8.f) Public Works Activity Report (July 2013) �•�
Public Works Activity Report
� � � f
Jul 1 throu h Jul 31 2013 ���>'���
Y b Y ,
Tim Kieffer, Public Works Director �����
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
• Potholed roads
• Performed bituminous cut outs and patch work
• Mowed ditches
• Unplugged several culverts
• Reshaped ditches
• Removed several trees from roadways
• Picked up debris on road
• Spread grass seed and blanket for erosion control at various locations
Sewer:
• Read pump run times at all of the lift stations
• Worked on STEP system on Layton Av
• Replaced the kitchen septic pump at the Community Center
Park and Recreation:
• Inspected playground equipment
• Mowed and weed whipped all City property
• Brush cut trails at Wind in the Pines and Lilleskogen Park
• Lowered weir structure at Lilleskogen Park
Water:
• Read water meters for Uptown system
Equipment and Building:
• Performed monthly OSHA inspections
• Replaced light bulbs at City Hall
• Replaced locks on the cold storage building
• Changed oil and rotated tires on the Ford F-250(103-11)
Miscellaneous:
• Located City utilities
Management tasks
Street:
• Scheduled the removal of a dangerous tree on 205th St
• Met with residents, contractor,and Watershed District about erosion issues on Larkspur Av.
• Met with the Watershed District to discuss several projects
• Scheduled and supervised the bituminous patching
• Inspected several driveway permits
• Ordered street signs
• Corresponded with City Engineer about several projects
• Scheduled the dust control
• Met with a resident about a right-of-way issue
• Scheduled an electrician to fix two street lights on Oakhill Rd
• Met with resident to obtain right-of-way on 228`h St
� Ordered manhole adjusting rings and two castings
Sewer:
• Worked with EcoCheck to inspect the septic tanks on the 201 system
• Scheduled the testing of the Anderson/Erickson Drainfield monitoring wells
• Corresponded with vendor to replace the 201 control panels
• Met with resident about a proposed septic system
Park and Recreation:
• Worked on a proposal for a trail at Hay Lake
• Scheduled the resurfacing of the tennis courts
• Worked with a volunteer group to spread woodchips at Lilleskogen Park
• Worked on constructing the Lilleskogen parking lot
Equipment and Building:
• Had electrician wire the ANSIL system in the Community Center kitchen to meet regulations
• Scheduled the replacement of the City Hall roof
Miscellaneous:
• Worked on several reports
2