09.d1 Engineering Updates 11-19-2024 City of Scandia Engineering Updates 11/19/2024 Engineering Italics = Old information Red = Projects removed from Engineering Update · 2024 Crack Fill and Seal Coat Project · Washington County Draft 2025-2029 Capital Improvement Plan · 2024 Street Improvement Project  Anticipated project schedule is as follows: o December 19, 2023  Approve Plans & specifications/Authorize Ad for Bid o January 24, 2024 o Bid Opening o February 20, 2024  CMSCWD was included on the December 7th plan review meeting and discussion, as well as been in contact for project updates throughout November and beginning of December.  The Preconstruction Meeting has been scheduled for April 3rd, at 10:00am.  Astech completed preliminary culvert cleaning on April 5th – 9th.  Astech will complete large tree removal on Saturday April 20th. o Resident notices were delivered on April 9th to all impacted by these tree removals.  Pavement reclamation for Phase 1 is scheduled to begin on April 25th.  Base Paving was completed on Phase 1 the week of May 13th – 17th.  Pipework on Phases 2 and 3 will begin the week of May 20th – 24th.  Basin grading along 196th Street on City property will also begin the week of May 20th – 24th.  All pipe work has been completed for Phase 1, 2, and 3.  Base paving for Phase 2 has been scheduled for the end of next week, June 17th – 21st. o This is dependent on completion of soft spot correction on Phase 2.  Phase 2 had the base layer of pavement placed from June 27th – 29th.  Phase 3 Pavement Reclamation took place from July 1st – 3rd.  Base Paving for Phase 3 has been tentatively scheduled for July 15th – 19th, weather dependent.  Base Paving for Phase 3 was completed between July 25th – 26th.  Wear Paving on Change Order and Phase 1 streets was completed between July 29th – 30th.  Wear Paving on Phase 2 and 3 street was completed between August 7th – 12th.  Shouldering has been scheduled for August 13th – 15th.  Striping was completed on August 26th on Lakamaga, 195th, Maxwill and Mayberry.  An updated punchlist was sent to the Contractor on September 3rd.  The Contractor still has a few remaining punchlist items to be completed prior to project closeout.  A site walkthrough was conducted with the MPCA on October 28th. o Minor non-compliance noted missing reports for the Contractor’s erosion control submission. These omissions have since been provided to the MPCA.  All punchlist items were completed on October 29th.  Contractor’s Request for Payment No. 6 and Final has been included as a separate agenda item (includes all relevant final documentation). · 2024 Tennis Court Reconstruction Project  Project Schedule is as follows: o Approve Plans & Specifications/Authorize ad for Bid – June 18, 2024. o Bid Opening – July 10, 2024. o Consider Contract Award at City Council Meeting – July 16, 2024.  Geotechnical report was received on March 26th, 2024. o The report soil borings determined that Barton Johson and Community Center Tennis Courts should both be reconstructed with new bases and pavement. Proposed sections have been discussed with City Staff.  Wetland Delineations were collected on Thursday April 11th. o Plan and permitting updates will be completed once delineations have been reviewed and discussed with City Staff.  Plans and specifications have been completed. City comments were received and implemented throughout this design process.  Request to approve plans, specifications and authorize ad for bid has been included as a separate agenda item.  Bids for the 2024 Tennis Court Reconstruction Project were opened on Wednesday, July 10th, at 9:00am.  The City Council awarded the Base Bid + Alternate 1 to Veit & Company, Inc. at the August 7th Council workshop.  Change Order No. 1 has been put together and sent to Veit & Company on August 12th.  A preconstruction meeting has been scheduled for Tuesday August 20th at 10am.  Construction will begin after September 9th.  Tree removal began by the City on Monday September 9th, with the Contractor beginning removal work on September 10th.  The Contractor stockpiled, and plans to test, the existing aggregate base layer to determine whether it can be re-used as base material. If passing, they will re-use what material they can, and supplement with new class 5 aggregate for the additional tennis court.  Change Order No. 2 has been put together and sent to Veit & Company on September 11th for unit pricing. Change Order No. 2 includes a price adjustment for removing unforeseen bituminous pavement below the aggregate base layer (this was not captured by soil borings due to the sporadic nature of the bituminous pavement). o This Change Order has been attached to the end of this report (unit price not yet received from Veit).  Fence posts have been installed, with concrete and pavement work to be completed still this month.  Minor basin corrective work will take place over the next week. Drain tile will be corrected to promote drainage, and additional filter media will be added to the basin.  Contractor’s Request for Payment No. 1 has been included as a separate agenda item.  The contractor poured the concrete maintenance strip on October 15th.  Paving was completed in 2 lifts. The first lift was placed on October 21st, and the second on October 24th.  Corrective concrete work was completed on October 29th.  Contractor’s Request for Payment No. 2 has been included as a separate agenda item. · Tii Gavo Development Phase II  Watershed permit has been obtained and grading work began on Tuesday July 11th. BMI will have staff on site for public infrastructure inspections.  The bituminous base layer was paved on 8/17/2023.  Aggregate shouldering was completed on 8/30/2023.  Restoration Punchlist will be created in early April 2024.  Hand auger borings have been scheduled for each of the non-functioning basins along with a grain analysis and hydrometer testing.  Once this revised work has been completed, an updated restoration punchlist will be created and sent to the Contractor.  A request to reduce the Letter of Credit for this development has been included as a separate agenda item.  Plowe Engineering is still waiting to receive the hand auger boring results.  Braun is still completing lab tests on the borings samples collected in June. Once completed, Plowe will begin corrective design in coordination with CMSCWD.  Plowe is currently working on the corrective design for the basins on-site, in coordination with the watershed, and hoping to have an approved plan within the next few weeks.  Weather permitting, these corrections will take place this year.  Corrective design has been completed and is being reviewed by the Contractor. The finalized plans will then be sent to the CMSCWD and City for review during the week of November 11th – 15th. · Floodplain Risk Assessment  Watershed District has received notification from the MPCA they did not receive the grant that was applied for.  CMSCWD Board is considering allocating funding for the Risk Assessment in 2024 at their 2024 CMSCWD Budget Workshop.  The draft 2024 CMSCWD budget currently includes funding to address model data gaps for the Big Marine Lake outlet, Carnelian Channel, and Carnelian Creek flowages. This is the first step in a multi-year process to complete the Floodplain Risk Assessment.  Application #3 was not awarded.  Application #4 is due on December 14th, 2023.  The 2024 CMSCWD budget includes funding to address model data gaps for the Big Marine Lake outlet, Carnelian Channel, and Carnelian Creek flowages. This is the first step in a multi-year process to complete the Floodplain Risk Assessment.  Application #4 was not funded.  Application #5 is being prepared for submittal on April 30th, 2024.  Application #5 has been prepared and submitted for the MPCA-Small Communities Planning for SWC Resilience on April 30th, 2024.  When the CMSCWD begins their 2025 budgeting process in July, the board will consider funding the next steps in the planning process, with or without a grant.  A survey of the Big Marine Outlet and channel has already been completed, assessing the conditions of the culverts, and evaluating the existing channel profile. This was an important step to improve the watershed’s model for planning and future maintenance.  A location map for this channel has been provided at the end of this report.  No Update on Application #5 as of July 10th, a verbal update will be brought to council on July 16th.  Application #5 has been selected and the CMSCWD will receive a grant in the amount of $50,000. This will be used to supplement the funds that CMSCWD has already allocated for this assessment in their 2025 draft budget.  CMSCWD held a public budget hearing on 9/25/2024.  CMSCWD has approved to enter into an agreement with the MPCA to complete this work. Modeling has begun, and the watershed plans to reach out to the City in November to schedule an initial input meeting.  Modeling work has begun, and post modeling engagement meetings with nearby cities will be scheduled in November. · Bliss Drainfield System  The final permit has been issued. The assumption is that we’ll end up on Track 2, with required system improvements due to the nitrate issue. Only thing that needs to take place in the next 6 months (February 28, 2022) is for new flow meters to be installed at the system, something we’ll begin working on. At the one year mark (September 1, 2022), we’ll need to have a Facility Evaluation Report drafted to summarize the system’s ability or inability to meet the nitrate limit.  New flow meters were installed by Public Works at the beginning of 2022 and specific flows to the three drainfield cells is now being monitored. Some additional nitrate testing was also performed in August 2022 to provide additional data points and to get an idea of how much nutrient removal is currently taking place through the sand filters.  As of September 1, 2022, the Facility Evaluation Report has been sent to the MPCA. We await their review, but based on the monitoring well samples taken throughout the last year it appears we’ll be on Track 2, with improvements to the system needed to deal with the nitrate issue. Assuming this is the case, the next step will be to complete a full Facility Plan by August of 2023 which evaluates the facility and its performance as a whole and provides options/recommendations for improvements to be made. This is required by Track 2 but is also the next step in obtaining PFA funding for the project.  We met with MPCA on December 16, 2022 to discuss funding options and laid out a schedule to complete a facility plan and apply for Point Source Implementation Grant (PSIG) funding.  City Council authorized work to complete the facility plan on January 4, 2023. Facility plan to be submitted by March 3, 2023. Also, Council authorized BMI to complete permit documents for permit modification due to added treatment for nitrate removal.  Testified at the Capitol on Wednesday, March 1, 2023 requesting funding for the Bliss Wastewater Treatment Facility.  Facility plan has been submitted for the City of Scandia’s Bliss Wastewater Treatment Facility along with and IUP request and PPL application to the Minnesota Public Facilities Authority on Friday, March 3, 2023. As of June 22, the MPCA has issued preliminary approval of this facility plan.  PSIG Funding application was submitted at the end of July (2023). Received follow-up questions from the MPCA and responses were sent at the end of August (2023).  City review period for draft MPCA SDS permit ended on 4/5; the public comment period has begun and will continue through 6/17.  Initial review comments have been received from the MPCA and responses returned.  Depending on multiple other factors, we’ll likely be re-applying for PSIG (Point Source Implementation Grant) by the end of July (deadline), as if obtained this could fund up to 80% of project.  Plans and specifications were submitted for MPCA review at the end of March.  Response has been received on the environmental review of the project and the DNR has identified the site as potential nesting land for Blanding’s Turtles. We are working to address the requirements associated with this in addition to the other revisions.  Comments from the MPCA have been addressed and have been certified by the MPCA as of the end of June.  As of the end of June, the new SDS Permit for the Scandia WW system has been issued. This means that groundwater monitoring well GW 008 now needs to be sealed within 180 days, as that is part of the permit requirements.  Bolton and Menk re-applied for PSIG at the end of July. The PFA has indicated that it’s unlikely that Scandia will be in the fundable range for 2025 given the lack of a bonding bill.  A meeting was conducted between City Staff, Bolton and Menk, and the MPCA on August 14th regarding lack of project funding.  Per that discussion, BMI has drafted a letter to be formally sent by the City to the MPCA which explains the situation and all steps that have been taken (and are continuing to be taken) to try and obtain funding to complete this required project. The letter also requested a modification to the permit schedule which would extend the timeline to construct from 2025 to 2026 with the assumption that a bonding bill will be passed which funds PSIG and allows Scandia a realistic path to obtaining this funding. This letter has been attached to the end of this report for the Council’s review.  The MPCA appears to be open to this process as a viable path forward. Ultimately if this is approved, we will re- apply for both the CWRF and PSIG programs in 2025 with the goal of being funded for construction in 2026. · Bliss Addition Stormwater Planning  Watershed still working toward 90% plans based on City Staff input received in November 2022.  City and Watershed have completed the MOU.  Watershed/Consultants redesigning project practices after a final utility meet locate identified previously un- marked conflicts.  Due to delays caused by utilities not marked on the initial locate, the CMSCWD will delay construction to 2024. Upon completion of the final plans, submittals will be prepared to the City for their review. CMSCWD anticipates soliciting bids in October 2023.  Revised plans were submitted to the City and review comments were sent back to the Watershed District on January 5, 2024.  Bid Opening was held on April 2nd, 2024 (Abstract of Bid Results at the end of this update).  Council chose to accept the Base Bid for this Project at the April 16th Council Meeting, and award the project to the lowest bidder, Dresel Contracting, Inc.  CMSCWD is currently working with residents on final vegetation selection for this project.  A preconstruction meeting is planned to be scheduled for the week of June 17th – 21st, pending City staff availability.  A preconstruction meeting was held on Tuesday June 25th with the Contractor, EOR, City Staff and Bolton & Menk.  Tree removal will take place in July, with the remainder of the project taking place during September to meet the substantial completion date of September 30th.  Private utility relocation and tree removals were completed during July.  The remaining construction is still scheduled to be completed in September.  The Contractor has been completing construction of BMPs the week of September 9th – September 13th.  Anticipated project completion is the week of September 23rd – 27th.  A site walkthrough was completed by EOR and the CMSCWD to develop a project punchlist.  The punchlist contains items to correct basin grading as well as turf restoration.  The punchlist is being reviewed and will be sent out the week of October 7th – 11th.  All punchlist work was completed on October 28th.  A site walkthrough was conducted with the MPCA as well on October 28th. o The MPCA requested the “owner” as listed on the permit needed to be updated from EOR to CMSCWD. This has been completed and submitted to the MPCA.  Pay Application #2 is being reviewed by EOR and CMSCWD.  Final project closeout is anticipated for the December or January Board meeting pending receipt of final documentation. · Highway 8 Study (Chisago to Taylors Falls)  Project website: https://talk.dot.state.mn.us/hwy-8-chisago-taylorsfalls o Comments and questions can be submitted on the project website.  Schedule: o August 2024 through December 2024 · Analyze existing conditions and engage stakeholders. o November 2024 through June 2025 · Develop and evaluate ideas for improvements with stakeholders and public involvement. o June 2024 through October 2025 · Finalize study recommendations. o 2032 · Construction (pavement resurfacing). · Highway 243 Osceola Bridge  Project website: http://www.dot.state.mn.us/metro/projects/hwy243osceola/index.html  Public Meeting scheduled for May 10, 2023, 5:00pm-7:00pm at the Osceola Village Board Room  Schedule: o Environmental documentation and preliminary design: 2022 through 2024 o Final design: 2024 through 2026 o Anticipated construction: 2027 through 2028 · The bridge is anticipated to be closed sometime in 2027 through 2028. The duration of this closure is being considered during alternative detour evaluations. o Restoration and project completion in 2029.  Project website has been updated with a location plan showing the extents of the work. The project will span the distance between TH 95 and TH 35.  Traffic Impacts are currently under review, and potential detour plans are being developed. o See the project website for up-to-date figures. Denise Workcuff Dmitry Tomasevich Communications and Engagement Project manager denise.workcuff@state.mn.us dmitry.tomasevich@state.mn.us 651-775-0025 651-245-4406 · Gateway Trail / County Road 52  Survey update o Topo survey was completed on November 7th, 2023.  Soil Boring update o AET submitted the lowest bid at $21,382.00 to perform this work and had the soonest drill rig availability. o AET has been authorized to complete soil boring and hand auger boring work on 11/10/2023. o Soil Borings are scheduled to be completed within 8-10 weeks, with a report coming a few weeks after completion of field work (Braun was at least a month behind this schedule and came in at $24,735.00). Hand Auger Borings in off street locations will be completed earlier prior to snowfall. o AET has been instructed not to begin any work on site until after December 19th. Once approval has been received, AET will begin hand auger borings (HABs) and then drill rig soil borings (SBs) a few weeks after.  AET began collecting hand auger borings (HABs) from December 22nd - 26th, and soil borings on December 26th - 29th.  A Geotechnical report is anticipated to be received the week of 3/18 - 3/22.  Figures/layouts are being created to discuss with City staff on 3/19.  DNR comments have been received and are being implemented into the figures/layouts.  County comments have been received and are being implemented into design for discussion at the June monthly design review meeting.  The next design review meeting with City Staff, County and the DNR is scheduled for Tuesday, June 18th at 1:00pm.  Our anticipated project design timeline is as follows: o 30% Plans in August o 60% Plans in September o 90% Plans in November o County ROW/Easement acquisition from November 2024-November 2025  30% Plans have been compiled to be discussed with City Staff, Washington County, and the DNR at the August 20th monthly meeting.  60% Plans have been compiled and discussed at our monthly meeting with City Staff, Washington County, and the DNR on September 17th.  90% Plans are scheduled to be complete prior to the November 19th meeting with City Staff, Washington County, and the DNR.  A draft bid package is being compiled and will be sent to the City, Washington County, and the DNR prior to our monthly meeting on Tuesday November 19th.  This project will not be bid until November 2025 with construction to follow the summer of 2026. This allows the County time to work through land acquisitions required to complete the project.