Loading...
4-27-22 minutesApril 27, 2022 A meeting of the Wastewater Advisory Committee was held on the above date with modifications. The meeting was conducted in-person at the Scandia Community Center and over an electronic platform. All participants who joined the meeting remotely could hear each other and contribute to discussions. The meeting was called to order at 6:30 by Chairperson Steve Kronmiller. In attendance were committee members Steve Kronmiller and Perry Rynders. A quorum was not achieved as Peter Nora and Dan Cartier were participating remotely, and Richard Bohrer and Doran O’Brien were absent. City Staff in attendance were City Administrator Ken Cammilleri, Public Works Director Charles Fischer and City Treasurer Colleen Firkus. City Engineers Ryan Goodman and Seth Peterson participated remotely. As there was no quorum there were no motions only information presented. PRESENTATION AND DISCUSSION ON CURRENT SYSTEM USE AND CAPACITY Cammilleri reported on system performance, conditions, and connections being permitted. Funding through the state legislature does not look likely so project will be downsized to take out Lift Station #2 replacement. Project will start in September/October by ordering renderings and specifications. Cammilleri hopes to get bonds for financing and to consult with financial advisor Ehlers about financing it and setting rate structure to accommodate costs. A joint meeting between Wastewater Committee and City Council may be held to present options. Fischer presented flow charts from Jan 2021 through April 2022 for Anderson-Erickson system. While spikes were seen during February and March due to spring runoff I&I issues, operating levels in general were below permitted gallons per day (GPD). Flows were determined by pump run times until meters were installed in February 2022. Actual times/inspections were just done this week and waiting on a report from the contractor. There was a pump issue in March as pump running but no flows, so error was in control panel. Uptown flows are measured by pump times. Flows were well below permitted 5,000 average per day (APD) in 2021, except for a spike in July when there was a draw-down of a tank for inspection causing extra pump run times. 2022 running as allowed under permit. Not seeing I&I issues especially with fast melt and rain this year. Manhole cover replacements complete in A&E. Bliss inspected this spring, handful of covers to be replaced to address I&I. All properties were inspected except two; one bank owned, one unoccupied. No I&I issues found on all inspected properties. Bliss flow charts in 2021 showed a March peak from spring as ground was still frozen and went above permitted APD. December’s chart appears to have a data entry error. Spikes in April 202 were due to snow melting on drainfields and going into sand filters. Graphs are comparable for each year with January plateaus, March peaks, and April spikes. Measurements between pump time readings and metering are consistent. NEW CONNECTIONS & PERMITS DISCUSSION There are a couple of properties that may be needing to connect soon. One has a nonconforming drainfield located on a property across the road from the house, not owned by the homeowner. City ordinance requires the city to do the permitting, but there are no new connection specifications in place to provide to contractors, or inspectors to handle permitting, or a contract with the County to handle new connections. City engineers are preparing connection specifications which will need to be reviewed by the Committee and City Council. The City follows the County ordinance is permitting based on number of bedrooms which could be modified to include number of bathrooms. CONTINUED DISCUSSION AND POSSIBLE CONSIDERATION TO RECOMMEND FACILITIES STUDIES FOR ANDERSON-ERIKSON AND UPTOWN TREATMENT SYSTEMS Bolton & Menk needs to know if the City wants to consider future expansions in the utilities’ facility studies, and if the City wants to allow more than 5,000 GPD which moves permitting from the County level to the State level at the MPCA. Engineer Goodman indicated there is capacity in the Bliss system. The A-E side has unconnected homes in the newly designated service area which would be allowed to connect. Homes in the service area can be rebuilt but not to exceed the current number of bedrooms. Bliss is eligible for state funds. But other funding would need to be found for A-E and Uptown systems such as a community septic program through the MPCA or grants through US Corp of Engineers. Federal infrastructure bills may provide assistance. Replacing the original infrastructure needs to be addressed. UPTOWN Scandia Heritage Alliance & Arts Center Water Tower Barn has momentum in the legislature and is in the Governor’s proposed budget. Can it be served by Uptown system? Estimated average daily flows are 215 GPD, with a peak of 800 GPD. During large events the bathrooms would be closed and portable toilets would be used. Engineer Peterson indicated there is capacity in the Uptown System to add the Heritage Center with the condition of closing toilets for big events and using portable toilets. Staff will be sending a letter to Heritage Alliance group to notify them a connection will be allowed with conditions. Kronmiller stated it seemed it was running at half capacity. There are residential systems uptown that are noncompliant and would like to connect. Would the city need to expand to cover new connections? How would cost of expansion be handled? Design capacity is not well defined. City staff has been unable to find original plans and specification documents that show allowed capacity, only through past correspondence. There are no records at the county. FUTURE DISCUSSIONS The Committee will need to discuss grants, facilities studies, design review for permits, SAC/connection fees. Engineer Peterson stated the analysis is done on Uptown system and we have the capacity and average treatment flow (Permitted Average flow 3500, Max 5000) and have anticipated the Heritage Ctr flows. The only unknown is the question of expanding the service area. Projections can’t be made until we know extent of service area. Cammilleri indicated he planned to survey residents in the potential service area. Next meeting is scheduled for Monday, May 23rd at 6:30 p.m. Need to meet in person to have a quorum. Meeting ended at 7:40 p.m. Respectfully submitted, Colleen Firkus, City Treasurer