Loading...
8.f) Public Works Activity Report (July 2013) �•� Public Works Activity Report � � � f Jul 1 throu h Jul 31 2013 ���>'��� Y b Y , Tim Kieffer, Public Works Director ����� (651) 433-5223 t.kieffer@ci.scandia.mn.us Maintenance tasks Street: • Potholed roads • Performed bituminous cut outs and patch work • Mowed ditches • Unplugged several culverts • Reshaped ditches • Removed several trees from roadways • Picked up debris on road • Spread grass seed and blanket for erosion control at various locations Sewer: • Read pump run times at all of the lift stations • Worked on STEP system on Layton Av • Replaced the kitchen septic pump at the Community Center Park and Recreation: • Inspected playground equipment • Mowed and weed whipped all City property • Brush cut trails at Wind in the Pines and Lilleskogen Park • Lowered weir structure at Lilleskogen Park Water: • Read water meters for Uptown system Equipment and Building: • Performed monthly OSHA inspections • Replaced light bulbs at City Hall • Replaced locks on the cold storage building • Changed oil and rotated tires on the Ford F-250(103-11) Miscellaneous: • Located City utilities Management tasks Street: • Scheduled the removal of a dangerous tree on 205th St • Met with residents, contractor,and Watershed District about erosion issues on Larkspur Av. • Met with the Watershed District to discuss several projects • Scheduled and supervised the bituminous patching • Inspected several driveway permits • Ordered street signs • Corresponded with City Engineer about several projects • Scheduled the dust control • Met with a resident about a right-of-way issue • Scheduled an electrician to fix two street lights on Oakhill Rd • Met with resident to obtain right-of-way on 228`h St � Ordered manhole adjusting rings and two castings Sewer: • Worked with EcoCheck to inspect the septic tanks on the 201 system • Scheduled the testing of the Anderson/Erickson Drainfield monitoring wells • Corresponded with vendor to replace the 201 control panels • Met with resident about a proposed septic system Park and Recreation: • Worked on a proposal for a trail at Hay Lake • Scheduled the resurfacing of the tennis courts • Worked with a volunteer group to spread woodchips at Lilleskogen Park • Worked on constructing the Lilleskogen parking lot Equipment and Building: • Had electrician wire the ANSIL system in the Community Center kitchen to meet regulations • Scheduled the replacement of the City Hall roof Miscellaneous: • Worked on several reports 2