Loading...
Expansion Costs per Midco 09-20-2023Passings MidCo Drop Cost RDOF DEED Wash Co Scandia Total Outside Money 2019-2023 Projects:355 590,084 355,000 40,000 585,309 94,522 634,085 2,299,000 1,664,915 2024 Big Marine Lake:112 185,000 12,000 0 0 372,500 92,500 662,000 569,500 2024 Line Extension Areas:18 54,000 18,000 0 106,100 0 0 178,100 178,100 2024 RDOF:3 0 0 15,000 0 0 0 15,000 15,000 488 829,084 385,000 55,000 691,409 467,022 726,585 3,154,100 2,427,515 Future Buildout Areas 425 $1,879,000 $425,000 $2,174,500 $4,478,500 * Kirk (Move to 2024)47 * Eco Bakken (Move to 2024)8 NE St Croix River 70 SE St Croix River 65 205th 52 240th 23 RDOF 10 White Rock Lake 31 Oak Meadow 26 Margo 5 May Township 15 New Addresses 73 Link to expansion Area Map:https://www.google.com/maps/d/edit?mid=1aDFb8vmreF40ZtY14-rkCFPSuQpR0B8&usp=sharing