Loading...
5.c 2 Log House Landing Concept Plan 20160526 (1)CONCEPT PLAN 5/26/2016 NOTE: SITE EROSION CONTROL WILL CONSIST OF FIBER ROLLS ABOVE OHW AND SILT CURTAIN AROUND UNDERWATER EXCAVATION AREAS. SEE ATTACHED DETAIL FOR PROPOSED EXCAVATION DEPTH OF PLANK INSTALLATION. NOTE: EOR HAS DEVELOPED THIS PLAN AS A CONCEPT FOR RAMP STABILIZATION ONLY. FINAL DIMENSIONS, MATERIALS, AND METHODS FOR CONSTRUCTION SHALL BE DETERMINED BYTHE CONTRACTOR AND THE CITY OF SCANDIA. ST. CROIX RIVER 60099 \ 69 69].33 GFA GROUND YI \ \ 1 \ 1 20084 II� � \ DECIDTREE UNE 1 69 GR BUILD UP GRADE (APPROX. 6") TO DIRECT o ECIO TREE UNE I\ 60086 I WATER AWAY FROM TOP OF RAMP LOOf9 698. GRAVEL62EDGE ` —�C' \ \ 1 DRAIN TILE AT PERIMETER OF � 10" REINFORCED CONCRETE DRIVE RAMP, CONCRETE RAMP 12' WIDTH -TOOLED, GROOVED SURFACE; EXCAVATE RAMP AREA 4011- � r i IMPORT 30" COMPACTED FILL REMOVE BOULDERS AND STUMP FROM 60023 > E 9 � 69a ; RAMP AREA PRIOR TO CONCRETE WORK STABILIZE WASHED OUT FOOT PATH WITH 36"WIDTH ROUGH CUT ° 24%� STONE STAIR - INSTALL PRIOR TO RAMP ' • ' a OVER GABION ANCHOR BASKETS VFl GE � I 1 t a CONCRETE PAVING JOINTS AT 15'O.C. a ' CONCRETE PAVEMENT ANCHORS AND re 17 oG / DRAIN TILE CENTERED BETWEEN JOINTS; y'69785 ` §aNDGE PER MNDOT STANDARD PLAN 5-297.235 / ` 9a / EROSION CONTROL NETLESS FIBER ROLL STABILIZE ROADWAY BANKS WITH 18-36" 1 BOULDERS OVER GEOTEXTILE FABRIC; SEED DISTURBED SLOPES WITH NATIVE � `'2% SEED MIX AND NETLESS FIBER BLANKET-- _:, cross- slope a 1 I INCREASE RAMP WIDTH 2-3'AT OUTSIDE \ RADIUS - PER SITE CONDITIONS ^tet fi]p.5GE1912) DRAINTILE PIPE WITH STABILIZED OUTLET °����� «�E� OHW 680 - MSL 1912 10" DEPTH DRESSER (OR =) AGGREGATE `L1 - SPILLWAY OVER COMPACTED FILL; 3-4" DIA. ABOVE DRAIN OUTLET, 6" DIA. BELOW DRAIN PIPE OUTLET 81'93 /CLINK \� B 16]95MSL 1912 f / (32) 12' WIDE CONCRETE PLANKS; SUPPLIED BY MN DNR; ANGLE RAMP DOWNSTREAM 14° OF PERPENDICULAR - (SEE ATTACHED DNR STANDARD DETAIL) - INSTALL PRIOR TO CONCRETE RAMP N DISTURBANCE AREA BELOW OHW - 616 SF 0 4 s i'6 _ 200 X 680.0.0 6 EDGE OFWATER n /a,�E; I LOGHOUSE LANDING e a t e r ecology community BOAT RAMP STABILIZATION