06.h Engineering Updates 10-21-2025 City of Scandia Engineering Updates 10/21/2025 Engineering Italics = Old information • 2026 Street Improvement Project (197th Street) ➢ Topo survey was collected over multiple days in early August 2025. ➢ Soil Boring draft logs were received from AET on August 26, 2025. ➢ A public meeting was held for residents on September 8, 2025. o A presentation providing background information and proposed improvements was given by City Staff along with Bolton and Menk. o Design aspects, construction timeline, residential impacts, and other factors were discussed at length with property owners. ➢ Anticipated project schedule is as follows: o Approve Plans & Specifications/Authorize Ad for Bid – January 20, 2026. o Bid Opening – March 4, 2026. o Consider Contract Award at City Council Meeting – March 17, 2026. • 2026 Scandia Trails Project ➢ Anticipated project schedule is as follows: o Approve Plans & Specifications/Authorize Ad for Bid – February 17, 2026. o Bid Opening – March 11, 2026. o Consider Contract Award at City Council Meeting – March 17, 2026. ➢ Topo Survey is scheduled to be completed by October 24, 2025. • 2025 Street Improvement Project ➢ Anticipated project schedule is as follows: o Approve Plans & specifications/Authorize Ad for Bid – January 21, 2025. o Bid Opening – February 19, 2025. o Consider Contract Award at City Council Meeting – March 18, 2025. ➢ Geotechnical report was received on December 11, 2024. ➢ Both CMSCWD and CLFLWD were contacted regarding potential “add -on” projects that could be implemented as part of the 2025 Street Improvement Project. Neither watershed identified any potential projects within our scope. ➢ CMSCWD will not be requiring any permits for this project. Permit application for CLFLWD will be submitted later this month. ➢ The following permits applications have been submitted: o Washington County right of way o Comfort Lake Forest Lake Watershed District erosion and sediment control o Type & Boundary (wetland delineations) ➢ Bids were opened on Wednesday, February 19th at 9:00am. Six Contractors submitted bids for the base bid and alternate 1 for this project. ➢ Bid results and recommendation of the award have been included as a separate agenda item. ➢ The preconstruction meeting for this project has been scheduled for Tuesday, April 15th at 10:00am. ➢ Construction notices will be delivered to residents two weeks prior to the start of construction that will include an anticipated project schedule. ➢ Construction is anticipated to begin on Monday June 9th. ➢ A preliminary schedule has been included at the end of this report for reference. o The Contractor will begin construction once completed with the Marine on St. Croix 2025 Street Improvement Project. This has been reflected in the schedule attached. ➢ The Contractor began reclaiming project streets on May 23rd. ➢ Storm sewer improvements began the week of May 26th. ➢ Initial roll testing and subgrade corrections began the week of June 2nd. ➢ A test roll of the corrected reclaimed base material was conducted using a fully loaded water truck supplied by the City of Scandia on June 24th. ➢ The base layer of bituminous pavement was paved on June 30th. ➢ Core samples were taken the following day and sent to Braun for testing. ➢ Contractor’s Request for Payment No. 3 has been included as a separate agenda item. ➢ Bituminous base patching was completed on July 15th. ➢ Bituminous wear paving was completed on July 17th. ➢ Culverts were cleaned at the end of July. ➢ The final punchlist has been sent to Valley Paving. Final quantities are being discussed to get final documentation process started for close out. ➢ Contractor’s request for Payment No. 4 has been included as a separate agenda item. • 2024 Tennis Court Reconstruction Project ➢ Project Schedule is as follows: o Approve Plans & Specifications/Authorize ad for Bid – June 18, 2024. o Bid Opening – July 10, 2024. o Consider Contract Award at City Council Meeting – July 16, 2024. ➢ Geotechnical report was received on March 26th, 2024. o The report soil borings determined that Barton Johson and Community Center Tennis Courts should both be reconstructed with new bases and pavement. Proposed sections have been discussed with City Staff. ➢ Wetland Delineations were collected on Thursday April 11th. o Plan and permitting updates will be completed once delineations have been reviewed and discussed with City Staff. ➢ Plans and specifications have been completed. City comments were received and implemented throughout this design process. ➢ Request to approve plans, specifications and authorize ad for bid has been included as a separate agenda item. ➢ Bids for the 2024 Tennis Court Reconstruction Project were opened on Wednesday, July 10th, at 9:00am. ➢ The City Council awarded the Base Bid + Alternate 1 to Veit & Company, Inc. at the August 7 th Council workshop. ➢ Change Order No. 1 has been put together and sent to Veit & Company on August 12th. ➢ A preconstruction meeting has been scheduled for Tuesday August 20th at 10am. ➢ Construction will begin after September 9th. ➢ Tree removal began by the City on Monday September 9th, with the Contractor beginning removal work on September 10th. ➢ The Contractor stockpiled, and plans to test, the existing aggregate base layer to determine whether it can be re-used as base material. If passing, they will re-use what material they can, and supplement with new class 5 aggregate for the additional tennis court. ➢ Change Order No. 2 has been put together and sent to Veit & Company on September 11th for unit pricing. Change Order No. 2 includes a price adjustment for removing unforeseen bituminous pavement below the aggregate base layer (this was not captured by soil borings due to the sporadic nature of the bituminous pavement). o This Change Order has been attached to the end of this report (unit price not yet received from Veit). ➢ Fence posts have been installed, with concrete and pavement work to be completed this month. ➢ Minor basin corrective work will take place over the next week. Drain tile will be corrected to promote drainage, and additional filter media will be added to the basin. ➢ Contractor’s Request for Payment No. 1 has been included as a separate agenda item. ➢ The contractor poured the concrete maintenance strip on October 15th. ➢ Paving was completed in 2 lifts. The first lift was placed on October 21st, and the second on October 24th. ➢ Corrective concrete work was completed on October 29th. ➢ Acrylic surfacing and court striping was completed the week of May 12th. ➢ Fencing within the courts was completed the week of May 19th. ➢ Topsoiling and remaining turf restoration was completed on June 4th. ➢ The City has requested that the Contractor re-stripe the multi-use pickleball courts to a lighter blue to increase the contrast with the surrounding green surfacing. o This is tentatively scheduled to be completed in 1-2 weeks. ➢ An initial punchlist has been created and distributed to the Contractor. ➢ The multi-use pickleball courts were re-striped to a lighter blue color on June 12th. ➢ Contractor’s Request for Payment No. 4 has been included as a separate agenda item. ➢ No request for Payment has been included for this project this month. Turf restoration has still not been accepted, which is required prior to project closeout. ➢ Final quantities were sent to Veit for review to get the process started for final project closeout once turf restoration has been accepted. ➢ An updated punchlist has been sent to Veit detailing remaining bare spots requiring additional seeding. We are still waiting for submission of final documentation. • Tii Gavo Development Phase II ➢ Watershed permit has been obtained and grading work began on Tuesday July 11th. BMI will have staff on site for public infrastructure inspections. ➢ The bituminous base layer was paved on 8/17/2023. ➢ Aggregate shouldering was completed on 8/30/2023. ➢ Hand auger borings have been scheduled for each of the non-functioning basins along with a grain analysis and hydrometer testing. ➢ A request to reduce the Letter of Credit for this development has been included as a separate agenda item. ➢ Plowe is currently working on the corrective design for the basins on-site, in coordination with the watershed, and hoping to have an approved plan within the next few weeks. ➢ Corrective design has been completed and is being reviewed by the Contractor. The finalized plans will then be sent to the CMSCWD and City for review during the week of November 11th – 15th. ➢ Corrective designs were submitted to the City and CMSCWD on Thursday, November 14th. ➢ The plans did not fully encompass the design aspects requested by CMSCWD to construct fully functioning water treatment basins. CMSCWD has since provided additional comments that are being implemented. ➢ A revised submittal was sent to CMSCWD for review on December 20th, 2024. ➢ CMSCWD sent review comments to the Plowe Engineering on January 10th, 2025. ➢ CMSCWD sent executed watershed permits to the Developer on Wednesday January 15th, 2025. o Corrective work will take place in the spring due to frost conditions and recent snowfall. ➢ Weather permitting the basin corrective work will begin in June. ➢ Corrective work on the basins is anticipated to be completed by the end of July. ➢ North Pine conducted a site visit in early July and deemed the basins too wet to perform the corrective work. The Contractor is still hoping to have the corrective work completed by the end of July, weather permitting. ➢ North Pine relayed that the basins are still too wet to perform corrective work but will be working on them as soon as they are able to. No schedule was submitted. o CMSCWD is continuing to push for this work to be completed as soon as possible and coordinating with the developer. ➢ Discussions were had between the Developer and CMSCWD on the remaining basin improvements. It was decided that a revised plan was required and will be submitted by Plowe Engineering the week of September 15th – 19th for review and implementation. ➢ North Pine plans to begin corrective work on the basins next week and is aiming to be completed by the end of October. • Floodplain Risk Assessment ➢ Application #5 has been prepared and submitted for the MPCA-Small Communities Planning for SWC Resilience on April 30th, 2024. ➢ A survey of the Big Marine Outlet and channel has already been completed, assessing the conditions of the culverts, and evaluating the existing channel profile. This was an important step to improve the watershed’s model for planning and future maintenance. ➢ Application #5 has been selected and the CMSCWD will receive a grant in the amount of $50,000. This will be used to supplement the funds that CMSCWD has already allocated for this assessment in their 2025 draft budget. ➢ CMSCWD held a public budget hearing on 9/25/2024. ➢ CMSCWD has agreed to enter into an agreement with the MPCA to complete this work. Modeling has begun, and the watershed plans to reach out to the City in November to schedule an initial input meeting. ➢ Modeling work has begun, and post modeling engagement meetings with nearby cities will be scheduled in November. ➢ The engagement plan for this project is as follows: o First Meeting: Late January/early February: One-on-one meeting with City/Township staff to review initial flood risk maps and identify hazards. o Second Meeting: Late March/April: Special workshop with each City/Township board to share flood hazard risk and vulnerability maps and discuss possible resiliency improvements. o Third Meeting: Date TBD: Draft results meeting to share with City/Town council and community members. ➢ CMSCWD is also coordinating with CLFLWD to host a coordinated input meeting with Washington County and State Agencies. ➢ The first meeting as described above has been scheduled for Thursday February 6th, 2025, at 9:00AM. This meeting will include City Staff and Bolton & Menk attendance. ➢ Both Charlie Fischer and Isiah Bubany attended the first floodplain risk assessment with CMSCWD, CLFLWD, and EOR representatives. ➢ A presentation was provided that walked through all potential flooding risks within the City of Scandia based on a 100-yr rain event. ➢ City Staff provided feedback on all problem areas including history of the street/property, as well as information regarding locations of critical City infrastructure. ➢ The second meeting with City staff was held on Tuesday, May 13th from 1:00pm to 3:00pm. ➢ Kyle, Charlie, and Isiah were in attendance to discuss high, medium, and low priority locations for future corrective action. ➢ Tentatively, the CMSCWD is planning to provide a summary to the City Council along with a final report in September or October. ➢ The Draft report referenced previously is in hand and is being reviewed for comments by early October. ➢ Comments were submitted to CMSCWD on October 1st, and summarized below: o Comment 1: will this report be updated in the Fall of 2026 when Atlas 15 is available? Or will another grant be required to complete that work? o Answer 1: CMSCWD is unsure currently, but Mike Isensee plans to bring this to the Board for consideration once Atlas 15 is released. o Comment 2: William O’Brien could benefit from an updated survey being conducted since there have been significant changes made over the last few years. o Answer 2: CMSCWD agrees that this is a priority location to conduct additional evaluation but has not committed to completing this work. ➢ Note: Atlas 14 is a comprehensive dataset developed by the National Oceanic and Atmospheric Administration (NOAA) that provides precipitation frequency estimates across the United States. Altas 15 would include updated precipitation estimations. • Bliss Drainfield System ➢ The final permit has been issued. The assumption is that we’ll end up on Track 2, with required system improvements due to the nitrate issue. Only thing that needs to take place in the next 6 months (February 28, 2022) is for new flow meters to be installed at the system, something we’ll begin working on. At the one year mark (September 1, 2022), we’ll need to have a Facility Evaluation Report drafted to summarize the system’s ability or inability to meet the nitrate limit. ➢ New flow meters were installed by Public Works at the beginning of 2022 and specific flows to the three drainfield cells is now being monitored. Some additional nitrate testing was also performed in August 2022 to provide additional data points and to get an idea of how much nutrient removal is currently taking place through the sand filters. ➢ As of September 1, 2022, the Facility Evaluation Report has been sent to the MPCA. We await their review, but based on the monitoring well samples taken throughout the last year it appears we’ll be on Track 2, with improvements to the system needed to deal with the nitrate issue. Assuming this is the case, the next step will be to complete a full Facility Plan by August of 2023 which evaluates the facility and its performance as a whole and provides options/recommendations for improvements to be made. This is required by Track 2 but is also the next step in obtaining PFA funding for the project. ➢ We met with MPCA on December 16, 2022 to discuss funding options and laid out a schedule to complete a facility plan and apply for Point Source Implementation Grant (PSIG) funding. ➢ City Council authorized work to complete the facility plan on January 4, 2023. Facility plan to be submitted by March 3, 2023. Also, Council authorized BMI to complete permit documents for permit modification due to added treatment for nitrate removal. ➢ Testified at the Capitol on Wednesday, March 1, 2023 requesting funding for the Bliss Wastewater Treatment Facility. ➢ Facility plan has been submitted for the City of Scandia’s Bliss Wastewater Treatment Facility along with and IUP request and PPL application to the Minnesota Public Facilities Authority on Friday, March 3, 2023. As of June 22, the MPCA has issued preliminary approval of this facility plan. ➢ PSIG Funding application was submitted at the end of July (2023). Received follow-up questions from the MPCA and responses were sent at the end of August (2023). ➢ City review period for draft MPCA SDS permit ended on 4/5; the public comment period has begun and will continue through 6/17. ➢ Initial review comments have been received from the MPCA and responses returned. ➢ Plans and specifications were submitted for MPCA review at the end of March. ➢ Response has been received on the environmental review of the project and the DNR has identified the site as potential nesting land for Blanding’s Turtles. We are working to address the requirements associated with this in addition to the other revisions. ➢ Comments from the MPCA have been addressed and have been certified by the MPCA as of the end of June. ➢ As of the end of June, the new SDS Permit for the Scandia WW system has been issued. This means that groundwater monitoring well GW 008 now needs to be sealed within 180 days, as that is part of the permit requirements. ➢ Bolton and Menk re-applied for PSIG at the end of July. The PFA has indicated that it’s unlikely that Scandia will be in the fundable range for 2025 given the lack of a bonding bill. ➢ A meeting was conducted between City Staff, Bolton and Menk, and the MPCA on August 14th regarding lack of project funding. ➢ Per that discussion, BMI has drafted a letter to be formally sent by the City to the MPCA which explains the situation and all steps that have been taken (and are continuing to be taken) to try and obtain funding to complete this required project. The letter also requested a modification to the permit schedule which would extend the timeline to construct from 2025 to 2026 with the assumption that a bonding bill will be passed which funds PSIG and allows Scandia a realistic path to obtaining this funding. This letter has been attached to the end of this report for the Council’s review. ➢ The MPCA appears to be open to this process as a viable path forward. Ultimately if this is approved, we will re- apply for both the CWRF and PSIG programs in 2025 with the goal of being funded for construction in 2026. ➢ BMI re-applied for the 2026 IUP in early June to stay on the PFA’s funding list. ➢ The MN legislature passed a bonding bill in early June, but we are still awaiting specifics prior to knowing how this will impact our project. ➢ BMI has updated the City’s PSIG Grant Application to get the City of Scandia in line for 2026 funding. We anticipate that we will know in early November what the City’s position is on the PSIG list. The goal, and hope, is to be positioned to obtain 80% of the project funding through the PSIG grant program, with the remainder covered by CWRF low interest loan. • Washington County Draft 2026-2030 Capital Improvement Plan ➢ As part of the annual budget process, Washington County prepares a five-year Capital Improvement Plan (CIP). The 2026-2030 CIP includes the county’s tentative plan for roads, bridges, parks, land, trails, transit, and public facilities. The first year of the plan is included in the county’s proposed 2026 budget. The “out-years” of 2027-2030 reflect projected needs and estimated costs, which may change based on future priorities and funding opportunities. ➢ The draft CIP document showing these projects in detail is available online by visiting the Washington County website: o Capital Improvement Plan | Washington County, MN - Official Website (washingtoncountymn.gov) ➢ The County is requesting comments in writing no later than November 7, 2025, to be considered when developing their final CIP. A public hearing will be held on November 25, 2025 at the Washington County Board Meeting. ➢ DRAFT COMMENTS ATTACHED TO REPORT AT THE END OF ENGINEERING UPDATES. • Highway 8 Study (Chisago to Taylors Falls) ➢ Project website: https://talk.dot.state.mn.us/hwy-8-chisago-taylorsfalls o Comments and questions can be submitted on the project website. ➢ Schedule: o August 2024 through December 2024 • Analyze existing conditions and engage stakeholders. o January 2025 through August 2025 • Develop and evaluate ideas for improvements with stakeholders and public involvement. o September 2025 through June 2026 • Finalize study recommendations. o 2032 • Construction (pavement resurfacing). • Highway 243 Osceola Bridge ➢ Project website: http://www.dot.state.mn.us/metro/projects/hwy243osceola/index.html ➢ Public Meeting scheduled for May 10, 2023, 5:00pm-7:00pm at the Osceola Village Board Room ➢ Schedule: o Environmental documentation and preliminary design: 2022 through 2025 o Final design: 2025 through 2026 o Anticipated construction: 2027 through 2028 • The bridge is anticipated to be closed from spring 2027 through fall 2028. o Restoration and project completion in 2029. ➢ Project website has been updated with a location plan showing the extents of the work. The project will span the distance between TH 95 and TH 35. ➢ Traffic Impacts are currently under review, and potential detour plans are being developed. o See the project website for up-to-date figures. Denise Workcuff Dmitry Tomasevich Communications and Engagement Project manager denise.workcuff@state.mn.us dmitry.tomasevich@state.mn.us 651-775-0025 651-245-4406 ➢ The Environmental Assessment Worksheet is now available for public review and comments. o All comments must be submitted via mail, email, or phone to Dmitry Tomasevich by December 26th. o A copy of the EAW has been included at the end of this monthly update. ➢ The Highway 95/Highway 243/260th Street intersection roundabout construction is planned to begin in the spring of 2026. This will be completed prior to work commencing on the bridge project. • Gateway Trail / County Road 52 ➢ Survey update o Topo survey was completed on November 7th, 2023. ➢ Soil Boring update o AET submitted the lowest bid at $21,382.00 to perform this work and had the soonest drill rig availability. o AET has been authorized to complete soil boring and hand auger boring work on 11/10/2023. o Soil Borings are scheduled to be completed within 8-10 weeks, with a report coming a few weeks after completion of field work (Braun was at least a month behind this schedule and came in at $24,735.00). Hand Auger Borings in off street locations will be completed earlier prior to snowfall. o AET has been instructed not to begin any work on site until after December 19th. Once approval has been received, AET will begin hand auger borings (HABs) and then drill rig soil borings (SBs) a few weeks after. ➢ AET began collecting hand auger borings (HABs) from December 22nd - 26th, and soil borings on December 26th - 29th. ➢ 30% Plans have been compiled to be discussed with City Staff, Washington County, and the DNR at the August 20th monthly meeting. ➢ 60% Plans have been compiled and discussed at our monthly meeting with City Staff, Washington County, and the DNR on September 17th. ➢ 90% Plans are scheduled to be complete prior to the November 19th meeting with City Staff, Washington County, and the DNR. ➢ This project will not be bid until November 2025 with construction to follow the summer of 2026. This allows the County time to work through land acquisitions required to complete the project. ➢ 90% Plans have been completed, and remaining project items are planned to be discussed on December 17 th at our monthly meeting with City Staff, Washington County, and the DNR. ➢ Additional easement acquisition and permitting will take place in 2025. ➢ 90% Plan comments have been received from Washington County and are being implemented. ➢ CMSCWD, and wetland impact permit applications will be applied for in the Spring per local rules requiring contractor submittals within a year of conditional approval. ➢ Kyle Morell and Isiah Bubany met with residents at 15230 and 15240 Oakhill Road on Monday, February 3 rd to discuss design aspects and impacts to each resident’s property. ➢ A trail site walkthrough was requested and will be conducted in the spring/early summer when weather allows us to further discuss trail alignment location and impacts. ➢ A separate agenda item has been included that breaks down the estimated costs of this project as well as proposed timeline moving forward. ➢ A public information meeting was held on June 11th, from 6:00pm to 8:30pm where project design aspects and impacts to Scandia residents were discussed at length. o The City of Scandia, Bolton & Menk, MNDNR, and Washington County all had project representatives available to answer questions. ➢ Agencies involved with this project will be holding a meeting recap on Tuesday, June 17 th at 1:00pm to discuss which aspects of the project could still be improved upon based on public comments. ➢ A brief project update was provided to Council at the July 2nd Council Workshop. A discussion was had regarding project design aspects and the associated costs. The outcome of this discussion was to proceed with the project as scheduled and to request to authorize advertisements for bid in the fall. ➢ The City of Scandia, Bolton and Menk, Washington County, and the MNDNR met multiple times in July to continue working through finalizing the plans for this project. ➢ Plans and specs are being finalized and will be brought to Council to request authorization to post advertisement for bids in October. ➢ A request to approve plans and specs and authorize advertisements for bids has been included as a separate agenda item. 14727 209 th St. N., Scandia, Minnesota 55073 Phone (651) 433 -2274 Fax (651) 433 -5112 http://www.ci tyofs candia.com October 21, 2025 Trung Le Washington County Office of Administration 14949 62nd Street North Stillwater, MN 55082 Re: Washington County 2026-2030 Draft Capital Improvement Plan Comments Dear Washington County, The City of Scandia would like to provide comment on the Washington County 2026-2030 Capital Improvement Plan (CIP), by expressing our support for the following planned projects: • Project RB-2582 Gateway Trail Extension. The project scope includes the construction of a segment of the Gateway Trail including a parking lot, paved off-road multi-use facility, adjacent horse trail parallel to County Highway 52 (Oakhill Road North), and a pedestrian tunnel under County Highway 52 from south of County Highway 3 (Olinda Trail) to just south of County Highway 52. The City of Scandia has secured $2.68M in funding through the Department of Natural Resources (DNR) Legislative-Citizen Commission on Minnesota Resources (LCCMR). Construction is planned for 2026. Ultimately this trail will connect to William O’Brien State Park. • Project RB-2682 County Road 50 (TH 61 to CSAH 15) Study. The project scope includes the following improvements on County Road (CR) 50 from Trunk Highway (TH) 61 to CSAH 15 (Manning Trail North): new pavement with widened shoulders, turn lanes at key locations if appropriate, evaluation of pedestrian and cycling accommodations, signs and striping, roadway drainage and surface water management, roadway geometrics evaluations. The current roadway section is narrow for a typical county road. There is no paved shoulder outside of the 12-foot lane width and very little, if any, gravel shoulder. Drainage ditches have filled in over the years, which impact how stormwater is collected and treated prior to moving out of the right-of- way corridor. The pavement has reached its full life span and signs and striping are out of date. There are also some very tight radius curves that will need to be analyzed for improvement. A typical pavement preservation project is not the right treatment here because of the very narrow pavement width and the lack of a stormwater drainage system. 14727 209 th St. N., Scandia, Minnesota 55073 Phone (651) 433 -2274 Fax (651) 433 -5112 http://www.ci tyofs candia.com • Project PARK-2016 Big Marine Park Reserve Improvements. The project scope includes planning and design for improvements identified in the master plan at Big Marine Park Reserve. The improvements may include water access and trail improvements. The county continues to acquire properties in accordance with the Big Marine Park Reserve Master Plan. This project will determine improvements that will help lay the foundation for future park investments. Improvements are planned on parcels that have been acquired by Washington County. • Project RB-2641 CSAH 3 (CSAH 7 to CSAH 4). The project scope includes the following improvements on County State Aid Highway (CSAH) 3 (Norell Avenue North) between CSAH 7 (Square Lake Trail North) and CSAH 4 (170th Street North); pavement rehabilitation, curb and gutter replacement, and retaining wall installation for roadway stabilization. The improvements identified through a corridor study completed in 2021 are necessary to ensure an ongoing safe and efficient operation of this highway segment. We would also like to provide our support on the plan incorporating the following projects: • Intersection evaluation and safety improvements at CR 52 & Hwy 97 as part of the Scandia City Center Study The intersection of County Road 52 & Hwy 97 brings additional concerns with its skewed alignment that limits driver and pedestrian sight distance when trying to cross the intersection. The City requests this intersection be added to the Scandia City Center Study to implement low cost-high benefit safety improvements at the intersection that may include improved intersection lighting, enhanced signing, and installation of intersection conflict warning system. The existing Scandia City Center Study is heavily based around pedestrian facilities rather than overall safety of the intersection for drivers as well, which is a concern. The City plans to voice these concerns to MnDOT, as was done in 2024 and 2023 as well. • Intersection evaluation and safety improvements at CSAH 15 & Hwy 97 The intersection of CSAH 15 & Hwy 97 has been the source of concern for many years and the City has submitted comments on this intersection on past draft CIP’s. This intersection experiences backups at AM & PM peak hours and is an intersection that has had many close calls that could have resulted in serious T-bone crashes. The City requests this intersection be added to the CIP that would include future intersection improvements. The City also would like to request the County complete an intersection study by 2026 in coordination with MnDOT at this intersection so future improvements or project constraints can be identified such as scope, funding, and necessary resources so preliminary work can be prepared which may simply be property acquisition to account for future improvements. In the meantime, if low cost/high benefit improvements can be implemented we request that proceed as well. Thank you for allowing our comments to be submitted on the Washington County 2026-2030 Draft CIP. Sincerely, Isiah Bubany, P.E. Project Engineer 2026-2030 Capital Improvement Plan Washington County Government Center | Office of Administration 14949 62nd Street North | Stillwater, MN 55082 P: 651-430-6017 | TTY: 651-430-6246 www.washingtoncountymn.gov Draft V1.5 9-30-25 1 2026 – 2030 Capital Improvement Plan Washington County, Minnesota Board of Commissioners Fran Miron – First District Stan Karwoski – Second District Bethany Cox – Third District Karla Bigham – Fourth District Michelle Clasen – Fifth District County Administrator Kevin Corbid 2 Table of Contents Page # Capital Improvement Plan .............................................................................................................................. 4 Graphics ....................................................................................................................................................... 10 Summary Information Summary Tables Category Summary .......................................................................................................................................................... 19 Projects by Category........................................................................................................................................................ 20 Funding Source Summary ............................................................................................................................................... 23 Projects by Funding Source ............................................................................................................................................. 24 Expenditure Type Summary ............................................................................................................................................ 30 Projects by Year .............................................................................................................................................................. 31 Detail Information Public Facilities Projects by Category........................................................................................................................................................ 37 Projects by Funding Source ............................................................................................................................................. 38 Project Sheets ................................................................................................................................................................. 40 Parks and Land Projects by Category........................................................................................................................................................ 61 Projects by Funding Source ............................................................................................................................................. 62 Project Sheets ................................................................................................................................................................. 63 Road and Bridge Projects by Category........................................................................................................................................................ 80 Projects by Funding Source ............................................................................................................................................. 82 Project Sheets ................................................................................................................................................................. 86 Index ............................................................................................................................................................ 154 3 2026-2030 Capital Improvement Plan On the following pages are graphical illustrations of project categories and funding sources for projects included in this document. As clarification of grouped funding sources, a key is provided below: FUNDING CATEGORY SOURCES INCLUDED Bond Proceeds / Other Bonds General Obligation Bond or Other Debt Instruments Capital Investment Funding Reprogrammed Property Tax Levy Capital Repair Fund Department Internal Rent County Transportation Sales Tax (Road & Bridge and Transit) Sales Tax and Motor Vehicle Excise Tax Intergovernmental Revenue Federal Grants Local Metropolitan Council Bonds State Aid, State Bonds & State Grants State Sales Tax Turnback (Jurisdictional Transfer) Other Mission Directed Budget Pool Operating Transfers/Other Contributions Transmission Line Tax Transportation Advancement Account (this is also a type of intergovernmental revenue) Transportation Advancement Account (Multi -Modal, Preservation, Safety & Trails) Planned Use of Fund Balance Prior Year(s) Revenue That Exceeds Expenditures Private Funds Donations From Private Parties Wheelage Tax Wheelage Tax Definitions for funding sources can be found on pages 7 through 8 of this document. 4 INTRODUCTION Capital planning is one of the fundamental building blocks in developing an effective budgeting process. Capital Plans serve as an important planning tool for Washington County to plan for, and anticipate, growth or economic changes. It also provides a mechanism to match cash flows to meet the desired level of capital improvements, as well as providing information to schedule capital projects that conform to cash flow constraints, maximize investment yields through thoughtful bond planning, or to establish the required levels and the most economical source of project funding. Capital plans also help to establish a guide for making capital investment decisions logically and in a deliberate and accountable fashion. In this way, options for major repair, replacement, acquisitions, and construction can be thoroughly evaluated. The purpose of the county’s Capital Improvement Plan (CIP) is to recognize and address county needs through long-term planning and balanced investment in supporting public infrastructure. To ensure that this commitment is viable and achievable, appropriate capital improvement factors will be given significant consideration in developing a CIP that addresses county priorities and serves the needs of the county over the next five years. This document will also provide a planning foundation for future needs assessments to ensure the county is responding to critical infrastructure components of future growth. The CIP represents a beginning in terms of producing a consolidated capital improvement plan and project schedule that will lead to timely and cost-effective completion. The objectives of the 2026-2030 Capital Improvement Plan are to present a comprehensive plan that communicates the following efforts: to ensure that county priorities are reflected in its capital investment plan, to provide a consolidated financial picture of known anticipated expenditures and outline recommended funding strategies for capital improvements, to document and communicate capital improvement needs for county projects that will ensure consistency and a comprehensive analysis of the costs and benefits of proposed capital investments, to provide information on the known fiscal impacts of capital investment plans on total county finances, and to effectively plan for improvements that support county needs in the areas of major capital projects such as public facilities, roads and bridges, and parks and land. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan, recognizes that social, economic, and political consideration will, by necessity, determine final project outcomes and costs. Consequently, the Washington County Board of Commissioners adopts this document with the provision that capital improvement planning is subject to the dynamics of county growth and acknowledges that other unanticipated needs or funding availability may take precedence over planned projects. EXPLANATION The projects programmed for funding are based on need and the county’s ability to finance them. The CIP covers a five-year period, with projects in the first year included in the annual budget. Each year the CIP plan is updated and extended one year to reflect changing conditions, circumstances, priorities, and needs. The CIP sets forth the schedule, estimated cost, sources of funding, and specific details of each capital improvement project. The 2026-2030 CIP totals $493,756,700, of which $125,087,200 will be included in the county’s adopted 2026 capital budget. Only new project costs that begin in any one of the five-year planning cycles are included in this CIP. If a multi-year project was budgeted in a year prior to this five-year period, and continues into the next five-year period, it is not reflected in this document, as those costs are not considered new project costs to the county. Under county policy, the unspent budget for those projects roll forward until the project is completed, without further board action. However, when a project that was reflected in a prior CIP has new budget dollars appropriated in the current CIP, total costs are mentioned above the description section of the project to accurately reflect all associated project costs: past, present, and future. Projects planned for construction outside of the five-year period will typically not show a construction cost in the current CIP. Projects included in this CIP have the following characteristics: CIP 2026-2030 5 are related to Parks and Land, or are related to Public Facilities, or are related to Transportation / Transit Infrastructure (roads and bridges), and are budgeted within the county’s Capital Projects Fund(s), or are budgeted within the Regional Rail Authority Fund, and have an expected useful life of five years or more The following describes the information listed in the summary tables and/or project detail sheets: Intersection Control Ranking System (ICRS) The Intersection Control Ranking System (ICRS) is a County Board approved policy for prioritizing the installation of traffic control improvements on roadways under Washington County’s jurisdiction. The Intersection Control Ranking System is not a measure of the safety of a given intersection. The Intersection Control Ranking System (ICRS) utilizes four of the traffic signal warrants from the Minnesota Manual on Uniform Traffic Control Devices (MnMUTCD), along with traffic counts and recent crash data to prioritize intersections under County jurisdiction for traffic control improvements. Sustainability Washington County's 2026-2030 Capital Improvement Plan, guided by the principles set out in the 2024-2029 Strategic Plan, prioritizes sustainability. The Capital Improvement Plan focuses on responsible resource management, environmental conservation, multi-modal transportation, and enhancing community infrastructure to ensure a healthier, more resilient future for all residents. Budget Impact/Other Information listed here describes if and to what extent the project will affect the county’s current and future operating budget and the services that the county provides. Financial factors may include personnel costs, maintenance costs, utility costs, or various changes in revenues/expenditures, etc. Estimated dollar amounts are included when known and available. Non- financial factors may include environmental impacts, response times, access to services, public safety, etc. Category There are three categories into which a project may fall: Parks & Land projects include the acquisition and development of land and park facilities for recreation and open space purposes. Public Facilities projects include the construction or expansion of county buildings used for offices and operations, excluding parks facilities included above. Road & Bridge projects involve the construction of transportation infrastructure, transit projects, pavement improvement projects, railroad crossing improvements, right-of-way acquisition needed for transportation projects, safety improvements, traffic management signals, etc. Department/Contact Identifies the capital project fund used to account for the project and identifies the department in charge of managing the project. Description A brief description and/or scope of the project. Justification This field is used to outline the need for the project. Project Number/Name These are the numbers and project names assigned to a specific project in the CIP. They are used in reviewing the status of ongoing projects and evaluating past years' efforts and accomplishments as CIP projects are completed. Numbers appearing CIP 2026-2030 6 along with a project name in the Road & Bridge projects indicate the county road number. For example, CSAH 13 is County State Aid Highway 13; TH 95 is Trunk Highway 95. This numeric format will appear throughout the Road & Bridge CIP section. Expenditure Type/Expenditures Describes the type of expenditure the project falls into: Construction, Contribution to Fund Balance, Planning/Design, and Right-of-Way. Five Year Costs This is the estimated cost of the project during the current five-year period; unknown factors at the time of publishing the CIP can result in changes to the actual project costs as those factors become known. If a project listed in this CIP had additional associated costs adopted in a former CIP, or will have costs in a future CIP, total estimated project costs may be shown above the project’s description section. For projects that involve other agencies whose funding does not run through the county’s financial records, only those costs managed by the county are listed, unless noted in the description of the project. NOTE: When Bond Proceeds are indicated as a funding source, a matching amount of expenditures are shown in the same year, however, all expenditures may not actually occur in the same year as the bonds are sold. They are reflected in this manner to reconcile to the county’s adopted budget in the first year of the CIP. Funding Sources These are the projected financing methods for the projects. If more than one funding source is used for a given project, the project will be listed with its corresponding amount under each applicable funding source on the Projects by Funding Source summary report. Funding needs are met using a variety of methods. The major financing methods included in this CIP are reviewed below: Bond Proceeds/Other Bonds are debt instruments sold by a county that are repaid over a number of years through county property taxes or through other revenue streams. Bond proceeds may include capital improvement bonds as well as capital notes sold by the county. Capital Investment Funding is property tax levy programmed to pay for capital improvement projects. This funding, along with funding generated through the issuance of debt, ensures the county can make the necessary investment in capital projects. Capital Repair Fund revenues are derived from rent each department pays to the Building Services Division based on a space allocation methodology. This fund pays for major rehabilitation, restoration, and maintenance of existing capital assets and county facilities. County Transportation Sale Tax (Road & Bridge and Transit) is a funding source derived from a ½ percent sales tax and $20 per motor vehicle excise tax. The revenue is dedicated for improvements included in a transportation and transit plan specific to this revenue source and adopted/amended by the County Board following a public hearing. Federal Grants are monies supplied by the federal government for certain local projects when they meet goals that are of national importance. These funds may range from as small as a 10 percent contribution to a 100 percent cost grant. Local Contribution is the amount a local government will pay toward a project that mutually benefits the county and the local jurisdiction. Typically, cities fund right-of-way acquisitions for road projects. Contributions from local governments are based on cost-participation agreements. Metropolitan Council Bonds are bonds issued by the Metropolitan Council that are received under a grant agreement. Mission Directed Budget Pool is a county-sponsored funding plan where a portion of unassigned year-end excess revenue over expenses is set aside for special priority projects that meet certain criteria set forth by the County Board. Operating Transfers In are funds from General Operations allocated to capital to fund one-time specific projects. CIP 2026-2030 7 Other Contributions includes funding for a project that is not a specific cost share. This may include, but not limited to, proceeds from the sale of an asset. Planned Use of Fund Balance (CPK is Parks, HCH is Historic Court House, R&B is Road & Bridge) is typically used when the timing of expenditures does not match receipt of the revenue. For example, revenues may be accumulated in advance of a major capital project and added to fund balance until project funding is needed, or fund balance may be used in anticipation of future reimbursements from external sources. In the CIP, fund balance is often identified with the originating funding source. Private Funds include revenue sources such as donations from private citizens, foundations, commissions, and other sources not listed elsewhere. State Aid is a formula-based grant from the Minnesota Department of Transportation (MnDOT) to fund maintenance and construction of road projects. State Bonds are revenues generated from the sale of state transportation bonds. State Grants are monies supplied by the state government for certain programs or projects when they meet goals that are of state importance. State Sales Tax revenues are generated from a 3/8ths of one percent sales tax which was voter-approved in 2008, and implemented on July 1, 2009, for the purpose of improving outdoor heritage, clean water, parks and trails, and cultural resources. Transportation Advancement Account (TAA) is revenue from the state that is used for safety and trails, preservation, and multi-modal projects. Transmission Line Tax is revenue paid by electric utility companies for certain electric transmission/distribution lines. Turnback (Jurisdictional Transfer) is funding that is given when a road is assigned to the jurisdictions best suited to effectively and efficiently own and operate them. Roads may be low priority for one agency may be a higher priority for another agency. The Minnesota Department of Transportation and local governments collaborate to fulfill the intent of this program. Wheelage Tax is a funding source derived by the collection of fees directly related to the registration of vehicles. This revenue is dedicated for pavement preservation projects within the county. ACKNOWLEDGMENT The county’s management team, along with its respective staff, and Public Works staff worked diligently to produce a document that is both practical and insightful about the underlying capital needs of the county and its communities. Each year, the Office of Administration, under the direction of the Washington County Board of Commissioners, facilitates the effort to administratively update this five-year plan. The proposed Capital Improvement Plan (CIP) is released to communities for their review and comment in October. The final CIP is presented to the Board of Commissioners for adoption following a public hearing in December. CIP 2026-2030 8 Questions and/or comments may be directed to: Washington County Government Center Office of Administration 14949 62nd Street North Stillwater, MN 55082 Or email questions and/or comments to: Trung Le, County Budget/Financial Analyst Wayne Sandberg, Director of Public Works trung.Le@washingtoncountymn.gov wayne.sandberg@washingtoncountymn.gov Xai Thao, County Budget/Financial Analyst xai.thao@washingtoncountymn.gov CIP 2026-2030 9 Graphic Illustrations 10 2026-2030 Capital Improvement Plan Total Expenditures by Year *2027 reflects projects that would be funded with the proceeds of a tentative $40M General Obligation Bond sale. $56.3 $52.0 $69.8 $150.6 $125.1 $40.0 $0 $25 $50 $75 $100 $125 $150 $175 $200 2030 2029 2028 *2027 2026 Millions 11 202 6-2030 CIP Project Category Funding Source Parks & Land 4% Public Facilities 27% Road & Bridge 69% Bond Proceeds (General Obligation) 8% Capital Investment Funding 10% Capital Repair Fund 2% County Transportation Sales Tax (Road & Bridge)10% County Transportation Sales Tax (Transit)3% Intergovernmental Revenues 45% Other Bonds 1%Other 2% Planned Use of Fund Balance 8% Transportation Advancement Account 8% Wheelage Tax 3% 12 2026 CIP (Budgeted) Project Category Funding Source Parks & Land 1%Public Facilities 13% Road & Bridge 86% Capital Investment Funding 5% Capital Repair Fund 2% County Transportation Sales Tax (Road & Bridge) 11%County Transportation Sales Tax (Transit)11% Intergovernmental Revenues 59% Other 1%Planned Use of Fund Balance 4% Transportation Advancement Account 5% Wheelage Tax 2% 13 2027 CIP Project Category Funding Source Parks & Land 3% Public Facilities 37% Road & Bridge 60% Bond Proceeds (General Obligation) 21% Capital Investment Funding 2% Capital Repair Fund 1% County Transportation Sales Tax (Road & Bridge) 7% Intergovernmental Revenues 45% Other Bonds 1%Other 2%Planned Use of Fund Balance 15% Transportation Advancement Account 4% Wheelage Tax 2% 14 2028 CIP Project Category Funding Source Parks & Land 6% Public Facilities 22% Road & Bridge 72% Capital Investment Funding 18% Capital Repair Fund 2% County Transportation Sales Tax (Road & Bridge) 10% Intergovernmental Revenues 41% Other Bonds 1% Other 4% Planned Use of Fund Balance 8% Transportation Advancement Account 12% Wheelage Tax 4% 15 2029 CIP Project Category Funding Source Parks & Land 5% Public Facilities 28% Road & Bridge 67% Capital Investment Funding 25% Capital Repair Fund 3% County Transportation Sales Tax (Road & Bridge) 14% Intergovernmental Revenues 34% Other Bonds 1%Other 2%Transportation Advancement Account 16% Wheelage Tax 5% 16 2030 CIP Project Category Funding Source Parks & Land 5% Public Facilities 27% Road & Bridge 68% Capital Investment Funding 24% Capital Repair Fund 3% County Transportation Sales Tax (Road & Bridge) 21% Intergovernmental Revenues 28% Other Bonds 1%Other 2%Transportation Advancement Account 15% Wheelage Tax 6% 17 Summary Information 18 CATEGORY SUMMARY Project Category 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Parks & Land $1,845,000 $6,199,000 $4,080,000 $2,775,000 $2,775,000 $17,674,000 Public Facilities $15,906,100 $71,175,000 $15,450,000 $14,650,000 $15,100,000 $132,281,100 Road & Bridge $107,336,100 $113,239,400 $50,261,100 $34,570,000 $38,395,000 $343,801,600 $125,087,200 $190,613,400 $69,791,100 $51,995,000 $56,270,000 $493,756,700 CIP 2026-2030 19 PROJECTS BY CATEGORY Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Public Facilities BSD-CH-2501 $1,300,000 $0 $0 $0 $0 $1,300,000 BSD-CW-2002 $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 BSD-CW-2101 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2401 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2501 $250,000 $0 $0 $0 $0 $250,000 BSD-CW-2600 $113,600 $0 $0 $0 $0 $113,600 BSD-CW-2701 $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 BSD-FL-2701 $0 $0 $300,000 $0 $0 $300,000 BSD-GC-2501 $0 $1,225,000 $0 $0 $0 $1,225,000 BSD-GC-2801 $0 $0 $0 $1,500,000 $0 $1,500,000 BSD-GC-2901 $0 $0 $0 $0 $1,400,000 $1,400,000 BSD-LIB-2601 $200,000 $0 $0 $0 $0 $200,000 BSD-LIB-2602 $150,000 $0 $0 $0 $0 $150,000 BSD-MSS-2001 $5,800,000 $31,500,000 $0 $0 $0 $37,300,000 BSD-PGL-2001 $5,789,300 $11,000,000 $0 $0 $0 $16,789,300 BSD-PHE-002 $0 $2,500,000 $0 $0 $0 $2,500,000 BSD-PHE-2601 $1,303,200 $0 $0 $0 $0 $1,303,200 BSD-PHE-2701 $0 $500,000 $1,500,000 $0 $0 $2,000,000 BSD-SWGC-2802 $0 $0 $500,000 $0 $0 $500,000 BSD-SWNS-2801 $0 $0 $500,000 $0 $0 $500,000 BSD-WBSL-001 $300,000 $20,000,000 $0 $0 $0 $20,300,000 PUBLIC FACILITIES TOTAL $15,906,100 $71,175,000 $15,450,000 $14,650,000 $15,100,000 $132,281,100 Parks & Land HC-1048-027 $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 HC-1048-029 $400,000 $0 $0 $0 $0 $400,000 HC-1048-030 $0 $100,000 $0 $0 $0 $100,000 PARK-1001 $100,000 $200,000 $100,000 $100,000 $100,000 $600,000 PARK-1003 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 PARK-1005 $0 $300,000 $850,000 $250,000 $250,000 $1,650,000 PARK-1006 $0 $0 $0 $250,000 $300,000 $550,000 PARK-2016 $0 $100,000 $1,100,000 $0 $0 $1,200,000 PARK-3009 $0 $0 $0 $0 $150,000 $150,000 PARK-3018 $0 $0 $250,000 $1,800,000 $0 $2,050,000 PARK-3020 $0 $475,000 $0 $0 $600,000 $1,075,000 PARK-3021 $0 $150,000 $775,000 $0 $0 $925,000 PARK-4006 $0 $2,000,000 $0 $0 $0 $2,000,000 PARK-8017 $0 $120,000 $630,000 $0 $0 $750,000 PARK-8018 $0 $0 $0 $0 $1,000,000 $1,000,000 PARK-9003 $970,000 $2,379,000 $0 $0 $0 $3,349,000 PARKS & LAND TOTAL $1,845,000 $6,199,000 $4,080,000 $2,775,000 $2,775,000 $17,674,000 Road & Bridge RB-2201 $1,100,000 $770,000 $620,000 $620,000 $620,000 $3,730,000 RB-2203 $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 RB-2204 $1,150,000 $1,150,000 $7,650,000 $8,500,000 $6,000,000 $24,450,000 RB-2204-01 $0 $5,300,000 $0 $0 $0 $5,300,000 RB-2204-02 $4,217,700 $0 $0 $0 $0 $4,217,700 RB-2204-03 $3,900,000 $0 $0 $0 $0 $3,900,000 CIP 2026-2030 20 Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2216 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 RB-2580 $350,000 $0 $0 $0 $0 $350,000 RB-2582 $2,689,000 $0 $0 $0 $0 $2,689,000 RB-2609 $0 $11,400,000 $0 $0 $0 $11,400,000 RB-2629 $0 $1,000,000 $0 $5,500,000 $0 $6,500,000 RB-2641 $0 $0 $0 $450,000 $4,400,000 $4,850,000 RB-2645 $0 $1,100,000 $0 $7,800,000 $0 $8,900,000 RB-2650 $0 $0 $550,000 $1,250,000 $0 $1,800,000 RB-2651 $3,025,000 $4,025,000 $2,900,000 $2,500,000 $3,175,000 $15,625,000 RB-2658 $0 $0 $0 $1,000,000 $2,100,000 $3,100,000 RB-2667 $4,500,000 $0 $0 $0 $0 $4,500,000 RB-2668 $0 $17,500,000 $0 $0 $0 $17,500,000 RB-2672 $0 $17,200,000 $0 $0 $0 $17,200,000 RB-2674 $40,000,000 $0 $0 $0 $0 $40,000,000 RB-2675 $3,750,000 $0 $0 $0 $0 $3,750,000 RB-2682 $400,000 $0 $0 $0 $0 $400,000 RB-2683 $600,000 $450,000 $2,600,000 $0 $0 $3,650,000 RB-2685 $6,000,000 $40,900,000 $0 $0 $0 $46,900,000 RB-2688 $130,000 $0 $0 $0 $0 $130,000 RB-2690 $400,000 $0 $7,100,000 $0 $0 $7,500,000 RB-2691 $850,000 $0 $5,500,000 $0 $0 $6,350,000 RB-2692 $0 $550,000 $0 $1,150,000 $0 $1,700,000 RB-2693 $1,000,000 $0 $5,300,000 $0 $0 $6,300,000 RB-2694 $4,500,000 $0 $0 $0 $0 $4,500,000 RB-2695 $3,300,000 $0 $0 $0 $0 $3,300,000 RB-2696 $100,000 $0 $0 $0 $0 $100,000 RB-2697 $3,600,000 $0 $0 $0 $0 $3,600,000 RB-2701 $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 RB-2702 $0 $450,000 $0 $0 $0 $450,000 RB-2703 $0 $3,800,000 $0 $0 $0 $3,800,000 RB-2801 $0 $0 $0 $0 $500,000 $500,000 RB-2803 $300,000 $0 $0 $0 $0 $300,000 RB-2804 $900,000 $0 $0 $0 $0 $900,000 RB-2807 $750,000 $4,500,000 $0 $0 $0 $5,250,000 RB-2808 $700,000 $0 $3,450,000 $0 $0 $4,150,000 RB-2809 $550,000 $0 $3,874,900 $0 $0 $4,424,900 RB-2811 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2812 $700,000 $0 $3,984,200 $0 $0 $4,684,200 RB-2813 $100,000 $0 $0 $0 $0 $100,000 RB-2814 $1,563,200 $0 $0 $0 $0 $1,563,200 RB-2815 $400,000 $0 $0 $0 $0 $400,000 RB-2816 $850,000 $0 $0 $0 $0 $850,000 RB-2817 $0 $300,000 $0 $0 $0 $300,000 RB-2818 $0 $300,000 $0 $500,000 $0 $800,000 RB-2819 $0 $0 $500,000 $0 $0 $500,000 RB-2820 $0 $0 $732,000 $0 $0 $732,000 RB-2821 $0 $0 $0 $800,000 $0 $800,000 RB-2822 $0 $0 $0 $200,000 $0 $200,000 RB-2823 $0 $250,000 $0 $0 $0 $250,000 RB-2824 $970,000 $0 $0 $0 $0 $970,000 RB-2827 $0 $250,000 $0 $0 $0 $250,000 RB-2828 $0 $0 $0 $0 $300,000 $300,000 RB-2829 $0 $0 $0 $2,200,000 $0 $2,200,000 CIP 2026-2030 21 Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2830 $0 $0 $800,000 $1,000,000 $8,700,000 $10,500,000 RB-2831 $0 $0 $450,000 $0 $0 $450,000 RB-2833 $0 $0 $600,000 $0 $0 $600,000 RB-2834 $0 $1,000,000 $0 $0 $0 $1,000,000 RB-2835 $0 $0 $0 $0 $650,000 $650,000 RB-2836 $0 $0 $300,000 $0 $0 $300,000 RB-2838 $0 $0 $1,900,000 $0 $6,600,000 $8,500,000 RB-2839 $0 $0 $0 $0 $400,000 $400,000 RRA-2297-11 $13,191,200 $294,400 $0 $0 $0 $13,485,600 ROAD & BRIDGE TOTAL $107,336,100 $113,239,400 $50,261,100 $34,570,000 $38,395,000 $343,801,600 $125,087,200 $190,613,400 $69,791,100 $51,995,000 $56,270,000 $493,756,700 CIP 2026-2030 22 FUNDING SOURCE SUMMARY Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Bond Proceeds $0 $40,000,000 $0 $0 $0 $40,000,000 Capital Investment Funding $6,392,500 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $49,292,500 Capital Repair Fund $2,000,000 $1,475,000 $1,550,000 $1,750,000 $1,700,000 $8,475,000 County Transportation Sales Tax (Road & Bridge)$13,300,000 $12,408,300 $7,350,000 $7,150,000 $12,000,000 $52,208,300 County Transportation Sales Tax (Transit)$13,191,200 $294,400 $0 $0 $0 $13,485,600 Federal Grants $14,013,200 $21,100,000 $4,591,100 $0 $0 $39,704,300 Federal Grants Request $0 $27,500,000 $0 $200,000 $0 $27,700,000 Local Contributions $18,874,000 $21,710,000 $7,160,000 $1,960,000 $2,060,000 $51,764,000 Metropolitan Council Bond Request $0 $0 $800,000 $400,000 $400,000 $1,600,000 Operating Transfer In $813,600 $3,000,000 $1,500,000 $0 $0 $5,313,600 Planned Use of Fund Balance $1,000,000 $0 $0 $0 $0 $1,000,000 Planned Use of Fund Balance-CPK $0 $575,000 $0 $0 $0 $575,000 Planned Use of Fund Balance-R&B $2,900,000 $20,241,700 $0 $0 $0 $23,141,700 Private Funds $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 State Aid $13,715,000 $13,635,000 $13,360,000 $13,985,000 $12,135,000 $66,830,000 State Bond Request $0 $2,000,000 $0 $0 $0 $2,000,000 State Grants $26,550,000 $1,369,000 $1,000,000 $0 $0 $28,919,000 State Sales Tax $385,000 $1,155,000 $2,405,000 $1,500,000 $1,500,000 $6,945,000 TAA - Multi-Modal $1,110,000 $1,175,000 $1,425,000 $1,200,000 $1,425,000 $6,335,000 TAA - Preservation $2,525,000 $3,350,000 $3,325,000 $3,475,000 $3,525,000 $16,200,000 TAA - Safety & Trails $2,700,000 $3,350,000 $3,400,000 $3,625,000 $3,575,000 $16,650,000 Transmission Line Tax $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Turnback - Fund Balance $1,700,000 $8,250,000 $5,350,000 $0 $0 $15,300,000 Wheelage Tax $2,892,700 $2,800,000 $3,150,000 $2,825,000 $3,525,000 $15,192,700 $125,087,200 $190,613,400 $69,791,100 $51,995,000 $56,270,000 $493,756,700 CIP 2026-2030 23 PROJECTS BY FUNDING SOURCE Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Capital Investment Funding BSD-CW-2701 $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 BSD-PGL-2001 $4,789,300 $0 $0 $0 $0 $4,789,300 BSD-PHE-2601 $1,303,200 $0 $0 $0 $0 $1,303,200 BSD-WBSL-001 $300,000 $0 $0 $0 $0 $300,000 CAPITAL INVESTMENT FUNDING TOTAL $6,392,500 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $49,292,500 Planned Use of Fund Balance-R&B BSD-MSS-2001 $0 $20,241,700 $0 $0 $0 $20,241,700 RB-2201 $400,000 $0 $0 $0 $0 $400,000 RB-2204-02 $1,200,000 $0 $0 $0 $0 $1,200,000 RB-2204-03 $1,300,000 $0 $0 $0 $0 $1,300,000 PLANNED USE OF FUND BALANCE-R&B TOTAL $2,900,000 $20,241,700 $0 $0 $0 $23,141,700 County Transportation Sales Tax (Road & Bridge) BSD-MSS-2001 $5,800,000 $2,258,300 $0 $0 $0 $8,058,300 RB-2609 $0 $3,500,000 $0 $0 $0 $3,500,000 RB-2641 $0 $0 $0 $0 $4,400,000 $4,400,000 RB-2645 $0 $800,000 $0 $5,500,000 $0 $6,300,000 RB-2650 $0 $0 $200,000 $800,000 $0 $1,000,000 RB-2651 $350,000 $850,000 $350,000 $550,000 $1,100,000 $3,200,000 RB-2672 $0 $4,000,000 $0 $0 $0 $4,000,000 RB-2675 $3,500,000 $0 $0 $0 $0 $3,500,000 RB-2682 $400,000 $0 $0 $0 $0 $400,000 RB-2685 $3,000,000 $1,000,000 $0 $0 $0 $4,000,000 RB-2690 $200,000 $0 $4,000,000 $0 $0 $4,200,000 RB-2701 $0 $0 $500,000 $300,000 $0 $800,000 RB-2809 $50,000 $0 $1,000,000 $0 $0 $1,050,000 RB-2838 $0 $0 $1,300,000 $0 $6,500,000 $7,800,000 COUNTY TRANSPORTATION SALES TAX (ROAD & BRIDGE) TOTAL $13,300,000 $12,408,300 $7,350,000 $7,150,000 $12,000,000 $52,208,300 State Aid RB-2201 $490,000 $560,000 $410,000 $410,000 $410,000 $2,280,000 RB-2203 $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 RB-2204 $300,000 $150,000 $1,800,000 $2,750,000 $0 $5,000,000 RB-2204-01 $0 $700,000 $0 $0 $0 $700,000 RB-2204-02 $1,500,000 $0 $0 $0 $0 $1,500,000 RB-2216 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2609 $0 $1,200,000 $0 $0 $0 $1,200,000 RB-2629 $0 $900,000 $0 $4,600,000 $0 $5,500,000 RB-2641 $0 $0 $0 $450,000 $0 $450,000 RB-2650 $0 $0 $300,000 $0 $0 $300,000 RB-2651 $1,825,000 $1,525,000 $1,100,000 $925,000 $925,000 $6,300,000 RB-2658 $0 $0 $0 $600,000 $1,200,000 $1,800,000 RB-2667 $2,500,000 $0 $0 $0 $0 $2,500,000 RB-2672 $0 $4,800,000 $0 $0 $0 $4,800,000 RB-2674 $1,000,000 $0 $0 $0 $0 $1,000,000 RB-2683 $500,000 $400,000 $2,300,000 $0 $0 $3,200,000 RB-2690 $0 $0 $400,000 $0 $0 $400,000 RB-2691 $600,000 $0 $1,500,000 $0 $0 $2,100,000 CIP 2026-2030 24 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2692 $0 $500,000 $0 $1,050,000 $0 $1,550,000 RB-2694 $1,250,000 $0 $0 $0 $0 $1,250,000 RB-2695 $1,800,000 $0 $0 $0 $0 $1,800,000 RB-2697 $200,000 $0 $0 $0 $0 $200,000 RB-2701 $0 $0 $0 $0 $4,000,000 $4,000,000 RB-2703 $0 $1,100,000 $0 $0 $0 $1,100,000 RB-2801 $0 $0 $0 $0 $400,000 $400,000 RB-2804 $300,000 $0 $0 $0 $0 $300,000 RB-2808 $600,000 $0 $2,400,000 $0 $0 $3,000,000 RB-2812 $0 $0 $1,000,000 $0 $0 $1,000,000 RB-2815 $400,000 $0 $0 $0 $0 $400,000 RB-2818 $0 $200,000 $0 $300,000 $0 $500,000 RB-2819 $0 $0 $400,000 $0 $0 $400,000 RB-2820 $0 $0 $200,000 $0 $0 $200,000 RB-2821 $0 $0 $0 $800,000 $0 $800,000 RB-2827 $0 $200,000 $0 $0 $0 $200,000 RB-2829 $0 $0 $0 $900,000 $0 $900,000 RB-2830 $0 $0 $300,000 $800,000 $4,400,000 $5,500,000 RB-2833 $0 $0 $550,000 $0 $0 $550,000 RB-2834 $0 $1,000,000 $0 $0 $0 $1,000,000 RB-2835 $0 $0 $0 $0 $400,000 $400,000 RB-2836 $0 $0 $300,000 $0 $0 $300,000 STATE AID TOTAL $13,715,000 $13,635,000 $13,360,000 $13,985,000 $12,135,000 $66,830,000 Turnback - Fund Balance RB-2651 $0 $750,000 $350,000 $0 $0 $1,100,000 RB-2668 $0 $3,500,000 $0 $0 $0 $3,500,000 RB-2693 $1,000,000 $0 $5,000,000 $0 $0 $6,000,000 RB-2807 $700,000 $4,000,000 $0 $0 $0 $4,700,000 TURNBACK - FUND BALANCE TOTAL $1,700,000 $8,250,000 $5,350,000 $0 $0 $15,300,000 Planned Use of Fund Balance $1,000,000 $0 $0 $0 $0 $1,000,000 Federal Grants RB-2668 $0 $7,000,000 $0 $0 $0 $7,000,000 RB-2674 $10,000,000 $0 $0 $0 $0 $10,000,000 RB-2685 $0 $13,600,000 $0 $0 $0 $13,600,000 RB-2694 $2,000,000 $0 $0 $0 $0 $2,000,000 RB-2695 $400,000 $0 $0 $0 $0 $400,000 RB-2807 $0 $500,000 $0 $0 $0 $500,000 RB-2809 $0 $0 $1,674,900 $0 $0 $1,674,900 RB-2812 $0 $0 $2,384,200 $0 $0 $2,384,200 RB-2814 $963,200 $0 $0 $0 $0 $963,200 RB-2816 $650,000 $0 $0 $0 $0 $650,000 RB-2820 $0 $0 $532,000 $0 $0 $532,000 FEDERAL GRANTS TOTAL $14,013,200 $21,100,000 $4,591,100 $0 $0 $39,704,300 Operating Transfer In BSD-CW-2501 $250,000 $0 $0 $0 $0 $250,000 BSD-CW-2600 $113,600 $0 $0 $0 $0 $113,600 BSD-LIB-2601 $200,000 $0 $0 $0 $0 $200,000 BSD-LIB-2602 $150,000 $0 $0 $0 $0 $150,000 BSD-PHE-002 $0 $2,500,000 $0 $0 $0 $2,500,000 BSD-PHE-2701 $0 $500,000 $1,500,000 $0 $0 $2,000,000 PARK-9003 $100,000 $0 $0 $0 $0 $100,000 OPERATING TRANSFER IN TOTAL $813,600 $3,000,000 $1,500,000 $0 $0 $5,313,600 Metropolitan Council Bond Request $0 $0 $800,000 $400,000 $400,000 $1,600,000 CIP 2026-2030 25 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Planned Use of Fund Balance-CPK PARK-1001 $0 $100,000 $0 $0 $0 $100,000 PARK-3020 $0 $475,000 $0 $0 $0 $475,000 PLANNED USE OF FUND BALANCE-CPK TOTAL $0 $575,000 $0 $0 $0 $575,000 Bond Proceeds $0 $40,000,000 $0 $0 $0 $40,000,000 Private Funds HC-1048-027 $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 PRIVATE FUNDS TOTAL $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 TAA - Safety & Trails RB-2580 $200,000 $0 $0 $0 $0 $200,000 RB-2609 $0 $700,000 $0 $0 $0 $700,000 RB-2645 $0 $0 $0 $1,500,000 $0 $1,500,000 RB-2650 $0 $0 $0 $100,000 $0 $100,000 RB-2651 $150,000 $275,000 $200,000 $275,000 $275,000 $1,175,000 RB-2658 $0 $0 $0 $350,000 $100,000 $450,000 RB-2672 $0 $2,000,000 $0 $0 $0 $2,000,000 RB-2688 $100,000 $0 $0 $0 $0 $100,000 RB-2690 $0 $0 $2,300,000 $0 $0 $2,300,000 RB-2693 $0 $0 $300,000 $0 $0 $300,000 RB-2695 $300,000 $0 $0 $0 $0 $300,000 RB-2696 $100,000 $0 $0 $0 $0 $100,000 RB-2703 $0 $150,000 $0 $0 $0 $150,000 RB-2803 $300,000 $0 $0 $0 $0 $300,000 RB-2804 $300,000 $0 $0 $0 $0 $300,000 RB-2808 $0 $0 $200,000 $0 $0 $200,000 RB-2809 $450,000 $0 $0 $0 $0 $450,000 RB-2812 $400,000 $0 $0 $0 $0 $400,000 RB-2813 $100,000 $0 $0 $0 $0 $100,000 RB-2814 $300,000 $0 $0 $0 $0 $300,000 RB-2817 $0 $100,000 $0 $0 $0 $100,000 RB-2818 $0 $0 $0 $100,000 $0 $100,000 RB-2823 $0 $125,000 $0 $0 $0 $125,000 RB-2828 $0 $0 $0 $0 $300,000 $300,000 RB-2829 $0 $0 $0 $1,300,000 $0 $1,300,000 RB-2830 $0 $0 $0 $0 $2,700,000 $2,700,000 RB-2831 $0 $0 $400,000 $0 $0 $400,000 RB-2835 $0 $0 $0 $0 $200,000 $200,000 TAA - SAFETY & TRAILS TOTAL $2,700,000 $3,350,000 $3,400,000 $3,625,000 $3,575,000 $16,650,000 Federal Grants Request RB-2609 $0 $5,000,000 $0 $0 $0 $5,000,000 RB-2685 $0 $22,500,000 $0 $0 $0 $22,500,000 RB-2822 $0 $0 $0 $200,000 $0 $200,000 FEDERAL GRANTS REQUEST TOTAL $0 $27,500,000 $0 $200,000 $0 $27,700,000 County Transportation Sales Tax (Transit) RRA-2297-11 $13,191,200 $294,400 $0 $0 $0 $13,485,600 COUNTY TRANSPORTATION SALES TAX (TRANSIT) TOTAL $13,191,200 $294,400 $0 $0 $0 $13,485,600 TAA - Preservation RB-2204 $0 $550,000 $2,900,000 $3,150,000 $3,200,000 $9,800,000 RB-2204-01 $0 $2,500,000 $0 $0 $0 $2,500,000 RB-2204-03 $2,300,000 $0 $0 $0 $0 $2,300,000 RB-2651 $225,000 $300,000 $225,000 $325,000 $325,000 $1,400,000 RB-2683 $0 $0 $200,000 $0 $0 $200,000 CIP 2026-2030 26 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total TAA - PRESERVATION TOTAL $2,525,000 $3,350,000 $3,325,000 $3,475,000 $3,525,000 $16,200,000 State Sales Tax PARK-1005 $0 $0 $300,000 $0 $0 $300,000 PARK-1006 $0 $0 $0 $0 $200,000 $200,000 PARK-2016 $0 $100,000 $1,000,000 $0 $0 $1,100,000 PARK-3018 $0 $0 $100,000 $1,500,000 $0 $1,600,000 PARK-3020 $0 $0 $0 $0 $400,000 $400,000 PARK-3021 $0 $150,000 $775,000 $0 $0 $925,000 PARK-8017 $0 $120,000 $230,000 $0 $0 $350,000 PARK-8018 $0 $0 $0 $0 $900,000 $900,000 PARK-9003 $385,000 $785,000 $0 $0 $0 $1,170,000 STATE SALES TAX TOTAL $385,000 $1,155,000 $2,405,000 $1,500,000 $1,500,000 $6,945,000 Capital Repair Fund BSD-CH-2501 $1,300,000 $0 $0 $0 $0 $1,300,000 BSD-CW-2002 $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 BSD-CW-2101 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2401 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-FL-2701 $0 $0 $300,000 $0 $0 $300,000 BSD-GC-2501 $0 $1,225,000 $0 $0 $0 $1,225,000 BSD-GC-2801 $0 $0 $0 $1,500,000 $0 $1,500,000 BSD-GC-2901 $0 $0 $0 $0 $1,400,000 $1,400,000 BSD-SWGC-2802 $0 $0 $500,000 $0 $0 $500,000 BSD-SWNS-2801 $0 $0 $500,000 $0 $0 $500,000 CAPITAL REPAIR FUND TOTAL $2,000,000 $1,475,000 $1,550,000 $1,750,000 $1,700,000 $8,475,000 State Grants PARK-9003 $0 $1,244,000 $0 $0 $0 $1,244,000 RB-2674 $26,000,000 $0 $0 $0 $0 $26,000,000 RB-2809 $0 $0 $1,000,000 $0 $0 $1,000,000 RB-2823 $0 $125,000 $0 $0 $0 $125,000 RB-2824 $550,000 $0 $0 $0 $0 $550,000 STATE GRANTS TOTAL $26,550,000 $1,369,000 $1,000,000 $0 $0 $28,919,000 Transmission Line Tax HC-1048-029 $400,000 $0 $0 $0 $0 $400,000 HC-1048-030 $0 $100,000 $0 $0 $0 $100,000 PARK-1001 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 PARK-1003 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 PARK-1005 $0 $300,000 $250,000 $250,000 $250,000 $1,050,000 PARK-1006 $0 $0 $0 $150,000 $0 $150,000 PARK-3009 $0 $0 $0 $0 $150,000 $150,000 PARK-3018 $0 $0 $150,000 $0 $0 $150,000 RB-2216 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 TRANSMISSION LINE TAX TOTAL $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Local Contributions PARK-9003 $485,000 $350,000 $0 $0 $0 $835,000 RB-2201 $210,000 $210,000 $210,000 $210,000 $210,000 $1,050,000 RB-2580 $150,000 $0 $0 $0 $0 $150,000 RB-2582 $2,689,000 $0 $0 $0 $0 $2,689,000 RB-2609 $0 $1,000,000 $0 $0 $0 $1,000,000 RB-2629 $0 $100,000 $0 $300,000 $0 $400,000 RB-2645 $0 $300,000 $0 $500,000 $0 $800,000 RB-2650 $0 $0 $50,000 $350,000 $0 $400,000 RB-2651 $150,000 $0 $400,000 $100,000 $100,000 $750,000 RB-2658 $0 $0 $0 $50,000 $800,000 $850,000 CIP 2026-2030 27 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2667 $2,000,000 $0 $0 $0 $0 $2,000,000 RB-2668 $0 $7,000,000 $0 $0 $0 $7,000,000 RB-2672 $0 $6,000,000 $0 $0 $0 $6,000,000 RB-2674 $3,000,000 $0 $0 $0 $0 $3,000,000 RB-2675 $250,000 $0 $0 $0 $0 $250,000 RB-2683 $100,000 $50,000 $100,000 $0 $0 $250,000 RB-2685 $3,000,000 $3,800,000 $0 $0 $0 $6,800,000 RB-2688 $30,000 $0 $0 $0 $0 $30,000 RB-2690 $200,000 $0 $400,000 $0 $0 $600,000 RB-2691 $250,000 $0 $4,000,000 $0 $0 $4,250,000 RB-2692 $0 $50,000 $0 $100,000 $0 $150,000 RB-2694 $1,250,000 $0 $0 $0 $0 $1,250,000 RB-2695 $500,000 $0 $0 $0 $0 $500,000 RB-2697 $3,400,000 $0 $0 $0 $0 $3,400,000 RB-2701 $0 $0 $200,000 $50,000 $200,000 $450,000 RB-2702 $0 $50,000 $0 $0 $0 $50,000 RB-2703 $0 $2,550,000 $0 $0 $0 $2,550,000 RB-2801 $0 $0 $0 $0 $100,000 $100,000 RB-2804 $300,000 $0 $0 $0 $0 $300,000 RB-2807 $50,000 $0 $0 $0 $0 $50,000 RB-2808 $100,000 $0 $500,000 $0 $0 $600,000 RB-2809 $50,000 $0 $200,000 $0 $0 $250,000 RB-2812 $300,000 $0 $200,000 $0 $0 $500,000 RB-2814 $300,000 $0 $0 $0 $0 $300,000 RB-2817 $0 $100,000 $0 $0 $0 $100,000 RB-2818 $0 $100,000 $0 $100,000 $0 $200,000 RB-2819 $0 $0 $100,000 $0 $0 $100,000 RB-2824 $110,000 $0 $0 $0 $0 $110,000 RB-2827 $0 $50,000 $0 $0 $0 $50,000 RB-2830 $0 $0 $100,000 $200,000 $500,000 $800,000 RB-2831 $0 $0 $50,000 $0 $0 $50,000 RB-2833 $0 $0 $50,000 $0 $0 $50,000 RB-2835 $0 $0 $0 $0 $50,000 $50,000 RB-2838 $0 $0 $600,000 $0 $100,000 $700,000 LOCAL CONTRIBUTIONS TOTAL $18,874,000 $21,710,000 $7,160,000 $1,960,000 $2,060,000 $51,764,000 Wheelage Tax RB-2204 $850,000 $450,000 $2,950,000 $2,600,000 $2,800,000 $9,650,000 RB-2204-01 $0 $2,100,000 $0 $0 $0 $2,100,000 RB-2204-02 $1,517,700 $0 $0 $0 $0 $1,517,700 RB-2204-03 $300,000 $0 $0 $0 $0 $300,000 RB-2651 $225,000 $250,000 $200,000 $225,000 $325,000 $1,225,000 RB-2839 $0 $0 $0 $0 $400,000 $400,000 WHEELAGE TAX TOTAL $2,892,700 $2,800,000 $3,150,000 $2,825,000 $3,525,000 $15,192,700 TAA - Multi-Modal RB-2629 $0 $0 $0 $600,000 $0 $600,000 RB-2645 $0 $0 $0 $300,000 $0 $300,000 RB-2651 $100,000 $75,000 $75,000 $100,000 $125,000 $475,000 RB-2672 $0 $400,000 $0 $0 $0 $400,000 RB-2695 $300,000 $0 $0 $0 $0 $300,000 RB-2702 $0 $400,000 $0 $0 $0 $400,000 RB-2808 $0 $0 $350,000 $0 $0 $350,000 RB-2811 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2812 $0 $0 $400,000 $0 $0 $400,000 CIP 2026-2030 28 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2816 $200,000 $0 $0 $0 $0 $200,000 RB-2817 $0 $100,000 $0 $0 $0 $100,000 RB-2824 $310,000 $0 $0 $0 $0 $310,000 RB-2830 $0 $0 $400,000 $0 $1,100,000 $1,500,000 TAA - MULTI-MODAL TOTAL $1,110,000 $1,175,000 $1,425,000 $1,200,000 $1,425,000 $6,335,000 State Bond Request $0 $2,000,000 $0 $0 $0 $2,000,000 $125,087,200 $190,613,400 $69,791,100 $51,995,000 $56,270,000 $493,756,700 CIP 2026-2030 29 EXPENDITURE TYPE SUMMARY Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Construction $89,672,400 $179,548,400 $60,331,100 $41,875,000 $47,025,000 $418,451,900 Contribution to Fund Balance $16,444,800 $0 $0 $0 $800,000 $17,244,800 Planning/Design $13,030,000 $10,265,000 $8,460,000 $7,920,000 $7,245,000 $46,920,000 Right-of-Way $5,940,000 $800,000 $1,000,000 $2,200,000 $1,200,000 $11,140,000 $125,087,200 $190,613,400 $69,791,100 $51,995,000 $56,270,000 $493,756,700 CIP 2026-2030 30 Project Name Department Project # Project Cost Courthouse North Wing Air Handling Unit Upgrades Capital Repair Fund Projects BSD-CH-2501 1,300,000 Countywide Site Improvements Capital Repair Fund Projects BSD-CW-2002 500,000 Countywide Painting / Wall Repairs Capital Repair Fund Projects BSD-CW-2101 100,000 County-Wide Lighting Improvements Capital Repair Fund Projects BSD-CW-2401 100,000 Electric Vehicle (EV) Charging Station Installation Capital Projects Fund BSD-CW-2501 250,000 Signage Study Implementation Capital Projects Fund BSD-CW-2600 113,600 Library Strategic Facility Plan Capital Projects Fund BSD-LIB-2601 200,000 Library Extended Access Capital Projects Fund BSD-LIB-2602 150,000 South Shop Improvements Capital Road & Bridge Projects BSD-MSS-2001 5,800,000 Park Grove Library Improvements Capital Projects Fund BSD-PGL-2001 5,789,300 Central Yard Waste Capital Projects Fund BSD-PHE-2601 1,303,200 R.H. Stafford Library Improvements Capital Projects Fund BSD-WBSL-001 300,000 Interior & Exterior Renovations Capital Historic Courthouse HC-1048-027 25,000 Historic Courthouse - Elevator Capital Historic Courthouse HC-1048-029 400,000 Park & Trail Long-Range Planning Capital Parks Projects PARK-1001 100,000 Park Facilities/Infrastructure Improvement Program Capital Parks Projects PARK-1003 350,000 Hardwood Creek Regional Trail Extension Capital Parks Projects PARK-9003 970,000 Intersection Control Projects Capital Road & Bridge Projects RB-2201 1,100,000 Safety & Traffic Capacity Projects Capital Road & Bridge Projects RB-2203 250,000 Pavement Preservation & Rehab Capital Road & Bridge Projects RB-2204 1,150,000 CSAH 4 – CSAH 15 to CSAH 3 Pavement Preservation Capital Road & Bridge Projects RB-2204-02 4,217,700 CSAH 38 Pavement Preservation Capital Road & Bridge Projects RB-2204-03 3,900,000 Structures & Roadway Stabilization Capital Road & Bridge Projects RB-2216 350,000 CSAH 18 Trail - La Lake Park to Woodlane Capital Road & Bridge Projects RB-2580 350,000 Gateway Trail Extension – Scandia Capital Road & Bridge Projects RB-2582 2,689,000 Construction Engineering, Inspection and Survey Capital Road & Bridge Projects RB-2651 3,025,000 CSAH 19 & 80th Street Intersection Capital Road & Bridge Projects RB-2667 4,500,000 CSAH 17 at TH 36 Intersection Capital Road & Bridge Projects RB-2674 40,000,000 CR 74 - CR 38 to Geneva Avenue Capital Road & Bridge Projects RB-2675 3,750,000 CR 50 - TH 61 to CSAH 15 Study Capital Road & Bridge Projects RB-2682 400,000 CSAH 11 Improvement Project Capital Road & Bridge Projects RB-2683 600,000 CR 19A - 100th Street Realignment Capital Road & Bridge Projects RB-2685 6,000,000 Radio Drive Pedestrian Management Study Capital Road & Bridge Projects RB-2688 130,000 CSAH 16 - Interlachen to TH 95 Capital Road & Bridge Projects RB-2690 400,000 CSAH 20 - CSAH 22 to Military Capital Road & Bridge Projects RB-2691 850,000 CSAH 96 Turnback Corridor Capital Road & Bridge Projects RB-2693 1,000,000 CSAH 18 - Settlers Ridge Intersection Capital Road & Bridge Projects RB-2694 4,500,000 CSAH 5 Sidewalk - Pine Tree Trail to Owens Street Capital Road & Bridge Projects RB-2695 3,300,000 CSAH 16- Interlachen to Settlers Ridge Parkway Capital Road & Bridge Projects RB-2696 100,000 CSAH 18 @ TH 95 Roundabout Capital Road & Bridge Projects RB-2697 3,600,000 CSAH 14 Trail - Granada Avenue to Hadley Avenue Capital Road & Bridge Projects RB-2803 300,000 CSAH 16 and Eagle Creek Lane Capital Road & Bridge Projects RB-2804 900,000 CSAH 5, CR 55, and CSAH 96 Intersection Capital Road & Bridge Projects RB-2807 750,000 CSAH 10 and CSAH 17 Intersection Capital Road & Bridge Projects RB-2808 700,000 CR 50 and TH 61 Intersection Capital Road & Bridge Projects RB-2809 550,000 Transit Circulator Support Capital Road & Bridge Projects RB-2811 200,000 CSAH 16 and Settlers Ridge Parkway Intersection Capital Road & Bridge Projects RB-2812 700,000 CSAH 21 – Middle St. Croix Valley Regional Trail Capital Road & Bridge Projects RB-2813 100,000 CSAH 16 Trail – Colby Lake to Dancing Waters Pkwy Capital Road & Bridge Projects RB-2814 1,563,200 CSAH 39 and TH 61 Intersection Capital Road & Bridge Projects RB-2815 400,000 Electric Vehicle (EV) Carshare at Gold Line Stations Capital Road & Bridge Projects RB-2816 850,000 CSAH 12 Trail – Mahtomedi Middle School to Inwood Way Capital Road & Bridge Projects RB-2824 970,000 Gold Line Bus Rapid Transit (BRT)Gold Line RRA-2297-11 13,191,200 Total for 2026 125,087,200 PROJECTS BY YEAR - 2026 31 Project Name Department Project # Project Cost Countywide Site Improvements Capital Repair Fund Projects BSD-CW-2002 50,000 Countywide Painting / Wall Repairs Capital Repair Fund Projects BSD-CW-2101 100,000 County-Wide Lighting Improvements Capital Repair Fund Projects BSD-CW-2401 100,000 Capital Redirect Projects Capital Repair Fund Projects BSD-CW-2701 4,200,000 Government Center Fire Safety Upgrades Capital Repair Fund Projects BSD-GC-2501 1,225,000 South Shop Improvements Capital Road & Bridge Projects BSD-MSS-2001 31,500,000 Park Grove Library Improvements Capital Projects Fund BSD-PGL-2001 11,000,000 Environmental Center Expansion Capital Projects Fund BSD-PHE-002 2,500,000 Southern Yard Waste Capital Projects Fund BSD-PHE-2701 500,000 R.H. Stafford Library Improvements Capital Projects Fund BSD-WBSL-001 20,000,000 Interior & Exterior Renovations Capital Historic Courthouse HC-1048-027 25,000 Historic Courthouse – Parking Lot Pavement Improvements Capital Historic Courthouse HC-1048-030 100,000 Park & Trail Long-Range Planning Capital Parks Projects PARK-1001 200,000 Park Facilities/Infrastructure Improvement Program Capital Parks Projects PARK-1003 350,000 Parks & Trails Pavement Preservation Capital Parks Projects PARK-1005 300,000 Big Marine Park Reserve Improvements Capital Parks Projects PARK-2016 100,000 Lake Elmo Park Reserve Single Track Trail Capital Parks Projects PARK-3020 475,000 Lake Elmo Park Reserve Pavilion Facilities Capital Parks Projects PARK-3021 150,000 Cottage Grove Ravine Regional Park Lighted Trails Capital Parks Projects PARK-4006 2,000,000 St. Croix Bluffs Regional Park Campground Improvements Capital Parks Projects PARK-8017 120,000 Hardwood Creek Regional Trail Extension Capital Parks Projects PARK-9003 2,379,000 Intersection Control Projects Capital Road & Bridge Projects RB-2201 770,000 Safety & Traffic Capacity Projects Capital Road & Bridge Projects RB-2203 200,000 Pavement Preservation & Rehab Capital Road & Bridge Projects RB-2204 1,150,000 CSAH 16 – CSAH 25 to Bielenberg Drive Pavement Preservation Capital Road & Bridge Projects RB-2204-01 5,300,000 Structures & Roadway Stabilization Capital Road & Bridge Projects RB-2216 350,000 CSAH 32 - CSAH 33 (Everton Ave) to US TH 61 Capital Road & Bridge Projects RB-2609 11,400,000 CSAH 21- I-94 to 40th Street North Capital Road & Bridge Projects RB-2629 1,000,000 CSAH 13 - CSAH 6 to CSAH 14 Capital Road & Bridge Projects RB-2645 1,100,000 Construction Engineering, Inspection and Survey Capital Road & Bridge Projects RB-2651 4,025,000 CSAH 27 - I-694 to CSAH 12 Reconstruction Capital Road & Bridge Projects RB-2668 17,500,000 CSAH 13 - CSAH 20 to Hargis Parkway Capital Road & Bridge Projects RB-2672 17,200,000 CSAH 11 Improvement Project Capital Road & Bridge Projects RB-2683 450,000 CR 19A - 100th Street Realignment Capital Road & Bridge Projects RB-2685 40,900,000 CSAH 12 - Kimbro to CSAH 15 Capital Road & Bridge Projects RB-2692 550,000 CSAH 14 - Lake Elmo Park Reserve to 39th Street Study Capital Road & Bridge Projects RB-2702 450,000 CSAH 22 @ TH 95 Roundabout Capital Road & Bridge Projects RB-2703 3,800,000 CSAH 5, CR 55, and CSAH 96 Intersection Capital Road & Bridge Projects RB-2807 4,500,000 Transit Circulator Support Capital Road & Bridge Projects RB-2811 200,000 CSAH 22 - CSAH 19 to CSAH 13 Study Capital Road & Bridge Projects RB-2817 300,000 CSAH 24 – 58th Street to 62nd Street Capital Road & Bridge Projects RB-2818 300,000 Trunk Highway 95 Corridor Study Capital Road & Bridge Projects RB-2823 250,000 CSAH 10 - County Line to CSAH 15 Corridor Study Capital Road & Bridge Projects RB-2827 250,000 CSAH 18 @ CSAH 19 Roundabout Modifications Capital Road & Bridge Projects RB-2834 1,000,000 Gold Line Bus Rapid Transit (BRT)Gold Line RRA-2297-11 294,400 Total for 2027 190,613,400 PROJECTS BY YEAR - 2027 32 Project Name Department Project # Project Cost Countywide Site Improvements Capital Repair Fund Projects BSD-CW-2002 50,000 Countywide Painting / Wall Repairs Capital Repair Fund Projects BSD-CW-2101 100,000 County-Wide Lighting Improvements Capital Repair Fund Projects BSD-CW-2401 100,000 Capital Redirect Projects Capital Repair Fund Projects BSD-CW-2701 12,400,000 North Service Center Chiller Replacement Capital Repair Fund Projects BSD-FL-2701 300,000 Southern Yard Waste Capital Projects Fund BSD-PHE-2701 1,500,000 Government Center Glass Replacement Capital Repair Fund Projects BSD-SWGC-2802 500,000 Force Main Sand Separator Installation Capital Repair Fund Projects BSD-SWNS-2801 500,000 Interior & Exterior Renovations Capital Historic Courthouse HC-1048-027 25,000 Park & Trail Long-Range Planning Capital Parks Projects PARK-1001 100,000 Park Facilities/Infrastructure Improvement Program Capital Parks Projects PARK-1003 350,000 Parks & Trails Pavement Preservation Capital Parks Projects PARK-1005 850,000 Big Marine Park Reserve Improvements Capital Parks Projects PARK-2016 1,100,000 Lake Elmo Park Reserve – Facility Improvements Capital Parks Projects PARK-3018 250,000 Lake Elmo Park Reserve Pavilion Facilities Capital Parks Projects PARK-3021 775,000 St. Croix Bluffs Regional Park Campground Improvements Capital Parks Projects PARK-8017 630,000 Intersection Control Projects Capital Road & Bridge Projects RB-2201 620,000 Safety & Traffic Capacity Projects Capital Road & Bridge Projects RB-2203 200,000 Pavement Preservation & Rehab Capital Road & Bridge Projects RB-2204 7,650,000 Structures & Roadway Stabilization Capital Road & Bridge Projects RB-2216 350,000 CSAH 29 - TH 36 to CSAH 12 Capital Road & Bridge Projects RB-2650 550,000 Construction Engineering, Inspection and Survey Capital Road & Bridge Projects RB-2651 2,900,000 CSAH 11 Improvement Project Capital Road & Bridge Projects RB-2683 2,600,000 CSAH 16 - Interlachen to TH 95 Capital Road & Bridge Projects RB-2690 7,100,000 CSAH 20 - CSAH 22 to Military Capital Road & Bridge Projects RB-2691 5,500,000 CSAH 96 Turnback Corridor Capital Road & Bridge Projects RB-2693 5,300,000 CSAH 19 @ CSAH 10 Intersection Capital Road & Bridge Projects RB-2701 700,000 CSAH 10 and CSAH 17 Intersection Capital Road & Bridge Projects RB-2808 3,450,000 CR 50 and TH 61 Intersection Capital Road & Bridge Projects RB-2809 3,874,900 Transit Circulator Support Capital Road & Bridge Projects RB-2811 200,000 CSAH 16 and Settlers Ridge Parkway Intersection Capital Road & Bridge Projects RB-2812 3,984,200 CSAH 17 – CSAH 14 to CSAH 12 Study Capital Road & Bridge Projects RB-2819 500,000 Traffic Signal Battery Backup Capital Road & Bridge Projects RB-2820 732,000 CSAH 15 - 43rd Street N to 55th Street N Capital Road & Bridge Projects RB-2830 800,000 CSAH 15 @ McKusick Rd N Intersection Capital Road & Bridge Projects RB-2831 450,000 CSAH 18 - I-494 to Settlers Ridge Parkway Study Capital Road & Bridge Projects RB-2833 600,000 Public Works North Shop Capital Road & Bridge Projects RB-2836 300,000 CR 50 – TH 61 to Ingersoll Avenue North Capital Road & Bridge Projects RB-2838 1,900,000 Total for 2028 69,791,100 PROJECTS BY YEAR - 2028 33 Project Name Department Project # Project Cost Countywide Site Improvements Capital Repair Fund Projects BSD-CW-2002 50,000 Countywide Painting / Wall Repairs Capital Repair Fund Projects BSD-CW-2101 100,000 County-Wide Lighting Improvements Capital Repair Fund Projects BSD-CW-2401 100,000 Capital Redirect Projects Capital Repair Fund Projects BSD-CW-2701 12,900,000 Stillwater Campus Roof Replacement Capital Repair Fund Projects BSD-GC-2801 1,500,000 Interior & Exterior Renovations Capital Historic Courthouse HC-1048-027 25,000 Park & Trail Long-Range Planning Capital Parks Projects PARK-1001 100,000 Park Facilities/Infrastructure Improvement Program Capital Parks Projects PARK-1003 350,000 Parks & Trails Pavement Preservation Capital Parks Projects PARK-1005 250,000 Regional Trail System Program Capital Parks Projects PARK-1006 250,000 Lake Elmo Park Reserve – Facility Improvements Capital Parks Projects PARK-3018 1,800,000 Intersection Control Projects Capital Road & Bridge Projects RB-2201 620,000 Safety & Traffic Capacity Projects Capital Road & Bridge Projects RB-2203 200,000 Pavement Preservation & Rehab Capital Road & Bridge Projects RB-2204 8,500,000 Structures & Roadway Stabilization Capital Road & Bridge Projects RB-2216 350,000 CSAH 21- I-94 to 40th Street North Capital Road & Bridge Projects RB-2629 5,500,000 CSAH 3 - CSAH 7 to CSAH 4 Capital Road & Bridge Projects RB-2641 450,000 CSAH 13 - CSAH 6 to CSAH 14 Capital Road & Bridge Projects RB-2645 7,800,000 CSAH 29 - TH 36 to CSAH 12 Capital Road & Bridge Projects RB-2650 1,250,000 Construction Engineering, Inspection and Survey Capital Road & Bridge Projects RB-2651 2,500,000 CSAH 18 – I-494 to Woodlane Drive Capital Road & Bridge Projects RB-2658 1,000,000 CSAH 12 - Kimbro to CSAH 15 Capital Road & Bridge Projects RB-2692 1,150,000 CSAH 19 @ CSAH 10 Intersection Capital Road & Bridge Projects RB-2701 350,000 Transit Circulator Support Capital Road & Bridge Projects RB-2811 200,000 CSAH 24 – 58th Street to 62nd Street Capital Road & Bridge Projects RB-2818 500,000 22nd Street Reconstruction Capital Road & Bridge Projects RB-2821 800,000 Fiber Ring Capital Road & Bridge Projects RB-2822 200,000 CSAH 13 Trail Rehab - CSAH 16 to I-94 Capital Road & Bridge Projects RB-2829 2,200,000 CSAH 15 - 43rd Street N to 55th Street N Capital Road & Bridge Projects RB-2830 1,000,000 Total for 2029 51,995,000 PROJECTS BY YEAR - 2029 34 Project Name Department Project # Project Cost Countywide Site Improvements Capital Repair Fund Projects BSD-CW-2002 100,000 Countywide Painting / Wall Repairs Capital Repair Fund Projects BSD-CW-2101 100,000 County-Wide Lighting Improvements Capital Repair Fund Projects BSD-CW-2401 100,000 Capital Redirect Projects Capital Projects Fund BSD-CW-2701 13,400,000 Government Center Ventilation Upgrades Capital Repair Fund Projects BSD-GC-2901 1,400,000 Interior & Exterior Renovations Capital Historic Courthouse HC-1048-027 25,000 Park & Trail Long-Range Planning Capital Parks Projects PARK-1001 100,000 Park Facilities/Infrastructure Improvement Program Capital Parks Projects PARK-1003 350,000 Parks & Trails Pavement Preservation Capital Parks Projects PARK-1005 250,000 Regional Trail System Program Capital Parks Projects PARK-1006 300,000 Lake Elmo Park Reserve Maintenance & Natural Resource Facility Improvements Capital Parks Projects PARK-3009 150,000 Lake Elmo Park Reserve Single Track Trail Capital Parks Projects PARK-3020 600,000 St Croix Bluffs Regional Park Facility Improvements Capital Parks Projects PARK-8018 1,000,000 Intersection Control Projects Capital Road & Bridge Projects RB-2201 620,000 Safety & Traffic Capacity Projects Capital Road & Bridge Projects RB-2203 200,000 Pavement Preservation & Rehab Capital Road & Bridge Projects RB-2204 6,000,000 Structures & Roadway Stabilization Capital Road & Bridge Projects RB-2216 350,000 CSAH 3 - CSAH 7 to CSAH 4 Capital Road & Bridge Projects RB-2641 4,400,000 Construction Engineering, Inspection and Survey Capital Road & Bridge Projects RB-2651 3,175,000 CSAH 18 – I-494 to Woodlane Drive Capital Road & Bridge Projects RB-2658 2,100,000 CSAH 19 @ CSAH 10 Intersection Capital Road & Bridge Projects RB-2701 4,200,000 CSAH 15 - 30th Street to CSAH 14 Capital Road & Bridge Projects RB-2801 500,000 Transit Circulator Support Capital Road & Bridge Projects RB-2811 200,000 CR 55 - CSAH 96 to CR 61 Study Capital Road & Bridge Projects RB-2828 300,000 CSAH 15 - 43rd Street N to 55th Street N Capital Road & Bridge Projects RB-2830 8,700,000 CSAH 19 - CSAH 22 to Dale Rd Capital Road & Bridge Projects RB-2835 650,000 CR 50 – TH 61 to Ingersoll Avenue North Capital Road & Bridge Projects RB-2838 6,600,000 Gold Line Jurisdictional Study Capital Road & Bridge Projects RB-2839 400,000 Total for 2030 56,270,000 PROJECTS BY YEAR - 2030 35 This category includes the construction or expansion of county buildings used for offices and operations, except for the parks system structures. These are listed under the parks area. The estimated project costs included costs of planning, construction, furnishings and fixtures, and any contingency items found necessary at a later date. Public Facilities Detailed Information 36 PROJECTS BY CATEGORY PUBLIC FACILITIES Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Public Facilities BSD-CH-2501 $1,300,000 $0 $0 $0 $0 $1,300,000 BSD-CW-2002 $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 BSD-CW-2101 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2401 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2501 $250,000 $0 $0 $0 $0 $250,000 BSD-CW-2600 $113,600 $0 $0 $0 $0 $113,600 BSD-CW-2701 $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 BSD-FL-2701 $0 $0 $300,000 $0 $0 $300,000 BSD-GC-2501 $0 $1,225,000 $0 $0 $0 $1,225,000 BSD-GC-2801 $0 $0 $0 $1,500,000 $0 $1,500,000 BSD-GC-2901 $0 $0 $0 $0 $1,400,000 $1,400,000 BSD-LIB-2601 $200,000 $0 $0 $0 $0 $200,000 BSD-LIB-2602 $150,000 $0 $0 $0 $0 $150,000 BSD-MSS-2001 $5,800,000 $31,500,000 $0 $0 $0 $37,300,000 BSD-PGL-2001 $5,789,300 $11,000,000 $0 $0 $0 $16,789,300 BSD-PHE-002 $0 $2,500,000 $0 $0 $0 $2,500,000 BSD-PHE-2601 $1,303,200 $0 $0 $0 $0 $1,303,200 BSD-PHE-2701 $0 $500,000 $1,500,000 $0 $0 $2,000,000 BSD-SWGC-2802 $0 $0 $500,000 $0 $0 $500,000 BSD-SWNS-2801 $0 $0 $500,000 $0 $0 $500,000 BSD-WBSL-001 $300,000 $20,000,000 $0 $0 $0 $20,300,000 PUBLIC FACILITIES TOTAL $15,906,100 $71,175,000 $15,450,000 $14,650,000 $15,100,000 $132,281,100 $15,906,100 $71,175,000 $15,450,000 $14,650,000 $15,100,000 $132,281,100 CIP 2026-2030 37 PROJECTS BY FUNDING SOURCE PUBLIC FACILITIES Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Capital Investment Funding BSD-CW-2701 $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 BSD-PGL-2001 $4,789,300 $0 $0 $0 $0 $4,789,300 BSD-PHE-2601 $1,303,200 $0 $0 $0 $0 $1,303,200 BSD-WBSL-001 $300,000 $0 $0 $0 $0 $300,000 CAPITAL INVESTMENT FUNDING TOTAL $6,392,500 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $49,292,500 Planned Use of Fund Balance-R&B BSD-MSS-2001 $0 $20,241,700 $0 $0 $0 $20,241,700 PLANNED USE OF FUND BALANCE-R&B TOTAL $0 $20,241,700 $0 $0 $0 $20,241,700 Operating Transfer In BSD-CW-2501 $250,000 $0 $0 $0 $0 $250,000 BSD-CW-2600 $113,600 $0 $0 $0 $0 $113,600 BSD-LIB-2601 $200,000 $0 $0 $0 $0 $200,000 BSD-LIB-2602 $150,000 $0 $0 $0 $0 $150,000 BSD-PHE-002 $0 $2,500,000 $0 $0 $0 $2,500,000 BSD-PHE-2701 $0 $500,000 $1,500,000 $0 $0 $2,000,000 OPERATING TRANSFER IN TOTAL $713,600 $3,000,000 $1,500,000 $0 $0 $5,213,600 County Transportation Sales Tax (Road & Bridge) BSD-MSS-2001 $5,800,000 $2,258,300 $0 $0 $0 $8,058,300 COUNTY TRANSPORTATION SALES TAX (ROAD & BRIDGE) TOTAL $5,800,000 $2,258,300 $0 $0 $0 $8,058,300 Planned Use of Fund Balance BSD-PGL-2001 $1,000,000 $0 $0 $0 $0 $1,000,000 PLANNED USE OF FUND BALANCE TOTAL $1,000,000 $0 $0 $0 $0 $1,000,000 Capital Repair Fund BSD-CH-2501 $1,300,000 $0 $0 $0 $0 $1,300,000 BSD-CW-2002 $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 BSD-CW-2101 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-CW-2401 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 BSD-FL-2701 $0 $0 $300,000 $0 $0 $300,000 BSD-GC-2501 $0 $1,225,000 $0 $0 $0 $1,225,000 BSD-GC-2801 $0 $0 $0 $1,500,000 $0 $1,500,000 BSD-GC-2901 $0 $0 $0 $0 $1,400,000 $1,400,000 BSD-SWGC-2802 $0 $0 $500,000 $0 $0 $500,000 BSD-SWNS-2801 $0 $0 $500,000 $0 $0 $500,000 CAPITAL REPAIR FUND TOTAL $2,000,000 $1,475,000 $1,550,000 $1,750,000 $1,700,000 $8,475,000 Bond Proceeds $0 $40,000,000 $0 $0 $0 $40,000,000 $15,906,100 $71,175,000 $15,450,000 $14,650,000 $15,100,000 $132,281,100 CIP 2026-2030 38 Description The project scope includes planning for the replacement and enhancement of four air-handling units in the original 2-story spaces on the west side of the courthouse. System components to be improved include air-handling units that distribute tempered air through ductwork to Variable Air Control (VAV) boxes within workspaces. The air handling units also provide fresh air intake to the building and exhausts the air that has been cycled through the building. Many of the air-handling units in the original 2-story courthouse were not addressed during the Campus 2025 Expansion project and are original to the old building which was built in 1965 and expanded in 1972. Planning for the improvements was scheduled for 2025, while implementation of the planned improvements is scheduled for 2026. Justification Air-handling equipment is original to the 2-story areas on the west side of the Courthouse built in 1965 and 1972 and has been extended past its expected useful life due to proper maintenance and care. As the systems continue to age, it becomes more susceptible to increased maintenance and costly emergency failures. Expected life cycles of air-handling units are 20 to 25 years. At the time of replacement, many of these units will be more than 30 years old. These systems are critical to maintaining a safe and comfortable environment in the courtrooms within the original 2-story building. BSD-CH-2501 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $1,300,000 $0 $0 $0 $0 $1,300,000 FUNDING TOTAL $1,300,000 $0 $0 $0 $0 $1,300,000 Expenditures Construction $1,300,000 $0 $0 $0 $0 $1,300,000 EXPENDITURES TOTAL $1,300,000 $0 $0 $0 $0 $1,300,000 Budget Impact/Other Replacing 30-plus-year-old air-handling systems would have expected operational and maintenance savings due to increased efficiency in the new equipment, which lowers long-term operational costs. This project will also help to avoid costly emergency repairs, which occur when aging equipment fails. Capital Project Category: Public Facilities Location: Stillwater District: District 3 Total Estimated Project Cost: $1,400,000 Prior Year(s) Total Cost: $100,000 Project #: BSD-CH-2501 Project Name: Courthouse North Wing Air Handling Unit Upgrades CIP 2026-2030 39 Description The project scope is an annual program to maintain various parking areas. Washington County has more than 150,000 square yards of parking lots at 12 locations. 2026 may include construction costs for parking lot and drive-lane improvements at the Stillwater Campus. 2027 may include lot striping throughout county parking lots. 2028 may include crack sealing throughout county parking lots. 2029 may include design for lot rehabilitation at the South Service Center. 2030 may include lot rehabilitation at the South Service Center. Justification Well-maintained sites provide the first impression to the public visiting county buildings. In addition to providing a good first impression, well-maintained sites prevent potential claims from visitors due to parking lot cracks or potholes and also eliminates potential slip/trip/fall hazards. BSD-CW-2002 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 FUNDING TOTAL $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 Expenditures Construction $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 EXPENDITURES TOTAL $500,000 $50,000 $50,000 $50,000 $100,000 $750,000 Budget Impact/Other Properly maintaining parking lots and sidewalks can reduce the risk of visitor claims due to slip/trip/fall hazards or lot deficiencies which can cause damage to vehicles. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $750,000 Prior Year(s) Total Cost: $0 Project #: BSD-CW-2002 Project Name: Countywide Site Improvements CIP 2026-2030 40 Description The project scope is an annual program for interior wall repair and patching county-wide. Annual painting may include the following locations: 2026: North Shop, Jail, and Law Enforcement Center 2027: North and South Service Centers and Jail 2028: Wildwood and Valley Libraries, Jail, and County Courthouse 2029: Oakdale Library and Jail 2030: Government Center and Jail Justification Due to the constant activity throughout all county buildings, interior walls get scratched or dinged quite frequently, leaving visible blemishes against the painted surfaces. This project will identify those areas of most immediate need of wall patching and painting to provide the level of aesthetic expected by the public. Making these repairs will also help to prevent further damage to gouges and scratches in the walls. BSD-CW-2101 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 FUNDING TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Expenditures Construction $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 EXPENDITURES TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Budget Impact/Other Properly maintaining and repainting the interior walls will prevent further damage to gypsum board walls. There is no anticipated change within the Building Services Division operating budget. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $500,000 Prior Year(s) Total Cost: $0 Project #: BSD-CW-2101 Project Name: Countywide Painting / Wall Repairs CIP 2026-2030 41 Description The project scope includes the replacement of existing, dated lighting fixtures with new energy efficient Light-Emitting Diode (LED) lighting throughout county buildings. Buildings in need of lighting upgrades include the Government Center, Courthouse, Law Enforcement Center, North and South Service Centers, Oakdale Library, Lake Elmo Library, and Southern Environmental Center. In 2026, areas within the LEC and Jail will be addressed. Justification Current fluorescent lighting in many county buildings is not energy efficient and has a negative effect on staff and visitors, especially those with light sensitivity. Additionally, fluorescent light bulbs burn out and need bulb replacements and occasionally need ballast replacements as well, which requires an electrician to complete. New LED lighting needs no bulb replacements or ballast replacements. Upgrades to the lighting will improve energy efficiency and occupant comfort, while also reducing operational costs. BSD-CW-2401 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 FUNDING TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Expenditures Construction $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 EXPENDITURES TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 Budget Impact/Other New energy efficient lighting is expected to decrease energy usage and reduce operational costs. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $830,100 Prior Year(s) Total Cost: $330,100 Project #: BSD-CW-2401 Project Name: County-Wide Lighting Improvements CIP 2026-2030 42 Description This project will install EV charging stations and infrastructure at multiple county building locations based on an EV charging study completed in 2024. Justification As EV technology becomes more prevalent in our area, charging stations will become more needed. This will provide a level of service to our residents while also advancing an important, sustainable clean-energy initiative. BSD-CW-2501 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Operating Transfer In $250,000 $0 $0 $0 $0 $250,000 FUNDING TOTAL $250,000 $0 $0 $0 $0 $250,000 Expenditures Planning/Design $25,000 $0 $0 $0 $0 $25,000 Construction $225,000 $0 $0 $0 $0 $225,000 EXPENDITURES TOTAL $250,000 $0 $0 $0 $0 $250,000 Budget Impact/Other The addition of EV charging stations will require ongoing maintenance. It is expected that EV charging station users will be required to pay for the service. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $450,000 Prior Year(s) Total Cost: $200,000 Project #: BSD-CW-2501 Project Name: Electric Vehicle (EV) Charging Station Installation CIP 2026-2030 43 Description Implement strategies from the 2024 Washington County signage study throughout county locations. Justification A study in 2024 identified a strategic plan for improving signage throughout Washington County facilities through the lens of residents navigating through spaces. Improvements are aimed at a better user experience including expanded availability to multiple languages and universal icons to reduce confusion. This project will implement those findings in existing locations through new and upgraded signage and wayfinding. The 2026 budget will address changes to the North and South Service Centers. BSD-CW-2600 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Operating Transfer In $113,600 $0 $0 $0 $0 $113,600 FUNDING TOTAL $113,600 $0 $0 $0 $0 $113,600 Expenditures Construction $113,600 $0 $0 $0 $0 $113,600 EXPENDITURES TOTAL $113,600 $0 $0 $0 $0 $113,600 Budget Impact/Other This project will have no impact to ongoing budgets outside of initial implementation costs. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $113,600 Prior Year(s) Total Cost: $0 Project #: BSD-CW-2600 Project Name: Signage Study Implementation CIP 2026-2030 44 Description The project scope includes addressing various facility and building needs throughout the county. Specific projects will be vetted through the Capital Planning committee for priority and recommended timeline, refined during the annual budget process, and dependent on county board approval. Justification This project is intended to address various known issues throughout county buildings. Projects could include facility remodeling, restacking, or expansions, and may be used to supplement or supplant bond proceeds. The highest priority projects will be identified and further defined as separate projects in future Capital Improvement Plans. BSD-CW-2701 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Investment Funding $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 FUNDING TOTAL $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 Expenditures Construction $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 EXPENDITURES TOTAL $0 $4,200,000 $12,400,000 $12,900,000 $13,400,000 $42,900,000 Budget Impact/Other These projects will address energy efficiency and the latest energy reducing technologies to minimize operational cost increases. These investments are designed to lower the county’s reliance on issuing debt. Any new square footage added to address service gaps will increase operational costs. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $42,900,000 Prior Year(s) Total Cost: $0 Project #: BSD-CW-2701 Project Name: Capital Redirect Projects CIP 2026-2030 45 Description The scope of this project is to replace the chiller at the North Service Center in Forest Lake. Justification The chiller at the North Service Center is reaching the end of its useful life. The chiller is critical to keeping the building occupiable in the summer months. BSD-FL-2701 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $0 $0 $300,000 $0 $0 $300,000 FUNDING TOTAL $0 $0 $300,000 $0 $0 $300,000 Expenditures Planning/Design $0 $0 $40,000 $0 $0 $40,000 Construction $0 $0 $260,000 $0 $0 $260,000 EXPENDITURES TOTAL $0 $0 $300,000 $0 $0 $300,000 Budget Impact/Other As equipment ages, the maintenance costs increase each year. Replacing aging equipment reduces maintenance costs and improves energy efficiency. Capital Project Category: Public Facilities Location: Forest Lake District: District 1 Total Estimated Project Cost: $300,000 Prior Year(s) Total Cost: $0 Project #: BSD-FL-2701 Project Name: North Service Center Chiller Replacement CIP 2026-2030 46 Description The project scope will include replacing the outdated main fire alarm system. This system serves both the Government Center and Courthouse. In addition, upgrades will need to be made to fire alarms throughout the buildings to be compatible with the new system. The fire sprinkler system will be evaluated to determine replacement needs to the system. Justification The fire safety system is critical to the safety and well-being of all building occupants. The system is original to the building, which was first constructed in 1986. The system was reprogrammed, and new field devices were added during the 2011 remodel, but the main fire alarm panel was not replaced. BSD-GC-2501 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $0 $1,225,000 $0 $0 $0 $1,225,000 FUNDING TOTAL $0 $1,225,000 $0 $0 $0 $1,225,000 Expenditures Planning/Design $0 $250,000 $0 $0 $0 $250,000 Construction $0 $975,000 $0 $0 $0 $975,000 EXPENDITURES TOTAL $0 $1,225,000 $0 $0 $0 $1,225,000 Budget Impact/Other The aging system is beyond its useful life and has regular maintenance issues, resulting in costly repairs. Replacement of the system is expected to reduce maintenance costs. Capital Project Category: Public Facilities Location: Stillwater District: District 3 Total Estimated Project Cost:$1,225,000 Prior Year(s) Total Cost: $0 Project #: BSD-GC-2501 Project Name: Government Center Fire Safety Upgrades CIP 2026-2030 47 Description Replacement of roofing at the Courthouse and Law Enforcement Center additions. Justification The current roof had a 10-year warranty and was installed in 2011. The roof has performed well through the warranty period and beyond but is starting to show wear with some areas starting to show leaks. BSD-GC-2801 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $0 $0 $0 $1,500,000 $0 $1,500,000 FUNDING TOTAL $0 $0 $0 $1,500,000 $0 $1,500,000 Expenditures Planning/Design $0 $0 $0 $100,000 $0 $100,000 Construction $0 $0 $0 $1,400,000 $0 $1,400,000 EXPENDITURES TOTAL $0 $0 $0 $1,500,000 $0 $1,500,000 Budget Impact/Other Replacement of the roof will create a new 30-year window of warranty, which will eliminate the need for costly repairs in that time period. Capital Project Category: Public Facilities Location: Stillwater District: District 3 Total Estimated Project Cost: $1,500,000 Prior Year(s) Total Cost: $0 Project #: BSD-GC-2801 Project Name: Stillwater Campus Roof Replacement CIP 2026-2030 48 Description The project scope includes planning for the replacement and enhancement of four air-handling units in the original spaces in the Government Center. System components to be improved include air-handling units that distribute tempered air through ductwork to Variable Air Control (VAV) boxes within workspaces. The air handling units also provide fresh air intake to the building and exhausts the air that has been cycled through the building. The air-handling units in the Government Center were not addressed during the Campus 2025 remodel project and are original to the building which was built in 1986 and expanded in 1992. Planning and implementation for the improvements is scheduled for 2030. Justification Air-handling equipment is original to the areas of the Government Center built in 1986 and has been extended past its expected useful life due to proper maintenance and care. As the systems continue to age, it becomes more susceptible to increased maintenance and costly emergency failures. Expected life cycles of air-handling units are 20 to 25 years. At the time of replacement, many of these units will be more than 30 years old. These systems are critical to maintaining a safe and comfortable environment for occupants and visitors. BSD-GC-2901 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $0 $0 $0 $0 $1,400,000 $1,400,000 FUNDING TOTAL $0 $0 $0 $0 $1,400,000 $1,400,000 Expenditures Planning/Design $0 $0 $0 $0 $100,000 $100,000 Construction $0 $0 $0 $0 $1,300,000 $1,300,000 EXPENDITURES TOTAL $0 $0 $0 $0 $1,400,000 $1,400,000 Budget Impact/Other Replacing 30-plus-year-old air-handling systems would have expected operational and maintenance savings due to increased efficiency in the new equipment, which lowers long-term operational costs. This project will also help to avoid costly emergency repairs, which occur when aging equipment fails. Capital Project Category: Public Facilities Location: Stillwater District: District 3 Total Estimated Project Cost: $1,400,000 Prior Year(s) Total Cost: $0 Project #: BSD-GC-2901 Project Name: Government Center Ventilation Upgrades CIP 2026-2030 49 Description This scope is for the creation of a library strategic facility plan. Justification The library strategic facility plan will help guide Washington County decisions related to equity of access to library services, the existing condition of current library buildings, built environment needs within libraries, and connecting countywide goals to library program needs. The plan will identify library facilities in need of remodeling, expansion, or replacement and show geographical and population-based gaps in library locations throughout the county. BSD-LIB-2601 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Operating Transfer In $200,000 $0 $0 $0 $0 $200,000 FUNDING TOTAL $200,000 $0 $0 $0 $0 $200,000 Expenditures Planning/Design $200,000 $0 $0 $0 $0 $200,000 EXPENDITURES TOTAL $200,000 $0 $0 $0 $0 $200,000 Budget Impact/Other This project will not have any long-term effect on ongoing operational budgets but will provide strategic guidance for future decision-making regarding library facilities. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $200,000 Prior Year(s) Total Cost: $0 Project #: BSD-LIB-2601 Project Name: Library Strategic Facility Plan CIP 2026-2030 50 Description The project scope is for the design of expanding the library extended access program to two new locations: Oakdale Library and Wildwood Library. Justification Library extended access is a program that provides additional hours of library access to patrons beyond the typical timeframe that the library is open. This requires proper security components, including card readers and cameras, to be added to spaces to ensure patron and staff safety and proper program usage. Design would occur in 2026, with implementation planned for a future year. BSD-LIB-2602 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Operating Transfer In $150,000 $0 $0 $0 $0 $150,000 FUNDING TOTAL $150,000 $0 $0 $0 $0 $150,000 Expenditures Planning/Design $150,000 $0 $0 $0 $0 $150,000 EXPENDITURES TOTAL $150,000 $0 $0 $0 $0 $150,000 Budget Impact/Other This project will increase ongoing costs for library operations due to added security equipment and services and increased energy costs due to additional hours of operations of the mechanical systems and lighting. Capital Project Category: Public Facilities Location: Various/Other District: Multiple Total Estimated Project Cost: $150,000 Prior Year(s) Total Cost: $0 Project #: BSD-LIB-2602 Project Name: Library Extended Access CIP 2026-2030 51 Description The project scope includes making significant improvements to the Public Works South Shop site in Woodbury, to include project design, construction, site improvements, building furnishings, mechanical and electrical equipment, office equipment, and technology. Design is scheduled to begin in the fall of 2025 with project bidding and construction targeted in 2027. Justification The Public Works South Shop in Woodbury is outdated and in need of replacement. In 2013, the Public Works Facility Study was completed, and it was determined that the design of the space is not suited for the size and amount of equipment needed in the southern portion of the County. Additionally, the building was noted as deteriorating, being non-compliant with the Americans with Disabilities Act, and using twice the amount of energy per square foot as it should. The facility was built based on now outdated equipment and technology needs. The design and space constraints cause operational inefficiencies and increase staff time needed to access equipment. BSD-MSS-2001 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding County Transportation Sales Tax (Road & Bridge)$5,800,000 $2,258,300 $0 $0 $0 $8,058,300 Planned Use of Fund Balance- R&B $0 $20,241,700 $0 $0 $0 $20,241,700 Bond Proceeds $0 $9,000,000 $0 $0 $0 $9,000,000 FUNDING TOTAL $5,800,000 $31,500,000 $0 $0 $0 $37,300,000 Expenditures Planning/Design $1,600,000 $0 $0 $0 $0 $1,600,000 Construction $0 $31,500,000 $0 $0 $0 $31,500,000 Contribution to Fund Balance $4,200,000 $0 $0 $0 $0 $4,200,000 EXPENDITURES TOTAL $5,800,000 $31,500,000 $0 $0 $0 $37,300,000 Budget Impact/Other The total estimated project cost is $35.1 million, and the main funding source is the County Transportation Sales Tax. $9 million is being carried in the planned 2027 Bond issuance for this project. If this Bond is not sold, this project would be delayed. The contribution to Fund Balance duplicates revenue/expenses, the true cost is $35.1M. Capital Project Category: Public Facilities Location: South Shop District: District 5 Total Estimated Project Cost: $35,100,000 Prior Year(s) Total Cost: $2,000,000 Prior Year(s) Total Savings: $18,041,700 Project #: BSD-MSS-2001 Project Name: South Shop Improvements CIP 2026-2030 52 Description The project scope includes making significant improvements and modifications to the Park Grove Library at its current location, to include project design, construction, building furnishes, office equipment, and technology. Design was scheduled in 2024, with project bidding targeted in 2025. Construction is anticipated to begin in the fall of 2025 with completion in the fall of 2026. Temporary library materials and services are planned at the South Service Center through the construction duration, as well as scheduled library program events at other locations within Cottage Grove. Justification The Park Grove Library is in need of extensive building system replacements based on system life expectancy and addressing the outdated layout of the library. This project will address the needs and desires of the community based on past community engagement activities conducted in 2018, as well as new community engagement as part of the design process. The planning and design work will provide a road map for completing the major renovation needed at the Park Grove Library. BSD-PGL-2001 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Planned Use of Fund Balance $1,000,000 $0 $0 $0 $0 $1,000,000 Capital Investment Funding $4,789,300 $0 $0 $0 $0 $4,789,300 Bond Proceeds $0 $11,000,000 $0 $0 $0 $11,000,000 FUNDING TOTAL $5,789,300 $11,000,000 $0 $0 $0 $16,789,300 Expenditures Construction $5,789,300 $11,000,000 $0 $0 $0 $16,789,300 EXPENDITURES TOTAL $5,789,300 $11,000,000 $0 $0 $0 $16,789,300 Budget Impact/Other The project will have a focus on improving energy efficiency and employee productivity. A future cost reduction corresponds to anticipated revenue savings in the Building Services Division operating budget. $500,000 is being carried in the budget to improve Hemingway Avenue to increase parking capacity and make road and pedestrian safety improvements. $11 Million is being carried in the planned 2027 Bond issuance for this project. If this Bond is not sold, this project would need to be funded by alternative sources. The total budget for this project, including funding in past Capital Improvement Plans is $18.3 Million. Capital Project Category: Public Facilities Location: Cottage Grove District: District 4 Total Estimated Project Cost: $18,289,300 Prior Year(s) Total Cost: $1,500,000 Project #: BSD-PGL-2001 Project Name: Park Grove Library Improvements CIP 2026-2030 53 Description The project scope includes facility expansion of 4,000 square feet to the building and expansion of the truck yard by adding three dock bays. Justification The Environmental Center opened in 2009. Annual citizen participation and hazardous waste collected have more than doubled since the center opened. In 2016-2017, a Facility Assessment and Strategic Planning Study was completed by an architect. These modifications to the center are recommended in the study and will improve operational efficiency so the center can continue to meet growth in participation, citizen demand, and waste volume without compromising service, environmental management, or safety. Design for the expansion was completed in 2021. Construction is proposed to be completed in conjunction with the construction of the new South Shop. BSD-PHE-002 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Operating Transfer In $0 $2,500,000 $0 $0 $0 $2,500,000 FUNDING TOTAL $0 $2,500,000 $0 $0 $0 $2,500,000 Expenditures Construction $0 $2,500,000 $0 $0 $0 $2,500,000 EXPENDITURES TOTAL $0 $2,500,000 $0 $0 $0 $2,500,000 Budget Impact/Other The added square footage to the building will increase operational and maintenance costs moving forward. Capital Project Category: Public Facilities Location: Woodbury District: District 5 Total Estimated Project Cost: $2,500,000 Prior Year(s) Total Cost: $0 Project #: BSD-PHE-002 Project Name: Environmental Center Expansion CIP 2026-2030 54 Description The project scope includes land acquisition, design, and development of a yard waste collection site in the central part of the county. Justification The county has evaluated service gaps in yard waste collections and residential access to this service. This project will address yard waste collection service to the central part of the county. The proposed property purchase for this Yard Waste site includes an existing building and a driver training track planned for use by Sheriff operations. BSD-PHE-2601 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Investment Funding $1,303,200 $0 $0 $0 $0 $1,303,200 FUNDING TOTAL $1,303,200 $0 $0 $0 $0 $1,303,200 Expenditures Contribution to Fund Balance $1,303,200 $0 $0 $0 $0 $1,303,200 EXPENDITURES TOTAL $1,303,200 $0 $0 $0 $0 $1,303,200 Budget Impact/Other This project will increase operations and maintenance costs because of the added infrastructure. Future upgrades to the existing amenities on the site, such as the building and driver training track are not included in the current funding and would require additional funding for future improvements. Capital Project Category: Public Facilities Location: Afton District: District 3 Total Estimated Project Cost: $6,632,900 Prior Year(s) Total Revenue: $5,329,700 Project #: BSD-PHE-2601 Project Name: Central Yard Waste CIP 2026-2030 55 Description The project scope includes design and development of a yard waste collection site in the southern part of the county. Justification The county has evaluated service gaps in yard waste collections and residential access to this service. This project will address yard waste collection service in the southern part of the county. The northern yard waste site in Forest Lake is currently operational, while the central yard waste site is slated for construction in 2026. The current preferred site location is on county-owned land at the Woodbury South Shop/South Environmental Center campus. Design is proposed to begin in 2027 with construction in 2028. BSD-PHE-2701 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Operating Transfer In $0 $500,000 $1,500,000 $0 $0 $2,000,000 FUNDING TOTAL $0 $500,000 $1,500,000 $0 $0 $2,000,000 Expenditures Planning/Design $0 $500,000 $0 $0 $0 $500,000 Construction $0 $0 $1,500,000 $0 $0 $1,500,000 EXPENDITURES TOTAL $0 $500,000 $1,500,000 $0 $0 $2,000,000 Budget Impact/Other This project will increase operations and maintenance costs due to the added infrastructure. Capital Project Category: Public Facilities Location: Woodbury District: District 5 Total Estimated Project Cost: $2,000,000 Prior Year(s) Total Cost: $0 Project #: BSD-PHE-2701 Project Name: Southern Yard Waste CIP 2026-2030 56 Description The project scope includes the replacement of glass in exterior windows throughout the Government Center. Justification The windows in the Government Center were replaced in 2011 as part of an overall building remodel project. The glass within the windows is no longer under warranty and has begun to fail leaving cloudy and distorted markings between the panes of glass. An exterior envelope project was completed in 2020 to address leaking through the brick above and around the windows as well. The leaking likely contributed to the glass failure. The 2020 envelope repairs will be evaluated during the glass replacement to ensure all leaks have been corrected as part of this project. BSD-SWGC-2802 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $0 $0 $500,000 $0 $0 $500,000 FUNDING TOTAL $0 $0 $500,000 $0 $0 $500,000 Expenditures Construction $0 $0 $500,000 $0 $0 $500,000 EXPENDITURES TOTAL $0 $0 $500,000 $0 $0 $500,000 Budget Impact/Other There are no long-term budget impacts associated with this project. The Capital Repair Fund would provide the budget for the glass replacement. Capital Project Category: Public Facilities Location: Stillwater District: District 3 Total Estimated Project Cost: $500,000 Prior Year(s) Total Cost: $0 Project #: BSD-SWGC-2802 Project Name: Government Center Glass Replacement CIP 2026-2030 57 Description The project scope will include the installation of an exterior sand separator to remove sand and sediment from the force main that transports sanitary waste from the North Shop to the City of Stillwater sanitary sewer system. This work will include rerouting a sanitary line within the fleet maintenance area to keep only water from snow melt and truck washing entering the exterior sand separator. Justification The original force main installation included a sand separator inside the vehicle wash bay, however, the volume of sand, salt, and sediment being washed off the plow trucks far exceeded the capacity of the interior sand separator. This caused large volumes of sand to enter the force main system, which clogged up the system and damaged pumps. The damaged pumps need to be replaced more often than their typical life cycle and the clogged lines need to be cleared through a process called pigging. In addition to these unplanned costs, the interior sand separator needs to be pumped out on a weekly basis to minimize the volume of sand entering the system. The exterior sand separator that will be installed will handle the volume of sand that the wash bay is producing, which will protect the pumps and mitigate the need for future pigging. BSD-SWNS-2801 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Repair Fund $0 $0 $500,000 $0 $0 $500,000 FUNDING TOTAL $0 $0 $500,000 $0 $0 $500,000 Expenditures Construction $0 $0 $500,000 $0 $0 $500,000 EXPENDITURES TOTAL $0 $0 $500,000 $0 $0 $500,000 Budget Impact/Other The system in its current state requires higher than anticipated maintenance costs due to the high volume of sand entering the system. The installation of the new exterior sand separator is expected to greatly reduce these ongoing maintenance costs. Capital Project Category: Public Facilities Location: Stillwater District: District 3 Total Estimated Project Cost: $500,000 Prior Year(s) Total Cost: $0 Project #: BSD-SWNS-2801 Project Name: Force Main Sand Separator Installation CIP 2026-2030 58 Description The project scope includes making significant improvements and modifications to the R. H. Stafford Library in Woodbury, to include project design, construction, office equipment, technology, addressing aging mechanical and electrical equipment, replacement of finishes, and improving the layout for maximum space efficiency. Design will be kicked off in 2025 with bidding targeted for early 2027. Construction is anticipated to begin in the spring of 2027 upon completion of the Park Grove Library project. Construction is anticipated to take approximately one year. Justification R.H. Stafford Library is the most used library in Washington County and is in need of upgrades. The space layout is inefficient, and finishes are showing their age. Mechanical and electrical equipment is reaching its useful life and is in need of replacement. BSD-WBSL-001 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Capital Investment Funding $300,000 $0 $0 $0 $0 $300,000 Bond Proceeds $0 $20,000,000 $0 $0 $0 $20,000,000 FUNDING TOTAL $300,000 $20,000,000 $0 $0 $0 $20,300,000 Expenditures Construction $300,000 $20,000,000 $0 $0 $0 $20,300,000 EXPENDITURES TOTAL $300,000 $20,000,000 $0 $0 $0 $20,300,000 Budget Impact/Other New equipment will greatly improve the energy efficiency of the building thus lowering operational costs. $300,000 is being carried in the budget to provide a temporary location for library materials and services in the Woodbury area. $20 million is being carried in the planned 2027 Bond issuance for this project. If this Bond is not sold, this project would be delayed. Capital Project Category: Public Facilities Location: Woodbury District: District 5 Total Estimated Project Cost: $22,313,600 Prior Year(s) Total Cost: $2,013,600 Project #: BSD-WBSL-001 Project Name: R.H. Stafford Library Improvements CIP 2026-2030 59 This category includes park facilities development and parkland acquisition and improvements. As the implementing agency for the Metropolitan Council, the county receives acquisition and development dollars from the Metropolitan Council. Before receiving funding, the county is required to have an approved master plan for each park site. Each master plan identifies land acquisition and development needs. All projects recommended for the CIP have involved public review at a public hearing, and review and approval by the Washington County Parks and Open Space Commission and the Washington County Board of Commissioners. Parks and Land Detailed Information 60 PROJECTS BY CATEGORY PARKS & LAND Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Parks & Land HC-1048-027 $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 HC-1048-029 $400,000 $0 $0 $0 $0 $400,000 HC-1048-030 $0 $100,000 $0 $0 $0 $100,000 PARK-1001 $100,000 $200,000 $100,000 $100,000 $100,000 $600,000 PARK-1003 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 PARK-1005 $0 $300,000 $850,000 $250,000 $250,000 $1,650,000 PARK-1006 $0 $0 $0 $250,000 $300,000 $550,000 PARK-2016 $0 $100,000 $1,100,000 $0 $0 $1,200,000 PARK-3009 $0 $0 $0 $0 $150,000 $150,000 PARK-3018 $0 $0 $250,000 $1,800,000 $0 $2,050,000 PARK-3020 $0 $475,000 $0 $0 $600,000 $1,075,000 PARK-3021 $0 $150,000 $775,000 $0 $0 $925,000 PARK-4006 $0 $2,000,000 $0 $0 $0 $2,000,000 PARK-8017 $0 $120,000 $630,000 $0 $0 $750,000 PARK-8018 $0 $0 $0 $0 $1,000,000 $1,000,000 PARK-9003 $970,000 $2,379,000 $0 $0 $0 $3,349,000 PARKS & LAND TOTAL $1,845,000 $6,199,000 $4,080,000 $2,775,000 $2,775,000 $17,674,000 $1,845,000 $6,199,000 $4,080,000 $2,775,000 $2,775,000 $17,674,000 CIP 2026-2030 61 PROJECTS BY FUNDING SOURCE PARKS & LAND Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Operating Transfer In PARK-9003 $100,000 $0 $0 $0 $0 $100,000 OPERATING TRANSFER IN TOTAL $100,000 $0 $0 $0 $0 $100,000 Metropolitan Council Bond Request $0 $0 $800,000 $400,000 $400,000 $1,600,000 State Sales Tax PARK-1005 $0 $0 $300,000 $0 $0 $300,000 PARK-1006 $0 $0 $0 $0 $200,000 $200,000 PARK-2016 $0 $100,000 $1,000,000 $0 $0 $1,100,000 PARK-3018 $0 $0 $100,000 $1,500,000 $0 $1,600,000 PARK-3020 $0 $0 $0 $0 $400,000 $400,000 PARK-3021 $0 $150,000 $775,000 $0 $0 $925,000 PARK-8017 $0 $120,000 $230,000 $0 $0 $350,000 PARK-8018 $0 $0 $0 $0 $900,000 $900,000 PARK-9003 $385,000 $785,000 $0 $0 $0 $1,170,000 STATE SALES TAX TOTAL $385,000 $1,155,000 $2,405,000 $1,500,000 $1,500,000 $6,945,000 State Grants PARK-9003 $0 $1,244,000 $0 $0 $0 $1,244,000 STATE GRANTS TOTAL $0 $1,244,000 $0 $0 $0 $1,244,000 Transmission Line Tax HC-1048-029 $400,000 $0 $0 $0 $0 $400,000 HC-1048-030 $0 $100,000 $0 $0 $0 $100,000 PARK-1001 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 PARK-1003 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 PARK-1005 $0 $300,000 $250,000 $250,000 $250,000 $1,050,000 PARK-1006 $0 $0 $0 $150,000 $0 $150,000 PARK-3009 $0 $0 $0 $0 $150,000 $150,000 PARK-3018 $0 $0 $150,000 $0 $0 $150,000 TRANSMISSION LINE TAX TOTAL $850,000 $850,000 $850,000 $850,000 $850,000 $4,250,000 Local Contributions PARK-9003 $485,000 $350,000 $0 $0 $0 $835,000 LOCAL CONTRIBUTIONS TOTAL $485,000 $350,000 $0 $0 $0 $835,000 State Bond Request $0 $2,000,000 $0 $0 $0 $2,000,000 Private Funds HC-1048-027 $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 PRIVATE FUNDS TOTAL $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 Planned Use of Fund Balance-CPK PARK-1001 $0 $100,000 $0 $0 $0 $100,000 PARK-3020 $0 $475,000 $0 $0 $0 $475,000 PLANNED USE OF FUND BALANCE-CPK TOTAL $0 $575,000 $0 $0 $0 $575,000 $1,845,000 $6,199,000 $4,080,000 $2,775,000 $2,775,000 $17,674,000 CIP 2026-2030 62 Description The project scope includes an annual program for improvements and renovations at the Historic Courthouse. These improvements were identified in the Historic Courthouse Historic Structure Report completed in 2023. The improvements planned are operational, general upkeep, and maintenance upgrades to the Historic Courthouse. Justification The Historic Courthouse Historic Structure Report identified immediate (0-2 year), intermediate (2-5 year), and longer-term (5- 10 year) improvements. Based on these recommendations, maintenance and restoration projects will be completed annually. Continued investments are needed to maintain a historic structure. HC-1048-027 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Private Funds $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 FUNDING TOTAL $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 Expenditures Construction $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 EXPENDITURES TOTAL $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 Budget Impact/Other Projects will improve infrastructure conditions, which will reduce annual maintenance costs. Capital Project Category: Parks & Land Location: Historic Courthouse District: District 3 Total Estimated Project Cost: $125,000 Prior Year(s) Total Cost: $0 Project #: HC-1048-027 Project Name: Interior & Exterior Renovations CIP 2026-2030 63 Description The project scope includes replacing the aging elevator at the Washington County Historic Courthouse. Justification The elevator at the Washington County Historic Courthouse is no longer compliant with standards and increasingly costly to maintain. Repairs are difficult due to the unit’s age, often requiring special parts and extended downtime. Breakdowns disrupt public access and create challenges for staff, visitors, and community groups that rely on the courthouse for events, tours, and programs. Replacing the elevator will ensure safe, dependable, and ADA-compliant vertical access within the historic building, protecting its continued use as a public facility while reducing costly maintenance demands. HC-1048-029 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Transmission Line Tax $400,000 $0 $0 $0 $0 $400,000 FUNDING TOTAL $400,000 $0 $0 $0 $0 $400,000 Expenditures Construction $400,000 $0 $0 $0 $0 $400,000 EXPENDITURES TOTAL $400,000 $0 $0 $0 $0 $400,000 Budget Impact/Other The project will reduce operation and maintenance costs associated with general operation and repair needs. Capital Project Category: Parks & Land Location: Historic Courthouse District: District 3 Total Estimated Project Cost: $400,000 Prior Year(s) Total Cost: $0 Project #: HC-1048-029 Project Name: Historic Courthouse - Elevator CIP 2026-2030 64 Description The project scope includes repaving the parking lot and pavement improvements at the Washington County Historic Courthouse. Justification The parking lot and surrounding pavement at the Washington County Historic Courthouse have deteriorated, creating safety concerns, accessibility challenges, and ongoing maintenance needs. Repaving will provide a safe, functional, and welcoming environment for visitors, staff, and community events while preserving the usability of the facility. The current budget will allow for the design. The County will monitor additional opportunities for funding construction. HC-1048-030 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Transmission Line Tax $0 $100,000 $0 $0 $0 $100,000 FUNDING TOTAL $0 $100,000 $0 $0 $0 $100,000 Expenditures Planning/Design $0 $100,000 $0 $0 $0 $100,000 EXPENDITURES TOTAL $0 $100,000 $0 $0 $0 $100,000 Budget Impact/Other The program will improve pavement conditions, thus reducing annual maintenance costs. Capital Project Category: Parks & Land Location: Historic Courthouse District: District 3 Total Estimated Project Cost: $100,000 Prior Year(s) Total Cost: $0 Project #: HC-1048-030 Project Name: Historic Courthouse – Parking Lot Pavement Improvements CIP 2026-2030 65 Description The parks and trails in Washington County provide residents and visitors an opportunity to explore natural resources through a wide variety of recreational facilities. The planning, development, operations, and management of the county's regional parks and trail system are guided by a Long-Range Plan document for each park and trail. Long-Range Plans and plan amendments to be prioritized for years 2026 and beyond will include: Prairie View Regional Trail and Mississippi River Regional Trail. Due to timelines of the current project and the proximity of project areas, the County is proposing to strategically coordinate and combine 2026 and 2027 regional trail planning efforts in 2027. Future Long-Range planning initiatives will be reviewed by the Washington County Board and recommended in future Capital Improvement Plans for feedback. Justification Long-Range Plans are important because a proposed park or trail project must be consistent with an approved Long-Range Plan to receive certain State or regional grants for acquisition, development, or maintenance reimbursement. Long-Range planning is also important because it allows the general public and local agencies to participate in the future development of Washington County’s park and trail system. PARK-1001 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Planned Use of Fund Balance- CPK $0 $100,000 $0 $0 $0 $100,000 Transmission Line Tax $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 FUNDING TOTAL $100,000 $200,000 $100,000 $100,000 $100,000 $600,000 Expenditures Contribution to Fund Balance $100,000 $0 $0 $0 $0 $100,000 Planning/Design $0 $200,000 $100,000 $100,000 $100,000 $500,000 EXPENDITURES TOTAL $100,000 $200,000 $100,000 $100,000 $100,000 $600,000 Budget Impact/Other Long-Range Plans determine the planning, acquisition, operations, and management of the county's park system; however, there are no additional impacts to the budget related to the actual planning process. There is no anticipated change within the Parks/Planning Division's operating budgets. Capital Project Category: Parks & Land Location: Various/Other District: Multiple Total Estimated Project Cost: $500,000 Prior Year(s) Total Cost: $0 Project #: PARK-1001 Project Name: Park & Trail Long-Range Planning CIP 2026-2030 66 Description This annual program is for improvements to existing park facilities and infrastructure. Examples of this program include: - Improvements to infrastructure: signage, concrete, pedestrian facilities, play area, and parking lot amenities - Improvements to buildings based on the Facility Condition Index (FCI) - Trail development - Capital project contingency - Planning/feasibility studies Justification Infrastructure in the Washington County parks and trails is nearing or beyond its useful life. This annual program is necessary to provide the ability to be responsive to smaller projects throughout the year that are not programmed into a larger capital project. This program is also needed for contingency for larger capital projects that exceed estimated budgets. PARK-1003 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Transmission Line Tax $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 FUNDING TOTAL $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 Expenditures Construction $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 EXPENDITURES TOTAL $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 Budget Impact/Other Projects will improve infrastructure conditions, thus reducing annual maintenance costs. The program may provide funding to serve as a financial match for Parks Capital Improvement Projects, including grants that originate from State Sales Tax and State Bonds. The program may also provide funding source for projects located outside of the Metropolitan Regional Parks System that are not eligible for State Sales Tax revenue. Capital Project Category: Parks & Land Location: Various/Other District: Multiple Total Estimated Project Cost: $1,750,000 Prior Year(s) Total Cost: $0 Project #: PARK-1003 Project Name: Park Facilities/Infrastructure Improvement Program CIP 2026-2030 67 Description This annual program is for improvements to pavement for Washington County parks and trails. Priorities will be guided by the Pavement Condition Index (PCI) and specific projects will be planned as funding permits. Projects that may be completed: 2027- St. Croix Bluffs Regional Park Parking Lots, Trails, and Roads 2028- Lake Elmo Park Reserve Swim Pond Parking Lots, Roads, and Group Campsite Area 2029- Recommendations determined on future PCI report 2030- Recommendations determined on future PCI report Justification Trails, parking lots, and roads within Washington County parks are nearing or beyond their useful life. Conducting maintenance/preservation projects will allow the county to extend the life of the pavement. Pavement preservation will also provide the public with improved safety and mobility and an overall more comfortable experience within the parks. PARK-1005 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $0 $300,000 $0 $0 $300,000 Transmission Line Tax $0 $300,000 $250,000 $250,000 $250,000 $1,050,000 Metropolitan Council Bond Request $0 $0 $300,000 $0 $0 $300,000 FUNDING TOTAL $0 $300,000 $850,000 $250,000 $250,000 $1,650,000 Expenditures Construction $0 $300,000 $850,000 $250,000 $250,000 $1,650,000 EXPENDITURES TOTAL $0 $300,000 $850,000 $250,000 $250,000 $1,650,000 Budget Impact/Other The program will improve pavement conditions, thus reducing annual maintenance costs. If the Bond is not received, it could delay future improvements. Capital Project Category: Parks & Land Location: Various/Other District: Multiple Total Estimated Project Cost: $1,650,000 Prior Year(s) Total Cost: $0 Project #: PARK-1005 Project Name: Parks & Trails Pavement Preservation CIP 2026-2030 68 Description This program is to support the design, construction, maintenance, and future improvements for the regional trail system. Funding will specifically focus on identified needs within the regional trail system. Items eligible for use of funds include: - Treatment to extend the life of trail pavement - Design process for segment of regional trail - Signage, wayfinding, interpretation features, rest stops, and trailheads for regional trails - Crossing or intersection safety improvements - Trail segment extensions Justification The regional trail system is a growing section of Washington County’s bike and ped plan. In order to provide safe and user- friendly experiences on the regional trails, items such as safety improvements, wayfinding, and trails in good repair are essential. PARK-1006 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $0 $0 $0 $200,000 $200,000 Transmission Line Tax $0 $0 $0 $150,000 $0 $150,000 Metropolitan Council Bond Request $0 $0 $0 $100,000 $100,000 $200,000 FUNDING TOTAL $0 $0 $0 $250,000 $300,000 $550,000 Expenditures Planning/Design $0 $0 $0 $250,000 $300,000 $550,000 EXPENDITURES TOTAL $0 $0 $0 $250,000 $300,000 $550,000 Budget Impact/Other Maintenance projects will improve infrastructure conditions, thus reducing annual maintenance costs. New trail projects will increase operation and maintenance costs associated with the additional features or miles of trail to maintain. The program may provide funding to serve as a financial match for Parks Capital Improvement Projects, including grants that originate from State Sales Tax and State Bonds. If the Bond is not received, the project could be delayed. Capital Project Category: Parks & Land Location: Various/Other District: Multiple Total Estimated Project Cost: $550,000 Prior Year(s) Total Cost: $0 Project #: PARK-1006 Project Name: Regional Trail System Program CIP 2026-2030 69 Description The project scope includes planning and design for improvements identified in the Long-Range Plan at Big Marine Park Reserve. The improvements may include access, natural resources, recreation, and trails. Justification The county continues to acquire properties in accordance with the Big Marine Park Reserve Long-Range Plan. This project will determine improvements that will help lay the foundation for future park investments. Improvements are planned on parcels that have been acquired by Washington County. PARK-2016 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $100,000 $1,000,000 $0 $0 $1,100,000 Metropolitan Council Bond Request $0 $0 $100,000 $0 $0 $100,000 FUNDING TOTAL $0 $100,000 $1,100,000 $0 $0 $1,200,000 Expenditures Planning/Design $0 $100,000 $0 $0 $0 $100,000 Construction $0 $0 $1,100,000 $0 $0 $1,100,000 EXPENDITURES TOTAL $0 $100,000 $1,100,000 $0 $0 $1,200,000 Budget Impact/Other The project will increase operation and maintenance costs associated with providing public access to and use of this land. If the Bond is not received, the project could be delayed. Capital Project Category: Parks & Land Location: Big Marine District: District 1 Total Estimated Project Cost: $1,200,000 Prior Year(s) Total Cost: $0 Project #: PARK-2016 Project Name: Big Marine Park Reserve Improvements CIP 2026-2030 70 Description The project scope includes design for a facility that meets the Parks Division's maintenance and natural resource staff office and storage needs within the Lake Elmo Park Reserve. Improvements may include renovating existing buildings and new facilities. The design will evaluate the reconfiguration of the current parks maintenance facility that could add staff lockers, break rooms, and office space. The project will also consider new equipment cleaning and storage space. Justification Improvements to the Parks maintenance facility campus will provide a safe working environment for staff, a secure system to protect county assets, and an opportunity to have a properly sized structure that can serve growing operational needs. Storage barns within Lake Elmo Park Reserve are in need of repair. Issues include ongoing electrical problems, moisture issues, and several break-ins, resulting in equipment damage or theft. Parks equipment is stored outside and exposed to all weather conditions, thus reducing the utility and lifespan of the equipment. PARK-3009 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Transmission Line Tax $0 $0 $0 $0 $150,000 $150,000 FUNDING TOTAL $0 $0 $0 $0 $150,000 $150,000 Expenditures Planning/Design $0 $0 $0 $0 $150,000 $150,000 EXPENDITURES TOTAL $0 $0 $0 $0 $150,000 $150,000 Budget Impact/Other The project will reduce operation and maintenance costs associated with equipment degradation and building maintenance. Capital Project Category: Parks & Land Location: Lake Elmo District: District 3 Total Estimated Project Cost: $150,000 Prior Year(s) Total Cost: $0 Project #: PARK-3009 Project Name: Lake Elmo Park Reserve Maintenance & Natural Resource Facility Improvements CIP 2026-2030 71 Description The project scope includes repairing and renovating existing buildings at the Lake Elmo Swim Pond and the shower facility at the Lake Elmo Campground. Renovations to the Lake Elmo Swim Pond will make improvements to the current concession stand and shower/bathroom facility. Improvements will include exterior and interior repairs to ensure the facility is usable for the public and improved ADA access. Renovations to the Lake Elmo Campground shower facility will include interior and exterior repairs as well as ADA improvements and a potential redesign of the current space to better fit public needs. Justification Both facilities are in need of repairs and must be upgraded to meet the current and future demand. PARK-3018 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $0 $100,000 $1,500,000 $0 $1,600,000 Transmission Line Tax $0 $0 $150,000 $0 $0 $150,000 Metropolitan Council Bond Request $0 $0 $0 $300,000 $0 $300,000 FUNDING TOTAL $0 $0 $250,000 $1,800,000 $0 $2,050,000 Expenditures Planning/Design $0 $0 $250,000 $0 $0 $250,000 Construction $0 $0 $0 $1,800,000 $0 $1,800,000 EXPENDITURES TOTAL $0 $0 $250,000 $1,800,000 $0 $2,050,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Cost estimate details will be a product of the 2028 design process. Additional funding is expected to be needed for construction. If the Bond is not received, the project could be delayed. Capital Project Category: Parks & Land Location: Lake Elmo District: District 3 Total Estimated Project Cost: $2,050,000 Prior Year(s) Total Cost: $0 Project #: PARK-3018 Project Name: Lake Elmo Park Reserve – Facility Improvements CIP 2026-2030 72 Description The project scope includes the construction of a single-track trail at Lake Elmo Park Reserve in accordance with previous design studies. The project will be implemented in two phases. The trails will be implemented in conformance with best practices and standards to minimize erosion issues and impact on vegetation and natural resources. Justification Washington County commissioned a study and preliminary design process for this project in 2021. The report provides guidance and recommendations for a single-track trail system. The county then optimized the route and implementation details during a final design process in 2024-25. The Lake Elmo Park Reserve master plan designates a single-track trail system. Mountain biking is currently allowed on specific multi-use trails within the park. A single-track system will provide separate trail facilities for these users, reducing share use conflicts. PARK-3020 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Planned Use of Fund Balance- CPK $0 $475,000 $0 $0 $0 $475,000 State Sales Tax $0 $0 $0 $0 $400,000 $400,000 Metropolitan Council Bond Request $0 $0 $0 $0 $200,000 $200,000 FUNDING TOTAL $0 $475,000 $0 $0 $600,000 $1,075,000 Expenditures Construction $0 $475,000 $0 $0 $600,000 $1,075,000 EXPENDITURES TOTAL $0 $475,000 $0 $0 $600,000 $1,075,000 Budget Impact/Other 2027 Fund Balance consists of: $400,000 of 2023 Transmission Line Tax and $75,000 of 2023 Equity Grant. The additional trails are expected to increase operations and maintenance costs. The county will explore opportunities to coordinate with volunteer groups to help maintain and improve the trails. If the Bond is not received, the project could be delayed. Capital Project Category: Parks & Land Location: Lake Elmo District: District 3 Total Estimated Project Cost: $1,525,000 Prior Year(s) Total Cost: $450,000 Project #: PARK-3020 Project Name: Lake Elmo Park Reserve Single Track Trail CIP 2026-2030 73 Description The project scope includes improvements to the North Pavilion and South Pavilion facilities. The improvements may include bathroom and septic upgrades, shelter facility updates, landscaping, parking and access improvements, and removal or reconstruction of the play areas. Justification The expectations and demand for reservable space to serve large group gatherings at Lake Elmo Park Reserve are increasing, putting additional strain on these well-used amenities. The existing shelter and bathroom facilities are approaching the end of their useful life and require improvements to meet ADA standards. The playgrounds near the pavilion shelters in the Lake Elmo Park Reserve are nearly 25 years old and standards, designs, and best practices have changed. To leverage recent investment in the destination playground near the swim pond, the county is considering renovating or possibly removing these structures. With the current funding, the project may not deliver all stated needs and may need to be implemented in further phases based on the outcome of the project's design. PARK-3021 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $150,000 $775,000 $0 $0 $925,000 FUNDING TOTAL $0 $150,000 $775,000 $0 $0 $925,000 Expenditures Planning/Design $0 $150,000 $0 $0 $0 $150,000 Construction $0 $0 $775,000 $0 $0 $775,000 EXPENDITURES TOTAL $0 $150,000 $775,000 $0 $0 $925,000 Budget Impact/Other The project will reduce operation and maintenance costs associated with facility repair. State Sales Tax will come in the form of a grant from the Metropolitan Council. Funding originates from State Sales Tax (deriving from the Clean Water, Land and Legacy amendment via the Parks and Trails Legacy Fund). Capital Project Category: Parks & Land Location: Lake Elmo District: District 3 Total Estimated Project Cost: $925,000 Prior Year(s) Total Cost: $0 Project #: PARK-3021 Project Name: Lake Elmo Park Reserve Pavilion Facilities CIP 2026-2030 74 Description The project scope includes planning and design of lighting for multi-use trails at Cottage Grove Ravine Regional Park. Justification This project builds upon recent improvements at Cottage Grove Ravine Regional Park, including the Ravine Landing facility. The project will help expand the park's year-round use and improve the visitors experience and safety during evening hours. The project in 2027 will produce the plan and design needed to implement the trail lighting in 2028. PARK-4006 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Bond Request $0 $2,000,000 $0 $0 $0 $2,000,000 FUNDING TOTAL $0 $2,000,000 $0 $0 $0 $2,000,000 Expenditures Planning/Design $0 $400,000 $0 $0 $0 $400,000 Construction $0 $1,600,000 $0 $0 $0 $1,600,000 EXPENDITURES TOTAL $0 $2,000,000 $0 $0 $0 $2,000,000 Budget Impact/Other The additional lighting fixtures are expected to increase operations and maintenance costs. The total estimated project cost is $2,000,000. If the Bond is not received, the project could be delayed. Capital Project Category: Parks & Land Location: Cottage Grove Ravine District: District 4 Total Estimated Project Cost: $2,000,000 Prior Year(s) Total Cost: $0 Project #: PARK-4006 Project Name: Cottage Grove Ravine Regional Park Lighted Trails CIP 2026-2030 75 Description The project scope includes planning and design for improvements to the St. Croix Bluffs Regional Park campground. Improvements include campsite upgrades and play area improvements. Justification The existing park facilities are in need of repairs and must be upgraded to meet the current and future demands. The playground in St. Croix Bluffs Regional Park campground is 25-plus years old. Standards, designs, and best practices have changed, resulting in a need to update and renovate this popular play structure. The electrical is also outdated at the campground and camper request for amenities have increased. Campsite upgrades will allow for better electrical, increased amperage, and potentially additional water hook-ups for campers. PARK-8017 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $120,000 $230,000 $0 $0 $350,000 Metropolitan Council Bond Request $0 $0 $400,000 $0 $0 $400,000 FUNDING TOTAL $0 $120,000 $630,000 $0 $0 $750,000 Expenditures Planning/Design $0 $120,000 $0 $0 $0 $120,000 Construction $0 $0 $630,000 $0 $0 $630,000 EXPENDITURES TOTAL $0 $120,000 $630,000 $0 $0 $750,000 Budget Impact/Other The project will reduce operation and maintenance costs associated with upkeep and general repair. If the Bond is not received, the project could be delayed. Capital Project Category: Parks & Land Location: St. Croix Bluffs District: District 4 Total Estimated Project Cost: $750,000 Prior Year(s) Total Cost: $0 Project #: PARK-8017 Project Name: St. Croix Bluffs Regional Park Campground Improvements CIP 2026-2030 76 Description The project scope includes repairing and renovating existing facilities at St Croix Bluffs Regional Park. Facilities may include picnic shelters, staff facilities, and campground buildings. Justification Existing facilities in St Croix Bluffs are in need of repairs and must be upgraded to meet the current and future demand. PARK-8018 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Sales Tax $0 $0 $0 $0 $900,000 $900,000 Metropolitan Council Bond Request $0 $0 $0 $0 $100,000 $100,000 FUNDING TOTAL $0 $0 $0 $0 $1,000,000 $1,000,000 Expenditures Contribution to Fund Balance $0 $0 $0 $0 $800,000 $800,000 Planning/Design $0 $0 $0 $0 $200,000 $200,000 EXPENDITURES TOTAL $0 $0 $0 $0 $1,000,000 $1,000,000 Budget Impact/Other The project will reduce operation and maintenance costs associated with upkeep and general repair. State Sales Tax and State Bond revenue will come in the form of a grant from the Metropolitan Council. Funding originates from State Sales Tax (deriving from the Clean Water, Land and Legacy amendment via the Parks and Trails Legacy Fund) and State Bonds. If the Bond is not received, the project could be delayed. $200,000 for design in 2030 with construction planned in 2031 utilizing $800,000 (Planned Use of Fund Balance) from the 2030 State Sales Tax. Capital Project Category: Parks & Land Location: St. Croix Bluffs District: District 4 Total Estimated Project Cost: $1,000,000 Prior Year(s) Total Cost: $0 Project #: PARK-8018 Project Name: St Croix Bluffs Regional Park Facility Improvements CIP 2026-2030 77 Description The Hardwood Creek Regional Trail is a north-south multi-use trail in north Washington County and is constructed primarily on former railroad right-of-way. A one-mile gap in the trail exists within the City of Hugo where the rail line remains active. This project will address this gap and extend the Hardwood Creek Regional Trail south to the county line. The design will be guided by the feasibility study conducted in 2021. The project may also include the construction of 0.2 mile segment along 140th St N. Justification The Hardwood Creek Regional Trail is the county’s most visited regional trail. A trail master plan was developed in 2013; since then, the county has been working to fund and implement the plan’s vision. The trail extension will fill an important gap in the existing trail network. Once complete, this project will be ready to connect to the Bruce Vento Regional Trail (Ramsey County) and ultimately link four counties: Washington, Ramsey, Anoka, and Chisago County. The City of Hugo is planning for improvements for the 140th St N and Fenway Blvd corridors in 2026. This provides an opportunity to improve existing sidewalk into a regional trail. PARK-9003 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $485,000 $350,000 $0 $0 $0 $835,000 State Grants $0 $1,244,000 $0 $0 $0 $1,244,000 State Sales Tax $385,000 $785,000 $0 $0 $0 $1,170,000 Operating Transfer In $100,000 $0 $0 $0 $0 $100,000 FUNDING TOTAL $970,000 $2,379,000 $0 $0 $0 $3,349,000 Expenditures Planning/Design $500,000 $0 $0 $0 $0 $500,000 Construction $150,000 $2,379,000 $0 $0 $0 $2,529,000 Right-of-Way $320,000 $0 $0 $0 $0 $320,000 EXPENDITURES TOTAL $970,000 $2,379,000 $0 $0 $0 $3,349,000 Budget Impact/Other This project will increase operation and maintenance costs associated with the additional miles of trail to maintain. Environment and Natural Resources Trust Fund (ENRTF) recommendations will be presented to the Legislature for consideration during the 2026 legislative session. State sales tax will come in the form of a grant from the Metropolitan Council. Funding originates from state sales tax (deriving from the Clean Water, Land and Legacy amendment via the Parks and Trails Legacy Fund). Local costs will be needed to deliver this project. Capital Project Category: Parks & Land Location: Hugo District: District 1 Total Estimated Project Cost: $3,349,000 Prior Year(s) Total Cost: $0 Project #: PARK-9003 Project Name: Hardwood Creek Regional Trail Extension CIP 2026-2030 78 This category includes the construction and preservation of the county’s 296 mile highway system. This system is comprised of 56 miles of county roads (CR) and 240 miles of County State Aid Highways (CSAH). Also included are proposed transit improvements on the Gold Line. A highway that receives state funding for construction and/or maintenance is called a County State Aid Highway (CSAH). Numbers in a project name or description indicate a county road number. For example, CSAH 13 refers to a project on a County State Aid Highway 13, TH refers to a Trunk Highway, and CR refers to a County Road (no State funding). Road and Bridge Detailed Information 79 PROJECTS BY CATEGORY ROAD & BRIDGES Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Road & Bridge RB-2201 $1,100,000 $770,000 $620,000 $620,000 $620,000 $3,730,000 RB-2203 $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 RB-2204 $1,150,000 $1,150,000 $7,650,000 $8,500,000 $6,000,000 $24,450,000 RB-2204-01 $0 $5,300,000 $0 $0 $0 $5,300,000 RB-2204-02 $4,217,700 $0 $0 $0 $0 $4,217,700 RB-2204-03 $3,900,000 $0 $0 $0 $0 $3,900,000 RB-2216 $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 RB-2580 $350,000 $0 $0 $0 $0 $350,000 RB-2582 $2,689,000 $0 $0 $0 $0 $2,689,000 RB-2609 $0 $11,400,000 $0 $0 $0 $11,400,000 RB-2629 $0 $1,000,000 $0 $5,500,000 $0 $6,500,000 RB-2641 $0 $0 $0 $450,000 $4,400,000 $4,850,000 RB-2645 $0 $1,100,000 $0 $7,800,000 $0 $8,900,000 RB-2650 $0 $0 $550,000 $1,250,000 $0 $1,800,000 RB-2651 $3,025,000 $4,025,000 $2,900,000 $2,500,000 $3,175,000 $15,625,000 RB-2658 $0 $0 $0 $1,000,000 $2,100,000 $3,100,000 RB-2667 $4,500,000 $0 $0 $0 $0 $4,500,000 RB-2668 $0 $17,500,000 $0 $0 $0 $17,500,000 RB-2672 $0 $17,200,000 $0 $0 $0 $17,200,000 RB-2674 $40,000,000 $0 $0 $0 $0 $40,000,000 RB-2675 $3,750,000 $0 $0 $0 $0 $3,750,000 RB-2682 $400,000 $0 $0 $0 $0 $400,000 RB-2683 $600,000 $450,000 $2,600,000 $0 $0 $3,650,000 RB-2685 $6,000,000 $40,900,000 $0 $0 $0 $46,900,000 RB-2688 $130,000 $0 $0 $0 $0 $130,000 RB-2690 $400,000 $0 $7,100,000 $0 $0 $7,500,000 RB-2691 $850,000 $0 $5,500,000 $0 $0 $6,350,000 RB-2692 $0 $550,000 $0 $1,150,000 $0 $1,700,000 RB-2693 $1,000,000 $0 $5,300,000 $0 $0 $6,300,000 RB-2694 $4,500,000 $0 $0 $0 $0 $4,500,000 RB-2695 $3,300,000 $0 $0 $0 $0 $3,300,000 RB-2696 $100,000 $0 $0 $0 $0 $100,000 RB-2697 $3,600,000 $0 $0 $0 $0 $3,600,000 RB-2701 $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 RB-2702 $0 $450,000 $0 $0 $0 $450,000 RB-2703 $0 $3,800,000 $0 $0 $0 $3,800,000 RB-2801 $0 $0 $0 $0 $500,000 $500,000 RB-2803 $300,000 $0 $0 $0 $0 $300,000 RB-2804 $900,000 $0 $0 $0 $0 $900,000 RB-2807 $750,000 $4,500,000 $0 $0 $0 $5,250,000 RB-2808 $700,000 $0 $3,450,000 $0 $0 $4,150,000 RB-2809 $550,000 $0 $3,874,900 $0 $0 $4,424,900 RB-2811 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2812 $700,000 $0 $3,984,200 $0 $0 $4,684,200 RB-2813 $100,000 $0 $0 $0 $0 $100,000 RB-2814 $1,563,200 $0 $0 $0 $0 $1,563,200 CIP 2026-2030 80 Project Category Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2815 $400,000 $0 $0 $0 $0 $400,000 RB-2816 $850,000 $0 $0 $0 $0 $850,000 RB-2817 $0 $300,000 $0 $0 $0 $300,000 RB-2818 $0 $300,000 $0 $500,000 $0 $800,000 RB-2819 $0 $0 $500,000 $0 $0 $500,000 RB-2820 $0 $0 $732,000 $0 $0 $732,000 RB-2821 $0 $0 $0 $800,000 $0 $800,000 RB-2822 $0 $0 $0 $200,000 $0 $200,000 RB-2823 $0 $250,000 $0 $0 $0 $250,000 RB-2824 $970,000 $0 $0 $0 $0 $970,000 RB-2827 $0 $250,000 $0 $0 $0 $250,000 RB-2828 $0 $0 $0 $0 $300,000 $300,000 RB-2829 $0 $0 $0 $2,200,000 $0 $2,200,000 RB-2830 $0 $0 $800,000 $1,000,000 $8,700,000 $10,500,000 RB-2831 $0 $0 $450,000 $0 $0 $450,000 RB-2833 $0 $0 $600,000 $0 $0 $600,000 RB-2834 $0 $1,000,000 $0 $0 $0 $1,000,000 RB-2835 $0 $0 $0 $0 $650,000 $650,000 RB-2836 $0 $0 $300,000 $0 $0 $300,000 RB-2838 $0 $0 $1,900,000 $0 $6,600,000 $8,500,000 RB-2839 $0 $0 $0 $0 $400,000 $400,000 RRA-2297-11 $13,191,200 $294,400 $0 $0 $0 $13,485,600 ROAD & BRIDGE TOTAL $107,336,100 $113,239,400 $50,261,100 $34,570,000 $38,395,000 $343,801,600 $107,336,100 $113,239,400 $50,261,100 $34,570,000 $38,395,000 $343,801,600 CIP 2026-2030 81 PROJECTS BY FUNDING SOURCE ROAD & BRIDGES Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Planned Use of Fund Balance-R&B RB-2201 $400,000 $0 $0 $0 $0 $400,000 RB-2204-02 $1,200,000 $0 $0 $0 $0 $1,200,000 RB-2204-03 $1,300,000 $0 $0 $0 $0 $1,300,000 PLANNED USE OF FUND BALANCE-R&B TOTAL $2,900,000 $0 $0 $0 $0 $2,900,000 County Transportation Sales Tax (Road & Bridge) RB-2609 $0 $3,500,000 $0 $0 $0 $3,500,000 RB-2641 $0 $0 $0 $0 $4,400,000 $4,400,000 RB-2645 $0 $800,000 $0 $5,500,000 $0 $6,300,000 RB-2650 $0 $0 $200,000 $800,000 $0 $1,000,000 RB-2651 $350,000 $850,000 $350,000 $550,000 $1,100,000 $3,200,000 RB-2672 $0 $4,000,000 $0 $0 $0 $4,000,000 RB-2675 $3,500,000 $0 $0 $0 $0 $3,500,000 RB-2682 $400,000 $0 $0 $0 $0 $400,000 RB-2685 $3,000,000 $1,000,000 $0 $0 $0 $4,000,000 RB-2690 $200,000 $0 $4,000,000 $0 $0 $4,200,000 RB-2701 $0 $0 $500,000 $300,000 $0 $800,000 RB-2809 $50,000 $0 $1,000,000 $0 $0 $1,050,000 RB-2838 $0 $0 $1,300,000 $0 $6,500,000 $7,800,000 COUNTY TRANSPORTATION SALES TAX (ROAD & BRIDGE) TOTAL $7,500,000 $10,150,000 $7,350,000 $7,150,000 $12,000,000 $44,150,000 State Aid RB-2201 $490,000 $560,000 $410,000 $410,000 $410,000 $2,280,000 RB-2203 $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 RB-2204 $300,000 $150,000 $1,800,000 $2,750,000 $0 $5,000,000 RB-2204-01 $0 $700,000 $0 $0 $0 $700,000 RB-2204-02 $1,500,000 $0 $0 $0 $0 $1,500,000 RB-2216 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2609 $0 $1,200,000 $0 $0 $0 $1,200,000 RB-2629 $0 $900,000 $0 $4,600,000 $0 $5,500,000 RB-2641 $0 $0 $0 $450,000 $0 $450,000 RB-2650 $0 $0 $300,000 $0 $0 $300,000 RB-2651 $1,825,000 $1,525,000 $1,100,000 $925,000 $925,000 $6,300,000 RB-2658 $0 $0 $0 $600,000 $1,200,000 $1,800,000 RB-2667 $2,500,000 $0 $0 $0 $0 $2,500,000 RB-2672 $0 $4,800,000 $0 $0 $0 $4,800,000 RB-2674 $1,000,000 $0 $0 $0 $0 $1,000,000 RB-2683 $500,000 $400,000 $2,300,000 $0 $0 $3,200,000 RB-2690 $0 $0 $400,000 $0 $0 $400,000 RB-2691 $600,000 $0 $1,500,000 $0 $0 $2,100,000 RB-2692 $0 $500,000 $0 $1,050,000 $0 $1,550,000 RB-2694 $1,250,000 $0 $0 $0 $0 $1,250,000 RB-2695 $1,800,000 $0 $0 $0 $0 $1,800,000 RB-2697 $200,000 $0 $0 $0 $0 $200,000 RB-2701 $0 $0 $0 $0 $4,000,000 $4,000,000 RB-2703 $0 $1,100,000 $0 $0 $0 $1,100,000 CIP 2026-2030 82 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2801 $0 $0 $0 $0 $400,000 $400,000 RB-2804 $300,000 $0 $0 $0 $0 $300,000 RB-2808 $600,000 $0 $2,400,000 $0 $0 $3,000,000 RB-2812 $0 $0 $1,000,000 $0 $0 $1,000,000 RB-2815 $400,000 $0 $0 $0 $0 $400,000 RB-2818 $0 $200,000 $0 $300,000 $0 $500,000 RB-2819 $0 $0 $400,000 $0 $0 $400,000 RB-2820 $0 $0 $200,000 $0 $0 $200,000 RB-2821 $0 $0 $0 $800,000 $0 $800,000 RB-2827 $0 $200,000 $0 $0 $0 $200,000 RB-2829 $0 $0 $0 $900,000 $0 $900,000 RB-2830 $0 $0 $300,000 $800,000 $4,400,000 $5,500,000 RB-2833 $0 $0 $550,000 $0 $0 $550,000 RB-2834 $0 $1,000,000 $0 $0 $0 $1,000,000 RB-2835 $0 $0 $0 $0 $400,000 $400,000 RB-2836 $0 $0 $300,000 $0 $0 $300,000 STATE AID TOTAL $13,715,000 $13,635,000 $13,360,000 $13,985,000 $12,135,000 $66,830,000 Turnback - Fund Balance RB-2651 $0 $750,000 $350,000 $0 $0 $1,100,000 RB-2668 $0 $3,500,000 $0 $0 $0 $3,500,000 RB-2693 $1,000,000 $0 $5,000,000 $0 $0 $6,000,000 RB-2807 $700,000 $4,000,000 $0 $0 $0 $4,700,000 TURNBACK - FUND BALANCE TOTAL $1,700,000 $8,250,000 $5,350,000 $0 $0 $15,300,000 TAA - Safety & Trails RB-2580 $200,000 $0 $0 $0 $0 $200,000 RB-2609 $0 $700,000 $0 $0 $0 $700,000 RB-2645 $0 $0 $0 $1,500,000 $0 $1,500,000 RB-2650 $0 $0 $0 $100,000 $0 $100,000 RB-2651 $150,000 $275,000 $200,000 $275,000 $275,000 $1,175,000 RB-2658 $0 $0 $0 $350,000 $100,000 $450,000 RB-2672 $0 $2,000,000 $0 $0 $0 $2,000,000 RB-2688 $100,000 $0 $0 $0 $0 $100,000 RB-2690 $0 $0 $2,300,000 $0 $0 $2,300,000 RB-2693 $0 $0 $300,000 $0 $0 $300,000 RB-2695 $300,000 $0 $0 $0 $0 $300,000 RB-2696 $100,000 $0 $0 $0 $0 $100,000 RB-2703 $0 $150,000 $0 $0 $0 $150,000 RB-2803 $300,000 $0 $0 $0 $0 $300,000 RB-2804 $300,000 $0 $0 $0 $0 $300,000 RB-2808 $0 $0 $200,000 $0 $0 $200,000 RB-2809 $450,000 $0 $0 $0 $0 $450,000 RB-2812 $400,000 $0 $0 $0 $0 $400,000 RB-2813 $100,000 $0 $0 $0 $0 $100,000 RB-2814 $300,000 $0 $0 $0 $0 $300,000 RB-2817 $0 $100,000 $0 $0 $0 $100,000 RB-2818 $0 $0 $0 $100,000 $0 $100,000 RB-2823 $0 $125,000 $0 $0 $0 $125,000 RB-2828 $0 $0 $0 $0 $300,000 $300,000 RB-2829 $0 $0 $0 $1,300,000 $0 $1,300,000 RB-2830 $0 $0 $0 $0 $2,700,000 $2,700,000 RB-2831 $0 $0 $400,000 $0 $0 $400,000 RB-2835 $0 $0 $0 $0 $200,000 $200,000 TAA - SAFETY & TRAILS TOTAL $2,700,000 $3,350,000 $3,400,000 $3,625,000 $3,575,000 $16,650,000 CIP 2026-2030 83 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Federal Grants Request RB-2609 $0 $5,000,000 $0 $0 $0 $5,000,000 RB-2685 $0 $22,500,000 $0 $0 $0 $22,500,000 RB-2822 $0 $0 $0 $200,000 $0 $200,000 FEDERAL GRANTS REQUEST TOTAL $0 $27,500,000 $0 $200,000 $0 $27,700,000 Federal Grants RB-2668 $0 $7,000,000 $0 $0 $0 $7,000,000 RB-2674 $10,000,000 $0 $0 $0 $0 $10,000,000 RB-2685 $0 $13,600,000 $0 $0 $0 $13,600,000 RB-2694 $2,000,000 $0 $0 $0 $0 $2,000,000 RB-2695 $400,000 $0 $0 $0 $0 $400,000 RB-2807 $0 $500,000 $0 $0 $0 $500,000 RB-2809 $0 $0 $1,674,900 $0 $0 $1,674,900 RB-2812 $0 $0 $2,384,200 $0 $0 $2,384,200 RB-2814 $963,200 $0 $0 $0 $0 $963,200 RB-2816 $650,000 $0 $0 $0 $0 $650,000 RB-2820 $0 $0 $532,000 $0 $0 $532,000 FEDERAL GRANTS TOTAL $14,013,200 $21,100,000 $4,591,100 $0 $0 $39,704,300 County Transportation Sales Tax (Transit) RRA-2297-11 $13,191,200 $294,400 $0 $0 $0 $13,485,600 COUNTY TRANSPORTATION SALES TAX (TRANSIT) TOTAL $13,191,200 $294,400 $0 $0 $0 $13,485,600 TAA - Preservation RB-2204 $0 $550,000 $2,900,000 $3,150,000 $3,200,000 $9,800,000 RB-2204-01 $0 $2,500,000 $0 $0 $0 $2,500,000 RB-2204-03 $2,300,000 $0 $0 $0 $0 $2,300,000 RB-2651 $225,000 $300,000 $225,000 $325,000 $325,000 $1,400,000 RB-2683 $0 $0 $200,000 $0 $0 $200,000 TAA - PRESERVATION TOTAL $2,525,000 $3,350,000 $3,325,000 $3,475,000 $3,525,000 $16,200,000 State Grants RB-2674 $26,000,000 $0 $0 $0 $0 $26,000,000 RB-2809 $0 $0 $1,000,000 $0 $0 $1,000,000 RB-2823 $0 $125,000 $0 $0 $0 $125,000 RB-2824 $550,000 $0 $0 $0 $0 $550,000 STATE GRANTS TOTAL $26,550,000 $125,000 $1,000,000 $0 $0 $27,675,000 Transmission Line Tax RB-2216 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 TRANSMISSION LINE TAX TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 Local Contributions RB-2201 $210,000 $210,000 $210,000 $210,000 $210,000 $1,050,000 RB-2580 $150,000 $0 $0 $0 $0 $150,000 RB-2582 $2,689,000 $0 $0 $0 $0 $2,689,000 RB-2609 $0 $1,000,000 $0 $0 $0 $1,000,000 RB-2629 $0 $100,000 $0 $300,000 $0 $400,000 RB-2645 $0 $300,000 $0 $500,000 $0 $800,000 RB-2650 $0 $0 $50,000 $350,000 $0 $400,000 RB-2651 $150,000 $0 $400,000 $100,000 $100,000 $750,000 RB-2658 $0 $0 $0 $50,000 $800,000 $850,000 RB-2667 $2,000,000 $0 $0 $0 $0 $2,000,000 RB-2668 $0 $7,000,000 $0 $0 $0 $7,000,000 RB-2672 $0 $6,000,000 $0 $0 $0 $6,000,000 RB-2674 $3,000,000 $0 $0 $0 $0 $3,000,000 RB-2675 $250,000 $0 $0 $0 $0 $250,000 RB-2683 $100,000 $50,000 $100,000 $0 $0 $250,000 CIP 2026-2030 84 Account Name Proposal 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total RB-2685 $3,000,000 $3,800,000 $0 $0 $0 $6,800,000 RB-2688 $30,000 $0 $0 $0 $0 $30,000 RB-2690 $200,000 $0 $400,000 $0 $0 $600,000 RB-2691 $250,000 $0 $4,000,000 $0 $0 $4,250,000 RB-2692 $0 $50,000 $0 $100,000 $0 $150,000 RB-2694 $1,250,000 $0 $0 $0 $0 $1,250,000 RB-2695 $500,000 $0 $0 $0 $0 $500,000 RB-2697 $3,400,000 $0 $0 $0 $0 $3,400,000 RB-2701 $0 $0 $200,000 $50,000 $200,000 $450,000 RB-2702 $0 $50,000 $0 $0 $0 $50,000 RB-2703 $0 $2,550,000 $0 $0 $0 $2,550,000 RB-2801 $0 $0 $0 $0 $100,000 $100,000 RB-2804 $300,000 $0 $0 $0 $0 $300,000 RB-2807 $50,000 $0 $0 $0 $0 $50,000 RB-2808 $100,000 $0 $500,000 $0 $0 $600,000 RB-2809 $50,000 $0 $200,000 $0 $0 $250,000 RB-2812 $300,000 $0 $200,000 $0 $0 $500,000 RB-2814 $300,000 $0 $0 $0 $0 $300,000 RB-2817 $0 $100,000 $0 $0 $0 $100,000 RB-2818 $0 $100,000 $0 $100,000 $0 $200,000 RB-2819 $0 $0 $100,000 $0 $0 $100,000 RB-2824 $110,000 $0 $0 $0 $0 $110,000 RB-2827 $0 $50,000 $0 $0 $0 $50,000 RB-2830 $0 $0 $100,000 $200,000 $500,000 $800,000 RB-2831 $0 $0 $50,000 $0 $0 $50,000 RB-2833 $0 $0 $50,000 $0 $0 $50,000 RB-2835 $0 $0 $0 $0 $50,000 $50,000 RB-2838 $0 $0 $600,000 $0 $100,000 $700,000 LOCAL CONTRIBUTIONS TOTAL $18,389,000 $21,360,000 $7,160,000 $1,960,000 $2,060,000 $50,929,000 Wheelage Tax RB-2204 $850,000 $450,000 $2,950,000 $2,600,000 $2,800,000 $9,650,000 RB-2204-01 $0 $2,100,000 $0 $0 $0 $2,100,000 RB-2204-02 $1,517,700 $0 $0 $0 $0 $1,517,700 RB-2204-03 $300,000 $0 $0 $0 $0 $300,000 RB-2651 $225,000 $250,000 $200,000 $225,000 $325,000 $1,225,000 RB-2839 $0 $0 $0 $0 $400,000 $400,000 WHEELAGE TAX TOTAL $2,892,700 $2,800,000 $3,150,000 $2,825,000 $3,525,000 $15,192,700 TAA - Multi-Modal RB-2629 $0 $0 $0 $600,000 $0 $600,000 RB-2645 $0 $0 $0 $300,000 $0 $300,000 RB-2651 $100,000 $75,000 $75,000 $100,000 $125,000 $475,000 RB-2672 $0 $400,000 $0 $0 $0 $400,000 RB-2695 $300,000 $0 $0 $0 $0 $300,000 RB-2702 $0 $400,000 $0 $0 $0 $400,000 RB-2808 $0 $0 $350,000 $0 $0 $350,000 RB-2811 $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 RB-2812 $0 $0 $400,000 $0 $0 $400,000 RB-2816 $200,000 $0 $0 $0 $0 $200,000 RB-2817 $0 $100,000 $0 $0 $0 $100,000 RB-2824 $310,000 $0 $0 $0 $0 $310,000 RB-2830 $0 $0 $400,000 $0 $1,100,000 $1,500,000 TAA - MULTI-MODAL TOTAL $1,110,000 $1,175,000 $1,425,000 $1,200,000 $1,425,000 $6,335,000 $107,336,100 $113,239,400 $50,261,100 $34,570,000 $38,395,000 $343,801,600 CIP 2026-2030 85 Description The project scope includes an annual program for intersection control upgrades. Projects under this program may be individually identified and programmed through the County's Intersection Control Ranking System (ICRS). Future projects may include improvements to County State Aid Highway (CSAH) 14 (34th Street North) at High Point Drive, CSAH 2 (Broadway Avenue) Signal Timing Updates, and CSAH 19 (Woodbury Drive) Signal Timing Updates. Justification High-level intersection controls (roundabouts and traffic signals) may be constructed at county highway intersections meeting criteria set forth in the ICRS. The county proactively plans for the installation of intersection controls to improve the safety and efficiency of traffic flow on the County Highway System. The annual ICRS determines the priority of these installations. The number of projects programmed varies depending on actual budget funding, the availability of matching funds, unforeseen development, or intersection safety problems. RB-2201 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $210,000 $210,000 $210,000 $210,000 $210,000 $1,050,000 State Aid $490,000 $560,000 $410,000 $410,000 $410,000 $2,280,000 Planned Use of Fund Balance- R&B $400,000 $0 $0 $0 $0 $400,000 FUNDING TOTAL $1,100,000 $770,000 $620,000 $620,000 $620,000 $3,730,000 Expenditures Planning/Design $100,000 $20,000 $20,000 $20,000 $20,000 $180,000 Construction $1,000,000 $750,000 $600,000 $600,000 $600,000 $3,550,000 EXPENDITURES TOTAL $1,100,000 $770,000 $620,000 $620,000 $620,000 $3,730,000 Budget Impact/Other The typical traffic signal costs $1,500 per year to operate and maintain. This cost to the public is offset by the increased traffic flow efficiency and enhanced safety. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $3,730,000 Prior Year(s) Total Cost: $0 Project #: RB-2201 Project Name: Intersection Control Projects CIP 2026-2030 86 Description The project scope includes an annual program for the mitigation of safety or traffic-capacity problems. Examples of solutions include: 1) turn-lane construction 2) signal-timing studies 3) flasher installations 4) minor curve corrections 5) pedestrian and trail projects 6) signing and striping improvements Justification This annual program is needed to provide the county with the ability to be responsive to small safety or traffic-capacity problems throughout the year that are not programmed into a larger capital project. The county proactively plans for safety/capacity projects in its budget. Keeping an allotment in the budget for these types of projects eliminates future safety hazards for vehicular and pedestrian traffic. Proactively improving/reducing safety or traffic- capacity problems is cost-efficient and keeps the potential for larger expenditures minimal. RB-2203 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 FUNDING TOTAL $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 Expenditures Construction $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 EXPENDITURES TOTAL $250,000 $200,000 $200,000 $200,000 $200,000 $1,050,000 Budget Impact/Other The project scope doesn't significantly increase the operating costs of a county highway. There is no anticipated change within the Road & Bridge Division operating budget. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $1,050,000 Prior Year(s) Total Cost: $0 Project #: RB-2203 Project Name: Safety & Traffic Capacity Projects CIP 2026-2030 87 Description The project scope includes an annual program comprised of pavement preservation projects, including: 1) seal coating 2) crack filling 3) pavement milling 4) overlays 5) hot and cold-in-place recycling 6) pavement reclamation 7) full-depth reclamation 8) minor subgrade corrections 9) right-of-way 2026 may include: 1) County-wide Crack Sealing 2) CSAH 9 north of CSAH 12 Justification These projects are scheduled to interrupt the normal deterioration of highways to extend the pavement life. Pavement condition is measured/calculated annually and reported as the system-wide Pavement Condition Index (PCI) that assigns a value to each roadway segment on a scale of 1-100, with higher numbers equating to better pavement condition. Public Works Performance Measures set two goals: 1) system-wide average PCI = 72 or greater, and 2) no roadway PCI should be lower than 40. RB-2204 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $300,000 $150,000 $1,800,000 $2,750,000 $0 $5,000,000 Wheelage Tax $850,000 $450,000 $2,950,000 $2,600,000 $2,800,000 $9,650,000 TAA - Preservation $0 $550,000 $2,900,000 $3,150,000 $3,200,000 $9,800,000 FUNDING TOTAL $1,150,000 $1,150,000 $7,650,000 $8,500,000 $6,000,000 $24,450,000 Expenditures Planning/Design $600,000 $300,000 $300,000 $400,000 $400,000 $2,000,000 Construction $550,000 $850,000 $7,350,000 $8,100,000 $5,600,000 $22,450,000 EXPENDITURES TOTAL $1,150,000 $1,150,000 $7,650,000 $8,500,000 $6,000,000 $24,450,000 Budget Impact/Other Projects completed under the Pavement Preservation Program reduce operation and maintenance costs. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $24,450,000 Prior Year(s) Total Cost: $0 Project #: RB-2204 Project Name: Pavement Preservation & Rehab CIP 2026-2030 88 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 16 (Valley Creek Road) from County State Aid Highway 25 (Century Avenue) to Bielenberg Drive: 1) new road and trail pavement 2) pedestrian and non-motorized accommodations 3) new striping 4) new signs Justification This section of highway suffers from aging pavement. County Highway 16 in this area has a roadway pavement condition index (PCI) between 37-70 and a trail PCI of 45. It was last repaved in 2006. With Woodbury watermain work east of here expected to wrap up in 2026, this corridor will be well-suited for a 2027 project. RB-2204-01 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $0 $700,000 $0 $0 $0 $700,000 Wheelage Tax $0 $2,100,000 $0 $0 $0 $2,100,000 TAA - Preservation $0 $2,500,000 $0 $0 $0 $2,500,000 FUNDING TOTAL $0 $5,300,000 $0 $0 $0 $5,300,000 Expenditures Construction $0 $5,300,000 $0 $0 $0 $5,300,000 EXPENDITURES TOTAL $0 $5,300,000 $0 $0 $0 $5,300,000 Budget Impact/Other This project will replace infrastructure that is in poor condition. This project will maintain operating costs and decrease maintenance repair expenses. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $5,300,000 Prior Year(s) Total Cost: $0 Project #: RB-2204-01 Project Name: CSAH 16 – CSAH 25 to Bielenberg Drive Pavement Preservation CIP 2026-2030 89 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 4 (170th Street N): 1) new pavement 2) new right turn lane 3) drainage and ditch improvements 4) new striping 5) new signs Justification This section of highway suffers from aging pavement. County Highway 4 in this area has a pavement condition index (PCI) of 34. It was originally constructed in 1961 with pavement improvements in 1992 and 2004, so it is due for investment. Drainage improvements will be analyzed with this project as well. RB-2204-02 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $1,500,000 $0 $0 $0 $0 $1,500,000 Wheelage Tax $1,517,700 $0 $0 $0 $0 $1,517,700 Planned Use of Fund Balance- R&B $1,200,000 $0 $0 $0 $0 $1,200,000 FUNDING TOTAL $4,217,700 $0 $0 $0 $0 $4,217,700 Expenditures Construction $4,217,700 $0 $0 $0 $0 $4,217,700 EXPENDITURES TOTAL $4,217,700 $0 $0 $0 $0 $4,217,700 Budget Impact/Other This project will reduce operations and maintenance costs associated with the pavement. Capital Project Category: Road & Bridge Location: May Township District: District 1 Total Estimated Project Cost: $4,217,700 Prior Year(s) Total Cost: $0 Project #: RB-2204-02 Project Name: CSAH 4 – CSAH 15 to CSAH 3 Pavement Preservation CIP 2026-2030 90 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 38 (Hastings Avenue, Glen Road, 7th Avenue, & Maxwell Avenue): 1) new pavement 2)pedestrian and non-motorized accommodations 3) new striping 4) new signs Justification This section of highway, which was originally constructed in 2002, suffers from aging pavement. County Highway 38 in this area has a roadway and trail pavement condition index (PCI) between 46 and 58, putting it in the yellow zone, making it well- suited for a mill and overlay. Repaving of this highway will coincide with the recent installation of a bicycle and pedestrian trail near Newport City Hall, completed in 2023 (RB-2660). RB-2204-03 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Wheelage Tax $300,000 $0 $0 $0 $0 $300,000 Planned Use of Fund Balance- R&B $1,300,000 $0 $0 $0 $0 $1,300,000 TAA - Preservation $2,300,000 $0 $0 $0 $0 $2,300,000 FUNDING TOTAL $3,900,000 $0 $0 $0 $0 $3,900,000 Expenditures Construction $3,900,000 $0 $0 $0 $0 $3,900,000 EXPENDITURES TOTAL $3,900,000 $0 $0 $0 $0 $3,900,000 Budget Impact/Other This project will reduce operations and maintenance costs associated with the pavement. Capital Project Category: Road & Bridge Location: Various/Other District: District 4 Total Estimated Project Cost: $3,900,000 Prior Year(s) Total Cost: : $0 Project #: RB-2204-03 Project Name: CSAH 38 Pavement Preservation CIP 2026-2030 91 Description The scope of this project is an annual program that includes ongoing inspection, maintenance, and replacement of structures throughout the county, such as bridges, culverts, and guardrails. Justification Washington County is responsible for the maintenance, management, and replacement of these structures. RB-2216 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 Transmission Line Tax $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 FUNDING TOTAL $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 Expenditures Planning/Design $50,000 $50,000 $50,000 $50,000 $50,000 $250,000 Construction $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000 EXPENDITURES TOTAL $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000 Budget Impact/Other These projects replace infrastructure that is in poor condition. Annual maintenance costs will be reduced with these projects. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $1,750,000 Prior Year(s) Total Cost: $0 Project #: RB-2216 Project Name: Structures & Roadway Stabilization CIP 2026-2030 92 Description The project scope includes adding an off-road pedestrian trail from La Lake Park to Woodlane Drive. Justification The City of Woodbury is planning to increase access and enhance natural resources and recreational opportunities at La Lake Park. Currently, there is no off-road pedestrian access to this park. This project adds an off-road trail on the south side of County State Aid Highway (CSAH) 18 from La Lake Park to Woodlane Drive, where users can continue a trip east, north, or south. RB-2580 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $150,000 $0 $0 $0 $0 $150,000 TAA - Safety & Trails $200,000 $0 $0 $0 $0 $200,000 FUNDING TOTAL $350,000 $0 $0 $0 $0 $350,000 Expenditures Construction $350,000 $0 $0 $0 $0 $350,000 EXPENDITURES TOTAL $350,000 $0 $0 $0 $0 $350,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: District 4 Total Estimated Project Cost: $550,000 Prior Year(s) Total Cost: $200,000 Project #: RB-2580 Project Name: CSAH 18 Trail - La Lake Park to Woodlane CIP 2026-2030 93 Description The project scope includes the construction of a segment of the Gateway Trail, including a parking lot, paved off-road multi- use facility, adjacent horse trail parallel to County Highway 52 (Oakhill Road North), and a pedestrian tunnel under County Highway 52, from south of County Highway 3 (Olinda Trail) to just south of County Highway 52. Justification The City of Scandia has secured $2.68M funding through the Department of Natural Resources (DNR) Legislative-Citizen Commission on Minnesota Resources (LCCMR). Construction is planned for 2026. Ultimately, this trail will connect to William O'Brien State Park. RB-2582 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $2,689,000 $0 $0 $0 $0 $2,689,000 FUNDING TOTAL $2,689,000 $0 $0 $0 $0 $2,689,000 Expenditures Construction $2,689,000 $0 $0 $0 $0 $2,689,000 EXPENDITURES TOTAL $2,689,000 $0 $0 $0 $0 $2,689,000 Budget Impact/Other This project will not affect operations and maintenance costs because it will be maintained by the Department of Natural Resources (DNR). Capital Project Category: Road & Bridge Location: Scandia District: District 1 Total Estimated Project Cost: $3,489,000 Prior Year(s) Total Cost: $800,000 Project #: RB-2582 Project Name: Gateway Trail Extension – Scandia CIP 2026-2030 94 Description The project scope includes the following improvements on County State Aid Highway (CSAH) 32 (11th Avenue): 1) intersection control 2) safety improvements 3) surface water management 4) drainage improvements 5) pedestrian improvements 6) congestion management 7) evaluate connection to Interstate 35 Justification The Broadway Avenue Project constructed a freeway overpass over Interstate 35 connecting CSAH 32 with CSAH 33 (Everton Avenue). This connection is regionally important. Increased traffic and a lack of pedestrian accommodations on CSAH 32 have resulted in the need to evaluate improvements to this roadway. RB-2609 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $1,000,000 $0 $0 $0 $1,000,000 State Aid $0 $1,200,000 $0 $0 $0 $1,200,000 County Transportation Sales Tax (Road & Bridge)$0 $3,500,000 $0 $0 $0 $3,500,000 TAA - Safety & Trails $0 $700,000 $0 $0 $0 $700,000 Federal Grants Request $0 $5,000,000 $0 $0 $0 $5,000,000 FUNDING TOTAL $0 $11,400,000 $0 $0 $0 $11,400,000 Expenditures Construction $0 $11,400,000 $0 $0 $0 $11,400,000 EXPENDITURES TOTAL $0 $11,400,000 $0 $0 $0 $11,400,000 Budget Impact/Other The project will increase operation and maintenance costs associated with additional pavement, trails, and sidewalk infrastructure. If the federal grant is not obtained, this project will be postponed, or the scope will be changed to a pavement preservation project, omitting the project elements above. Capital Project Category: Road & Bridge Location: Forest Lake District: District 1 Total Estimated Project Cost: $14,565,000 Prior Year(s) Total Cost: $3,165,000 Project #: RB-2609 Project Name: CSAH 32 - CSAH 33 (Everton Ave) to US TH 61 CIP 2026-2030 95 Description The project scope includes the following improvements on County State Aid Highway (CSAH) 21 (Stagecoach Trail North) between the Interstate 94 crossing and 40th Street North: 1) safety improvements - including center left turn lanes and right turn lanes 2) pavement improvements 3) surface water management 4) intersection improvements 5) shoulder improvements Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates. Justification In 2016, a corridor strategic plan was developed for the CSAH 21 corridor from the Interstate 94 bridge to the intersection with CSAH 14. The overall corridor improvements were designed to be implemented in phases. Phase I, from 40th Street to CSAH 14, was implemented in 2018. This project represents Phase II implementation of the corridor strategic plan and will complete the identified improvements. RB-2629 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $100,000 $0 $300,000 $0 $400,000 State Aid $0 $900,000 $0 $4,600,000 $0 $5,500,000 TAA - Multi-Modal $0 $0 $0 $600,000 $0 $600,000 FUNDING TOTAL $0 $1,000,000 $0 $5,500,000 $0 $6,500,000 Expenditures Planning/Design $0 $700,000 $0 $0 $0 $700,000 Construction $0 $0 $0 $5,500,000 $0 $5,500,000 Right-of-Way $0 $300,000 $0 $0 $0 $300,000 EXPENDITURES TOTAL $0 $1,000,000 $0 $5,500,000 $0 $6,500,000 Budget Impact/Other The project will increase operations and maintenance costs because of the added pavement widths and infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 3 Total Estimated Project Cost: $6,500,000 Prior Year(s) Total Cost: $0 Project #: RB-2629 Project Name: CSAH 21- I-94 to 40th Street North CIP 2026-2030 96 Description The project scope includes the following improvements on County State Aid Highway (CSAH) 3 (Norell Avenue North) between CSAH 7 (Square Lake Trail North) and CSAH 4 (170th Street North): 1) pavement rehabilitation 2) curb and gutter replacement 3) retaining wall for roadway stabilization Justification In 2020, a corridor plan was developed for the CSAH 3 from CSAH 7 to CSAH 4. Community and stakeholder engagement identified a priority on protecting the natural resources in the area, leading to a community-supported proposal to complete pavement preservation, install stormwater retention, construct a retaining wall near Warner Nature Pond, and replace the bituminous curb and gutter on this corridor. RB-2641 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $0 $0 $0 $450,000 $0 $450,000 County Transportation Sales Tax (Road & Bridge)$0 $0 $0 $0 $4,400,000 $4,400,000 FUNDING TOTAL $0 $0 $0 $450,000 $4,400,000 $4,850,000 Expenditures Planning/Design $0 $0 $0 $400,000 $0 $400,000 Construction $0 $0 $0 $0 $4,400,000 $4,400,000 Right-of-Way $0 $0 $0 $50,000 $0 $50,000 EXPENDITURES TOTAL $0 $0 $0 $450,000 $4,400,000 $4,850,000 Budget Impact/Other The project will not increase operation and maintenance costs. There is no anticipated change within the Road & Bridge Division operating budget. Capital Project Category: Road & Bridge Location: May Township District: District 1 Total Estimated Project Cost: $5,575,000 Prior Year(s) Total Cost: $725,000 Project #: RB-2641 Project Name: CSAH 3 - CSAH 7 to CSAH 4 CIP 2026-2030 97 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 13 (Ideal Avenue) in Oakdale and Lake Elmo: 1) safety improvements, including widening of shoulders 2) pavement improvement 3) turn lanes and intersection improvements 4) pedestrian and non-motorized upgrades 5) drainage improvements Justification Increased traffic and development drive the need for roadway upgrades, including improving intersections and replacing the railroad crossing. This area is also a nexus for regional surface water drainage; hence, the design needs to work toward accommodating and improving regional surface water management in this area. The intersection of CSAH 6 and CSAH 13 was analyzed in the 2023 Intersection Control Ranking System (ICRS) Report, where it was found that the intersection is currently operating safely, with a crash rate around the average rate for similar intersections on county roads statewide. The project represents Phase 4 of improvements to the CSAH 13 corridor, which started with the segment from 44th Street to 50th Street in 2017 (Phase 1), then CSAH 14 to 44th Street in 2022 (Phase 2), then from Olson Lake Trail to 55th Street in 2024 (Phase 3). RB-2645 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $300,000 $0 $500,000 $0 $800,000 County Transportation Sales Tax (Road & Bridge)$0 $800,000 $0 $5,500,000 $0 $6,300,000 TAA - Safety & Trails $0 $0 $0 $1,500,000 $0 $1,500,000 TAA - Multi-Modal $0 $0 $0 $300,000 $0 $300,000 FUNDING TOTAL $0 $1,100,000 $0 $7,800,000 $0 $8,900,000 Expenditures Planning/Design $0 $600,000 $0 $0 $0 $600,000 Construction $0 $0 $0 $7,800,000 $0 $7,800,000 Right-of-Way $0 $500,000 $0 $0 $0 $500,000 EXPENDITURES TOTAL $0 $1,100,000 $0 $7,800,000 $0 $8,900,000 Budget Impact/Other The project will increase operation and maintenance costs associated with additional pavement, drainage, and sidewalk infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $9,500,000 Prior Year(s) Total Cost: $600,000 Project #: RB-2645 Project Name: CSAH 13 - CSAH 6 to CSAH 14 CIP 2026-2030 98 Description The project scope includes the following improvements on County State Aid Highway (CSAH) 29 (Hilton Trail) from 62nd Street to CSAH 12 (75th Street North): 1) new pavement 2) turn lane and intersection improvements 3) pedestrian and non-motorized accommodations 4) roadway drainage and surface water management Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification This section of highway has been managed as a preservation corridor through a microsurfacing project in 2017 and a mill and thinlay with fog seal in 2023. Currently, CSAH 29 suffers from a lack of turn lanes and pedestrian accommodations. The best long-term solution for this segment is to perform a combination of pavement reconstruction, in which turn lanes are added to improve safety and management of vehicles entering and existing the corridor. Off-road pedestrian accommodations and stormwater facilities will also be analyzed. Construction is planned outside of the 5-year Capital Improvement Plan. RB-2650 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $50,000 $350,000 $0 $400,000 State Aid $0 $0 $300,000 $0 $0 $300,000 County Transportation Sales Tax (Road & Bridge)$0 $0 $200,000 $800,000 $0 $1,000,000 TAA - Safety & Trails $0 $0 $0 $100,000 $0 $100,000 FUNDING TOTAL $0 $0 $550,000 $1,250,000 $0 $1,800,000 Expenditures Planning/Design $0 $0 $550,000 $650,000 $0 $1,200,000 Right-of-Way $0 $0 $0 $600,000 $0 $600,000 EXPENDITURES TOTAL $0 $0 $550,000 $1,250,000 $0 $1,800,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 2 Total Estimated Project Cost: $1,800,000 Prior Year(s) Total Cost: $0 Project #: RB-2650 Project Name: CSAH 29 - TH 36 to CSAH 12 CIP 2026-2030 99 Description The scope of this project includes an annual program that provides construction engineering, inspection, and survey services as a supplement to the county's staff to aid in the delivery of the transportation projects during the construction season. Justification Washington County is responsible for the construction and maintenance of county highways. To ensure that projects are built to the applicable standards using appropriate construction methods and materials, it is important to have highly qualified professionals inspect and manage all construction activities. This contract allows for supplemental staff to be hired during peak times to achieve those goals. RB-2651 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $150,000 $0 $400,000 $100,000 $100,000 $750,000 State Aid $1,825,000 $1,525,000 $1,100,000 $925,000 $925,000 $6,300,000 Wheelage Tax $225,000 $250,000 $200,000 $225,000 $325,000 $1,225,000 County Transportation Sales Tax (Road & Bridge)$350,000 $850,000 $350,000 $550,000 $1,100,000 $3,200,000 TAA - Preservation $225,000 $300,000 $225,000 $325,000 $325,000 $1,400,000 TAA - Safety & Trails $150,000 $275,000 $200,000 $275,000 $275,000 $1,175,000 TAA - Multi-Modal $100,000 $75,000 $75,000 $100,000 $125,000 $475,000 Turnback - Fund Balance $0 $750,000 $350,000 $0 $0 $1,100,000 FUNDING TOTAL $3,025,000 $4,025,000 $2,900,000 $2,500,000 $3,175,000 $15,625,000 Expenditures Planning/Design $3,025,000 $4,025,000 $2,900,000 $2,500,000 $3,175,000 $15,625,000 EXPENDITURES TOTAL $3,025,000 $4,025,000 $2,900,000 $2,500,000 $3,175,000 $15,625,000 Budget Impact/Other This project will not increase operation and maintenance costs because there is no anticipation of increased infrastructure. There is no anticipated change within the Road & Bridge Division operating budget. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $15,625,000 Prior Year(s) Total Cost: $0 Project #: RB-2651 Project Name: Construction Engineering, Inspection and Survey CIP 2026-2030 100 Description The project scope for County State Aid Highway (CSAH) 18 (Bailey Road) from Highway I-494 to Woodlane Drive will be identified through the CSAH 18 I-494 to Settlers Ridge Parkway Study (RB-2833) Potential improvements include: 1) highway expansion from a two-lane undivided highway to a four-lane divided highway 2) access management 3) construction of trails on both the north and south sides of the highway 4) drainage improvements, including storm water treatment facilities 5) intersection control improvements Justification CSAH 18 is an east-west arterial serving regional traffic and providing access to the City of Woodbury’s La Lake Park. The Century Avenue Extension Study highlighted the need to plan for improvements to this corridor. Providing for increased capacity and allowing appropriate access is critical for regional traffic. RB-2658 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $0 $50,000 $800,000 $850,000 State Aid $0 $0 $0 $600,000 $1,200,000 $1,800,000 TAA - Safety & Trails $0 $0 $0 $350,000 $100,000 $450,000 FUNDING TOTAL $0 $0 $0 $1,000,000 $2,100,000 $3,100,000 Expenditures Planning/Design $0 $0 $0 $1,000,000 $900,000 $1,900,000 Right-of-Way $0 $0 $0 $0 $1,200,000 $1,200,000 EXPENDITURES TOTAL $0 $0 $0 $1,000,000 $2,100,000 $3,100,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $3,100,000 Prior Year(s) Total Cost: $0 Project #: RB-2658 Project Name: CSAH 18 – I-494 to Woodlane Drive CIP 2026-2030 101 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 19 (Keats Avenue South) and 80th Street intersection: 1) single-lane roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Justification Traffic growth and ongoing development in the region have increased volumes around this intersection. The current all-way stop does not adequately service the demand. This intersection is ranked near the top of the county's Intersection Control Ranking System. It is well suited for an upgrade but will need significant reconstruction to address all its needs. RB-2667 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $2,000,000 $0 $0 $0 $0 $2,000,000 State Aid $2,500,000 $0 $0 $0 $0 $2,500,000 FUNDING TOTAL $4,500,000 $0 $0 $0 $0 $4,500,000 Expenditures Construction $4,500,000 $0 $0 $0 $0 $4,500,000 EXPENDITURES TOTAL $4,500,000 $0 $0 $0 $0 $4,500,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Cottage Grove District: District 4 Total Estimated Project Cost: $5,200,000 Prior Year(s) Total Cost: $700,000 Project #: RB-2667 Project Name: CSAH 19 & 80th Street Intersection CIP 2026-2030 102 Description Preliminary engineering, community engagement, and environmental analysis are ongoing; the project scope may include the following improvements in the cities of Mahtomedi and White Bear Lake. 1) signal or roundabout at the two entrances to Century College 2) highway improvements 3) highway drainage and surface water management 4) pedestrian and bicycle facility improvements This segment of TH 120 has recently been turned back as part of this project, will be renamed to CSAH 27, and is planned to be reconstructed in 2027. Preliminary engineering and public engagement will determine the final project scope, right-of-way acquisition required, and cost estimates. Justification This segment of highway suffers from a deteriorating pavement quality, capacity issues at intersections, a lack of pedestrian facilities, and drainage challenges. Ramsey County, Mahtomedi, White Bear Lake, and Century College have been active participants and are supportive of these improvements. To date, $7 million in federal funding has been secured. $5 million in funding has been secured through the turnback. RB-2668 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $0 $7,000,000 $0 $0 $0 $7,000,000 Local Contributions $0 $7,000,000 $0 $0 $0 $7,000,000 Turnback - Fund Balance $0 $3,500,000 $0 $0 $0 $3,500,000 FUNDING TOTAL $0 $17,500,000 $0 $0 $0 $17,500,000 Expenditures Construction $0 $17,500,000 $0 $0 $0 $17,500,000 EXPENDITURES TOTAL $0 $17,500,000 $0 $0 $0 $17,500,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Mahtomedi District: District 2 Total Estimated Project Cost: $19,500,000 Prior Year(s) Total Cost: $2,000,000 Project #: RB-2668 Project Name: CSAH 27 - I-694 to CSAH 12 Reconstruction CIP 2026-2030 103 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 13 (Radio Drive) from Hargis Parkway to CSAH 20 (Military Road): 1) highway expansion from a two-lane undivided highway to a four-lane divided highway 2) construction of trails on both the east and west sides of the highway 3) drainage improvements, including storm water treatment facilities 4) new roundabout at CSAH 13 at Dale Road to replace the current all-way stop 5) new roundabout at CSAH 13 at CSAH 20 (Military Road) to replace the existing roundabout that is under-capacity 6) City of Woodbury watermain upgrades Justification This portion of CSAH 13 is a north-south minor arterial serving regional traffic in the south Woodbury and north Cottage Grove area. Land development in the area continues, including three notable developments on the east side - Bridlewood Farms, Copper Ridge, and Twenty One Oaks, as well as a few notable developments on the west side - Oak Hill and Woodbury Family House Dominium. Improvements to CSAH 13 will provide increased capacity and allow for appropriate access for this regional growth. RB-2672 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $6,000,000 $0 $0 $0 $6,000,000 State Aid $0 $4,800,000 $0 $0 $0 $4,800,000 County Transportation Sales Tax (Road & Bridge)$0 $4,000,000 $0 $0 $0 $4,000,000 TAA - Safety & Trails $0 $2,000,000 $0 $0 $0 $2,000,000 TAA - Multi-Modal $0 $400,000 $0 $0 $0 $400,000 FUNDING TOTAL $0 $17,200,000 $0 $0 $0 $17,200,000 Expenditures Construction $0 $17,200,000 $0 $0 $0 $17,200,000 EXPENDITURES TOTAL $0 $17,200,000 $0 $0 $0 $17,200,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $19,365,400 Prior Year(s) Total Cost: $2,165,400 Project #: RB-2672 Project Name: CSAH 13 - CSAH 20 to Hargis Parkway CIP 2026-2030 104 Description The project scope includes improvements to County State Aid Highway (CSAH) 17 at the intersection with Trunk Highway (TH) 36 in the cities of Lake Elmo and Grant. The work is expected to include: 1) a grade-separated crossing of TH 36 2) ramps to provide access between CSAH 17 and TH 36 3) retaining walls 4) storm water treatment facilities 5) pedestrian facilities 6) intersection controls for frontage roads 7) frontage road extension on the south side Justification TH 36 users currently experience congestion (capacity constraints) during both A.M. and P.M. peak hours, resulting from the existing signal at CSAH 17 (Lake Elmo Avenue). This congestion results in an unacceptable level of service during peak hours, which is expected to worsen as traffic volumes are forecasted to increase. Due to the extended cycle lengths, CSAH 17 has long wait times before being served by the signal. The existing, closely-spaced frontage road intersection on the north of TH 36 consistently queues traffic through the intersection. This CSAH 17 intersection has a crash and severity rate that is significantly higher than the Minnesota Department of Transportation (MnDOT) statewide system average for similar signalized intersections. To date, $10 million in federal grants and $26 million in state bonds/grants have been secured for the construction of this project. RB-2674 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $10,000,000 $0 $0 $0 $0 $10,000,000 Local Contributions $3,000,000 $0 $0 $0 $0 $3,000,000 State Aid $1,000,000 $0 $0 $0 $0 $1,000,000 State Grants $26,000,000 $0 $0 $0 $0 $26,000,000 FUNDING TOTAL $40,000,000 $0 $0 $0 $0 $40,000,000 Expenditures Construction $40,000,000 $0 $0 $0 $0 $40,000,000 EXPENDITURES TOTAL $40,000,000 $0 $0 $0 $0 $40,000,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $46,534,300 Prior Year(s) Total Cost: $6,534,300 Project #: RB-2674 Project Name: CSAH 17 at TH 36 Intersection CIP 2026-2030 105 Description The project scope includes participating in a study of existing conditions and proposed repairs to the deep ravine adjacent to County Road (CR) 74 between Century Avenue/Geneva Avenue and Hastings Avenue in the City of Newport. Justification This ravine has slowly eroded over time, resulting in steep slopes just off the north side of CR 74. The ravine takes water from a large area up on a plateau and transports it to Hastings Avenue. The South Washington Watershed District will be leading this study, and Washington County will be a partner to address the common interest of maintaining the ravine to transport storm water and to support the county road. RB-2675 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $250,000 $0 $0 $0 $0 $250,000 County Transportation Sales Tax (Road & Bridge)$3,500,000 $0 $0 $0 $0 $3,500,000 FUNDING TOTAL $3,750,000 $0 $0 $0 $0 $3,750,000 Expenditures Construction $3,750,000 $0 $0 $0 $0 $3,750,000 EXPENDITURES TOTAL $3,750,000 $0 $0 $0 $0 $3,750,000 Budget Impact/Other Steep grades and inadequate drainage infrastructure require County maintenance crews to spend more time maintaining this corridor than other similar roadways. This project will increase operations and maintenance costs with added trail infrastructure, but it will reduce operations and maintenance costs associated with the pavement and gravel shoulders due to improved drainage. Capital Project Category: Road & Bridge Location: Newport District: District 4 Total Estimated Project Cost: $4,650,000 Prior Year(s) Total Cost: $900,000 Project #: RB-2675 Project Name: CR 74 - CR 38 to Geneva Avenue CIP 2026-2030 106 Description The project scope includes a study of the following potential improvements on County Road (CR) 50 from Trunk Highway (TH) 61 to CSAH 15 (Manning Trail North): 1) new pavement with widened shoulders 2) turn lanes at key locations if appropriate 3) evaluation of pedestrian and cycling accommodations 4) signs and striping 5) roadway drainage and surface water management 6) roadway geometrics evaluations Justification The current roadway section is narrow for a typical county road. There is no paved shoulder outside of the 12-foot lane width and very little, if any, gravel shoulder. Drainage ditches have filled in over the years, which impacts how storm water is collected and treated prior to moving out of the right-of-way corridor. The pavement has reached its full life span, and the signs and striping are out of date. There are also some very tight radius curves that will need to be analyzed for improvement. A typical pavement preservation project is not the right treatment here because of the very narrow pavement width and the lack of a stormwater drainage system. RB-2682 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding County Transportation Sales Tax (Road & Bridge)$400,000 $0 $0 $0 $0 $400,000 FUNDING TOTAL $400,000 $0 $0 $0 $0 $400,000 Expenditures Planning/Design $400,000 $0 $0 $0 $0 $400,000 EXPENDITURES TOTAL $400,000 $0 $0 $0 $0 $400,000 Budget Impact/Other The project will increase operation and maintenance costs because of the proposed added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 1 Total Estimated Project Cost: $400,000 Prior Year(s) Total Cost: $0 Project #: RB-2682 Project Name: CR 50 - TH 61 to CSAH 15 Study CIP 2026-2030 107 Description The scope of this project includes the potential for the following improvements to County State Aid Highway (CSAH) 11 (Fairy Falls Road) from the intersection of Boom Road to County State Aid Highway (CSAH) 5 (Stonebridge Trail N). 1) intersection improvements 2) retaining wall 3) roadway drainage and surface water management 4) new pavement 5) signing and stripping 6) analysis of public access to Fairy Falls within the County right-of-way Justification CSAH 11 descends steeply from Fairy Falls Road toward Boom Road, where the combination of challenging grades, steep embankments, and erosion complicates stormwater management. At the intersection, a tight-radius curve on the steep slope adds to the safety concerns. This project proposes improvements to the intersection that address these grade, drainage, and geometric challenges, enhancing both safety and functionality. Additionally, pavement will be replaced from Orwell Avenue North to CSAH 5 (Stonebridge Trail North). RB-2683 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $100,000 $50,000 $100,000 $0 $0 $250,000 State Aid $500,000 $400,000 $2,300,000 $0 $0 $3,200,000 TAA - Preservation $0 $0 $200,000 $0 $0 $200,000 FUNDING TOTAL $600,000 $450,000 $2,600,000 $0 $0 $3,650,000 Expenditures Planning/Design $450,000 $450,000 $0 $0 $0 $900,000 Construction $0 $0 $2,600,000 $0 $0 $2,600,000 Right-of-Way $150,000 $0 $0 $0 $0 $150,000 EXPENDITURES TOTAL $600,000 $450,000 $2,600,000 $0 $0 $3,650,000 Budget Impact/Other The project will increase operation and maintenance costs because of the proposed added infrastructure. Capital Project Category: Road & Bridge Location: Stillwater District: District 3 Total Estimated Project Cost: $3,650,000 Prior Year(s) Total Cost: $0 Project #: RB-2683 Project Name: CSAH 11 Improvement Project CIP 2026-2030 108 Description The project scope will include planning/design on County Road (CR) 19/A (Keats Avenue South) for a potential future project that may include: 1) construct a new highway alignment to connect US Trunk Highway 61 directly to 100th Street South 2) new alignments of Miller Road and Keats Avenue to connect to the new CR 19/A alignment 3) coordinate and construct a new railroad crossing 4) pedestrian and bicycle facilities 5) storm water treatment improvements 6) intersection improvements at US TH 61/10 ramps 7) roadway jurisdiction analysis Justification Washington County led a southwest Arterial Study in cooperation with the City of Cottage Grove to analyze the area of Cottage Grove south of US TH 61/10, prompted by a lack of regional transportation facilities. The conclusion of the study identified a conceptual alignment agreed upon by both agencies after an extensive public involvement process. Development pressure has since increased in the area, justifying the further development of the first phase of this new county highway segment, which will be this new alignment. To date $13.6 million in grants have been secured for the construction of this project. RB-2685 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $0 $13,600,000 $0 $0 $0 $13,600,000 Local Contributions $3,000,000 $3,800,000 $0 $0 $0 $6,800,000 County Transportation Sales Tax (Road & Bridge)$3,000,000 $1,000,000 $0 $0 $0 $4,000,000 Federal Grants Request $0 $22,500,000 $0 $0 $0 $22,500,000 FUNDING TOTAL $6,000,000 $40,900,000 $0 $0 $0 $46,900,000 Expenditures Planning/Design $3,000,000 $0 $0 $0 $0 $3,000,000 Construction $0 $40,900,000 $0 $0 $0 $40,900,000 Right-of-Way $3,000,000 $0 $0 $0 $0 $3,000,000 EXPENDITURES TOTAL $6,000,000 $40,900,000 $0 $0 $0 $46,900,000 Budget Impact/Other A future project would increase operation and maintenance costs due to the realignment of this highway. The city applied for a federal grant. If the federal grant is not obtained, this project may be postponed or the scope changed until adequate funding is received. Capital Project Category: Road & Bridge Location: Cottage Grove District: District 4 Total Estimated Project: $54,436,700 Prior Year(s) Total Cost: $7,536,700 Project #: RB-2685 Project Name: CR 19A - 100th Street Realignment CIP 2026-2030 109 Description The scope of this study is to investigate the existing and future pedestrian and bicycle needs along County State Aid Highway (CSAH) 13 (Radio Drive) near the City Place development and Tamarack Village retail center to develop a plan to accommodate a potential increase in pedestrian activity in the area. Washington County and Woodbury can then use the agreed upon recommendations to implement improvement projects in a strategic way. Justification This segment of Radio Drive has supported numerous retail and commercial uses since the 1990s. Most recently, the City Place development has brought in a large apartment complex to complement the residential areas that surround this large retail zone. This study is a first effort at looking to provide better pedestrian and bicycle access to this area. RB-2688 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $30,000 $0 $0 $0 $0 $30,000 TAA - Safety & Trails $100,000 $0 $0 $0 $0 $100,000 FUNDING TOTAL $130,000 $0 $0 $0 $0 $130,000 Expenditures Planning/Design $130,000 $0 $0 $0 $0 $130,000 EXPENDITURES TOTAL $130,000 $0 $0 $0 $0 $130,000 Budget Impact/Other This study will not increase operation and maintenance costs. Capital Project Category: Road & Bridge Location: Woodbury District: District 2 Total Estimated Project Cost: $130,000 Prior Year(s) Total Cost: $0 Project #: RB-2688 Project Name: Radio Drive Pedestrian Management Study CIP 2026-2030 110 Description Washington County is currently leading a study of this corridor, with the scope including an analysis of the County State Aid Highway (CSAH) 16 corridor between Interlachen Parkway and Trunk Highway (TH) 95 (Manning Avenue S), looking at current and future needs to provide a vision that helps guide improvement opportunities. This study will look at future needs with regard to highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. Justification This section of highway, which was turned over from the City of Woodbury to Washington County in 2018, suffers from a deteriorating pavement section, a lack of pedestrian facilities, a lack of shoulders, and poor vehicular operations. A study of this corridor was completed in 2025 to identify and prioritize improvements to be constructed in 2028. RB-2690 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $200,000 $0 $400,000 $0 $0 $600,000 State Aid $0 $0 $400,000 $0 $0 $400,000 County Transportation Sales Tax (Road & Bridge)$200,000 $0 $4,000,000 $0 $0 $4,200,000 TAA - Safety & Trails $0 $0 $2,300,000 $0 $0 $2,300,000 FUNDING TOTAL $400,000 $0 $7,100,000 $0 $0 $7,500,000 Expenditures Construction $0 $0 $7,100,000 $0 $0 $7,100,000 Right-of-Way $400,000 $0 $0 $0 $0 $400,000 EXPENDITURES TOTAL $400,000 $0 $7,100,000 $0 $0 $7,500,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $8,601,000 Prior Year(s) Total Cost: $1,101,000 Project #: RB-2690 Project Name: CSAH 16 - Interlachen to TH 95 CIP 2026-2030 111 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 20 (Jamaica Avenue) from Military Road to CSAH 22 (70th Street): 1) new pavement, curb and gutter, medians, and ditches 2) turn lane and intersection improvements 3) pedestrian and non-motorized accommodations 4) roadway drainage and surface water management Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification This section of highway, which was turned up from the City of Cottage Grove to Washington County in 2018, suffers from a deteriorating pavement section, poor drainage, a lack of pedestrian facilities, a lack of shoulders, and poor vehicular operations. RB-2691 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $250,000 $0 $4,000,000 $0 $0 $4,250,000 State Aid $600,000 $0 $1,500,000 $0 $0 $2,100,000 FUNDING TOTAL $850,000 $0 $5,500,000 $0 $0 $6,350,000 Expenditures Planning/Design $450,000 $0 $0 $0 $0 $450,000 Construction $0 $0 $5,500,000 $0 $0 $5,500,000 Right-of-Way $400,000 $0 $0 $0 $0 $400,000 EXPENDITURES TOTAL $850,000 $0 $5,500,000 $0 $0 $6,350,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Cottage Grove District: District 4 Total Estimated Project Cost: $6,700,000 Prior Year(s) Total Cost: $350,000 Project #: RB-2691 Project Name: CSAH 20 - CSAH 22 to Military CIP 2026-2030 112 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 12 (75th Street) from Kimbro Avenue to CSAH 15 (Manning Avenue): 1) new roadway and trail pavement 2) turn lane and intersection improvements 3) permanent reconstruction of the emergency road improvement area 4) roadway drainage and surface water management Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification This section of highway currently suffers from deteriorating roadway and pedestrian trail pavement and requires permanent reconstruction of the portion of highway that was raised due to flooding in 2020. RB-2692 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $50,000 $0 $100,000 $0 $150,000 State Aid $0 $500,000 $0 $1,050,000 $0 $1,550,000 FUNDING TOTAL $0 $550,000 $0 $1,150,000 $0 $1,700,000 Expenditures Planning/Design $0 $550,000 $0 $650,000 $0 $1,200,000 Right-of-Way $0 $0 $0 $500,000 $0 $500,000 EXPENDITURES TOTAL $0 $550,000 $0 $1,150,000 $0 $1,700,000 Budget Impact/Other This project will reduce operations and maintenance costs associated with the pavement. Capital Project Category: Road & Bridge Location: Grant District: District 1 Total Estimated Project Cost: $1,700,000 Prior Year(s) Total Cost: $0 Project #: RB-2692 Project Name: CSAH 12 - Kimbro to CSAH 15 CIP 2026-2030 113 Description Washington County is currently leading a study of the County State Aid Highway (CSAH) 96 corridor through the cities of Dellwood, Grant, Stillwater, and Stillwater Township, looking at current and future needs to provide a vision that helps guide roadway improvements. This study is looking at future needs regarding highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, highway shoulders, guardrails, etc., which will guide future phases. Justification County State Aid Highway (CSAH) 96 was transferred from the Minnesota Department of Transportation (MnDOT) to Washington County in 2023. RB-2693 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding TAA - Safety & Trails $0 $0 $300,000 $0 $0 $300,000 Turnback - Fund Balance $1,000,000 $0 $5,000,000 $0 $0 $6,000,000 FUNDING TOTAL $1,000,000 $0 $5,300,000 $0 $0 $6,300,000 Expenditures Planning/Design $500,000 $0 $0 $0 $0 $500,000 Construction $0 $0 $5,300,000 $0 $0 $5,300,000 Right-of-Way $500,000 $0 $0 $0 $0 $500,000 EXPENDITURES TOTAL $1,000,000 $0 $5,300,000 $0 $0 $6,300,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $6,700,000 Prior Year(s) Total Cost: $400,000 Project #: RB-2693 Project Name: CSAH 96 Turnback Corridor CIP 2026-2030 114 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 18 (Bailey Road) and Settlers Ridge Parkway: 1) single-lane roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Justification Traffic growth and ongoing development in the region have increased traffic volumes around this intersection. The current all- way stop does not adequately serve the demand. This intersection is ranked near the top of the County's Intersection Control Ranking System. It is well-suited for an upgrade, but it will need significant reconstruction to address all the needs. Washington County was awarded a Highway Safety Improvement Program (HSIP) Grant in 2023 for this project. RB-2694 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $2,000,000 $0 $0 $0 $0 $2,000,000 Local Contributions $1,250,000 $0 $0 $0 $0 $1,250,000 State Aid $1,250,000 $0 $0 $0 $0 $1,250,000 FUNDING TOTAL $4,500,000 $0 $0 $0 $0 $4,500,000 Expenditures Construction $4,500,000 $0 $0 $0 $0 $4,500,000 EXPENDITURES TOTAL $4,500,000 $0 $0 $0 $0 $4,500,000 Budget Impact/Other The project will increase operational costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: District 5 Total Estimated Project Cost: $5,200,000 Prior Year(s) Total Cost: $700,000 Project #: RB-2694 Project Name: CSAH 18 - Settlers Ridge Intersection CIP 2026-2030 115 Description This project is to construct an Americans with Disabilities Act accessible sidewalk along County State Aid Highway (CSAH) 5 (Olive Street) from Pine Tree Trail to Owens Street. The project scope includes: 1) new 5' wide concrete sidewalk 2) curb and gutter repairs 3) roadway drainage and surface water management 4) public and private utility modifications 5) pavement improvement 6) new signing and striping Justification Washington County was awarded a $400,000 federal grant in 2023 for the construction of this sidewalk. This sidewalk will connect an existing gap in the trail/sidewalk system along County State Aid Highway (CSAH) 5 (Olive Street) and will allow pedestrians to continue onto an off-road facility while traveling through this section instead of entering onto the roadway. RB-2695 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $400,000 $0 $0 $0 $0 $400,000 Local Contributions $500,000 $0 $0 $0 $0 $500,000 State Aid $1,800,000 $0 $0 $0 $0 $1,800,000 TAA - Safety & Trails $300,000 $0 $0 $0 $0 $300,000 TAA - Multi-Modal $300,000 $0 $0 $0 $0 $300,000 FUNDING TOTAL $3,300,000 $0 $0 $0 $0 $3,300,000 Expenditures Construction $3,300,000 $0 $0 $0 $0 $3,300,000 EXPENDITURES TOTAL $3,300,000 $0 $0 $0 $0 $3,300,000 Budget Impact/Other The project will increase operational costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Stillwater District: District 3 Total Estimated Project Cost: $3,900,000 Prior Year(s) Total Cost: $600,000 Project #: RB-2695 Project Name: CSAH 5 Sidewalk - Pine Tree Trail to Owens Street CIP 2026-2030 116 Description The scope of this project includes appropriate improvements to be constructed in conjunction with the City of Woodbury-led watermain installation along this corridor. Potential improvements include: Off-road pedestrian improvements, signal and Americans with Disabilities Act upgrades, and turn lane additions. Justification Washington County is partnering with the City of Woodbury to identify appropriate highway improvements in conjunction with their efforts to install watermain infrastructure along this corridor. RB-2696 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding TAA - Safety & Trails $100,000 $0 $0 $0 $0 $100,000 FUNDING TOTAL $100,000 $0 $0 $0 $0 $100,000 Expenditures Construction $100,000 $0 $0 $0 $0 $100,000 EXPENDITURES TOTAL $100,000 $0 $0 $0 $0 $100,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $100,000 Prior Year(s) Total Cost: $0 Project #: RB-2696 Project Name: CSAH 16- Interlachen to Settlers Ridge Parkway CIP 2026-2030 117 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 18 (Bailey Road/40th Street South) and Trunk Highway (TH) 95: 1) roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements This project is led by MnDOT, which secured $2.7M in Highway Safety Improvement Program (HSIP) funds for this project. Justification Traffic growth and ongoing development in the region have increased traffic volumes around this intersection. It is well-suited for an upgrade, but it will need significant reconstruction to address all the needs. The Minnesota Department of Transportation (MnDOT) is leading this project. Washington County has a cost share due to its jurisdiction over two legs of this intersection. RB-2697 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $3,400,000 $0 $0 $0 $0 $3,400,000 State Aid $200,000 $0 $0 $0 $0 $200,000 FUNDING TOTAL $3,600,000 $0 $0 $0 $0 $3,600,000 Expenditures Construction $3,600,000 $0 $0 $0 $0 $3,600,000 EXPENDITURES TOTAL $3,600,000 $0 $0 $0 $0 $3,600,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $3,600,000 Prior Year(s) Total Cost: $0 Project #: RB-2697 Project Name: CSAH 18 @ TH 95 Roundabout CIP 2026-2030 118 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 19 (Keats Avenue) and CSAH 10 (10th Street North): 1) evaluation for a traffic signal or roundabout construction 2) park entrance improvements 3) roadway drainage and surface water management 4) pedestrian and bicycle facility improvements Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification Traffic growth and ongoing development in the region have increased volumes around this intersection. The all-way stop intersection currently operates safely and efficiently during the majority of the day, but backups extending more than 1,000 feet occur frequently. The County has applied for funding for improvements at this intersection, but it has not yet been successful. Installing a roundabout or traffic signal at this intersection will require significant road work and will include a review of recurring flooding issues west and south of the intersection. RB-2701 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $200,000 $50,000 $200,000 $450,000 State Aid $0 $0 $0 $0 $4,000,000 $4,000,000 County Transportation Sales Tax (Road & Bridge)$0 $0 $500,000 $300,000 $0 $800,000 FUNDING TOTAL $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 Expenditures Planning/Design $0 $0 $700,000 $0 $0 $700,000 Construction $0 $0 $0 $0 $4,200,000 $4,200,000 Right-of-Way $0 $0 $0 $350,000 $0 $350,000 EXPENDITURES TOTAL $0 $0 $700,000 $350,000 $4,200,000 $5,250,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Lake Elmo District: District 3 Total Estimated Project Cost: $5,250,000 Prior Year(s) Total Cost: $0 Project #: RB-2701 Project Name: CSAH 19 @ CSAH 10 Intersection CIP 2026-2030 119 Description The project scope includes an analysis of the County State Aid Highway (CSAH) 14 corridor between the Lake Elmo Park Reserve and 39th Street. The analysis will look at current and future needs to provide a vision that helps guide improvement opportunities in this growing residential and business corridor, along with implementation of the Central Greenway Regional Trail. This study will look at future needs regarding highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. Justification This portion of Washington County has seen significant residential development. CSAH 14 suffers from a deteriorating pavement quality, a lack of pedestrian facilities and crossing opportunities, a lack of shoulders, inadequate access management, and poor vehicular operations. Additionally, the Lake Elmo Elementary School is expected to close due to the construction of a new school, leading to potential redevelopment of that site. RB-2702 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $50,000 $0 $0 $0 $50,000 TAA - Multi-Modal $0 $400,000 $0 $0 $0 $400,000 FUNDING TOTAL $0 $450,000 $0 $0 $0 $450,000 Expenditures Planning/Design $0 $450,000 $0 $0 $0 $450,000 EXPENDITURES TOTAL $0 $450,000 $0 $0 $0 $450,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Lake Elmo District: District 3 Total Estimated Project Cost: $450,000 Prior Year(s) Total Cost: $0 Project #: RB-2702 Project Name: CSAH 14 - Lake Elmo Park Reserve to 39th Street Study CIP 2026-2030 120 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 22 (70th Street South) and Trunk Highway (TH) 95: 1) single-lane roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Justification Traffic growth and ongoing development in the region have increased traffic volumes around this intersection, which currently operates as an all-way stop. It is well-suited for an upgrade, but it will need significant reconstruction to address all the needs. The Minnesota Department of Transportation (MnDOT) is leading this project. Washington County has a cost share due to its jurisdiction over two legs of this intersection. RB-2703 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $2,550,000 $0 $0 $0 $2,550,000 State Aid $0 $1,100,000 $0 $0 $0 $1,100,000 TAA - Safety & Trails $0 $150,000 $0 $0 $0 $150,000 FUNDING TOTAL $0 $3,800,000 $0 $0 $0 $3,800,000 Expenditures Construction $0 $3,800,000 $0 $0 $0 $3,800,000 EXPENDITURES TOTAL $0 $3,800,000 $0 $0 $0 $3,800,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 4 Total Estimated Project Cost: $3,800,000 Prior Year(s) Total Cost: $0 Project #: RB-2703 Project Name: CSAH 22 @ TH 95 Roundabout CIP 2026-2030 121 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 15 (Manning Avenue) from 30th Street to CSAH 14 (Stillwater Boulevard/40th Street South): 1) highway expansion from a two-lane undivided highway to a four-lane divided highway 2) evaluation of trails on both the east and west sides of the highway 3) drainage improvements, including storm water treatment facilities 4) railroad crossing review Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates. Justification CSAH 15 is the backbone of the county's transportation system; thus, it is an important north-south route connecting Interstate 94 to Lake Elmo, Stillwater, and beyond. A corridor study completed in 2014 identified these highway improvements, which are necessary to ensure the ongoing safe and efficient operation of this highway segment. RB-2801 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $0 $0 $100,000 $100,000 State Aid $0 $0 $0 $0 $400,000 $400,000 FUNDING TOTAL $0 $0 $0 $0 $500,000 $500,000 Expenditures Planning/Design $0 $0 $0 $0 $500,000 $500,000 EXPENDITURES TOTAL $0 $0 $0 $0 $500,000 $500,000 Budget Impact/Other The project will increase operation and maintenance costs because of the added pavement widths and stormwater infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 3 Total Estimated Project Cost: $500,000 Prior Year(s) Total Cost: $0 Project #: RB-2801 Project Name: CSAH 15 - 30th Street to CSAH 14 CIP 2026-2030 122 Description The project scope includes the replacement of the failing pavement on the off-road pedestrian trail along County State Aid Highway 14 (34th Street North) from Granada Avenue to Hadley Avenue in the City of Oakdale. Justification This trail segment, constructed in 2005, has a pavement condition index (PCI) in the red zone. Replacing the pavement will improve pedestrian accessibility. RB-2803 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding TAA - Safety & Trails $300,000 $0 $0 $0 $0 $300,000 FUNDING TOTAL $300,000 $0 $0 $0 $0 $300,000 Expenditures Construction $300,000 $0 $0 $0 $0 $300,000 EXPENDITURES TOTAL $300,000 $0 $0 $0 $0 $300,000 Budget Impact/Other This project will maintain operating costs and decrease maintenance repair expenses. Capital Project Category: Road & Bridge Location: Oakdale District: District 2 Total Estimated Project Cost: $450,000 Prior Year(s) Total Cost: $150,000 Project #: RB-2803 Project Name: CSAH 14 Trail - Granada Avenue to Hadley Avenue CIP 2026-2030 123 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 16 (Valley Creek Road) and the Eagle Creek Lane intersection: 1) traffic signal 2) pedestrian and bicycle facility improvements Justification Traffic growth and ongoing development in the region have increased traffic volumes around this intersection. This intersection is ranked near the top of the county's Intersection Control Ranking System. While access spacing is far short of county access spacing guidelines and presents a number of challenges, County and City staff have discussed alternatives to improve safety at this intersection, and a traffic signal was chosen as the best alternative. Improvements will accommodate the city watermain and a future trail on the north side of CSAH 16, which is proposed for construction in 2026 (BR-2814). RB-2804 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $300,000 $0 $0 $0 $0 $300,000 State Aid $300,000 $0 $0 $0 $0 $300,000 TAA - Safety & Trails $300,000 $0 $0 $0 $0 $300,000 FUNDING TOTAL $900,000 $0 $0 $0 $0 $900,000 Expenditures Construction $900,000 $0 $0 $0 $0 $900,000 EXPENDITURES TOTAL $900,000 $0 $0 $0 $0 $900,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: District 5 Total Estimated Project Cost: $900,000 Prior Year(s) Total Cost: $0 Project #: RB-2804 Project Name: CSAH 16 and Eagle Creek Lane CIP 2026-2030 124 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 5 (Stonebridge Trail), County Road (CR) 55 (Norell Avenue), and CSAH 96 (Dellwood Road): 1) improved intersection control- likely with a roundabout or roundabouts 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design and environmental analysis, along with public engagement, will determine the final project scope, right-of- way acquisition requirements, and cost estimates. Justification The current all-way stop does not adequately serve the demand seen at this intersection, leading to this intersection being well-suited for an upgrade. RB-2807 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $0 $500,000 $0 $0 $0 $500,000 Local Contributions $50,000 $0 $0 $0 $0 $50,000 Turnback - Fund Balance $700,000 $4,000,000 $0 $0 $0 $4,700,000 FUNDING TOTAL $750,000 $4,500,000 $0 $0 $0 $5,250,000 Expenditures Planning/Design $500,000 $0 $0 $0 $0 $500,000 Construction $0 $4,500,000 $0 $0 $0 $4,500,000 Right-of-Way $250,000 $0 $0 $0 $0 $250,000 EXPENDITURES TOTAL $750,000 $4,500,000 $0 $0 $0 $5,250,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Stillwater Township District: District 3 Total Estimated Project Cost: $5,750,000 Prior Year(s) Total Cost: $500,000 Project #: RB-2807 Project Name: CSAH 5, CR 55, and CSAH 96 Intersection CIP 2026-2030 125 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 10 (10th Street) and CSAH 17 (Lake Elmo Avenue). 1) improved intersection control- likely with a roundabout or signal 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification Stillwater Public School District is currently constructing a new elementary school in the northwest corner of CSAH 10 and CSAH 17. This new school will increase traffic volumes at this intersection, which is currently controlled with all-way stop signs. As a part of the site development approval process, Washington County partnered with the City of Lake Elmo and the Stillwater Public School District to install transportation infrastructure to ensure that the immediate area will operate safely at the time of school opening, which is planned for fall 2026. RB-2808 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $100,000 $0 $500,000 $0 $0 $600,000 State Aid $600,000 $0 $2,400,000 $0 $0 $3,000,000 TAA - Safety & Trails $0 $0 $200,000 $0 $0 $200,000 TAA - Multi-Modal $0 $0 $350,000 $0 $0 $350,000 FUNDING TOTAL $700,000 $0 $3,450,000 $0 $0 $4,150,000 Expenditures Planning/Design $400,000 $0 $0 $0 $0 $400,000 Construction $0 $0 $3,450,000 $0 $0 $3,450,000 Right-of-Way $300,000 $0 $0 $0 $0 $300,000 EXPENDITURES TOTAL $700,000 $0 $3,450,000 $0 $0 $4,150,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Lake Elmo District: District 3 Total Estimated Project Cost: $4,754,000 Prior Year(s) Total Cost: $604,000 Project #: RB-2808 Project Name: CSAH 10 and CSAH 17 Intersection CIP 2026-2030 126 Description The project scope includes the following improvements at the intersection of County Road (CR) 50 (202nd Street) and Trunk Highway (TH) 61. 1) improved intersection control- likely with a roundabout or signal 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design and environmental analysis, along with public engagement, will determine the final project scope, right-of- way acquisition requirements, and cost estimates. Justification This intersection serves as a critical crossing point of Highway 61 from County Highway 50 to the Hardwood Creek Regional Trail. It is currently controlled by side-street stop signs and a High-Intensity Activated Crosswalk (HAWK) beacon. However, this configuration is insufficient given the nature of pedestrian and vehicular traffic at this location. Notably, in April 2024, two pedestrians were struck by a vehicle while attempting to cross. Washington County has successfully secured $1.6M in Federal Grants and $1M from the MnDOT Metro Local Partnership Program Funding to improve this intersection. RB-2809 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $0 $0 $1,674,900 $0 $0 $1,674,900 Local Contributions $50,000 $0 $200,000 $0 $0 $250,000 County Transportation Sales Tax (Road & Bridge)$50,000 $0 $1,000,000 $0 $0 $1,050,000 State Grants $0 $0 $1,000,000 $0 $0 $1,000,000 TAA - Safety & Trails $450,000 $0 $0 $0 $0 $450,000 FUNDING TOTAL $550,000 $0 $3,874,900 $0 $0 $4,424,900 Expenditures Planning/Design $450,000 $0 $0 $0 $0 $450,000 Construction $0 $0 $3,874,900 $0 $0 $3,874,900 Right-of-Way $100,000 $0 $0 $0 $0 $100,000 EXPENDITURES TOTAL $550,000 $0 $3,874,900 $0 $0 $4,424,900 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Forest Lake District: District 1 Total Estimated Project Cost: $4,824,900 Prior Year(s) Total Cost: $400,000 Project #: RB-2809 Project Name: CR 50 and TH 61 Intersection CIP 2026-2030 127 Description Provide financial support to existing and expanded transit circulator routes provided by cities and non-profit partners throughout the county. Justification Multiple cities in the county fund and coordinate circulator transit services that generally target getting seniors to retail. The circulators typically operate only one day a week and for a few hours. The county will work with each existing circulator to expand the service. This could be additional hours or days of the week and/or additional routes or expanded destinations. RB-2811 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding TAA - Multi-Modal $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 FUNDING TOTAL $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 Expenditures Construction $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 EXPENDITURES TOTAL $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 Budget Impact/Other This project will not increase operation and maintenance costs as it will not be adding new infrastructure. There is no anticipated change within the Road & Bridge Division operating budget. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $1,200,000 Prior Year(s) Total Cost: $200,000 Project #: RB-2811 Project Name: Transit Circulator Support CIP 2026-2030 128 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 16 (Valley Creek Road) and Settlers Ridge Parkway. 1) improved intersection control - likely with a roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design and environmental analysis, along with public engagement, will determine the final project scope, right-of- way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification Washington County conducted a corridor study on CSAH 16 in 2024 to review and evaluate safety improvements along the corridor. This intersection is recommended to be converted from an all-way stop to a roundabout. Benefits of this project will include: • Providing high-visibility ADA-compliant pedestrian/bike crossings • Eliminating left-turn movements against opposing traffic, reducing the likelihood of collisions • Reducing vehicle congestion, idling, and emissions To date $2,384,200 in Federal Grants have been secured for the construction of this project. RB-2812 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $0 $0 $2,384,200 $0 $0 $2,384,200 Local Contributions $300,000 $0 $200,000 $0 $0 $500,000 State Aid $0 $0 $1,000,000 $0 $0 $1,000,000 TAA - Safety & Trails $400,000 $0 $0 $0 $0 $400,000 TAA - Multi-Modal $0 $0 $400,000 $0 $0 $400,000 FUNDING TOTAL $700,000 $0 $3,984,200 $0 $0 $4,684,200 Expenditures Planning/Design $300,000 $0 $0 $0 $0 $300,000 Construction $0 $0 $3,984,200 $0 $0 $3,984,200 Right-of-Way $400,000 $0 $0 $0 $0 $400,000 EXPENDITURES TOTAL $700,000 $0 $3,984,200 $0 $0 $4,684,200 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: District 5 Total Estimated Project Cost: $4,684,200 Prior Year(s) Total Cost: $0 Project #: RB-2812 Project Name: CSAH 16 and Settlers Ridge Parkway Intersection CIP 2026-2030 129 Description This project includes land acquisition for a future Middle St. Croix Trail-head in Afton. Justification A Long-Range Plan of the Middle St. Croix Regional Trail connecting Afton to Stillwater was completed in 2023. RB-2813 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding TAA - Safety & Trails $100,000 $0 $0 $0 $0 $100,000 FUNDING TOTAL $100,000 $0 $0 $0 $0 $100,000 Expenditures Right-of-Way $100,000 $0 $0 $0 $0 $100,000 EXPENDITURES TOTAL $100,000 $0 $0 $0 $0 $100,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Afton District: District 3 Total Estimated Project Cost: $100,000 Prior Year(s) Total Cost: $0 Project #: RB-2813 Project Name: CSAH 21 – Middle St. Croix Valley Regional Trail CIP 2026-2030 130 Description The project scope includes adding an off-road multi-use trail on the north side of County State Aid Highway (CSAH) 16 (Valley Creek Road) from the existing pedestrian tunnel/underpass near Colby Lake Park to Dancing Waters Parkway. Justification The City of Woodbury has secured $963,200 in funding through the regional solicitation program to partially fund construction of this project. This trail addition will close an existing gap in the trail network. RB-2814 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $963,200 $0 $0 $0 $0 $963,200 Local Contributions $300,000 $0 $0 $0 $0 $300,000 TAA - Safety & Trails $300,000 $0 $0 $0 $0 $300,000 FUNDING TOTAL $1,563,200 $0 $0 $0 $0 $1,563,200 Expenditures Construction $1,563,200 $0 $0 $0 $0 $1,563,200 EXPENDITURES TOTAL $1,563,200 $0 $0 $0 $0 $1,563,200 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $1,563,200 Prior Year(s) Total Cost: $0 Project #: RB-2814 Project Name: CSAH 16 Trail – Colby Lake to Dancing Waters Pkwy CIP 2026-2030 131 Description The project scope includes pavement and signal upgrades to County State Aid Highway (CSAH) 39 (80th Street South) from Hadley Avenue to TH 61. Justification The City of Cottage Grove, in partnership with MnDOT, is planning a project to improve pavement and replace aging traffic signal infrastructure on 80th Street. The County will partner with these agencies to complete appropriate upgrades to County infrastructure. RB-2815 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $400,000 $0 $0 $0 $0 $400,000 FUNDING TOTAL $400,000 $0 $0 $0 $0 $400,000 Expenditures Construction $400,000 $0 $0 $0 $0 $400,000 EXPENDITURES TOTAL $400,000 $0 $0 $0 $0 $400,000 Budget Impact/Other This project will maintain operating costs and decrease maintenance repair expenses. Capital Project Category: Road & Bridge Location: Cottage Grove District: District 4 Total Estimated Project Cost: $400,000 Prior Year(s) Total Cost: $0 Project #: RB-2815 Project Name: CSAH 39 and TH 61 Intersection CIP 2026-2030 132 Description The project scope includes adding electric vehicle (EV) chargers and carshare vehicles at three Gold Line stations (Woodlane, Helmo, and Greenway). Justification The project would place EV carshare hubs and public charging at select Gold Line stations in Washington County, substantially increasing the number of destinations available to Gold Line users and creating public charging infrastructure. The project would include make-ready infrastructure for chargers and shared electric vehicles. RB-2816 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $650,000 $0 $0 $0 $0 $650,000 TAA - Multi-Modal $200,000 $0 $0 $0 $0 $200,000 FUNDING TOTAL $850,000 $0 $0 $0 $0 $850,000 Expenditures Construction $850,000 $0 $0 $0 $0 $850,000 EXPENDITURES TOTAL $850,000 $0 $0 $0 $0 $850,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $850,000 Prior Year(s) Total Cost: $0 Project #: RB-2816 Project Name: Electric Vehicle (EV) Carshare at Gold Line Stations CIP 2026-2030 133 Description Corridor study on County State Aid Highway (CSAH) 22 (70th Street) from CSAH 19 (Woodbury Drive) to CSAH 13 (Hinton Avenue). Justification This study will analyze current and future needs along the corridor to provide a vision that helps guide future improvement opportunities. The study will look at needs with regard to highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. RB-2817 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $100,000 $0 $0 $0 $100,000 TAA - Safety & Trails $0 $100,000 $0 $0 $0 $100,000 TAA - Multi-Modal $0 $100,000 $0 $0 $0 $100,000 FUNDING TOTAL $0 $300,000 $0 $0 $0 $300,000 Expenditures Planning/Design $0 $300,000 $0 $0 $0 $300,000 EXPENDITURES TOTAL $0 $300,000 $0 $0 $0 $300,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Cottage Grove District: District 4 Total Estimated Project Cost: $300,000 Prior Year(s) Total Cost: $0 Project #: RB-2817 Project Name: CSAH 22 - CSAH 19 to CSAH 13 Study CIP 2026-2030 134 Description The project scope includes preliminary engineering and engagement for the following potential improvements to County State Aid Highway (CSAH) 24 (Osgood Avenue N) between 58th Street and 62nd Street: 1) vehicular operations improvements 2) safety improvements, including center medians 3) pavement improvement 4) surface water management 5) intersection improvements, including turn lanes and traffic signals Preliminary design and environmental analysis, along with public engagement, will determine the final project scope, right-of- way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification Several projects have taken place on and adjacent to the CSAH 24 corridor, including realignment of the north frontage road in 2015, realignment of the southeast frontage road (CSAH 26) in 2016, pavement rehabilitation of CSAH 24 in 2018, and realignment of the southwest frontage road in 2022. RB-2818 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $100,000 $0 $100,000 $0 $200,000 State Aid $0 $200,000 $0 $300,000 $0 $500,000 TAA - Safety & Trails $0 $0 $0 $100,000 $0 $100,000 FUNDING TOTAL $0 $300,000 $0 $500,000 $0 $800,000 Expenditures Planning/Design $0 $300,000 $0 $500,000 $0 $800,000 EXPENDITURES TOTAL $0 $300,000 $0 $500,000 $0 $800,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Oak Park Heights District: District 3 Total Estimated Project Cost: $800,000 Prior Year(s) Total Cost: $0 Project #: RB-2818 Project Name: CSAH 24 – 58th Street to 62nd Street CIP 2026-2030 135 Description Corridor study on County State Aid Highway (CSAH) 17 (Lake Elmo Avenue) from CSAH 14 (Stillwater Blvd.) to CSAH 12 (75th Street). Justification This study will analyze current and future needs along the corridor to provide a vision that helps guide future improvement opportunities. The study will look at needs with regards to highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. RB-2819 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $100,000 $0 $0 $100,000 State Aid $0 $0 $400,000 $0 $0 $400,000 FUNDING TOTAL $0 $0 $500,000 $0 $0 $500,000 Expenditures Planning/Design $0 $0 $500,000 $0 $0 $500,000 EXPENDITURES TOTAL $0 $0 $500,000 $0 $0 $500,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Grant District: District 1 Total Estimated Project Cost: $500,000 Prior Year(s) Total Cost: $0 Project #: RB-2819 Project Name: CSAH 17 – CSAH 14 to CSAH 12 Study CIP 2026-2030 136 Description The project will install battery backup systems (BBS) at 26 existing high-priority traffic signals within the City of Woodbury, Oakdale, and Lake Elmo. Justification The BBS work will include a combination of retrofitting signal cabinets that already accommodate the BBS or replacing existing service cabinets with new, compatible cabinets. The project focuses on traffic signals along the CSAH 16 and CSAH 13 corridors, which serve as key access routes for residents traveling to local destinations and accessing the Interstate system at I-94 or I-494. Once installed, the BBS will provide a backup power source at traffic signals that will operate during unexpected outages, preventing the critical safety, congestion, and accessibility impacts that result when outages occur. RB-2820 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants $0 $0 $532,000 $0 $0 $532,000 State Aid $0 $0 $200,000 $0 $0 $200,000 FUNDING TOTAL $0 $0 $732,000 $0 $0 $732,000 Expenditures Construction $0 $0 $732,000 $0 $0 $732,000 EXPENDITURES TOTAL $0 $0 $732,000 $0 $0 $732,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $732,000 Prior Year(s) Total Cost: $0 Project #: RB-2820 Project Name: Traffic Signal Battery Backup CIP 2026-2030 137 Description The project scope includes the reconstruction of 22nd Street to: 1) improve grades and sightlines 2) add paved shoulders 3) add turn lanes 4) provide recoverable slopes and establish clear zones 5) improve drainage 6) meet County and State Aid Design Standards Justification Following the opening of the St. Croix River Crossing bridge that connects Minnesota and Wisconsin, Washington County initiated the St. Croix Valley Roadway Jurisdictional Study in 2018 to provide technical analysis and recommendations for potential changes in roadway jurisdiction for routes in this area. The outcome of this study provided a framework for future discussions related to the long-term operation and maintenance of identified roadways between the county and other road authorities. 22nd Street was identified as a recommended transfer from the Township to the county. After this Jurisdictional Study was complete, the County and the Township executed an MOU in 2021 that gave the county confidence to kick off a more detailed corridor study on 22nd Street. This corridor study kicked off in 2023 and concluded in 2024. Through engagement with the public and our agency partners, a preferred design was determined and supported by the Township officials through a Resolution of Support. Construction of this project falls outside of this 2026-2030 Capital Improvement Plan and would not occur until 2031 at the earliest. RB-2821 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $0 $0 $0 $800,000 $0 $800,000 FUNDING TOTAL $0 $0 $0 $800,000 $0 $800,000 Expenditures Planning/Design $0 $0 $0 $500,000 $0 $500,000 Right-of-Way $0 $0 $0 $300,000 $0 $300,000 EXPENDITURES TOTAL $0 $0 $0 $800,000 $0 $800,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: West Lakeland Township District: District 3 Total Estimated Project Cost: $800,000 Prior Year(s) Total Cost: $0 Project #: RB-2821 Project Name: 22nd Street Reconstruction CIP 2026-2030 138 Description The project will add a fiber optic connection. Justification This fiber connection will improve business continuity and traffic operations while supporting the sheriff's response. RB-2822 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Federal Grants Request $0 $0 $0 $200,000 $0 $200,000 FUNDING TOTAL $0 $0 $0 $200,000 $0 $200,000 Expenditures Planning/Design $0 $0 $0 $200,000 $0 $200,000 EXPENDITURES TOTAL $0 $0 $0 $200,000 $0 $200,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $200,000 Prior Year(s) Total Cost: $0 Project #: RB-2822 Project Name: Fiber Ring CIP 2026-2030 139 Description Corridor study on Trunk Highway (TH) 95 (Manning Avenue) from TH 61 to I-94. Justification This study will analyze current and future needs along the corridor to provide a vision that helps guide future improvement opportunities. The study will look at needs with regard to highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. This study will not include a jurisdictional review of Highway 95. RB-2823 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Grants $0 $125,000 $0 $0 $0 $125,000 TAA - Safety & Trails $0 $125,000 $0 $0 $0 $125,000 FUNDING TOTAL $0 $250,000 $0 $0 $0 $250,000 Expenditures Planning/Design $0 $250,000 $0 $0 $0 $250,000 EXPENDITURES TOTAL $0 $250,000 $0 $0 $0 $250,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $250,000 Prior Year(s) Total Cost: $0 Project #: RB-2823 Project Name: Trunk Highway 95 Corridor Study CIP 2026-2030 140 Description The Mahtomedi school campus and athletic facilities, the regional trail system, and other community resources are on the north side of County State Aid Highway (CSAH) 12 east of the traffic signal at the entrance to the Mahtomedi Middle School. However, there is no existing sidewalk or trail along the south side of CSAH 12, nor is there a designated crossing to safely connect community members to the south of CSAH 12 to those resources. This project adds a pedestrian facility along the south side of CSAH 12 and provides a connection to the school grounds. Justification Washington County submitted a successful application for State Safe Routes to School funds for this project and was awarded funds for 2026. These funds will help deliver this important trail extension, which, when completed, will extend from Trunk Highway (TH) 120 to the Gateway neighborhood cul-de-sac. The scope and details of all these phases were jointly developed, with the cities of Mahtomedi, Willernie, and Grant, as well as with the Mahtomedi Public School District. RB-2824 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $110,000 $0 $0 $0 $0 $110,000 State Grants $550,000 $0 $0 $0 $0 $550,000 TAA - Multi-Modal $310,000 $0 $0 $0 $0 $310,000 FUNDING TOTAL $970,000 $0 $0 $0 $0 $970,000 Expenditures Planning/Design $200,000 $0 $0 $0 $0 $200,000 Construction $750,000 $0 $0 $0 $0 $750,000 Right-of-Way $20,000 $0 $0 $0 $0 $20,000 EXPENDITURES TOTAL $970,000 $0 $0 $0 $0 $970,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Grant District: District 1 Total Estimated Project Cost: $970,000 Prior Year(s) Total Cost: $0 Project #: RB-2824 Project Name: CSAH 12 Trail – Mahtomedi Middle School to Inwood Way CIP 2026-2030 141 Description Corridor study on County State Aid Highway (CSAH) 10 (10th Street) from Trunk Highway 120 (Century Avenue) to CSAH 15 (Manning Avenue). Justification This study will analyze current and future needs along the corridor to provide a vision that helps guide future improvement opportunities. The study will look at needs with regard to highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. The study will also analyze flooding associated with Goose Lake. Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. RB-2827 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $50,000 $0 $0 $0 $50,000 State Aid $0 $200,000 $0 $0 $0 $200,000 FUNDING TOTAL $0 $250,000 $0 $0 $0 $250,000 Expenditures Planning/Design $0 $250,000 $0 $0 $0 $250,000 EXPENDITURES TOTAL $0 $250,000 $0 $0 $0 $250,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $250,000 Prior Year(s) Total Cost: $0 Project #: RB-2827 Project Name: CSAH 10 - County Line to CSAH 15 Corridor Study CIP 2026-2030 142 Description The project scope includes a study of the following potential improvements on County Road (CR) 55 from County State Aid Highway (CSAH) 96 to County Road (CR) 61: 1) new pavement 2) evaluation of pedestrian and cycling accommodations 3) signs and striping 4) roadway drainage and surface water management Justification With upgrades to County State Aid Highway 5 south of County State Aid Highway 96 completing construction in 2025 and planning underway for reconstruction of the County State Aid Highway 5, County Road 55, and County State Aid Highway 96 intersection planned for 2027, analyzing investments in the County Highway 55 corridor will provide a vision for pavement improvement and gauge support for the closure of an off-road trail gap connecting to the Gateway State Trail. RB-2828 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding TAA - Safety & Trails $0 $0 $0 $0 $300,000 $300,000 FUNDING TOTAL $0 $0 $0 $0 $300,000 $300,000 Expenditures Planning/Design $0 $0 $0 $0 $300,000 $300,000 EXPENDITURES TOTAL $0 $0 $0 $0 $300,000 $300,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Stillwater Township District: District 3 Total Estimated Project Cost: $300,000 Prior Year(s) Total Cost: $0 Project #: RB-2828 Project Name: CR 55 - CSAH 96 to CR 61 Study CIP 2026-2030 143 Description This project will repave the pedestrian trail and install ADA upgrades on CSAH 13 from CSAH 16 to I-94. Justification This asphalt trail is nearing or beyond its useful life. Conducting maintenance/preservation will allow the county to extend the life of the pavement and better serve users. Pavement preservation will also provide the public with improved safety and mobility and an overall more comfortable experience. RB-2829 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $0 $0 $0 $900,000 $0 $900,000 TAA - Safety & Trails $0 $0 $0 $1,300,000 $0 $1,300,000 FUNDING TOTAL $0 $0 $0 $2,200,000 $0 $2,200,000 Expenditures Construction $0 $0 $0 $2,200,000 $0 $2,200,000 EXPENDITURES TOTAL $0 $0 $0 $2,200,000 $0 $2,200,000 Budget Impact/Other This project will replace infrastructure that is in poor condition. Annual maintenance costs will be reduced. Capital Project Category: Road & Bridge Location: Woodbury District: Multiple Total Estimated Project Cost: $2,200,000 Prior Year(s) Total Cost: $0 Project #: RB-2829 Project Name: CSAH 13 Trail Rehab - CSAH 16 to I-94 CIP 2026-2030 144 Description The project scope includes the following improvements to County State Aid Highway (CSAH) 15 (Manning Avenue) from 43rd St N to 55th Street: 1) highway expansion from a two-lane undivided highway to a four-lane divided highway 2) evaluation of trails on both the east and west sides of the highway 3) drainage improvements, including storm water treatment facilities Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates. Justification This portion of CSAH 15 is a north-south minor arterial serving regional traffic in the area, including access to the Stillwater Area High School. Improvements to CSAH 15 will provide increased capacity and allow for appropriate access for this regional growth, while providing improved safety and off-road pedestrian accommodations. This segment of the trail has been identified in the Central Greenway Regional Trail Long-Range Plan and as a high priority in the Washington County MOVE Bike and Pedestrian Plan. RB-2830 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $100,000 $200,000 $500,000 $800,000 State Aid $0 $0 $300,000 $800,000 $4,400,000 $5,500,000 TAA - Safety & Trails $0 $0 $0 $0 $2,700,000 $2,700,000 TAA - Multi-Modal $0 $0 $400,000 $0 $1,100,000 $1,500,000 FUNDING TOTAL $0 $0 $800,000 $1,000,000 $8,700,000 $10,500,000 Expenditures Planning/Design $0 $0 $800,000 $600,000 $0 $1,400,000 Construction $0 $0 $0 $0 $8,700,000 $8,700,000 Right-of-Way $0 $0 $0 $400,000 $0 $400,000 EXPENDITURES TOTAL $0 $0 $800,000 $1,000,000 $8,700,000 $10,500,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: District 3 Total Estimated Project Cost: $10,500,000 Prior Year(s) Total Cost: $0 Project #: RB-2830 Project Name: CSAH 15 - 43rd Street N to 55th Street N CIP 2026-2030 145 Description The project scope includes the following improvements at the intersection of County State Aid Highway (CSAH) 15 (Manning Avenue) and the McKusick Road N intersection: 1) signal or roundabout 2) highway drainage and surface water management 3) pedestrian and bicycle facility improvements Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. Justification Traffic growth and ongoing development in the region have increased traffic volumes around this intersection. The current intersection does not adequately serve the demand. This intersection does not meet signal warrants currently but is reaching capacity. It is well-suited for an upgrade, but it will need significant reconstruction to address all the needs. RB-2831 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $50,000 $0 $0 $50,000 TAA - Safety & Trails $0 $0 $400,000 $0 $0 $400,000 FUNDING TOTAL $0 $0 $450,000 $0 $0 $450,000 Expenditures Planning/Design $0 $0 $450,000 $0 $0 $450,000 EXPENDITURES TOTAL $0 $0 $450,000 $0 $0 $450,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $450,000 Prior Year(s) Total Cost: $0 Project #: RB-2831 Project Name: CSAH 15 @ McKusick Rd N Intersection CIP 2026-2030 146 Description The project scope will include an analysis of the County State Aid Highway (CSAH) 18 corridor between I-494 and Settlers Ridge Parkway. The analysis will be looking at current and future needs to provide a vision that helps guide improvement opportunities in this growing residential and business corridor. This study will look at future needs regarding highway capacity, intersections, access, right-of-way, drainage, pedestrian/bicycle facilities, utilities, etc. Justification CSAH 18 is an east-west arterial serving regional traffic and providing access to the City of Woodbury’s La Lake Park. The Century Avenue Extension Study highlighted the need to plan for improvements to this corridor. Providing for increased capacity and allowing appropriate access is critical for regional traffic, and this section of highway suffers from a deteriorating pavement section, a lack of pedestrian facilities, a lack of shoulders, and poor vehicular operations. A corridor study of CSAH 18 from CSAH 20 (Military Road) to CSAH 13 (Radio Drive) was completed in 2018, but continued growth and pending development warrant an update. RB-2833 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $50,000 $0 $0 $50,000 State Aid $0 $0 $550,000 $0 $0 $550,000 FUNDING TOTAL $0 $0 $600,000 $0 $0 $600,000 Expenditures Planning/Design $0 $0 $600,000 $0 $0 $600,000 EXPENDITURES TOTAL $0 $0 $600,000 $0 $0 $600,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $600,000 Prior Year(s) Total Cost: $0 Project #: RB-2833 Project Name: CSAH 18 - I-494 to Settlers Ridge Parkway Study CIP 2026-2030 147 Description In 2018, Washington County completed a study of the County State Aid Highway (CSAH) 18 (Bailey Road) Corridor. Results of that study have been implemented via several projects, including improvements to CSAH 18 between Pioneer Drive and CSAH 19 (Woodbury Drive), completed in 2019. Traffic impacts related to construction on parallel routes, adjacent private development projects, and expected growth in the area, including the Math and Science Academy, have led to increased traffic volumes and delays at the roundabout at CSAH 18 and CSAH 19. This project will review the roundabout capacity to identify responsible improvements to increase traffic flow. Justification This intersection suffers from vehicular delay. RB-2834 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $0 $1,000,000 $0 $0 $0 $1,000,000 FUNDING TOTAL $0 $1,000,000 $0 $0 $0 $1,000,000 Expenditures Planning/Design $0 $200,000 $0 $0 $0 $200,000 Construction $0 $800,000 $0 $0 $0 $800,000 EXPENDITURES TOTAL $0 $1,000,000 $0 $0 $0 $1,000,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Woodbury District: District 5 Total Estimated Project Cost: $1,000,000 Prior Year(s) Total Cost: $0 Project #: RB-2834 Project Name: CSAH 18 @ CSAH 19 Roundabout Modifications CIP 2026-2030 148 Description The project scope for County State Aid Highway 19 – CSAH 22 to Dale will be identified through the CSAH 19 - US TH 61 to Dale Road Study (RB-2687). Potential improvements include: 1) highway expansion from a two-lane undivided highway to a four-lane divided highway 2) construction of trails on both the east and west sides of the highway 3) drainage improvements, including storm water treatment facilities 4) intersection improvements Justification This portion of CSAH 19 is a north-south arterial serving regional traffic in the area. The county completed a two-lane to four- lane expansion of CSAH 19 (Woodbury Drive) from CSAH 18 (Bailey Road) to Dale Road in response to development pressure, increasing pedestrians, and increases in traffic volumes. Development in Woodbury will continue moving south along CSAH 19 while Cottage Grove experiences high development adjacent to CSAH 19 as well. Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition requirements, and cost estimates, which will be included in a future capital improvement plan. RB-2835 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $0 $0 $50,000 $50,000 State Aid $0 $0 $0 $0 $400,000 $400,000 TAA - Safety & Trails $0 $0 $0 $0 $200,000 $200,000 FUNDING TOTAL $0 $0 $0 $0 $650,000 $650,000 Expenditures Planning/Design $0 $0 $0 $0 $650,000 $650,000 EXPENDITURES TOTAL $0 $0 $0 $0 $650,000 $650,000 Budget Impact/Other This project will increase operation and maintenance costs because of the added infrastructure. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $650,000 Prior Year(s) Total Cost: $0 Project #: RB-2835 Project Name: CSAH 19 - CSAH 22 to Dale Rd CIP 2026-2030 149 Description This project is for engineering services to determine appropriate improvements to the existing North Shop exterior storage areas. Justification The Public Works North shop was originally constructed in 1952, with an addition in 1962, and ultimately the building was reconstructed in 2016/2017. Budget constraints at the time severely limited opportunities for improvement to the exterior storage area of the site. This area suffers from failing pavement, aging buildings, drainage issues, space constraints, and inefficiencies. This phase of planning/design will determine the final project scope and cost estimates, which will be included in a future capital improvement plan. RB-2836 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding State Aid $0 $0 $300,000 $0 $0 $300,000 FUNDING TOTAL $0 $0 $300,000 $0 $0 $300,000 Expenditures Planning/Design $0 $0 $300,000 $0 $0 $300,000 EXPENDITURES TOTAL $0 $0 $300,000 $0 $0 $300,000 Budget Impact/Other This project will not increase operation and maintenance costs because it is a study at this time. Capital Project Category: Road & Bridge Location: Stillwater Township District: District 1 Total Estimated Project Cost: $300,000 Prior Year(s) Total Cost: $0 Project #: RB-2836 Project Name: Public Works North Shop CIP 2026-2030 150 Description The project scope for County Road 50 – Trunk Highway (TH) 61 to Ingersoll Avenue North will be identified through the CR 50 - TH 61 to CSAH 15 Study (RB-2682). Potential improvements include: 1) new pavement with widened shoulders 2) turn lanes at key locations where appropriate 3) evaluation of pedestrian and cycling accommodations 4) signs and striping 5) roadway drainage and surface water management 6) roadway geometric improvements Justification The existing roadway segment is substandard in width for a typical county highway, with no paved shoulders beyond the 12- foot travel lanes and minimal gravel shoulders, if any. Ongoing development along the western corridor is increasing traffic demand and safety concerns. Over time, drainage ditches have become obstructed, compromising stormwater conveyance and treatment within the right-of-way. The pavement has reached the end of its service life. Additionally, several tight-radius curves present geometric deficiencies that warrant further evaluation and potential realignment. Due to the constrained pavement width and absence of a functioning stormwater drainage system, this corridor is not a candidate for standard pavement preservation treatments. A more comprehensive reconstruction approach is necessary to address safety, drainage, and long-term durability. RB-2838 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Local Contributions $0 $0 $600,000 $0 $100,000 $700,000 County Transportation Sales Tax (Road & Bridge)$0 $0 $1,300,000 $0 $6,500,000 $7,800,000 FUNDING TOTAL $0 $0 $1,900,000 $0 $6,600,000 $8,500,000 Expenditures Planning/Design $0 $0 $900,000 $0 $0 $900,000 Construction $0 $0 $0 $0 $6,600,000 $6,600,000 Right-of-Way $0 $0 $1,000,000 $0 $0 $1,000,000 EXPENDITURES TOTAL $0 $0 $1,900,000 $0 $6,600,000 $8,500,000 Budget Impact/Other This project will replace infrastructure that is in poor condition. This project will maintain operating costs and decrease maintenance repair expenses. Capital Project Category: Road & Bridge Location: Forest Lake District: District 1 Total Estimated Project Cost: $8,500,000 Prior Year(s) Total Cost: $0 Project #: RB-2838 Project Name: CR 50 – TH 61 to Ingersoll Avenue North CIP 2026-2030 151 Description The project scope includes a study to determine proper future road jurisdictions for roadways impacted by the Gold Line Bus Rapid Transit Project and associated local roadway improvements. The study will be done with State and local partners. Justification The proper jurisdiction of a roadway provides for the most efficient and effective delivery of services, management of traffic, and meeting customer expectations. With the opening of the Gold Line Bus Rapid Transit Project in March 2025, local and sub-regional traffic patterns may see some shifting. RB-2839 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding Wheelage Tax $0 $0 $0 $0 $400,000 $400,000 FUNDING TOTAL $0 $0 $0 $0 $400,000 $400,000 Expenditures Planning/Design $0 $0 $0 $0 $400,000 $400,000 EXPENDITURES TOTAL $0 $0 $0 $0 $400,000 $400,000 Budget Impact/Other This project will not increase operations or maintenance costs since it is a study. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $400,000 Prior Year(s) Total Cost: Project #: RB-2839 Project Name: Gold Line Jurisdictional Study CIP 2026-2030 152 Description The scope of this project includes design, right-of-way acquisition, and construction of the Gold Line Bus Rapid Transit (BRT). This will be Minnesota’s first BRT line in a dedicated guideway. It will provide all-day transit service in both directions between Saint Paul, Maplewood, Landfall, Oakdale, and Woodbury, roughly every 15 minutes. Justification METRO Gold Line BRT began the development process in 2010 and opened for service in 2025. The project entered the Federal Transit Administration (FTA) process in 2018 and finalized the project funding partners and budget when the project received the federal Full Funding Grant Agreement (FFGA) in 2023. The total project budget was $505.3 million. Washington County’s share is $120.3 million (24.16%). Other funding partners include the FTA (47.37%), Ramsey County (24.2%), and state and local funds (4.27%). Washington County is also responsible for a federally ineligible sound wall in the amount of $198,000. While the project began service in 2025, there are additional punch list items, change orders, warranty work, right-of-way (ROW) acquisition, and project close-out activities that need to occur. The current project cash flow extends through 2027 and may extend longer if the ROW process is not finished. Project staff is currently calculating that the overall project will underrun the set project budget. The exact amount under budget will not be known until all project activities are finished, but the anticipated budget underrun is reflected in the 2026 and 2027 CIP amounts. RRA-2297-11 Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total Funding County Transportation Sales Tax (Transit)$13,191,200 $294,400 $0 $0 $0 $13,485,600 FUNDING TOTAL $13,191,200 $294,400 $0 $0 $0 $13,485,600 Expenditures Contribution to Fund Balance $10,841,600 $0 $0 $0 $0 $10,841,600 Construction $2,349,600 $294,400 $0 $0 $0 $2,644,000 EXPENDITURES TOTAL $13,191,200 $294,400 $0 $0 $0 $13,485,600 Budget Impact/Other Washington County contributions are shown as estimates based on current policies and the selection of a bus rapid transit alternative. Capital Project Category: Road & Bridge Location: Various/Other District: Multiple Total Estimated Project Cost: $120,500,000 Prior Year(s) Total Cost: $107,014,400 Project #: RRA-2297-11 Project Name: Gold Line Bus Rapid Transit (BRT) CIP 2026-2030 153 Index 154 Project # Project Name Category Page# BSD-CH-2501 Courthouse North Wing Air Handling Unit Upgrades Public Facilities 39 BSD-CW-2002 Countywide Site Improvements Public Facilities 40 BSD-CW-2101 Countywide Painting / Wall Repairs Public Facilities 41 BSD-CW-2401 County-Wide Lighting Improvements Public Facilities 42 BSD-CW-2501 Electric Vehicle (EV) Charging Station Installation Public Facilities 43 BSD-CW-2600 Signage Study Implementation Public Facilities 44 BSD-CW-2701 Capital Redirect Projects Public Facilities 45 BSD-FL-2701 North Service Center Chiller Replacement Public Facilities 46 BSD-GC-2501 Government Center Fire Safety Upgrades Public Facilities 47 BSD-GC-2801 Stillwater Campus Roof Replacement Public Facilities 48 BSD-GC-2901 Government Center Ventilation Upgrades Public Facilities 49 BSD-LIB-2601 Library Strategic Facility Plan Public Facilities 50 BSD-LIB-2602 Library Extended Access Public Facilities 51 BSD-MSS-2001 South Shop Improvements Public Facilities 52 BSD-PGL-2001 Park Grove Library Improvements Public Facilities 53 BSD-PHE-002 Environmental Center Expansion Public Facilities 54 BSD-PHE-2601 Central Yard Waste Public Facilities 55 BSD-PHE-2701 Southern Yard Waste Public Facilities 56 BSD-SWGC-2802 Government Center Glass Replacement Public Facilities 57 BSD-SWNS-2801 Force Main Sand Separator Installation Public Facilities 58 BSD-WBSL-001 R.H. Stafford Library Improvements Public Facilities 59 HC-1048-027 Interior & Exterior Renovations Parks & Land 63 HC-1048-029 Historic Courthouse - Elevator Parks & Land 64 HC-1048-030 Historic Courthouse – Parking Lot Pavement Improvements Parks & Land 65 PARK-1001 Park & Trail Long-Range Planning Parks & Land 66 PARK-1003 Park Facilities/Infrastructure Improvement Program Parks & Land 67 PARK-1005 Parks & Trails Pavement Preservation Parks & Land 68 PARK-1006 Regional Trail System Program Parks & Land 69 PARK-2016 Big Marine Park Reserve Improvements Parks & Land 70 PARK-3009 Lake Elmo Park Reserve Maintenance & Natural Resource Facility Improvements Parks & Land 71 PARK-3018 Lake Elmo Park Reserve – Facility Improvements Parks & Land 72 PARK-3020 Lake Elmo Park Reserve Single Track Trail Parks & Land 73 PARK-3021 Lake Elmo Park Reserve Pavilion Facilities Parks & Land 74 PARK-4006 Cottage Grove Ravine Regional Park Lighted Trails Parks & Land 75 PARK-8017 St. Croix Bluffs Regional Park Campground Improvements Parks & Land 76 PARK-8018 St Croix Bluffs Regional Park Facility Improvements Parks & Land 77 PARK-9003 Hardwood Creek Regional Trail Extension Parks & Land 78 RB-2201 Intersection Control Projects Road & Bridge 86 RB-2203 Safety & Traffic Capacity Projects Road & Bridge 87 RB-2204 Pavement Preservation & Rehab Road & Bridge 88 RB-2204-01 CSAH 16 – CSAH 25 to Bielenberg Drive Pavement Preservation Road & Bridge 89 RB-2204-02 CSAH 4 – CSAH 15 to CSAH 3 Pavement Preservation Road & Bridge 90 RB-2204-03 CSAH 38 Pavement Preservation Road & Bridge 91 RB-2216 Structures & Roadway Stabilization Road & Bridge 92 RB-2580 CSAH 18 Trail - La Lake Park to Woodlane Road & Bridge 93 RB-2582 Gateway Trail Extension – Scandia Road & Bridge 94 RB-2609 CSAH 32 - CSAH 33 (Everton Ave) to US TH 61 Road & Bridge 95 RB-2629 CSAH 21- I-94 to 40th Street North Road & Bridge 96 RB-2641 CSAH 3 - CSAH 7 to CSAH 4 Road & Bridge 97 RB-2645 CSAH 13 - CSAH 6 to CSAH 14 Road & Bridge 98 RB-2650 CSAH 29 - TH 36 to CSAH 12 Road & Bridge 99 RB-2651 Construction Engineering, Inspection and Survey Road & Bridge 100 RB-2658 CSAH 18 – I-494 to Woodlane Drive Road & Bridge 101 RB-2667 CSAH 19 & 80th Street Intersection Road & Bridge 102 RB-2668 CSAH 27 - I-694 to CSAH 12 Reconstruction Road & Bridge 103 RB-2672 CSAH 13 - CSAH 20 to Hargis Parkway Road & Bridge 104 RB-2674 CSAH 17 at TH 36 Intersection Road & Bridge 105 RB-2675 CR 74 - CR 38 to Geneva Avenue Road & Bridge 106 155 Project # Project Name Category Page# RB-2682 CR 50 - TH 61 to CSAH 15 Study Road & Bridge 107 RB-2683 CSAH 11 Improvement Project Road & Bridge 108 RB-2685 CR 19A - 100th Street Realignment Road & Bridge 109 RB-2688 Radio Drive Pedestrian Management Study Road & Bridge 110 RB-2690 CSAH 16 - Interlachen to TH 95 Road & Bridge 111 RB-2691 CSAH 20 - CSAH 22 to Military Road & Bridge 112 RB-2692 CSAH 12 - Kimbro to CSAH 15 Road & Bridge 113 RB-2693 CSAH 96 Turnback Corridor Road & Bridge 114 RB-2694 CSAH 18 - Settlers Ridge Intersection Road & Bridge 115 RB-2695 CSAH 5 Sidewalk - Pine Tree Trail to Owens Street Road & Bridge 116 RB-2696 CSAH 16- Interlachen to Settlers Ridge Parkway Road & Bridge 117 RB-2697 CSAH 18 @ TH 95 Roundabout Road & Bridge 118 RB-2701 CSAH 19 @ CSAH 10 Intersection Road & Bridge 119 RB-2702 CSAH 14 - Lake Elmo Park Reserve to 39th Street Study Road & Bridge 120 RB-2703 CSAH 22 @ TH 95 Roundabout Road & Bridge 121 RB-2801 CSAH 15 - 30th Street to CSAH 14 Road & Bridge 122 RB-2803 CSAH 14 Trail - Granada Avenue to Hadley Avenue Road & Bridge 123 RB-2804 CSAH 16 and Eagle Creek Lane Road & Bridge 124 RB-2807 CSAH 5, CR 55, and CSAH 96 Intersection Road & Bridge 125 RB-2808 CSAH 10 and CSAH 17 Intersection Road & Bridge 126 RB-2809 CR 50 and TH 61 Intersection Road & Bridge 127 RB-2811 Transit Circulator Support Road & Bridge 128 RB-2812 CSAH 16 and Settlers Ridge Parkway Intersection Road & Bridge 129 RB-2813 CSAH 21 – Middle St. Croix Valley Regional Trail Road & Bridge 130 RB-2814 CSAH 16 Trail – Colby Lake to Dancing Waters Pkwy Road & Bridge 131 RB-2815 CSAH 39 and TH 61 Intersection Road & Bridge 132 RB-2816 Electric Vehicle (EV) Carshare at Gold Line Stations Road & Bridge 133 RB-2817 CSAH 22 - CSAH 19 to CSAH 13 Study Road & Bridge 134 RB-2818 CSAH 24 – 58th Street to 62nd Street Road & Bridge 135 RB-2819 CSAH 17 – CSAH 14 to CSAH 12 Study Road & Bridge 136 RB-2820 Traffic Signal Battery Backup Road & Bridge 137 RB-2821 22nd Street Reconstruction Road & Bridge 138 RB-2822 Fiber Ring Road & Bridge 139 RB-2823 Trunk Highway 95 Corridor Study Road & Bridge 140 RB-2824 CSAH 12 Trail – Mahtomedi Middle School to Inwood Way Road & Bridge 141 RB-2827 CSAH 10 - County Line to CSAH 15 Corridor Study Road & Bridge 142 RB-2828 CR 55 - CSAH 96 to CR 61 Study Road & Bridge 143 RB-2829 CSAH 13 Trail Rehab - CSAH 16 to I-94 Road & Bridge 144 RB-2830 CSAH 15 - 43rd Street N to 55th Street N Road & Bridge 145 RB-2831 CSAH 15 @ McKusick Rd N Intersection Road & Bridge 146 RB-2833 CSAH 18 - I-494 to Settlers Ridge Parkway Study Road & Bridge 147 RB-2834 CSAH 18 @ CSAH 19 Roundabout Modifications Road & Bridge 148 RB-2835 CSAH 19 - CSAH 22 to Dale Rd Road & Bridge 149 RB-2836 Public Works North Shop Road & Bridge 150 RB-2838 CR 50 – TH 61 to Ingersoll Avenue North Road & Bridge 151 RB-2839 Gold Line Jurisdictional Study Road & Bridge 152 RRA-2297-11 Gold Line Bus Rapid Transit (BRT)Road & Bridge 153 156