09.d2 Bid Results - 2024 Street Improvement Project 14727 209 th St. N., Scandia, Minnesota 55073 Phone (651) 433 -2274 Fax (651) 433 -5112 http://www.ci tyofscandia.com January 24, 2024 Honorable Mayor and City Council City of Scandia 14727 209th Street N. Scandia, MN 55073-8503 Re: Bid Results 2024 Street Improvement Project Dear Mayor and Council: Bids for the 2024 Street Improvement Project were opened on Wednesday, January 24, 2024. A Bid Abstract has been included. The following is a bid summary: Contractor Base Bid Alternate 1 Base + Alt Asphalt Surface Technologies Corp. $2,434,745.12 $6,000.00 $2,440,745.12 Park Construction Company $2,459,039.70 $10,200.00 $2,469,239.70 Valley Paving, Inc. $2,483,828.75 $2,600.00 $2,486,428.75 North Valley, Inc. $2,493,581.83 $5,302.95 $2,498,884.78 Northwest Asphalt $2,596,176.30 $10,000.00 $2,606,176.30 Dresel Contracting Inc. $2,612,650.31 $7,770.00 $2,620,420.31 OMG Midwest Inc. dba Minnesota Paving & Materials $2,660,023.41 $7,791.40 $2,667,814.81 Bituminous Roadways Inc. $3,020,618.00 $5,000.00 $3,025,618.00 Based on the favorable bids received, we recommend the City award the Base Bid and Alternate to the lowest bidder, As phalt Surface Technologies Corporation, in the amount of $2,440,745.12. In coordination with City staff, additional streets have been reviewed as additions to the 2024 Street Improvement Project. We recommend the City approve the additions of Lamar Avenue, 186th Street N, Kirk Avenue, and 185th Street N (West of Manning Trail N) to the 2024 Street Improvement Project, in the amount of $315,000.00. If you have any questions, please feel free to contact me at (651) 304-1491. Sincerely, Isiah C. Bubany, P.E. Project Engineer Enclosures: Bid Abstract, Location Map ABSTRACT OF BIDS 2024 STREET IMPROVEMENT PROJECT CITY OF SCANDIA, MN BMI PROJECT NO. 0N1.131876 BID DATE: 1/24/2023 TIME: 9:00 AM 1 2 3 4 ITEM MNDOT APPROX. NO. SPEC NO. ITEM NOTES QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT BASE BID 1 01 71 13 MOBILIZATION 1 LUMP SUM $150,000.00 $150,000.00 $112,000.00 $112,000.00 $125,300.00 $125,300.00 $60,000.00 $60,000.00 $48,153.11 $48,153.11 2 01 55 26 TRAFFIC CONTROL 1 LUMP SUM $15,000.00 $15,000.00 $3,300.00 $3,300.00 $2,300.00 $2,300.00 $2,340.00 $2,340.00 $2,434.71 $2,434.71 3 31 11 00 CLEARING AND GRUBBING 1 LUMP SUM $2,500.00 $2,500.00 $5,000.00 $5,000.00 $8,180.00 $8,180.00 $5,200.00 $5,200.00 $3,977.21 $3,977.21 4 31 11 00 REMOVE TREE 8 EACH $1,000.00 $8,000.00 $990.00 $7,920.00 $205.00 $1,640.00 $338.00 $2,704.00 $1,325.74 $10,605.92 5 31 11 00 REMOVE STUMP 1 EACH $500.00 $500.00 $660.00 $660.00 $256.00 $256.00 $260.00 $260.00 $662.87 $662.87 6 02 41 13 SALVAGE AND REINSTALL MAILBOX 10 EACH $300.00 $3,000.00 $302.50 $3,025.00 $409.00 $4,090.00 $286.00 $2,860.00 $324.63 $3,246.30 7 02 41 13 SALVAGE AND REINSTALL DELINEATOR 4 EACH $250.00 $1,000.00 $440.00 $1,760.00 $97.10 $388.40 $98.80 $395.20 $102.80 $411.20 8 02 41 13 SALVAGE CASTING 3 EACH $300.00 $900.00 $209.00 $627.00 $414.00 $1,242.00 $105.00 $315.00 $226.19 $678.57 9 02 41 13 SALVAGE METAL APRON 2 EACH $250.00 $500.00 $195.80 $391.60 $156.00 $312.00 $345.00 $690.00 $209.65 $419.30 10 02 41 13 SALVAGE PIPE CULVERT 40 LIN FT $20.00 $800.00 $12.10 $484.00 $20.80 $832.00 $35.00 $1,400.00 $13.24 $529.60 11 02 41 13 REMOVE STORM PIPE/CULVERT 627 LIN FT $20.00 $12,540.00 $11.88 $7,448.76 $12.50 $7,837.50 $13.00 $8,151.00 $12.69 $7,956.63 12 02 41 13 REMOVE TRASH GUARD 1 EACH $300.00 $300.00 $242.00 $242.00 $77.90 $77.90 $165.00 $165.00 $259.29 $259.29 13 02 41 13 REMOVE CONCRETE APRON 2 EACH $750.00 $1,500.00 $286.00 $572.00 $768.00 $1,536.00 $188.00 $376.00 $307.85 $615.70 14 02 41 13 REMOVE METAL APRON 35 EACH $250.00 $8,750.00 $170.50 $5,967.50 $77.90 $2,726.50 $95.00 $3,325.00 $185.37 $6,487.95 15 02 41 13 REMOVE DRAINAGE STRUCTURE 2 EACH $1,000.00 $2,000.00 $550.00 $1,100.00 $467.00 $934.00 $800.00 $1,600.00 $592.52 $1,185.04 16 02 41 13 REMOVE BITUMINOUS PAVEMENT - DRIVEWAY 200 SQ YD $12.00 $2,400.00 $13.22 $2,644.00 $23.30 $4,660.00 $5.25 $1,050.00 $14.99 $2,998.00 17 02 41 13 SAW CUT BITUMINOUS PAVEMENT - FULL DEPTH 232 LIN FT $3.00 $696.00 $3.50 $812.00 $2.50 $580.00 $2.00 $464.00 $9.74 $2,259.68 18 32 01 16.11 RECLAIM BITUMINOUS PAVEMENT (8" THICK) (P) 71260 SQ YD $1.25 $89,075.00 $0.84 $59,858.40 $1.05 $74,823.00 $0.91 $64,846.60 $1.32 $94,063.20 19 33 01 30.12 CLEAN PIPE CULVERT 727 LIN FT $25.00 $18,175.00 $3.08 $2,239.16 $12.00 $8,724.00 $12.00 $8,724.00 $3.31 $2,406.37 20 33 01 30.12 TELEVISE STORM PIPE 190 LIN FT $10.00 $1,900.00 $5.50 $1,045.00 $8.60 $1,634.00 $8.60 $1,634.00 $3.48 $661.20 21 31 20 00 DITCH GRADING 1405 LIN FT $40.00 $56,200.00 $16.80 $23,604.00 $15.80 $22,199.00 $13.20 $18,546.00 $20.63 $28,985.15 22 31 20 00 SALVAGE AND REINSTALL RECLAIM MATERIAL (P) 640 CU YD $25.00 $16,000.00 $22.00 $14,080.00 $17.60 $11,264.00 $8.30 $5,312.00 $48.61 $31,110.40 23 31 20 00 SUBGRADE EXCAVATION (EV) 2600 CU YD $35.00 $91,000.00 $16.50 $42,900.00 $48.30 $125,580.00 $33.50 $87,100.00 $41.30 $107,380.00 24 31 20 00 COMMON EXCAVATION (LV) 770 CU YD $30.00 $23,100.00 $31.90 $24,563.00 $32.00 $24,640.00 $37.25 $28,682.50 $29.52 $22,730.40 25 31 32 19 GEOTEXTILE FABRIC, TYPE V NON-WOVEN 7130 SQ YD $2.50 $17,825.00 $1.10 $7,843.00 $1.60 $11,408.00 $1.80 $12,834.00 $3.52 $25,097.60 26 32 01 16.11 HAUL AWAY EXCESS RECLAIM MATERIAL TO CITY GRAVEL STREETS (LV) 2300 CU YD $25.00 $57,500.00 $24.64 $56,672.00 $18.00 $41,400.00 $19.00 $43,700.00 $21.11 $48,553.00 27 32 11 23 AGGREGATE BASE, CLASS 5 560 TON $30.00 $16,800.00 $26.07 $14,599.20 $30.60 $17,136.00 $25.50 $14,280.00 $30.30 $16,968.00 28 32 01 16.11 TOLERANCE RECLAIM (P) 71260 SQ YD $1.00 $71,260.00 $1.10 $78,386.00 $1.36 $96,913.60 $0.75 $53,445.00 $1.44 $102,614.40 29 32 15 00 AGGREGATE SHOULDERING, CLASS 2 LIMESTONE 3180 TON $25.00 $79,500.00 $31.46 $100,042.80 $31.40 $99,852.00 $38.35 $121,953.00 $31.01 $98,611.80 30 32 15 00 AGGREGATE SURFACING, 3/4" MINUS LIMESTONE - DRIVEWAY 20 TON $60.00 $1,200.00 $44.80 $896.00 $101.00 $2,020.00 $60.00 $1,200.00 $37.87 $757.40 31 32 15 00 AGGREGATE SURFACING, 1/2" MINUS TRAP ROCK - DRIVEWAY 50 TON $70.00 $3,500.00 $44.80 $2,240.00 $47.80 $2,390.00 $60.00 $3,000.00 $43.28 $2,164.00 32 32 15 00 AGGREGATE SURFACING CLASS 5 390 TON $65.00 $25,350.00 $35.00 $13,650.00 $30.00 $11,700.00 $45.00 $17,550.00 $34.63 $13,505.70 33 32 12 01 BITUMINOUS PATCH SPECIAL 540 SQ YD $65.00 $35,100.00 $49.50 $26,730.00 $40.50 $21,870.00 $36.00 $19,440.00 $60.62 $32,734.80 34 32 12 00 TYPE SP 9.5 UPPER WEARING COURSE MIXTURE (3,C) 6900 TON $95.00 $655,500.00 $88.11 $607,959.00 $84.50 $583,050.00 $94.50 $652,050.00 $87.63 $604,647.00 35 32 12 00 TYPE SP 12.5 LOWER WEARING COURSE MIXTURE (3,C) 11500 TON $93.00 $1,069,500.00 $86.26 $991,990.00 $81.50 $937,250.00 $92.00 $1,058,000.00 $83.50 $960,250.00 36 32 12 00 BITUMINOUS MATERIAL FOR TACK COAT 5590 GAL $3.00 $16,770.00 $3.30 $18,447.00 $0.01 $55.90 $1.90 $10,621.00 $3.08 $17,217.20 37 32 12 00 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) - DRIVEWAY 200 SQ YD $50.00 $10,000.00 $44.00 $8,800.00 $41.00 $8,200.00 $19.00 $3,800.00 $53.86 $10,772.00 38 33 42 13 CONNECT TO EXISTING STORM SEWER 3 EACH $1,000.00 $3,000.00 $1,727.00 $5,181.00 $779.00 $2,337.00 $770.00 $2,310.00 $1,841.54 $5,524.62 Valley Paving, Inc North Valley, Inc.Asphalt Surface Technologies Corp.Engineer's Estimate Park Construction Company ABSTRACT OF BIDS 2024 STREET IMPROVEMENT PROJECT CITY OF SCANDIA, MN BMI PROJECT NO. 0N1.131876 BID DATE: 1/24/2023 TIME: 9:00 AM 1 2 3 4 ITEM MNDOT APPROX. NO. SPEC NO. ITEM NOTES QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT Valley Paving, Inc North Valley, Inc.Asphalt Surface Technologies Corp.Engineer's Estimate Park Construction Company 39 33 42 00 15" CMP, CULVERT (DRIVEWAY) 398 LIN FT $85.00 $33,830.00 $50.60 $20,138.80 $67.50 $26,865.00 $52.40 $20,855.20 $55.17 $21,957.66 40 33 42 00 15" CMP, APRON (DRIVEWAY) 24 EACH $600.00 $14,400.00 $467.50 $11,220.00 $784.00 $18,816.00 $335.00 $8,040.00 $491.00 $11,784.00 41 33 42 00 15" RC PIPE (CLASS 5) 274 LIN FT $100.00 $27,400.00 $67.10 $18,385.40 $60.20 $16,494.80 $103.00 $28,222.00 $72.00 $19,728.00 42 33 42 00 15" RC PIPE APRON 15 EACH $1,500.00 $22,500.00 $1,382.70 $20,740.50 $1,870.00 $28,050.00 $1,000.00 $15,000.00 $1,599.90 $23,998.50 43 33 42 00 21" RC PIPE APRON 1 EACH $2,500.00 $2,500.00 $1,457.50 $1,457.50 $2,280.00 $2,280.00 $1,380.00 $1,380.00 $1,721.28 $1,721.28 44 34 41 05 STRUCTURE MARKER 45 EACH $200.00 $9,000.00 $71.50 $3,217.50 $107.00 $4,815.00 $109.25 $4,916.25 $113.62 $5,112.90 45 33 42 00 27" DIA STORM SEWER CBBH, INCL NEW CSTG (DETAIL H) 1 EACH $4,500.00 $4,500.00 $1,980.00 $1,980.00 $3,570.00 $3,570.00 $1,970.00 $1,970.00 $2,096.43 $2,096.43 46 33 42 00 4' DIA STORM SEWER MH, INCL SALVAGED CSTG (STO-3) 1 EACH $6,000.00 $6,000.00 $3,245.00 $3,245.00 $6,810.00 $6,810.00 $4,050.00 $4,050.00 $3,437.03 $3,437.03 47 33 42 00 5' DIA STORM SEWER CBMH, INCL SALVAGED CSTG (DETAIL G) 1 EACH $6,500.00 $6,500.00 $5,313.00 $5,313.00 $6,810.00 $6,810.00 $5,135.00 $5,135.00 $5,665.85 $5,665.85 48 33 01 30.86 ADJUST SALVAGED SAN MH CSTG, INCL HDPE RINGS 1 EACH $1,000.00 $1,000.00 $605.00 $605.00 $791.00 $791.00 $1,320.00 $1,320.00 $2,894.60 $2,894.60 49 01 57 13 CULVERT END PROTECTION 76 EACH $250.00 $19,000.00 $220.00 $16,720.00 $97.10 $7,379.60 $104.00 $7,904.00 $102.80 $7,812.80 50 01 57 13 STORM DRAIN INLET PROTECTION 2 EACH $250.00 $500.00 $200.00 $400.00 $192.00 $384.00 $150.00 $300.00 $687.13 $1,374.26 51 01 57 13 BIOLOG 400 LIN FT $5.00 $2,000.00 $4.95 $1,980.00 $5.10 $2,040.00 $5.20 $2,080.00 $3.25 $1,300.00 52 31 37 00 RANDOM RIP RAP CLASS II 10 CU YD $150.00 $1,500.00 $115.50 $1,155.00 $98.60 $986.00 $140.00 $1,400.00 $118.06 $1,180.60 53 31 37 00 RANDOM RIP RAP CLASS III 20 CU YD $150.00 $3,000.00 $115.50 $2,310.00 $114.00 $2,280.00 $140.00 $2,800.00 $114.75 $2,295.00 54 32 91 19.13 COMMON TOPSOIL BORROW (LV) 770 CU YD $60.00 $46,200.00 $44.00 $33,880.00 $20.60 $15,862.00 $21.00 $16,170.00 $42.20 $32,494.00 55 32 92 00 TURF RESTORATION, SEED MIXTURE (25-131), AND BLANKET CAT 15 950 SQ YD $6.00 $5,700.00 $4.40 $4,180.00 $9.05 $8,597.50 $7.30 $6,935.00 $3.15 $2,992.50 56 32 92 00 TURF RESTORATION, SEED MIXTURE (35-241), AND BLANKET CAT 15 3670 SQ YD $6.00 $22,020.00 $4.40 $16,148.00 $6.50 $23,855.00 $5.40 $19,818.00 $2.33 $8,551.10 57 32 17 23 4" DOUBLE YELLOW LINE, MULTI COMP 19500 LIN FT $1.00 $19,500.00 $0.82 $15,990.00 $0.77 $15,015.00 $0.78 $15,210.00 $0.90 $17,550.00 BASE BID TOTAL BID: $2,815,691.00 $2,434,745.12 $2,459,039.70 $2,483,828.75 $2,493,581.83 ALTERNATE 1 58 31 11 00 CLEARING AND GRUBBING 1 LUMP SUM $10,000.00 $10,000.00 $6,000.00 $6,000.00 $10,200.00 $10,200.00 $2,600.00 $2,600.00 $5,302.95 $5,302.95 ADD ALTERNATE TOTAL BID: $10,000.00 $6,000.00 $10,200.00 $2,600.00 $5,302.95 TOTAL AMOUNT BID (BASE + ALTERNATE): $2,825,691.00 $2,440,745.12 $2,469,239.70 $2,486,428.75 $2,498,884.78 ABSTRACT OF BIDS 2024 STREET IMPROVEMENT PROJECT CITY OF SCANDIA, MN BMI PROJECT NO. 0N1.131876 BID DATE: 1/24/2023 TIME: 9:00 AM ITEM MNDOT APPROX. NO. SPEC NO. ITEM NOTES QUANT. UNIT BASE BID 1 01 71 13 MOBILIZATION 1 LUMP SUM 2 01 55 26 TRAFFIC CONTROL 1 LUMP SUM 3 31 11 00 CLEARING AND GRUBBING 1 LUMP SUM 4 31 11 00 REMOVE TREE 8 EACH 5 31 11 00 REMOVE STUMP 1 EACH 6 02 41 13 SALVAGE AND REINSTALL MAILBOX 10 EACH 7 02 41 13 SALVAGE AND REINSTALL DELINEATOR 4 EACH 8 02 41 13 SALVAGE CASTING 3 EACH 9 02 41 13 SALVAGE METAL APRON 2 EACH 10 02 41 13 SALVAGE PIPE CULVERT 40 LIN FT 11 02 41 13 REMOVE STORM PIPE/CULVERT 627 LIN FT 12 02 41 13 REMOVE TRASH GUARD 1 EACH 13 02 41 13 REMOVE CONCRETE APRON 2 EACH 14 02 41 13 REMOVE METAL APRON 35 EACH 15 02 41 13 REMOVE DRAINAGE STRUCTURE 2 EACH 16 02 41 13 REMOVE BITUMINOUS PAVEMENT - DRIVEWAY 200 SQ YD 17 02 41 13 SAW CUT BITUMINOUS PAVEMENT - FULL DEPTH 232 LIN FT 18 32 01 16.11 RECLAIM BITUMINOUS PAVEMENT (8" THICK) (P) 71260 SQ YD 19 33 01 30.12 CLEAN PIPE CULVERT 727 LIN FT 20 33 01 30.12 TELEVISE STORM PIPE 190 LIN FT 21 31 20 00 DITCH GRADING 1405 LIN FT 22 31 20 00 SALVAGE AND REINSTALL RECLAIM MATERIAL (P) 640 CU YD 23 31 20 00 SUBGRADE EXCAVATION (EV) 2600 CU YD 24 31 20 00 COMMON EXCAVATION (LV) 770 CU YD 25 31 32 19 GEOTEXTILE FABRIC, TYPE V NON-WOVEN 7130 SQ YD 26 32 01 16.11 HAUL AWAY EXCESS RECLAIM MATERIAL TO CITY GRAVEL STREETS (LV) 2300 CU YD 27 32 11 23 AGGREGATE BASE, CLASS 5 560 TON 28 32 01 16.11 TOLERANCE RECLAIM (P) 71260 SQ YD 29 32 15 00 AGGREGATE SHOULDERING, CLASS 2 LIMESTONE 3180 TON 30 32 15 00 AGGREGATE SURFACING, 3/4" MINUS LIMESTONE - DRIVEWAY 20 TON 31 32 15 00 AGGREGATE SURFACING, 1/2" MINUS TRAP ROCK - DRIVEWAY 50 TON 32 32 15 00 AGGREGATE SURFACING CLASS 5 390 TON 33 32 12 01 BITUMINOUS PATCH SPECIAL 540 SQ YD 34 32 12 00 TYPE SP 9.5 UPPER WEARING COURSE MIXTURE (3,C) 6900 TON 35 32 12 00 TYPE SP 12.5 LOWER WEARING COURSE MIXTURE (3,C) 11500 TON 36 32 12 00 BITUMINOUS MATERIAL FOR TACK COAT 5590 GAL 37 32 12 00 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) - DRIVEWAY 200 SQ YD 38 33 42 13 CONNECT TO EXISTING STORM SEWER 3 EACH 5 6 7 8 UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT $145,138.00 $145,138.00 $153,400.00 $153,400.00 $125,000.00 $125,000.00 $150,000.00 $150,000.00 $10,000.00 $10,000.00 $41,475.00 $41,475.00 $24,000.00 $24,000.00 $25,000.00 $25,000.00 $9,000.00 $9,000.00 $8,520.00 $8,520.00 $8,543.46 $8,543.46 $10,500.00 $10,500.00 $1,100.00 $8,800.00 $750.00 $6,000.00 $752.07 $6,016.56 $1,100.00 $8,800.00 $650.00 $650.00 $600.00 $600.00 $601.65 $601.65 $525.00 $525.00 $300.00 $3,000.00 $480.00 $4,800.00 $275.76 $2,757.60 $410.00 $4,100.00 $405.00 $1,620.00 $480.00 $1,920.00 $95.26 $381.04 $100.00 $400.00 $125.00 $375.00 $400.00 $1,200.00 $250.14 $750.42 $150.00 $450.00 $110.00 $220.00 $330.00 $660.00 $330.91 $661.82 $200.00 $400.00 $42.00 $1,680.00 $30.00 $1,200.00 $30.08 $1,203.20 $17.00 $680.00 $8.10 $5,078.70 $11.48 $7,197.96 $11.51 $7,216.77 $7.00 $4,389.00 $50.00 $50.00 $240.00 $240.00 $240.66 $240.66 $200.00 $200.00 $220.00 $440.00 $480.00 $960.00 $481.32 $962.64 $310.00 $620.00 $42.00 $1,470.00 $102.86 $3,600.10 $103.14 $3,609.90 $65.00 $2,275.00 $550.00 $1,100.00 $786.00 $1,572.00 $788.16 $1,576.32 $425.00 $850.00 $22.00 $4,400.00 $6.00 $1,200.00 $6.02 $1,204.00 $14.00 $2,800.00 $6.00 $1,392.00 $3.60 $835.20 $3.61 $837.52 $2.50 $580.00 $0.70 $49,882.00 $1.15 $81,949.00 $1.60 $114,016.00 $1.90 $135,394.00 $12.00 $8,724.00 $14.40 $10,468.80 $14.44 $10,497.88 $20.00 $14,540.00 $8.50 $1,615.00 $24.00 $4,560.00 $24.07 $4,573.30 $8.50 $1,615.00 $12.42 $17,450.10 $18.99 $26,680.95 $19.04 $26,751.20 $20.00 $28,100.00 $20.66 $13,222.40 $15.00 $9,600.00 $15.04 $9,625.60 $32.00 $20,480.00 $28.15 $73,190.00 $29.32 $76,232.00 $29.40 $76,440.00 $41.00 $106,600.00 $36.50 $28,105.00 $32.36 $24,917.20 $32.45 $24,986.50 $30.00 $23,100.00 $3.10 $22,103.00 $4.57 $32,584.10 $4.58 $32,655.40 $1.60 $11,408.00 $26.00 $59,800.00 $33.98 $78,154.00 $34.07 $78,361.00 $37.00 $85,100.00 $18.65 $10,444.00 $31.92 $17,875.20 $32.01 $17,925.60 $32.00 $17,920.00 $0.96 $68,409.60 $0.84 $59,858.40 $1.70 $121,142.00 $2.20 $156,772.00 $36.55 $116,229.00 $30.63 $97,403.40 $36.09 $114,766.20 $32.00 $101,760.00 $120.00 $2,400.00 $66.60 $1,332.00 $66.78 $1,335.60 $60.00 $1,200.00 $62.00 $3,100.00 $44.88 $2,244.00 $45.00 $2,250.00 $68.00 $3,400.00 $28.00 $10,920.00 $40.42 $15,763.80 $40.53 $15,806.70 $32.00 $12,480.00 $33.00 $17,820.00 $33.59 $18,138.60 $53.68 $28,987.20 $29.00 $15,660.00 $92.83 $640,527.00 $87.26 $602,094.00 $87.48 $603,612.00 $103.00 $710,700.00 $91.27 $1,049,605.00 $85.59 $984,285.00 $85.25 $980,375.00 $99.00 $1,138,500.00 $5.00 $27,950.00 $3.40 $19,006.00 $0.01 $55.90 $1.00 $5,590.00 $39.36 $7,872.00 $43.31 $8,662.00 $53.88 $10,776.00 $38.00 $7,600.00 $1,000.00 $3,000.00 $1,200.00 $3,600.00 $2,251.14 $6,753.42 $1,100.00 $3,300.00 Northwest Asphalt Dresel Contracting Inc. OMG Midwest Inc. dba Minnesota Paving & Materials Bituminous Roadways Inc. ABSTRACT OF BIDS 2024 STREET IMPROVEMENT PROJECT CITY OF SCANDIA, MN BMI PROJECT NO. 0N1.131876 BID DATE: 1/24/2023 TIME: 9:00 AM ITEM MNDOT APPROX. NO. SPEC NO. ITEM NOTES QUANT. UNIT 39 33 42 00 15" CMP, CULVERT (DRIVEWAY) 398 LIN FT 40 33 42 00 15" CMP, APRON (DRIVEWAY) 24 EACH 41 33 42 00 15" RC PIPE (CLASS 5) 274 LIN FT 42 33 42 00 15" RC PIPE APRON 15 EACH 43 33 42 00 21" RC PIPE APRON 1 EACH 44 34 41 05 STRUCTURE MARKER 45 EACH 45 33 42 00 27" DIA STORM SEWER CBBH, INCL NEW CSTG (DETAIL H) 1 EACH 46 33 42 00 4' DIA STORM SEWER MH, INCL SALVAGED CSTG (STO-3) 1 EACH 47 33 42 00 5' DIA STORM SEWER CBMH, INCL SALVAGED CSTG (DETAIL G) 1 EACH 48 33 01 30.86 ADJUST SALVAGED SAN MH CSTG, INCL HDPE RINGS 1 EACH 49 01 57 13 CULVERT END PROTECTION 76 EACH 50 01 57 13 STORM DRAIN INLET PROTECTION 2 EACH 51 01 57 13 BIOLOG 400 LIN FT 52 31 37 00 RANDOM RIP RAP CLASS II 10 CU YD 53 31 37 00 RANDOM RIP RAP CLASS III 20 CU YD 54 32 91 19.13 COMMON TOPSOIL BORROW (LV) 770 CU YD 55 32 92 00 TURF RESTORATION, SEED MIXTURE (25-131), AND BLANKET CAT 15 950 SQ YD 56 32 92 00 TURF RESTORATION, SEED MIXTURE (35-241), AND BLANKET CAT 15 3670 SQ YD 57 32 17 23 4" DOUBLE YELLOW LINE, MULTI COMP 19500 LIN FT BASE BID TOTAL BID: ALTERNATE 1 58 31 11 00 CLEARING AND GRUBBING 1 LUMP SUM ADD ALTERNATE TOTAL BID: TOTAL AMOUNT BID (BASE + ALTERNATE): 5 6 7 8 UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT Northwest Asphalt Dresel Contracting Inc. OMG Midwest Inc. dba Minnesota Paving & Materials Bituminous Roadways Inc. $50.10 $19,939.80 $74.98 $29,842.04 $75.19 $29,925.62 $55.00 $21,890.00 $290.00 $6,960.00 $310.50 $7,452.00 $311.35 $7,472.40 $750.00 $18,000.00 $63.00 $17,262.00 $143.74 $39,384.76 $144.14 $39,494.36 $110.00 $30,140.00 $1,086.10 $16,291.50 $1,226.67 $18,400.05 $1,230.05 $18,450.75 $2,000.00 $30,000.00 $1,699.50 $1,699.50 $1,840.00 $1,840.00 $1,845.07 $1,845.07 $2,800.00 $2,800.00 $62.00 $2,790.00 $150.00 $6,750.00 $105.29 $4,738.05 $110.00 $4,950.00 $2,090.00 $2,090.00 $3,795.00 $3,795.00 $5,080.91 $5,080.91 $3,600.00 $3,600.00 $3,202.50 $3,202.50 $5,117.50 $5,117.50 $5,905.68 $5,905.68 $4,400.00 $4,400.00 $5,092.50 $5,092.50 $6,928.75 $6,928.75 $7,721.92 $7,721.92 $6,800.00 $6,800.00 $895.00 $895.00 $1,495.00 $1,495.00 $1,846.95 $1,846.95 $1,200.00 $1,200.00 $92.00 $6,992.00 $108.00 $8,208.00 $8.02 $609.52 $100.00 $7,600.00 $170.00 $340.00 $240.00 $480.00 $240.66 $481.32 $260.00 $520.00 $7.00 $2,800.00 $3.60 $1,440.00 $3.61 $1,444.00 $3.10 $1,240.00 $150.00 $1,500.00 $138.60 $1,386.00 $138.98 $1,389.80 $120.00 $1,200.00 $130.00 $2,600.00 $138.60 $2,772.00 $138.98 $2,779.60 $120.00 $2,400.00 $68.00 $52,360.00 $38.95 $29,991.50 $39.06 $30,076.20 $42.00 $32,340.00 $3.02 $2,869.00 $3.60 $3,420.00 $3.61 $3,429.50 $4.00 $3,800.00 $2.21 $8,110.70 $4.20 $15,414.00 $4.21 $15,450.70 $5.00 $18,350.00 $0.80 $15,600.00 $0.91 $17,745.00 $0.75 $14,625.00 $0.80 $15,600.00 $2,596,176.30 $2,612,650.31 $2,660,023.41 $3,020,618.00 $10,000.00 $10,000.00 $7,770.00 $7,770.00 $7,791.40 $7,791.40 $5,000.00 $5,000.00 $10,000.00 $7,770.00 $7,791.40 $5,000.00 $2,606,176.30 $2,620,420.31 $2,667,814.81 $3,025,618.00 PPPP OU C C C C G G G G E U P P P C E- D E- D E- D E- D E- D E - D E- D E- D E-D E-D E-D E-D E-D E- D E- D E- D E-D E- D E- D E - D E- D E- D E-D E- D E- D E- D E- D E- D E-D E-D E- D E-D E-D E- D E - D E - D E-D E-D E - D E- D E-D OE OE OE OE E OE E- D E- D E-D E- D E-D E-D E-D E-D OE OE OE OE OE E-D E- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G- D G- D E E E E E E G-D G-D G-D G-D G-D G-D G- D G- D G-D G- D G- D G-D G-D G-D G-D G-D G-D G-D G-D G-D G-D E G-D G-D G-D G - D G-D C- D C-D C-D C-D C- D C- D C- D C- D C- D C- D C- D C- D C- D C- D C- D C- D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C-D C- D C- D C-D C-D C-D C-D C-D C- D C- D C- D C- D C- D C-D C- D C- D C- D C- D C - D C - D C- D C - D C - D C- D C- D C- D C- D C C C F-D F-D F-D F-D F-D F-D F- D F- D F- D F- D F- D F- D F- D F- D F- D F- D F-D F- D F - D F - D F- D F- D F- D F- D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F-D F- D F- D F- D F- D F- D F-D F-D F-D F-D F-D F-D F-D F- D F- D F- D F-D F-D F- D F- D F- D F- D F - D F - D F- D F - D F- D F- D F- D F- D F-D F-D F-D F-D F- D F-D F-D F- D F-D LAKAMAGA TRAIL N 195TH STREET N 196TH S T R E E T N MA X W I L L A V E N U E N 205TH STREET N M A Y B E R R Y T R A I L N 205T H S T R E E T N NE W G A T E AV E N U E N OL I N D A T R A I L (C S A H 3 ) MAYBERRY TRAIL N BIG MARINE LAKE PROJECT LOCATION M E A D O W R I D G E L A N E N OE OE OE E-D E- D OE OE OE OE OE O E OE O E O E O E E E E E E G- D G - D G - D G - D G - D G- D G - D G - D G- D G- D G-D G-D G-D G-D G-D G-D G-D G - D G - D C-DC-D C-D C-D C-D C-D C- D C-DC-D C-D C-D OC OC O C O C C-D C- D C - D C - D C - D O C OC OC OC O C OCOC O C O C C C C C C F-D F-D F-D F - D F - D F - D F-D F-D F- D F - D F - D F - D F - D F - D F - D F- D F- D F-DF-D F - D > > 185TH STREET N LA N G L Y A V E N U E N 190TH STREET N 189TH S T R E E T N 187TH S T R E E T N L A N G L Y C O U R T N L A N G L Y A V E N U E N PROJECT LOCATION 3507 HIGH POINT DRIVE NORTH BLDG. 1 SUITE E130 OAKDALE, MINNESOTA 55128 Phone: (651) 704-9970 Email: Oakdale@bolton-menk.com www.bolton-menk.com R SHEET B o l t o n & M e n k , I n c . 20 2 3 , A l l R i g h t s R e s e r v e d c H: \ S C N D \ 0 N 1 1 3 1 8 7 6 \ C A D \ C 3 D \ 1 3 1 8 7 6 G 2 0 1 . d w g 1/ 9 / 2 0 2 4 8 : 3 5 : 1 1 A M DESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.SCANDIA, MINNESOTA 2024 STREET IMPROVEMENT PROJECT 0N1.131876 0 BID 12/19/2023 1 ADD 1/9/2024 DATELIC. NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. RYAN GOODMAN 46664 12/19/2023 ICB ICB CAQ G2.01GENERAL LOCATION PLAN FEETSCALE 0 200 400 HORZ. R FEETSCALE 0 400 800 HORZ. R SE E L E F T SE E R I G H T NOTES: 1.PHASE 1 1.1.LANGLY AVENUE N 1.2.LANGLY COURT N 2.PHASE 2 2.1.205TH STREET N 2.2.196TH STREET N 2.3.LAKAMAGA TRAIL N (MEADOWRIDGE LANE N TO WEST END) 2.4.MAXWILL AVENUE N 3.PHASE 3 3.1.LAKAMAGA TRAIL (MEADOWRIDGE LANE N TO EAST) 3.2.195TH STREET N 3.3.MAYBERRY TRAIL N 4.CONTRACTOR MAY SUBMIT ALTERNATIVE SCHEDULE/PHASING TO ENGINEER FOR REVIEW. 5.SEE SHEET G2.02 AND PROJECT MANUAL FOR SPECIFIED HAUL ROUTES. PHASE 1 PHASE 2 PHASE 3 KIRK AVE & 185TH ST (WEST OF MANNING) 186TH ST LAMAR AVE MA N N I N G T R A I L N ( C S A H 1 5 ) 185TH ST N H: \ S C N D \ 0 N 1 1 3 1 8 7 6 \ C A D \ C 3 D \ F I G R - 1 3 1 8 7 6 - S t r e e t A d d i t i o n L o c a t i o n M a p . d w g 2/ 7 / 2 0 2 4 7 : 0 4 : 1 4 A M R 2024 Street Improvement Project City of Scandia Figure - Street Additions Location Map February 2024 R FEETSCALE 0 200 400