03. Draft 2026 Fee Schedule
Staff Report
Date of Meeting: December 3, 2025
To: City Council
From: Brenda Eklund, City Clerk
Re: Proposed 2026 Fee Schedule
Chapter 31.04 of the City’s Code of Ordinances provides for the fees set by the City Council
which are reasonable and necessary to protect the public health, safety, and quality of life in
the city. Each year, fees are reviewed and adopted by ordinance to reflect any changes
identified by staff.
Updates to the 2026 fee schedule include the following:
• Add the Administrative Citation Fee and Appeal Filing Fee as adopted with Code
Enforcement Ordinance No. 2025-07 approved in June 2025.
• Under Electrical Permit Fees on page 3 of the fee schedule, the fees have been adjusted
as recommended by Electrical Inspector Joe Wheaton. The minimum fee for an
inspection trip will increase from $50 to $75 per trip, and increases to power sources
have been made per Mr. Wheaton’s request. Mr. Wheaton noted that the state has
increased the minimum fee to $80 on state issued permits. Mr. Wheaton’s email and
schedule is attached to this report.
• The Big Marine Sewer System and the Uptown Sewer System user fees will be
evaluated in early 2026 by the Wastewater Advisory Committee. Rates will then be
adjusted by an amendment to the fee schedule in March 2026. The WW Committee is
waiting to hear if funding for the Bliss Sewer System Improvement Project is approved
by the state, and what effect the project costs will have on the enterprise fund.
The Draft 2026 Fee Schedule is for information and discussion purposes, and proposed for
adoption at the December 16, 2025 Regular meeting. The fee schedule will become effective on
January 1, 2026.
From: Joseph Wheaton <frazjoe@gmail.com>
Sent: Sunday, October 26, 2025 7:51 PM
To: mail <mail@ci.scandia.mn.us>
Subject: 2026 Proposed Electrical Fee Schedule
Greetings Kyle, Brenda, Bee & Veronica,
I have attached a Word Doc with the Fee schedule that I wish the Council to approve.
The State has already passed their new Electrical Inspection Fee Schedule.
The minimum Fee will be $ 80.00
A New House will be $ 200.00
My proposal would set the minimum Fee at $ 75.00.
And a New House would be $ 225.00
Please review the document, and contact me should you have any concerns.
Grateful to be of service!
--
Joseph Wheaton
Contract Electrical Inspector
612-866-3784
frazjoe@gmail.com
8
Panel Changes
Pools
Per Enclosure $125.00
Plus Circuits $125.00
C. Solar Fees
For review of plans and specificaions of proposed installations there shall be a
minimum fee of $100 up to and including $30,000 of electrical estimate, plus 1/10 of
one percent (1%) of any amount in excess of $30,000 to be paid by persons or
firms requesting review.
The inspection fee for the installation of solar PV systems is:
City of Scandia
2025 Final Fee Schedule
Ord Type Terms & Conditions 2025
TOTAL INSPECTION FEE from REI fee worksheet, or
$75.00 multiplied by the number of required inspection
trips, whichever is greater (Maximum 3 inspection
trips)
$75.00
SPECIAL INSPECTION - $100.00 (Weekend rates for
special inspecion are double)
$100.00
A surcharge of $1.00 is imposed on every permit
effective 7/1/10 as per M.S. § 326B.148, in addition to
the inspection fee
Item Description Fee
0 – 400 Amp Power Source $75/source
401 – 800 Amp Power Source $150/source
Over 800 Amp Power Source $225/source
0 to 200 Amp Circuit or Feeder $12.00
Over 200 Amp Circuit or Feeder $30/feeder or circuit
New One or Two Family Dwelling (up to 25 circuits and feeders per unit) Does not
include service
$150.00
New One or Two Family Dwelling (additional circuits over 25 per unit) Does not
include service
$12.00
Existing One or Two Family Dwelling (up to 15 feeders or circuits are installed or
extended per unit) Does not include service
$150/dwelling unit
Existing One or Two Family Dwelling (where less than 15 feeders or circuits are
installed or extended per unit) Does not include service
$12.00
Separate bonding inspection $75.00
Inspection of concrete-encased grounding electrode $75.00
Technology circuits & circuits less than 50 volts $1.00/device or apparatus
Additional inspection trip(s) $75.00
Item Description Fee
0 to 400 Amp Power Source $75/source
401 – 800 Amp Power Source $150/source
Over 800 Amp Power Source $225/source
0 to 200 Amp Circuit or Feeder $12/feeder or circuit
Over 200 Amp Circuit or Feeder $30/feeder or circuit
New Multi Family Dwelling Unit (with up to 15 circuits and feeders per unit) Does
not include service
$125/dwelling unit
New Multi Family Dwelling Unit (additional circuits over 20 per unit) Does not
include service
$12.00
Existing Multi Family Dwelling Unit (up to 10 feeders or circuits are installed or
extended) Does not include service
$100/unit
Existing Multi Family Dwelling Unit (where 10 or more feeders or circuits are
installed or extended) Does not include service
$12.00
Transformer (Light, Heat or Power) rated up to 10KVA $25/transformer
Transformer (Light, Heat or Power) rated in excess of 10KVA $50/transformer
Manufactured Home Park (Lot Supply) $50/pedestal
RV Pedestals (all circuits originating in pedestal incl. factory circuits) $12.00
Street, Parking Lot, Outdoor, Traffic Standards $10/standard
Power Supplies for Signs & Outline Lighting $5/power supply
Technology circuits & circuits less than 50 volts $1.00/device or apparatus
Retrofit of existing lighting fixtures $1.00/fixture
Circuits over 250 volts Double fee
(1) 0 watts to and including 5,000 watts, $90 or
(2) 5,001 watts to and including 10,000 watts, $150 or
(3) 10,001 watts to and including 20,000 watts, $225 or
(4) 20,001 watts to and including 30,000 watts, $300 or
(5) 30,001 watts to and including 40,000 watts, $375 or
d. Permits < $ 200 expire in 6 months. > $ 200 but < $ 1000 expire in 12 months
Panel Changes
Pools
4.07-5 B. Non-Dwellings and Multi Family Dwellings
TOTAL INSPECTION FEE from REI fee worksheet, or
$75.00 multiplied by the number of required inspection
trips, whichever is greater
SPECIAL INSPECTION - $100.00 (Weekend rates for
special inspecion are double)
A surcharge of $1 is imposed on every permit effective
7/1/10 as per M.S. § 326B.148, in addition to the
inspection fee
Per Enclosure $125.00
Plus Circuits $125.00
$75.00
$100.00
Wheaton Proposed Electrical Permit Fees
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other
ADMINISTRATION AND FINANCE
Administrative Citation 200.00$ *
* See City Code 32.06 for increased fees for multiple citations
Administrative Citation Appeal Filing Fee 200.00$
Assessment Search 20.00$ each
Faxes (send or receive)0.25$
per page, plus long distance
charges
Non-Sufficient Fund Check Fee 25.00$ each
Photocopies 0.25$ each page
Audio disk - meetings 10.00$ each
Special meetings scheduled based on individual request 100.00$
Documents - Public Information Data Request
ADMINISTRATION LICENSES AND PERMITS
Dangerous Dog Registration 300.00$ annual
Dog Redemption fee 100.00$ each
Event Center License fee 25.00$ annual
Fertilizer/Pesticide 100.00$ annual
Gambling Licenses 15.00$ per application
Special Event Permit 25.00$
Cannabis Business Registration Fee, Annual 2,200.00$
Cannabis Business - Temporary Event Fee 250.00$ per event
Liquor License
3.2 percent Malt Liquor On-Sale, Annual $ 150.00
3.2 percent Malt Liquor Off-Sale, Annual $ 100.00
Temporary 3.2 percent Malt Liquor $ 25.00
Off-Sale Intoxicating Liquor, Annual $ 100.00
On-Sale Intoxicating Liquor, Annual $ 2,000.00
Annual Intoxicating Liquor On-Sale, Club License, maximum or as provided by M.S. Ch.
340A $ 2,000.00
Sunday On-Sale Intoxicating Liquor, Annual $ 200.00
Combination On-Sale/Off-Sale Intoxicating Liquor, Annual $ 2,500.00
Temporary On-Sale Intoxicating Liquor $ 50.00
On-Sale Wine, Annual $ 500.00
One-Day Consumption and Display Permit, Non-Profit $ 25.00
Consumption and Display Permit, Regular $ 250.00
Investigation Fee $ -
If conducted within the State of Minnesota: $ 500.00
If conducted outside the State of Minnesota, the actual costs will be charged not to
exceed: $ 10,000.00
Tobacco
Year-round $ 272.00 per application
Seasonal $ 196.00 per application
2026 RATES, FEES AND CHARGES
The City of Scandia charges for copies of government data. These charges are authorized under section 13.03, subdivision 3. You must pay for the
copies before we will give them to you.
The actual cost of making paper or electronic copies includes employee time, the cost of the materials onto which we are copying the data (paper, CD,
DVD, etc.), and mailing costs (if any). If your request is for copies of data that we cannot reproduce ourselves, such as photographs, we will charge you
the actual cost we must pay an outside vendor for the copies. Services performed by City personnel will be billed at one and one-half (1.5) times the
actual payroll hourly rate
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
BUILDING CONSTRUCTION PERMIT FEES AND LICENSES
Building Permit Fee
Total Valuation
$1.00 to $4,000.00 $ 99.50
$4,000.01 to $25,000.00 $ 99.50 for the first $4,000
$ 14.75 each addititonal $1,000
$25,000.01 to $50,000.00 $ 415.00 for the first $25,000
$ 10.75 each addititonal $1,000
$50,000.01 to $100,000.00 $ 680.00 for the first $50,000
$ 7.50 each addititonal $1,000
$100,000.01 to $500,000.00 $ 1,050.00 for the first $100,000
$ 6.00 each addititonal $1,000
$500,00.01 to $1,000,000.00 $ 3,425.00 for the fist $500,000
$ 5.00 each addititonal $1,000
$1,000,000.01 and up $ 5,900.00 for the first $1,000,000
$ 4.00 each addititonal $1,000
Air Conditioning (central) $ 30.00
Air-to-Air Heat Exchanger $ 30.00
City Inspection fee $ 60.00 per hour
20%of permit fee only
Building Moving $ 110.00 2,500.00$
Electrical per State Schedule
Fireplace (zero-clearance) $ 30.00
Gas Piping $ 30.00
Mechanical $ 35.00
plus 1 hour minimum
inspection fee
Plumbing (per fixture) $ 8.00
plus 1 hour minimum
inspection fee
Plan Review Fee - Identical Plans 25% of building permit fee
Plan Review Fee - Non-identical Plans 65% of building permit fee
Returned building permits - permit applications returned without issuance 50% of Plan Review Fee
Surcharge Fee
Technology Fee $ 2.00
Investigation Fee
DEMOLITION - Accessory Building $ 60.00
DEMOLITION - Commercial or Residential $ 120.00 $ 1,000.00
Permit fees to be based on job cost valuation or a fixed fee as
stated in the following. The determination of value or
valuation shall be made by the Building Official.
Building permit refund charge - within 1 year with no work performed and no inspections
made
Surcharge fees shall be collected on all permits issued for
Whenever any work for which a city permit is required has commenced without first obtaining a permit, a special investigation shall be made before a
permit will be issued. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is subsequently issued. The
investigation fee shall be equal to the amount of the permit fee required by this schedule. The payment of the investigation fee shall not exempt any
person from compliance with all other provisions of this code nor from any prescribed by law.
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
ELECTRICAL PERMIT FEES
Inspection Fee $ 50.00 $75.00 inspection / trip
0 to 400 Amp Power Source $ 50.00 $75.00 source
401 - 800 Amp Power Source $ 100.00 $150.00 source
Over 800 Amp Power Source $ 150.00 $225.00 source
0 to 200 Amp Circuit or Feeder $ 12.00 feeder or circuit
Over 200 Amp Circuit or Feeder $ 50.00 $30.00 feeder or circuit
New One- or Two-Family Dwelling does not include service (up to 25 circuits and feeders per unit) $ 150.00 dwelling unit
New One- or Two-Family Dwelling does not include service (additional circuits over 25 per unit) $ 12.00 feeder or circuit
Existing One- or Two-Family Dwelling (up to 15 feeders or circuits are installed or extended per unit) $ 150.00 dwelling unit
Existing One- or Two-Family Dwelling (where less than 15 feeders or circuits are installed or extended per unit) $ 12.00 feeder or circuit
Inspection of concrete-encased grounding electrode $ 50.00 $75.00 inspection
Technology circuits & circuits less than 50 volts $ 1.00 device
Pools - plus circuits $ 100.00 $125.00
Panel changes (per enclosure) $ 100.00 $125.00 enclosure
Additional inspection trip(s) $ 50.00 $75.00 inspection / trip
Surcharge $ 1.00 permit
Technology Fee $ 2.00 permit
Inspection Fee $ 50.00 $75.00 inspection / trip
0 to 400 Amp Power Source $ 50.00 $75.00 source
401 - 800 Amp Power Source $ 100.00 $150.00 source
Over 800 Amp Power Source $ 150.00 $225.00 source
0 to 200 Amp Circuit or Feeder $ 12.00 feeder or circuit
Over 200 Amp Circuit or Feeder $ 30.00 feeder or circuit
*Over 250 volts:
*0 to 400 Amp Power Source $ 100.00 source
*401 - 800 Amp Power Source $ 200.00 source
*Over 800 Amp Power Source $ 300.00 source
*0 to 200 Amp Circuit or Feeder $ 24.00 feeder or circuit
*Over 200 Amp Circuit or Feeder $ 60.00 feeder or circuit
New Multi-Family Dwelling Unit (with up to 20 circuits and feeders per unit) $ 100.00 $125.00 unit
New Multi-Family Dwelling Unit (additional circuits over 20 per unit) $ 12.00 feeder or circuit
Existing Multi-Family Dwelling Unit $ 100.00 unit
Existing Multi-Family Dwelling Unit (up to 10 feeders or circuits are installed or extended) $ 12.00 feeder or circuit
Transformer (Light, Heat or Power) rated up to 10KVA $ 25.00 transformer
Transformer (Light, Heat or Power) rated in excess of 10KVA $ 50.00 transformer
Manufactured Home Park (Lot Supply) $ 50.00 pedestal
RV Pedestals (all circuits originating in pedestal incl. factory circuits) $ 12.00 circuit
Street, Parking Lot, Outdoor, Traffic Standards $ 5.00 $10.00 standard
Power Supplies for Signs & Outline Lighting $ 5.00 power supply
Technology circuits & circuits less than 50 volts $ 1.00 device
Retrofit of existing lighting fixtures $ 1.00 fixture
Pools- plus circuits $ 100.00 $125.00
Panel changes (per enclosure) $ 100.00 $125.00 enclosure
Additional inspection trip(s) $ 50.00 $75.00 inspection / trip
Solar Photovoltaic Systems
0 to 5,000 watts 90.00$
5,001 to 10,000 watts 150.00$
10,001 to 20,000 watts 225.00$
20,001 to 30,000 watts 300.00$
30,0001 to 40,000 watts 375.00$
40,001 to 1,000,000 watts 375.00$
each additional 10kW over 40kW 25.00$
1,000,000 to 5,000,000 watts 3,975.00$
RESIDENTIAL
NON-RESIDENTIAL AND MULTIFAMILY
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
each additional 10kW over 1,000 kW 15.00$
5,000,000 watts and larger 12,975.00$
each additional 10kW over 5,000 kW 10.00$
Surcharge 1.00$ permit
Technology Fee 2.00$ permit
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
FIRE
Fireworks $ 100.00
PARKS AND COMMUNITY CENTER
Activity Fee $ 20.00
Participation Fee $ 25.00
Community Center Rental Resident Non-resident
Community groups
- less than 150 guests 150.00$
- 150+ guests 300.00$
Heritage Room - 50 guests or less 50.00$
Memorial Service 100.00$ 150.00$
Hall 200.00$ 475.00$
Prior Day Set-up 100.00$ 150.00$
Heritage Room 75.00$ 100.00$
Kitchen 300.00$ 300.00$
Attendant if liquor served 135.00$ 135.00$
Cash Deposit Required
Cleaning / Damage - determined by size of the event 100.00$ 300.00$
Audio-Visual Equipment 100.00$ 100.00$
Park Shelter Reservation Park Shelter Reservation
Hay Lake Shelter $ 25.00 $ 50.00
Warming House $ 50.00 $ 100.00
Cleaning / Damage Deposit $ 100.00 $ 100.00
Security deposit for lighted ballfield reservations $ 50.00-300.00 $ 50.00-300.00
Ice Time Reservations Ice Rink - 1 session per week for the season 200.00$ + tax
Ballfield Reservation
Lighted ballfield
PLANNING AND ZONING
FEE ESCROW DEPOSIT
Variance
Variance application $ 200.00 1,800.00$
Variance Extension
Variance Extension - Administrative $ 50.00
Variance Extension - Council $ 100.00 450.00$
Conditional Use Permit (CUP)
Pre-application review - Planning Commission $ 50.00 750.00$
Conditional Use Permit $ 200.00 2,500.00$
CUP Amendment $ 200.00 2,500.00$
CUP Extension
CUP Extension - Administrative $ 50.00
CUP Extension - Council $ 100.00 450.00$
Interim Use Permit $ 200.00 1,500.00$
$0 for Scandia Softball Association, others City may charge the
estimated cost for lighting
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
Annual Operating Permit
Annual Operating Permit renewal - administrative $ 100.00 450.00$
Annual Operating Permit renewal - council $ 200.00 1,500.00$
Administrative Permits
Accessory Dwelling Unit $ 250.00
Grading/Land Alteration $ 50.00 600.00$
Grading/Land Alteration more than 100 c.y. $ 50.00 1,000.00$
Land Clearing $ 75.00 500.00$
Cell Tower Admin Permit $ 50.00 375.00$
Lot Line Adjustment/Lot Consolidation $ 50.00 375.00$
Sign (permanent) $ 50.00
All other Administrative Permits, zoning verification letter included $ 50.00
Planned Unit Development
Planned Unit Development Concept Plan 200.00$ 750.00$
PUD preliminary plan 200.00$ 1,500.00$
PUD final plan 200.00$ 3,000.00$
PUD amendment 500.00$ 1,500.00$
SITE PLAN REVIEW
Pre-application Site Plan Review 50.00$ 750.00$
Site Plan Review, Minor Projects 100.00$ 1,500.00$
Site Plan Review, Major Projects 250.00$ 3,000.00$
Plan Modification 50.00$ 500.00$
Site Plan Extension
Administrative 50.00$
Council 100.00$ 450.00$
Amendment
Rezoning (Map Amendment) 500.00$ 1,500.00$
Amendment—Development Code Text 500.00$ 1,500.00$
Amendment—Comprehensive Plan Map 500.00$ 1,500.00$
Amendment—Comprehensive Plan Text 500.00$ 1,500.00$
Environmental Review
EAW (Environmental Assessment Worksheet) 750.00$ 3,000.00$
EIS (Environmental Impact Statement) 750.00$ 15,000.00$
Subdivision
Concept plam
Minor Subdivision 100.00$ 1,500.00$
Preliminary Plat/ Major Subdivision 250.00$ 2,500.00$
Final Plat 200.00$ 1,500.00$
Park Dedication Fee for each new parcel 3,000.00$
Sealcoat Fee $0.30 per square foot of public road
Vacation
Right-of-Way 350.00$ 1,500.00$
Utility Easement 350.00$ 1,500.00$
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
Wetland Review
Wetland Review including No loss exemption / determination, Delineation approval,
Replacement plan application, Wetland banking application, and other 100.00$ 800.00$
Mines
AOP 500.00$ 5,000.00$
CUP 500.00$ 10,000.00$
City Staff and Consultant Billing
Investigation Fee
Payment of Fees and Escrow deposit
PUBLIC WORKS FEES:
Right of Way
Driveway Access 50.00$ 500.00$
Obstruction 50.00$
Excavating / Street opening 150.00$ 3,500.00$
Small Cell Wireless Co-locate wireless support structure 150.00$
Small Cell Wireless Co-location annual maintenance 25.00$
Small Cell Wireless electrical service
per radio node - Less than or equal to 100 maximum watts 73.00$
Whenever any work for which a city permit is required has commenced without first obtaining a permit, a special investigation shall be made before a
permit will be issued. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is subsequently issued. The
investigation fee shall be equal to the amount of the permit fee required by this schedule. The payment of the investigation fee shall not exempt any
person from compliance with all other provisions of this code nor from any prescribed by law.
No application shall be considered complete until the fees have been paid. Application fees are not refundable. In addition to the application fee,
applicants shall be required to reimburse the city for all out-of-pocket costs that are incurred for processing, reviewing and hearing the application.
These costs shall include, but are not limited to: parcel searches; publication and mailing of notices; review by the city’s engineering, planning and other
consultants; legal costs, and recording fees. A minimum escrow deposit to cover these costs shall be collected by the city at the time of application. The
Zoning Administrator shall have discretion to increase the amount of the escrow for any application at any time if the city’s costs are reasonably
expected to exceed the minimum amount. The Zoning Administrator shall also have discretion to require an escrow deposit even where no minimum
amount is specified by this ordinance, if authorized by the Development Code. Applications for projects requiring more than one type of review (for
example, a Conditional Use Permit and a Preliminary Plat) shall include the cumulative total of all application fees specified for each type of review. The
minimum escrow deposit shall be the cumulative total for each type of application required for the project, unless the Zoning Administrator determines
that this amount would significantly exceed the city’s reasonable expenses to review the applications, in which case the amount of the escrow deposit
may be reduced. After review of the application has been completed and all costs have been paid, any costs exceeding the escrow balance shall be
invoiced to the applicant. Any escrow balance remaining shall be refunded to the applicant. No interest shall be paid on escrow deposits. Amendments
to previously approved applications shall require the payment of the same fees as for the initial permit application, except for Plan Modifications not
requiring review by the Planning Commission and City Council or as otherwise provided by the Development Code.
For applications that include excessive staff time, services
performed by City personnel will be billed at one and one-half
(1.5) times the actual payroll hourly rate. Services provided by
City consultants will be billed at the current consultant rate. All
recording fees to be billed at current rates.
CITY OF SCANDIA ORDINANCE NO. 2025-18
EXHIBIT A
Fees Escrow and Other 2026 RATES, FEES AND CHARGES
per radio node - greater than 100 maximum watts 182.00$
If actual cost of electricity if greater than foregoing Actual Cost
Small Cell Wireless application fee - per site 100.00$
Small Cell Wireless annual fee - per site 270.00$
Equipment – Per hour charge (does not include operator)Latest published FEMA equipment rates
Public Works Operator per hour
Contracted work , materials, and supplies
Administrative fee
SEWER
Big Marine Sewer System
Anderson-Erickson Sewer Bliss Sewer
Base Charge
Annual 1,653.93$ 1,708.00$
Quarterly 413.48$ 427.00$
Seasonal 750.00$ 750.00$
Energy Adjustment Charge
Annual 10.00$
Quarterly 2.50$
Late Payment Fee 10.00$
Annual interest rate on account balances 30 days past due;12%
Annual interest rate on delinquent accounts certified for collection with property
taxes 12%
Connection fee, per dwelling unit 10,000.00$
Cost of repairs
Equipment – Per hour charge (does not include operator)Latest published FEMA equipment rates
Public Works Operator per hour
Contracted work , materials, and supplies
Administrative fee
Uptown Sewer System
Base Charge
Annual 628.90$
Quarterly 157.23$
Volume Charge 74.10$ per 1,000 gallons
Late Payment Fee 10.00$
Annual interest rate on account balances 30 days past due;12%
Annual interest rate on delinquent accounts certified for collection with property
taxes 12%
Connection fee, per dwelling unit 10,000.00$
5% of labor and equipment total
Wages and fringes per hour worked
cost +10%
Wages and fringes per hour worked
cost +10%
5% of labor and equipment total