Loading...
Wastewater Activity Report 2013-2014 Wastewater Activity Report � � i � ���� ���� Tim Kieffer, Public Works Director ��1i1� �� (651) 433-5223 t.kieffer@ci.scandia.mn.us April 1 throu�h April 30, 2014 Maintenance tasks • Read pump run times at all of the lift stations • Replaced 3 STEP system floats on the Bliss System Management tasks • Corresponded with contractors about upgrades to the 201 System • Met with resident to discuss his frozen building sewer on the Bliss System May 1 through May 31, 2014 Maintenance tasks • Read pump run times at all of the lift stations • Performed annual septic tank inspections Management tasks • Scheduled septic tank inspections with EcoCheck • Corresponded with several residents June 1 throu�h June 30, 2014 Maintenance tasks • Read pump run times at all of the lift stations • Worked with contractor to raise two access covers on the Bliss System • Mowed drainfields and lift stations • Replaced two pumps and one control panel on the 201 System Management tasks • Scheduled septic tank improvements with contractor Wastewater Activity Report � � � � C� � .,J. � Tim Kieffer, Public Works Director ��1���� (651) 433-5223 t.kieffer@ci.scandia.mn.us March 1 throu�h March 31, 2014 Maintenance tasks • Read pump run times at all of the lift stations • Responded to resident's concern on the Bliss system Management tasks • Corresponded with contractors about upgrades to the 201 system Wastewater Activity Report � � i � G-�C�'� ����� Tim Kieffer, Public Works Director ��1A 1�T�� (651) 433-5223 t.kiefFer@ci.scandia.mn.us ��� November 1 through November 30, 2013 Maintenance tasks • Read pump run times at all of the lift stations • Responded to a STEP system alarm on the Bliss system Management tasks • Corresponded with EcoCheck • Met with contractor about upgrades to the 201 systems • Created wastewater CIP • Scheduled septic tank repair with contractor December 1 throu�h December 31, 2013 Maintenance tasks • Read pump run times at all of the lift stations • Responded to a STEP alarm on the Bliss system • Plowed drainfields Management tasks • Corresponded with EcoCheck and County • Corresponded with contractor about upgrades to the 201 systems January 1 throu�h January 31, 2014 Maintenance tasks • Read pump run times at all of the lift stations • Responded to two STEP alarms on the Bliss system • Plowed drainfields Management tasks • Corresponded with EcoCheck about the Bliss system • Corresponded with contractor about upgrades to the 201 system • E-mailed the County and MPCA about improvements to the drainfields February 1 throu�h February 28, 2014 Maintenance tasks • Read pump run times at all of the lift stations • Responded to two STEP alarms on the Bliss system • Plowed drainfields • Replaced STEP pump on the Bliss system Management tasks • Corresponded with EcoCheck about the Bliss system • Corresponded with contractors about upgrades to the 201 system • Created a 201database to track maintenance 2 Wastewater Activity Report � l� � � ���.��1 �. � Tim Kieffer, Public Works Director ��1e► 1�T�� (651) 433-5223 t.kieffer@ci.scandia.mn.us �'�l"� August 1 through August 31, 2013 Maintenance tasks • Read pump run times at all of the lift stations • Worked on STEP system on Layton Av • Mr.Anderson and Mr. Kieffer attended Service Provider training • Mowed drainfields Management tasks • Worked with EcoCheck to repair valves at Bliss Lift Station 4 • Scheduled contractor to pump septic tanks on the 201 system • Scheduled contractor to raise access cover on the Bliss system • Worked with contractor to repair monitoring wells at the Anderson/Erickson Drainfield • Met with vendor to replace the 201 control panels September 1 through September 30 Maintenance tasks • Read pump run times at all of the lift stations Management tasks • Worked with EcoCheck to repair valves at Bliss Lift Station 4 • Scheduled contractor to pump septic tank on the Uptown system • Corresponded with Elim Church to have their septic tank pumped • Met with several vendors to replace the 201 control panels • Met with White Bear Township to review their SCADA system • Corresponded with the County about the Anderson/Erickson monitoring wells October 1 throu�h October 31 Maintenance tasks • Read pump run times at all of the lift stations • Responded to two STEP system back-ups on the Bliss system • Repaired driveway after the septic tank access cover was raised Management tasks • Corresponded with EcoCheck • Met with contractor about upgrades to the 201 systems • Attended wastewater operator training �. Wastewater Staff Report � � � c� � ���� G�� Tim Kieffer, Public Works Director ����� (651) 433-5223 t.kieffer@ci.scandia.mn.us July 1 throu�h Julv 31. 2013 Maintenance tasks • Read pump run times at all of the lift stations • Worked on STEP system on Layton Av • Replaced the kitchen septic pump at the Community Center Management tasks • Worked with EcoCheck to inspect the septic tanks on the 201 system • Scheduled the testing of the Anderson/Erickson Drainfield monitoring wells • Corresponded with vendor to replace the 201 control panels • Met with resident about a proposed septic system June 1 throu�h June 30. 2013 Maintenance tasks • Read pump run times at all of the lift stations Management tasks • Worked with EcoCheck on the Uptown and Bliss systems • Scheduled the septic and pump tank inspections for the 201 system with EcoCheck • Sent out inspection notice letters • Scheduled the replacement of the Bliss Drainfield transformer with Xcel • Worked on the 201 and Uptown budgets • Corresponded with engineer about the final improvements to the Uptown System May 1 throu�h Mav 31.2013 Maintenance tasks • Read pump run times at all of the lift stations • Raised access cover for the kitchen septic and pump tanks at the Community Center Management tasks • Worked with EcoCheck on the Uptown and Bliss systems • Worked with contractor to clean wet well at Bliss Lift Station 4 • Met with several contractors about upgrading the 201 control panels • Diagnosed problem at the Gammelgarden Apri) 1 through April 30, 2013 Maintenance tasks • Read pump run times at all of the lift stations • Responded to emergency call outs at two Bliss STEP systems • Repaired top casting on a storm sewer manhole Management tasks • Worked with EcoCheck on the Uptown and Bliss systems • Ordered two Bliss STEP pumps to have in an emergency • Attended training for managing sewer systems • Worked with contractor at Bliss Lift Station 4