � �p u�5 25 gp � 25 2pS � u� g o c� � oO o h o o �. o
j.�i � � � �O v O�i O N � O � � �O 4 N `�O� N O N 4� � c'�^'f a�o N � N
0 CV M V N N N N f- a0 {y C
� � � �
�
c� Q 3
N go g S 25 a
0 c`�.i � � � �
N y
�
�
N � 7$ 0 25
N � $ � �
N N
p O � �
~ C7 �!
N � �
O p N M
N c'�
O � g �
N � �
�
25 25 �S ZS � 25
� o
0 8 � � $ °° �
M
N
00 25 � 25 7S c � g 25
o � $ o �ri �n �i �(�
� N N N �• h
N
N �"i � �
T
� o � � s o $ �—
� � � � � � �
N
� � o a g � g � � � �
p �c o O � g � c^'� a�o rn �+�i
N M N N M N O
N � M
O O
� � $ � g o 5'
N v � So S N � �•�j
t0
�
'!"� lV � �'f ? � M M � 17 I�f t�f nf t7 � x t�f Af N r'1 N Y
fl � � �
Q �
a F F F
3C ��y a a a a O $ 'i $ � $2 � g 4 � R R R �z b q 43 � F
�y a a n a� � � � � � s � � � � � � � 4 � � � S � A
u
� � � � � � P � ^ �
LL � o m � � o � �,
� Ny
� � N � �! 1� � � � C Q�I � q
� � c Q � L° � 3 � � � � � � � � � � w
m �
t" E i' E ee � � � m � � 2 � a`� `o �.-. n � u� N
� n e° � Pr `u n' � a � "L � a Q 1O �� �rn �� � o � v
� b � � � �co o � � ���i 2 � � � oN �� � �yM �R � 3 � H
�„ C a a �C J �3 �ao F-V 1- K � c � �c �� � O c � c � � � � o
ai c a> > � � n q� �i d d n d `'�
1`�.. m °' � �j 1�5' � � ;c �M = 'tFS o Ey � � E�N 3 0 �m -� � EN � c 2 V ¢ �
06 X� S' C ,� O p,�. � p � � Ct -� Cn C� n� J "a � Sc U LL. F � �
{.. _ ,=Z p �7 W N df
E! � N C C IIl •' �Ifj � m N n N n �� �n �n � � C �
A a � � � � A" � au �� � s� �� �� $� aLL � S'� R�� �i o 5 � c� �
� � � � � � $ � � � � � � � � � � � � � � o
0 � O �O O O � v! � � h O � O q �! O � � N
H �7 n'1 � et ty N F S � ty !� t� N W � �- N � ^
N N� �
�
�
�
N g g o
'�
N °r N v
b
�
N
S
N o
N ^
� �
N o
O �
N
O
N
O
N
O�
O
N
Cd � W
o � U o a o �
0 0
�" O N e�oi �i � N
� � 0
� �, N
� N �
� � � � � o �
� � � � �
� o vs N � � °
� � a H �
w � ��'' W
o ti �, � � �
� O ~ � N
� .,� a N
v v a
� � ss � � � �
0
N $ � � � g � g
CV N
� � 8 8 � � �
N � � R� � � �
� N N M C t7 N f7 � r- '- �- � M th P� N e7 th
�
� � �
a H H
CI O � � N F1 f0 O � � �LJ N �- nf ' N
� ,� � � § � � � �, � � $ �, � � � � LL � LL ? � �
� +., y Grr
�
W � � 8 � y ` � � � � 4
d 2 i O E a V� e�i Q i� Y! c $ � 3 .�
�p �° � .r� u . � � c c @ � uo
y m � n ty � 8' d "" ani o � � °� � n � � o
o � N o E � � � c � � A � �, � � � `$ °� � � N
~�+ N � � � V � V $ c �i � � � � � �. mooppp �
G f9 � N � � :� � fA � 2 d � � � �-' ti d' � �p ��j ry
� io `� � O, � c � i+ ao n �� � o
V ..�r, � .� Q � 2 L (� � � 2 � � � � �. Q �n � �n V 3� �V �
p � � � _ �• � y � � ��' •a �E � m � `�7, � � �LL �� C
O /' � '2 m S' � � � t �o W d p � c� m �° �o c> .�� o e° p
V] V W U m J � � � C/J Cn Z N a'U LL Cn H C:� H fn d LL �oiS
�? g � do d g � � �o $ � � � � � � � �p � � � g � � � ry
� ti � �d N N a N N N � � � N N � � �O S b V' � N N �
r� �
.: c�i N C
H
�
�
O O
M $ o �
N
N � N °y'
�
�
N � � $ 8 �
N
N `t c�v � r> c4i
� � � � 8
N c`�.� �i � o
�n
��,, � � $
N � �, �
�: � � S 8 � � S
N � � t�D � N � M
°.�° 0 5� 8 8 8 0 �
N "' N � m o �
`c� t�i M v
�
O
n g g o �
N `� � g
�o � $ � � $ � $
0 8 N R � SM � �
N
� �p o� � ggo ��p
N O �b,� � M O N N
N
p�y O 4 � O �fJ
p v c�v m
N � g
,£ �n .-� �n m �n M 2 <n �n N N N N co c� r� .- 2 � 2 2
O y � �
p" H E� E+
O F F i� F �0 N � N f0 � � O� VrJ
4g N FI
� � � � � � � � � � t� L� �i � S � � � � (i a � �` � �
� � �
� i,,, o
c r' °' °' s� Q n
o � � y c � �r a> �, tt
E � � N L � E � � � E "' rn °� i C �4
e� � � Ept � �� � � y ¢ o n � g' O � � i'�"' o
� a '�C, n 4 �� �L �� 2^ � i� C�G �p i � � � °n-� � d � p� � v
�2 N =0 N� h- �j o a� y � y .� ..`d, .4�-.7 U � c 4." C �
H pN �P'� � M EN o y � c a m ip O � '� N
� �p 7 � �n C �1 > to d' c A N �
� c c � �c ��.. p� c 0 c � �n C � c �c = V g � d �j a � o
c
a� '� � EQ E '�4 � � ��, �' _ � � � E� � O. 4 �'E .�'� s � � � c � � m � a' �
� 0 8�' dS� �� cn Y3 �LL � � 8 � 8 �i� � o" a E � E' � v�i � i •� � � $ g =
� �aai 4+gi rn o o m �o '��c rn aai o m �o c W � Ep a�i Ep ani L � � aGi .� � m °—� �' � A
C/� F- � F-Q.' ��. N� d lL Cn d' N R' N� O U O..' U Q' LL lL lL F- VJ N � J O
� O O O O O 9 � N
F � e � � � «�,' �
�
�
0
N`
�
5� �
M $ a
N N G
N
�
N �
N �
O
N
� g
N �
O �
N �
N �
O $
N �
� orr
O �N
00 $
� a
N o�
�
� � �
O o �
N �
� a
~ N
N �
� 8 � $ 8 g S 8
o � ;d � � � ;� �;
N p
a>
�t �.�
O �N
� � m �
•� �
O � � �
a F H H H
^, O
� � � g a � N A
w �
� � b
� � d � d
� � � w C7 �°
..� > a�i �
y W � N � V� `�
> a �" U �
� � � � � � O
a � o
E „ � � a w � �
� � � � � � ~ �
++ � w � a�i � �
r°n 0 C7 A+ 3 � � �
, .
Equipment Replacement Fund
2014-2018
Replacements by Department
Year Fire Pubiic Works Total
2014 $0 $0 $0
Zois S2oo,o0o So SZoo,000
2016 $17,000 $225,000 $242,000
2017 $85,000 $0 $85,000
2018 $75,000 $276,000 $351,000
70TAL $377,000 $501,000 $878,000
Percent 42.94�0 57.06% 100.00%
2014 Allocation $42,938 $57,062 $100,000
___ _ ---- - __ _ __ _---– __- ------ _--__ — -----
! Replacements by Department
; 2014-2018
I Fire
439�0
Public Works
5796 w �.,.�.�. K _ �,,.�. . . _ .
���
r
Equipment Replacement Fund Cash Flow
2014-2023
Year Total$ Replacements Funding Balance
2014 $0 $100,000 422000
2015 $200,000 $100,000 $322,000
2016 $254,000 $100,000 $168,000
2017 $85,000 $100,000 $183,000
2018 $351,000 $100,000 -$68,000
2019 $75,000 $100,000 -$43,000
2020 $0 $100,000 $57,000
2021 $55,500 $100,000 $101,500
2022 $310,000 $100,000 -$108,500
2023 $25,500 $100,000 -$34,000
Equipment Replacment Fund
2014-2023
$500,000 . __.__.__ _._ __
_
,-___---.__._._._
$400,000 -}- -
$300,000 ��- --
� �Total$ Replacements
$200,000 �- -
; �:Funding
$100,000 � Balance
So � -, _ -. _ _ _ _
'yR 'yh 'y6 'y1 'y�`"'ti' 'L� 'L,' �
-$100,000 'y�-'y�--'�--''�
-$20Q000 �----- - ________�__ ----�__.
��'�
City of Scandia
Capital Improvement Program
2014-2018
Appendix
�
Capit�l Impmvement Program 2014 rh� 2018
Department Administration
C�ty of Scandia, Minnesota coo�M
Type New
Project N A-006 Useful Life
Project Name Electronic Data Storage
Cstegory Other
Priority 2:High priority
UCSCII�OII
Purchase of system to begin electronic data storage
Justiflcsflon
Space limitation in city offices and growing amounts of data to be kept
Improve staff efficiency in locating information
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehiGes/Furnishings 12,250 12,250
ToW 12�� �z,25o
Funding Sources 2014 2015 2016 2017 2018 Total
Capital Improvement Fund 12,250 12,250
Total 12�� 12,250
DRAFT jor 2014-1018 Update Monday.August OS,2013
�,
Capital Improvement Program 2014 rh� 2018
Depar[ment Fire
C�ty of Scandia, lVlinnesot� Contact Fire Chief
Type Maintenance
Project# F-0O1
Useful Life 15 years
Project Name Fire St�tion HVAC Replacement
Cstegory Buildings
Priority 2:High priority
Descaption
Replace HVAC System at Fire Hall
JustiScation
Usefullife expected.
Expenditures 2014 2015 2016 2017 2018 Total
Constructlon/Maintenance 20,000 �,�0
Total so,000 20,000
Funding Sources 2014 2015 2016 2017 2018 Total
General Fund 20,000 20,OD0
To1�1 20,000 20,000
DRAFT for 1014-2018 Update Monday,August OS,2013
O��
Capital Improvement Piogram 2014 rh�, 2018
Department Fire
City of Scandia, Minnesots Contact Fire Chief
Type Replacement
Project# F-003
Useful Life 10 years
Project Name Fire Department Radio Replacement Gt o�
eg y EquipmenU Vehicles
Priority 1:Urgait,high priority
Descrlptlon
Replace radios used for emergency communications with Washington County and fireground communication.(20l 8)
.Tuefification
Emergency communications
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Fumishings 75,000 75,000
Totsl �s,000 �5,000
Fundfng Sources 2014 2015 2016 2017 2018 Total
Equipment Replacement Fund 75,000 75,000
TOtsl 75,000 75,000
DRAFTfor 2014-2018 Update Monday,August OS,2013
��
Capital Impmvement Progiam 2014 rh� 2018
Depanment Fire
G�ty of Scandis, Minnesof� Contact FireChief
Type New
Project# F-004
Useful Life 7 years
Project Name Fire Chief s Car
Category Equipmend Vehicles
Priority 3: Worthwhile
Deecifpt�on
Purchase multi-purpose vehicle:
1. Chief s car for direct response to emergencies.
2. Use as command vehicle at scene.
3. Transport personnel for non-emergency meetings and training out of the area.
Justification
Eliminate use of personal vehicles for Fire Dept business
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50�000 50,000
Funding Sources 2014 2015 2016 2017 2018 Total
General Fund �,�0 �.�
Total so,000 so,000
DRAFTfor2014-1018 Update Monday,Augusl O5,2013
a�
Capital Improvement Plvgram 2014 �h�, 2018
Department Fire
C�ty of Scandia, Minnesotn Contact Fire Chief
Type New
Project# F-�9
Useful Life 25 years
Project Name Civil Defense Sirens Cate o ui menU Vehicles
8 rY E9 P
Priorlty 2:High priority
Descdptlon
.�stiScation
Public safery.
Expenditures 2014 2015 2016 2017 2018 Total
ConsUuctioNMaintenance �,�1 �,�0
Tot�l 30,000 30,000
Funding Sources 2014 2015 2016 201'7 2018 Total
Capital Improvement Fund 30,000 30,000
Total 30,00o ao,000
DRAFT for 2014-2018 Updaie Monday,August OS,1073
��
Capiffil Impmvement Progrnm 2014 rh,,,� 2018
Department Fire
G�ity of Scandia, llTinnesot� Contact FireChief
Type Replacement
Project# F-011
Useful Life 20 years
Project Name Tanker 5177 Replacement Category EquipmenU Vehicles
Priority 3: Worthwhile
DCSCII�OII
Tanker 5177 Replacemrnt
Justification
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehicles/Furnishings 200,000 ����
Tofal 200,000 2oo,ouo
Funding Sources 2014 2415 2016 2017 2018 Total
Equipment Replacement Fund 200,000 2�,�
Tofal 2ooAoo 200,000
DR4F7'for 1014-1018 Update Monday,August O5,2013
��
Capital Impmvement Prngram 2014 rh,� 2018
Department Fire
CYty of Scandia, Nlinnesota Contact Fire Chief
Type Replacement
Project# F-013
Useful Life 20 years
ProJeM Name Grass Rig 5175 Replacement Category EquipmeoU Vehicl�,s
Priority 3: Worthwhile
Descdptlon
Grass Rig 5175 Replacetnent (2017)
.TuetiScation
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Fumishings 85,000 85,000
Total �,�0 85,000
Funding Sources 2014 2015 2016 2017 2018 Total
Equipment Replacement Fund 85,000 85,000
Tots! ss,000 &5,000
DRAFT for 2014-2018 Update Monday,August O5,2013
��
Capital Improvement Pmgism 2014 rhru 2018
Department Fire
CYty of Scandia, Minnesol� Coetact Fire Chief
Type New
Project# F-016 Useful Life 40 years
Project Name Second Fire Station
Category Buildings
Priority 3: Worthwhile
�SCl�p�OII
Second fire station. Potential locations: Big Lake School site,or joint project with City of Forest Lake.
J�atiflcation
Improve service to area beyond ISO guidelines;decreased fire insurance premiums for portion of service area.
Expenditures 2014 2015 2016 2017 2018 Total
Construcction/Maintenance 125,000 125,000
Total 125,U00 125,000
Funding Sources 2014 2015 2016 2017 2018 Total
Debt Service Fund 125,000 125,000
Total 12s,000 125,000
DRAFT for 2019-1078 Update Monday.August O5,2013
(J��
Capital Impmvement Progism 2014 rh� 2018
Department Fire
CYty of Scanc�a, Minnesota Contact Fire Chief
Type Impmvanent
Project# F-018 Useful I.ife 20 years
ProJect Naroe Back-up Generator for Fire Aall cec�ory an�
Priority 3: Worthwhile
DCBC1�]11�OII
Provide back-up power for Fire Ha11 and portable to address sewer pumping issues if necessary
J�fiScation
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Furnishings 36,000 36,000
Total �,�0 36,000
Funding 5ources 2014 2015 2016 2017 2018 Total
Capital Improvement Fund 36,000 36,000
Total �.� 36,000
DRAF7'for 2014-2018 Update �fonday,August 05,1013
� 1
Capital Innprovement Ptogram 2014 rh,� 2018
Department Fire
G�ty of Scandia, Minnesotn Contact
Type Replacement
pro�ect# F-022
Useful l.ife 15 years
Project Name SCBA Compressor Replacement Category Other
Priority 2:High priority
DCSCI1p110II
Compressor used to fill SCBA air pacs
JustiScation
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehicles/Furnish(ngs 17,000 17,000
Totai �7,000 �7,000
Funding Sources 2014 2015 2016 2017 2018 Total
Equipment Replacement Fund 17,000 17.000
Total 17,00o i 7,000
DRAFTfor d014-2018 Update Monday,August 05.1013
.J"'
Capital Improvement Program 2014 rh� 2018
Department ke Rink
GYty of Scandia, lViinnesot� ContAct Park and Rec Commince
Type Replacement
Project# IR-002
Useful Life 25 years
Project Name Zamboni Replacement
Category EquipmenV Vehicles
Priority N/A
DC8C11�OII
Replacement of(used)Zamboni for outdoor ice rink
Ju�tl�caflon
End of useful life of existing equipment.
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehicles/Fumishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2014 2015 2016 2017 2018 Total
Grants/Donations 40,000 4D,000
Total 40,000 40,000
DRAFT jor 2014-2018 Update Monday,August O5,1013
��
{ I
Capital Impmvement Pmgiam 2014 rhru 2018
Department Parlcs and Recreation
(�ty of Scandia, Minnesot� ContaM Park and Rec Committee
Project# PR-001 Type Improvcment
Useful Llfe 20 years
Project Name Lilleskogen Park Improvements cac�ory park t�npro�e�►«►�
Priority 2:High priorily
DCBCI�p�OII
Preliminary Cost Estimate from Lilleskogen Park Plan,January 2007&estimates from SRF Inc.,April 2008,parking lot design&estimates]une
2011
Phase 1,2009 ($24,800)
l. Site surveying and engineering for water control structure: $13,8(?0
2. Construction/earthwork: 510,000
3. WeedManagement: $1,000
Phase 2,2011
4.Parking Lot Design($6,000)
Phase 3,2012
5.Parking Lot Constrution($44,000)
Phase 4,2013($103,000)
5. Site utilities: 58,000
b. Trails and Board: $90,000
7. Electrical(parking lot security lighting) 55,000
Phase 5,2014($47,500)
6. Vegetation removals($21,500)
7. Landscaping/vegetation restorations($26,000)
Phase 6,20]5 ($36,000)
8. Site fiunishin s icnic shelter tables,benches,si a e etc.
J�tificstion
#!1 priority of Park and Recreation Committee
Park is gateway to village center;connection to pedestrian trails,accessible to school.
Expenditures 2014 2015 2016 2017 2018 Total
Construction/Maintenance 47,500 15,000 62,500
EquipNehicleslFumishings 21,000 21,000
Tot>1 47,500 36,000 83,500
Funding Sources 2014 2015 2016 2017 2018 Total
Grants/Donations 47,500 36,000 83,500
Total 47,500 36,000 83,500
DR4FT for 2014-2018 Update Monday,August OS,2013
3�
� ►
Capital Innprnvement Pmgrnm 2014 rh� 2018
Dep�rtment Pazks and Rxreation
C�ty of Scandia, lVlinnesota Contact Park and Rec Committee
'I�'pe ln,proven,enc
Project it PR-002
Useful Life 20 years
Project Name Wind in the Pines Park
Category Park Improvement
Priority 3: Worthwhile
Desciiption
Site Survey and Boundary Markers-S4>800(2010)
Signage/fumishings--$2,000(2011)
Natural Resources Management Plan-- �10,000(2014)
J�etiBcatton
Second priority of Park and Recreation Committee.
StairsJ trail impmvement needed to allow use of steep trai]without erosion and keep users from trespassing on private property.
Expenditures 2014 2015 2016 2017 2018 Total
Planning/Design 10,000 10,000
TQ� 10,000 10,000
Funding Sources 2014 2015 2016 2017 2018 Total
Park Improvement Fund 10,000 10,000
Tofal �o,� to,000
DRAF7'jor 2014-1018 Update Monday,August OS,2013
�
�
� ♦
Capital Improvement Progism 2014 rh,� 2018
Department Parks and Recreation
C�ty of Scandia, Minnesot� Contact Maintenance Sup.
Type Replacement
Project# PR-018
Useful Life 20 years
Project Name Tennis Court Reconstruction
Category Park Improvement
Priority 3: Worthwhile
Deaciiption
Replace tennis courts at Community Center.
.Tusflfication
End of useful life/when resurfacing is no longer effective
Expenditures 2014 2015 2016 2017 2018 Total
ConstrucUoNMaintenance 60,000 60,000
Totsl s0,000 60,000
Funding Sources 2014 2015 2016 2417 2018 Total
General Fund 60,000 60,000
Tot�l 60,000 60,000
DRAFTfor 2014-2018 Updare Monday,Augusl OS,2013
r��
. �
Capital Impmvement Program 2014 rh,� 2018
Department Parks and Recreation
C�ty of Scand�a, Nrnnesota Contsct
Type Improvemtnt
Project# PR-019 Usefui Lite 20 yeazs
Project Name Log House Landing Improvements
Category Other
Priority N/A
DC8C1�p�0II
Improvements to landing and road to address erosion issues. Cost share with CMSCWD.
Landing improvements in 2014
Roadway improvcments in 2015
JusflRcation
adress erosion issues and gravel going into St.Croix River
Expenditures 2014 2015 2016 2017 2018 Total
Construction/Maintenance 40,D00 200,000 240,000
Totsl 40,000 200,000 240,000
Funding Sources 2014 2015 2016 2017 2018 Total
Capital Improvement Fund 20,000 100,000 120,000
Grantsl Donations 20,000 100,000 120,000
ToW ��� 200,000 240,000
DRAFTfor 1014-2018 Updale Monday,August O5,2013
��
. �
Capital Impr�vement Pmgram 2014 th� 2018
Department Public Works
City of Scandia, Minnesot� Contact Engineer
Type Maintenance
Project# PW-002
Useful Life Variable
Project Name Street Maintenance Program
Category Road Re�onsVuction
Priority 1:Urgent,high priority
Description
Te.n-year rehab.Program including crack seating and seal coat,reclaim and overlay,reconstruction,as recommended by 2008 Pavement
Managernent Plan(UPDATE UNDERWAI�
Ju�tiflcation
Maintain investment in paved roadways.Assumes new assessment policy allowing debt financing of significant portion of rehabilitation and
reconstruction program,beginning with street reconstruction project in 2015.
Expenditures 2014 2015 2016 2017 2018 Total
ConstrucGon/Maintenance 300,000 2,300,000 300,000 300,000 300,000 3,500,000
Total �o,000 2,aoo,000 �oo,000 �oo,000 aoo,000 3,soo,000
Funding Sources 2014 2015 2016 2017 2018 Total
Debt Service Fund 2,000,000 2,OOD,OOD
General Fund 30D,000 300,000 300,000 300,000 300,000 1,500,000
Tot81 �,000 2,300,000 300,000 300,000 300,000 3,500,000
DRAFTjor 2014-1018 Update Monday,Augusl OS,1013
� �i
�
r �
Capit�l Impmvement Pmgram 2014 thru 2018
Department Public Works
G�ty of Scandie, lVlinnesot� Contact Maintenance Sup.
ProJect# PW-004 Type Replacement
Useful Life 10 years
Project Name Pickup w/Plow Replacement 2008 Ford F350 (102-08) cet�o�y EquipmenV Vehicles
Priority 3: Worthwhile
DCaCIiphOII
Replace 2008 Ford F350 Pickup w/Plow (102-08)
JustiScaflon
Useful life of equipment. Used for day-to-day maintence operations and to plow small streets&cul-d�sacs
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehicles/Fumishings 25,500 25,500
Total 25,500 25,500
Funding Sources 2014 2015 2016 2017 2018 Total
Equipment Replacement Fund 25,500 25,500
To1�l 25,500 25,500
DRAF7'for?014-2018 Update Monday,August OS,2013
� 1
1 f
Capital Impmvement Prngram 2014 th,u 2018
Department Public Works
C�ty of Scandia, lVlinnesota Contsct Maintenance Sup.
Type Replacement
Project# PW-005
Useful Lite 7 years
Project Name John Deere Tractor Mower wBroom&Blower(303-09) Cstegory EquipmenU Vehicles
Priority 3: Worthwhile
Descaiption
John Deerc Tractor Mower w/Broom&Blower,planned replaoements (303-09)
3�stificaHon
Replace at end of useful life.
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2014 2015 2016 2017 2018 Total
Equipment Repiacement Fund 25,000 25,000
Total 25,000 25,000
DRAFTjor7014-1018 Updale Monday,August 05,1013
3�
Capit�l Impmvement Program 2014 rh,� 2018
Department Public Works
C�ty of Scandia, Minnesota Contact Maintenance Sup.
Type New
Project# PW-006
Uaeful Life 10 years
Project Name New Dump Truck/Plow(Replace 201-97)
Category EquipmenV Vehicles
Priority 1:Urgent,high priority
Descdptlon
New tandem-axel plow truck.Trade or sell 1997 Ford 8000 Dump Truck w/Plow(201-97)retained for a back-up after purchase of Mack(203-11)
JustiRcatlon
Improve spced of snow removal by adding a third route.
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Fumishings 200,000 200,000
ToW 2ooAoo 200,000
Funding Sources 2014 2015 201b 2017 2018 Total
Debt Service Fund 200,000 200,OD0
Total �,� 200,000
DRAFT for 1014-1078 Update Monday,August O5,2013
3`'1
� � <
Capital Improvement Pmgram 2014 rh� 2018
Dep�rtment Public Worlcs
C�ty of Scanclia, Minnesota Contact Maintenance Sup.
Project H PW-010 Type Replacement
Usetul Life 10 years
Project Name 2002 Sterling Dump Truck/Plow Replacement(202-02) c.c�ory EquipmenU Vehicles
Priority 3: Worthwhile
Descifiption
2002 Sterling Dump Truck w/Plow Replacement(202-02)
Justification
Replace at cnd of useful lfe. Replace single-aacel with tandem-axel truck.
Expenditures 2014 2015 2016 2017 2018 Tota!
EquipNehicles/Furnishings 200,000 200,000
Total zoo,000 2oo,oao
Funding Sources 2014 2015 2016 2017 2018 Total
Equipment Replacement Fund 200,000 200,000
Total 200,000 200,000
DRAFT for 7014-1018 Updare Monday,August OS,2013
d�(�
�.,
} � �
Capital Improvement Prngram 2014 lh,� 2018
Department Public Works
C�ty of Scandia, Minnesota Contact Maintenance Sup.
Type Replacement
Project# PW-016
Uaeful Life 20 yeazs
ProJect Name 1998 John Deere Motor Grader Replacement(301-98) cacego,y Equipmend Vehicles
Prior)ty N/A
Descdpflon
Replace 1998 John Deere Motor Grader(301-98)
Jnstltication
Replacement at end of useful life is needed if remaining gravel roads are not paved and/or existing paved roads are not reconstructed.
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Fumishings 225�000 223�000
TOtsl 225�000 225,000
Funding Sources 2014 2015 2016 2017 2018 Total
Equfpment Replaoement Fund 225,000 225,000
Total 225,000 225,000
DRAFT for 2014-2018 Update Monday,August OS,2013
��
Capit�l Iniprovement Progiam 2oi4 rh� 2oi8
Department Public Works
C�ty of Scandia, NIInnesota Contact Mai»tenancc Sup.
Type Replacement
Project u PW-019
Usetul Life 10 years
Project Name 2008 Ford Ranger Replacement(101-08) ca��ory oct�e�
Priority 3: Worthwhile
Descdption
Replace 2008 Ford Ranger Pickup Truck(101-08).
Originally assigned to Building Official,reassigned to Public Works Dept.in 2012 for 2013 C1P Update. Replace with larger 4x4 pickup.
JusliIIcafton
Replace at end of useful life.
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehides/Furnishings 25,500 25,500
Total 25,soo z5,soo
Funding Sources 2014 2015 2016 2017 2018 Total
Equipment Replacement Fund 25,5DU 25,500
Tohl 25,500 25,500
DRAFTfor 2014-1018 Update Monday,August 03,2013
`"1 O�
Capiffil Impmvement Progiam 2014 rh� 2018
Department Public Works
C�ty of Scandia, lVlinnesotn Contact Maintenance Sup.
Type New
projecc a PW-024
Useful Life 10 years
Project Name Utility Truck with Crane
Category Equipment/Vehicles
Pr3ority 3: Worthwhile
Descdp8on
Utility turck with crane to be used for pump maintenance and other utility work.
Add$10,000 for air compressor on board
Justification
Needed if ciry is to assume full responsibiltiy for maintneance of wastewater treatment systems. Cost would be shared by 201 and Uptown Funds.
Eapenditures 2014 2015 2016 2017 2018 Total
EquipNehiGes/Fumishings 70,000 70,000
Total 70,000 �o,000
Funding Sources 2014 2015 2016 2017 2018 Total
Capital Improvement Fund 40,000 4Q,000
Sewer Fund(201) 30,000 30,000
Total �o.� 7D,000
DRAFT for 2014-?018 Update Monday.August OS,2013
��
Capital Lnpmvement Program 2014 rh,� 2018
Department Public Works
C�ty of Scandia, Minnesota copt8�t
Type New
Project# PW-02b Useful Life
Project Name Wood Chipper Category Other
Priority 2:High priority
Desciiption
15"wood chipper
Juatlficafion
complete tree trimming in house
Expenditures 2014 2015 2016 2017 2018 Total
EquipNehicles/Fumishings 37,500 37,500
Totsl 37,500 37,500
Funding Sources 2014 2015 2016 2017 2018 Total
Capital Improvement Fund 37,500 37,500
TOW 37�� 37,500
DRAFTfor 2014-1018 Update Monday,August 05,1013
y�
Capital Improvement Program 2014 chr,� 2018
Department Public Works
CYty of Scan+dia, lViinnesota Contact
Type Maintenance
project# PW-027
Useful Life 20 years
ProjeM Name Qll1IIe�1 AVC Category Road Reconstrvction
Prtor3ty N/A
Deacdplion
Overlat on Quinell Ave
Jusflfication
Expenditures 2014 2015 2016 2017 2018 Total
ConstructionlMaintenance 185,000 185,000
Tot�l 185,000 185,000
Funding Sources 2014 2015 2016 2017 2018 Total
Grants/Donations 120,000 120,000
Othed TBD 65,000 65,000
Total 185,000 185,000
DRAFT for 2014-?018 Update Monday,August OS,201.3
��