8.d Engineering Updates 2016-8-16 City of Scandia
Engineering Updates 8/16/2016
Engineering italics = old information
• 2016 Street Improvements
All work has been completed other than establishment of final restoration and
minor punch list items. As a separate business item included on the agenda,
Contractor’s Request for Payment No. 3 has been included.
• 2016 Seal Coat and Crack Filling Project
Crack filling work has been completed. Seal coating work is scheduled for Friday
(August 12 th ) unless weather pushes it to the following Monday or Tuesday. All
the Seal Coating work should be completed within a day and a half, initial
sweeping will be completed 3 – 8 days later, and the second sweeping 30 days
after the initial sweeping.
• Bliss Drainfield System
A memo was prepared in response to a June 9, 2016 letter from the MPCA regarding the
Compliance Evaluation Inspection of the Scandia Bliss Wastewater Treatment Facility on
May 24, 2016. The purpose of the memo was to address the concerns regarding the
Nitrogen Mitigation Plan.
Seth Peterson was onsite with City Staff on August 11 th to review the physical
conditions of the Bliss Drainfield System and to identify items that need to be
corrected that can be budgeted within the Capital Improvement Plan.