Loading...
09.d2 Tii Gavo Phase II Utility Street Improvements - Letter of Credit Reduction No 114727 209 th St. N. PO Box 128, Scandia, Minnesota 55073 Phone (651) 433-2274 Fax (651) 433-5112 http://www.ci.scandia.mn.us June 10, 2024 Honorable Mayor and City Council City of Forest Lake 1408 Lake Street S Forest Lake, MN 55025 RE: Tii Gavo 2nd Addition Utility & Street Improvements Letter of Credit Reduction Request No. 1 Dear Mayor and Council: The Representatives from J. Johnson Development LLC (Tii Gavo 2nd Addition) have requested a reduction in their financial surety for the site improvements that have been completed to date for the subdivision located between Lakamaga Trail N and Newgate Ave N off of Big Marie Lake. Work completed to date on the project included installation of the sanitary sewer pressure system to individual lots that is privately owned and maintained, site grading, installation of storm sewer culverts and storm basins, streets up to base course, and placement of erosion control devices. The majority of this work was completed in 2023. Remaining work to be completed includes correction work within the stormwater basins because they are not drawing down, completion of the street including wear course and aggregate shouldering, and final restoration. The current Letter of Credit is for the amount of $557,600. The estimated value of the remaining site work is $115,600 which includes 125% of the estimated construction of the remaining items as required by the Development Agreement. We request that the City Council consider the request to reduce the financial securities for the improvements to an amount no less than $115,600 for this project. Please contact me if you have any questions regarding this letter of credit reduction Sincerely, Ryan J. Goodman, P.E. City Engineer Item No.Description Unit Estimated Quantity Unit Price Total Price 1 Mobilization (For Stormwater correction work and final street work) LS 0.25 $20,000.00 $5,000.00 2 Traffic Control (For Stormwater correction work and final street work) LS 1 $1,500.00 $1,500.00 3 Temporary Construction Entrance EA 0 $2,000.00 $0.00 4 Connect to Existing Sanitary Sewer EA 0 $2,000.00 $0.00 5 1.25" Pressure Lateral LF 0 $35.00 $0.00 6 2" PE Pressure Main LF 0 $45.00 $0.00 7 Air Release Manhole EA 0 $4,500.00 $0.00 8 Clean Out LF 0 $1,000.00 $0.00 9 Curb Stop EA 0 $750.00 $0.00 $6,500.00 10 Connect to Existing Storm Sewer EA 0 $1,500.00 $0.00 11 12" RCP Storm Sewer, CL 5, 0'-10' DEEP LF 0 $55.00 $0.00 12 12" Flared End Section EA 0 $1,500.00 $0.00 13 Riprap Class III CY 0 $55.00 $0.00 14 Infiltration Basin - Punch List Work LS 1 $30,000.00 $30,000.00 15 Organic Compost, Grade 2 CY 0 $35.00 $0.00 16 Storm Drain Inlet Protection EA 17 $100.00 $1,700.00 $31,700.00 17 Remove Bituminous Pavement SY 0 $5.00 $0.00 18 Sawing Bituminous Pavement LF 0 $5.00 $0.00 19 Subgrade Preparation SY 0 $2.00 $0.00 20 Subgrade Excavation CY 0 $15.00 $0.00 21 Common Excavation CY 0 $20.00 $0.00 22 Select Granular Borrow, Modified CY 0 $25.00 $0.00 23 Aggregate Base, Class 5 TN 0 $18.00 $0.00 24 Aggregate Shouldering, Class 2 TN 175 $39.00 $6,825.00 25 Geotextile Fabric SY 0 $3.00 $0.00 26 Remove and Replace Concrete Curb LF 0 $50.00 $0.00 27 Type SP 9.5 Wearing Course Mixture (3,C)TN 375 $105.00 $39,375.00 28 Type SP 12.5 Non Wearing Course Mixture (3,C)TN 0 $85.00 $0.00 29 Bituminous Tack Coat GAL 260 $8.00 $2,080.00 30 Silt Fence LF 0 $3.00 $0.00 31 Site Restoration and Final Punch List Items LS 1 $6,000.00 $6,000.00 $54,280.00 $6,500.00 $31,700.00 $54,280.00 Total Project Construction Costs $92,480.00 125% Per Improvement Agreement $115,600.00 Letter of Credit Amount Entered in Improvement Agreement $115,600.00 Part 3 - Street Improvements Total Estimated Construction Costs Part 1- Sanitary Sewer Total Estimated Construction Costs Part 2 - Storm Sewer Total Estimated Construction Costs Summary Part 3 - Street Improvements Part 2 - Storm Sewer Total Estimated Construction Costs Part 3 - Street Improvements Total Estimated Construction Costs Part 2 - Storm Sewer TII GAVO 2ND ADDITION Letter of Credit Reduction No. 1 Part 1 - Sanitary Sewer Part 1- Sanitary Sewer Total Estimated Construction Costs June 2024 Page 1