10.d2 2023 Street Crack Filling and Seal Coat Project - Contractor's Request for Payment No 2nd and Final 14727 209th St. N. PO Box 128, Scandia, Minnesota 55073 Phone (651) 433 -2274 Fax (651) 433-5112 http://www.ci.scandia.mn.us August 26, 2023 Honorable Mayor and City Council City of Scandia 14727 209th Street N. Scandia, MN 55073-8503 Re: Contractor’s Request for Payment No. 2nd and Final 2023 Crack Filling and Seal Coat Project Dear Mayor and Council: Enclosed please find Contractor’s Request for Payment No. 2 and Final, IC134 Withholding Affidavits, and Lien Waiver’s for the 2023 Crack Filling and Seal Coat Project. We recommend the council approve the Contractor’s Request for Payment No. 1 and pay $13,276.48 to Allied Blacktop Company. The contractor has successfully completed all work on the project and withholding has been reduced to 0%. Please call me at (612) 597-7140 if there are any questions or concerns regarding this Contractor’s Payment request. Sincerely, Ryan J. Goodman, P.E. City Engineer Enclosures: Contractor’s Request for Payment No. 2nd and Final, IC134’s and Lien Waivers 2 and Final From 1. 2. 3. 4. 5. a.X b.X c. 6. 7. 8. 9. Name:Name: 4,275.65$ Date: By: Title: By: Title: Approved by City of Scandia The undersigned Contractor certifies, to the best of its knowledge, the following: (1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment; (2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and (3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective; and (4) The provisions of M. S. 290.92 have been complied with and that all claims against me by reason of the Contract have been Recommended by Bolton & Menk, Inc. Name: Allied Blacktop Company Contractor's Certification Amount due this application Contractor: Balance to finish, including retainage (Line 3 - Line 4) Date: Signature: Work Completed Stored Materials Total Retainage (Line 5.a + Line 5.b) Amount eligible to date (Line 4 - Line 5.c) Less previous payments $ 164,100.85 $ - -$ -$ 13,276.48$ 150,824.37$ -$ 164,100.85$ Contractor: Engineer: Project: 0N1.130046 Contractor's Application for Payment Application No.: City of Scandia Allied Blacktop Company Bolton & Menk, Inc. 2023 Crack Filling and Seal Coat Project Owner's Project No.: Engineer's Project No.: Agency's Project No.: Application Period: Contract: Owner: 8/8/2023 Application Date:8/9/2023 139,576.50$ 28,800.00$ Net change by Change Orders 6/13/2023 to Original Contract Price 164,100.85$ 168,376.50$ Retainage Current Contract Price (Line 1 + Line 2) Total Work completed and materials stored to date (Sum of Column G Lump Sum Total and Column J Unit Price Total) Date: Title: EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. Contractor's Application for Payment Owner's Project No.: Engineer's Project No.: Agency's Project No.: 2 and Final From 06/13/23 to 08/08/23 A C D E F F1 F2 G H I J K L Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Quantity Previous Estimate Value Previous Estimate Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) 1 1.00 LS 10,000.00 10,000.00 0.80 8,000.00 1.00 10,000.00 10,000.00 100% - 2 1.00 LS 5,000.00 5,000.00 0.95 4,750.00 1.00 5,000.00 5,000.00 100% - 3 18,000.00 GAL 2.50 45,000.00 18,000.00 45,000.00 18,000.00 45,000.00 45,000.00 100% - 4 550.00 TN 105.00 57,750.00 550.00 57,750.00 550.00 57,750.00 57,750.00 100% - 5 7,500.00 LBS 2.50 18,750.00 7,500.00 18,750.00 7,500.00 18,750.00 18,750.00 100% - 6 5,250.00 LF 0.45 2,362.50 - - 5,173.00 2,327.85 2,327.85 99% 34.65 7 2.00 EA 165.00 330.00 - - 2.00 330.00 330.00 100% - 8 48.00 SF 8.00 384.00 - - 46.00 368.00 368.00 96% 16.00 139,576.50$ 134,250.00$ 139,525.85$ -$ 139,525.85$ 100% 50.65$ 9 1.00 LS 1,250.00 1,250.00 0.95 1,187.50 1.00 1,250.00 1,250.00 100% - 10 4,690.00 GAL 2.50 11,725.00 3,103.00 7,757.50 3,103.00 7,757.50 7,757.50 66% 3,967.50 11 140.00 TN 105.00 14,700.00 140.00 14,700.00 140.00 14,700.00 14,700.00 100% - 12 450.00 LB 2.50 1,125.00 347.00 867.50 347.00 867.50 867.50 77% 257.50 28,800.00$ 24,512.50$ 24,575.00$ -$ 24,575.00$ 85% 4,225.00$ 168,376.50$ 158,762.50$ 164,100.85$ -$ 164,100.85$ 97% 4,275.65$ TOTAL CHANGE ORDER TOTAL BASE BID + CHANGE ORDER NO. 1 SEAL COAT AGGREGATE, FA-2 (MOD) BITUMINOUS MATERIAL FOR SEAL COAT AGGREGATE FA-2 MODIFIED ROUTE AND SEAL CRACKS CHANGE ORDER BASE BID TOTAL Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + I) ($) Contract Information Bid Item No. BITUMINOUS MATERIAL FOR SEAL COAT Engineer: Contractor: Project: Contract: DOUBLE YELLOW STRIPE RAIL ROAD MESSAGE Application Date:Application Period:Application No.: Previous Estimate 08/09/23 B BASE BID % of Value of Item (J / F) (%) Balance to Finish (F - J) ($) MOBILZATION TRAFFIC CONTROL Description Work Completed 24" STOP BAR TRAFFIC CONTROL Progress Estimate - Unit Price Work City of Scandia Bolton & Menk, Inc. Allied Blacktop Company 2023 Crack Filling and Seal Coat Project Owner: 0N1.130046 ROUTE & SEAL Unit Price EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 1