4.b Staff Report Public Hearing CIP Meeting Date: 11/3/2009
Agenda Item:
Planning Commission/
City Council Agenda Report
City of Scandia
14727 209th St. North
Scandia, MN 55073 (651) 433-2274
Action Requested: Hold a public hearing on the 2010 to 2014 City of Scandia Capital
Improvement Program (CIP), including amendments to the adopted
2009-2013 CIP, a proposed amendment to the 2008-2030
Comprehensive Plan (Appendix F.)
Deadline/ Timeline: The CIP is typically updated annually, before the City Council adopts
the budget in December.
Background: • The City adopted its Comprehensive Plan on March 17, 2009. As
required by state law, the plan included a five year(2009-2013)
CIP for major infrastructure needs.
• Because the CIP is a required element of the Comprehensive Plan,
changes must be adopted using the same procedure as an
amendment to the plan, including a public hearing by the Planning
Commission.
• The draft CIP prepared for the hearing was based on input from
the Capital Improvements Committee, and from direction received
from the City Council during their August budget meetings and
subsequent discussions.
• The updated CIP assumes two changes that affect 2009
expenditures, which should be considered part of the amendment.
They are described in detail on page 2 of the draft CIP. The two
changes relate to Rescue 5179 Replacement (F-010, changing
timing from 2010 to 2009 and 2010) and construction of a
Salt/Sand Shelter (PW- 011, changing timing from 2011 to 2009
and reducing cost from $60,000 to $20,000.)
Recommendation: The Planning Commission should hold the hearing and make any
recommendations you may have to the City Council. The Council
may adopt the amended CIP, by adopting the draft resolution
provided. Council approval requires a 2/3 majority (4 votes.)
Attachments/ • Draft Resolution No.: 11-03-09-04
Materials provided: • Capital Improvement Plan (CIP), Public Hearing Draft dated
Page 1 of 2
10/30/09
November I, 2009
• CIP Project Data Sheets
Contact(s):
Prepared by: Anne Hurlburt, Administrator
(CIP Hearing)
Page 2 of 2
10/30/09
CITY OF SCANDIA
RESOLUTION NO. 11-03-09-04
RESOLUTION AMENDING THE 2008 — 2030
SCANDIA COMPREHENSIVE PLAN
WHEREAS, on March 17, 2009 the City of Scandia adopted a 2008 — 2030
Comprehensive Plan, to guide the future of the community and to meet the requirements of the
Metropolitan Land Planning Act; and
WHEREAS, the Comprehensive Plan includes a Capital Improvement Program (CIP) for
the years 2009 through 2013, which is Appendix F to the plan; and
WHEREAS, following a duly noticed public hearing and recommendation of the Scandia
Planning Commission, the City Council has determined that amendments to the CIP are
necessary to extend the CIP through the new planning period of 2010 through 2014;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SCANDIA, WASHINGTON COUNTY, MINNESOTA, that it should and hereby
does adopt the 2010 through 2014 Capital Improvement Plan (CIP), and that the document made
part of this resolution as "Exhibit A" shall replace Appendix F of the Comprehensive Plan
adopted March 17, 2009, in its entirety.
Adopted by the Scandia City Council this 3rd day of November, 2009.
Dennis D. Seefeldt, Mayor
AVE EST:
City Clerk/ Administrator
43 •
•
A
tniti .neNota
City of Scandia
Capital Improvement Program
2010 — 2014
Planning Commission
Public Hearing Draft
November 1, 2009
•
TABLE OF CONTENTS
Introduction
What is a CIP and Why Have One? 1
Scope of the Draft CIP 1
Funding Sources 2
Amendments to 2009-2013 CIP
2
2010-2014 CIP Overview
Street Maintenance Program............ . ....... ....... ............. ............ 3
Equipment Replacement Fund 3
Project Priorities 5
Project Highlights by Department 5
CIP Summary Data
Projects by Year, 2010 thru 2014 7
Projects by Funding Source, 2010 thru 2014 9
Projects & Funding Sources by Department, 2010 thru 2014 11
Projects & Funding Sources by Department, 2015 thru 2019 ...... 13
Projects & Funding Sources by Department, 2020 thru 2024 14
Projects & Funding Sources by Department, 2025 thru 2029 15
Pending Projects 16
Equipment Replacement
All Equipment Replacements, 2010 thru 2029 17
Replacements by Department, 2010 thru 2019 18
Equipment Replacement Fund Cash Flow, 2010 thru 2019 19
INTRODUCTION
This Capital Improvement Program (CIP) for the five-year period of 2010 through 2014 is the third
such document prepared by the City of Scandia, and was prepared based on input from the Capital
Improvements Committee appointed by the City Council. When adopted, it will be an amendment
to the CIP included in the Comprehensive Plan adopted on March 17, 2009, replacing Appendix F
of the plan in its entirety.
What is a CIP and why have one?
A Capital Improvement Program, or CIP, is a multi-year(typically 5 years) capital expenditure plan
for a City's infrastructure (such as streets, parks and utility systems), vehicles, equipment and public
buildings. It identifies the major projects needed and desired by the community, their potential
costs and how they would be financed. Including a project in a CIP does not commit the city to that
project. The City Council must specifically authorize each one, and the associated funding, before
any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the
budgeting process) projects may go forward as planned, advance ahead of schedule, be removed
entirely, or new projects may be added, depending upon changes in circumstances and priorities.
The Minnesota Land Planning Act requires that the implementation plan portion of the
Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water
supply, parks and open space) for a five-year time period. Cities often, however, expand the scope
of their CIPs to include other capital needs (major equipment replacements, for example) and
sometimes look beyond the five-year time period, up to 20 years in the future for some projects.
Such projects represent more of a "wish-list" that can be evaluated each time the plan is updated.
As a part of the Comprehensive Plan, the CIP does have some legal standing. Minnesota Statutes
Chapter 473.865 provides that "a local governmental unit shall not adopt any official control or
fiscal device which is in conflict with its comprehensive plan." A fiscal device includes a budget or
bond issue; so it is important that the plan and CIP be kept up to date and in synch with city
budgets.
The primary benefit of a CIP is as a financial planning tool, to help the city plan for the impact of
capital needs on future budgets and property taxes, and to help forecast the need for borrowing to
undertake major projects. The information developed as part of the capital planning process can
help document the need for various projects and help the City Council sort out competing priorities.
Scope of the CIP
The Capital Improvements Committee recommended that Scandia's CIP include all capital projects
that cost at least $10,000 and have a useful life span of five years or longer. Projects include all
capital needs including major repairs to buildings and equipment purchases and
replacements. Any projects not meeting these parameters would be reviewed as part of the
annual operating budget, but would not be included in the CIP.
1
Funding Sources
The CIP identifies a possible funding source(s) for each project listed. The various funding sources
are as follows:
Capital Improvement Fund Existing City fund, primarily from property tax levy, set aside
for capital projects.
Debt Service Fund Projects financed by borrowing, later to be repaid with
property taxes, and potentially special assessments
depending upon the characteristics of the project.
Equipment Replacement Fund Internal service fund used to segregate funds set aside for
planned replacements of existing major equipment. Funds
are transferred from operating budgets (primarily property
tax revenues.) The fund may also receive funds realized
through debt financing.
General Fund Annual operating budget, primarily funded by property tax
revenues.
Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park
dedication fees paid by developers and others who subdivide
their land.
In addition to these sources, it is possible that future projects could be funded from donations,
grants, user fees or other sources not listed.
AMENDMENTS TO 2009-2013 CIP
The CIP update includes some amendments to fund two projects in 2009 that had previously been
planned for later years.
The first project is Rescue 5179 Replacement (F-010). The entire cost of this project ($220,000)
was initially planned for 2010. In August of 2009, the city became aware of an opportunity to
purchase the chassis for this vehicle at a very favorable price, and with features that would no
longer be available if the city had waited until 2010 to begin the project. The chassis was purchased
for $42,664.29 and delivered in October of 2009. The build-out of the rescue truck on the chassis
will be publicly bid in early 2010, estimated at $177,336 (the balance of the $220,000 total
estimate.) Debt financing for the project will be secured in 2010.
The second project is the Salt/Sand Shelter(PW-01 1.) This project was initially planned in 2008,
but the Council decided to re-evaluate the project. In the 2008 CIP update, the project was delayed
to 20111 at a higher cost of$60,000 to allow for a metal or wooden structure, instead of the fabric
structure initially proposed. In the fall of 2009, the Council re-evaluated the proposal and requested
an amendment to the CIP be considered. The amendment would be to fund a $20,000 fabric
structure from the Capital Improvement Fund for construction yet in 2009. The draft CIP for 2010-
2014 assumes that this amendment will be approved.
2
2010-2014 CIP OVERVIEW
For 2010 through 2014, the CIP includes 21 separate projects with a total estimated cost of over $6
million. All cost estimates are preliminary and based on current dollars. No assumptions have been
made about inflation. It will be important to refine and update costs when the plan is reviewed,
especially for projects in the first year or two of the plan.
Some projects beyond the five year planning period (2015-2029) are also included in the CIP. Most
of these projects are replacements for equipment and vehicles (such as fire trucks) which may have
a life span of 10, 15 to 20 years or even more. The plan also includes a list of"pending" projects,
for which a timeline (and in most cases, cost estimates) have not yet been identified. As more
information is developed about the need for, cost and possible funding sources for these projects,
they will be included in future CIP updates.
Street Maintenance Program
The 2007 CIP update identified the need for a pavement management plan to help the city monitor
road conditions and better understand the type of projects and funding levels needed to maintain the
investment that has been made in paved roads. This study was completed in 2008. The goal of the
plan is to extend the life of city streets and to reduce the lifecycle costs for maintaining them in
good condition. The study recommended a significant increase in resources devoted to road
maintenance. The 2009 budget was $204,000 for contractual road maintenance and repairs. The
proposed CIP and 2010 budget amount is $250,000.
Fully funding the pavement management study's recommendation would require more resources.
The amount shown for 2011 and subsequent years is $600,000 for planning purposes, based on the
needs identified in the study. The amount actually available for the budget will be evaluated each
year. Due to current levy limits, the city will not be able to increase funding to the higher levels
needed without investigating other funding options, such as assessments. In 2009, the Capital
Improvement Committee discussed assessment policies, but made no recommendations.
Equipment Replacement Fund
A major recommendation of the 2007 CIP was that the City should create a Equipment
Replacement Fund to set aside funds on an annual basis for planned replacement of vehicles and
major pieces of operating equipment. The fund was created in late 2007.
The fund receives transfers from the operating budget of each department depending on its
equipment needs. This allows the departmental budgets for each major function to accurately show
the costs of funding that function, including equipment, while segregating the funds from the
operating budgets. Any revenues from the sale of old equipment being replaced are also deposited
into the fund. Ideally, over time the fund would receive enough funds to be on a pay-as-you-go
basis. At a minimum, accumulating funds for future replacement needs will reduce need for
borrowing, and flatten spikes in the annual tax levy needed to pay for major purchases.
Just as for other capital projects, the decision whether or not to replace a particular piece of
equipment, and what to replace it with, will need to be made by the City Council at the time of the
3
purchase. The City could decide to keep some equipment longer than planned. Or, equipment
could wear out more quickly than expected. It is likely that some items will not be replaced, or that
new technology or equipment could alter plans to replace a particular item. The initial purchase of
new equipment will be considered as part of the annual operating budget, and once purchased,
future replacements would be added to the schedule.
In the 2007 the forecast was that in the first three years of the fund an average of about $120,000
per year would be needed to "break even." In order to fund the plan in later years, the funding level
would need to increase to over$150,000 per year. Even so, the fund would be at a deficit and
require the city to borrow some of the cost of new equipment. In each of the years 2008 and 2009,
the city budgeted $40,000 in transfers to the new fund. The fund balance at the end of 2009 is
forecasted to be $28,818.
For 2010, operating budget transfers to the fund are proposed to double to $80,000,plus revenue
from a $200,000 debt issue to finance project F-010 (Rescue 5179 Replacement.) The bars on the
following chart show the projected fund balance levels at the end of each of the next ten years,
assuming that the city continues to contribute $80,000 to the fund each year.
Equipment Replacement Fund
2010-2019
$400,000
$300,000
$200,000
$100,000
$0
k I --- I
2010 2011 2.12 2013 2014 2015 2016 2017 2018 2019
-$100,000 -
-$200,000
-$300,000
-$400,000
-$500,000
Year
Elm Total$Replacements
Funding
—Ile—Year End Fund Balance,
The chart data assumes the replacement schedule included in this CIP. It does not include any other
revenues (such as revenue from the sale of old equipment or new debt issues after 2010.) It shows
that the city should continue to increase contributions to the fund, and that significant additional
4
borrowing will likely be required to fund planned replacements in 2012 through 2014 (major
projects include replacement of two fire trucks and a dump truck/plow.)
Project Priorities
Capital improvement projects should be prioritized in some way so that limited funding can be allocated
to those which are most important. This is difficult because the varying nature of the projects and their
benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have
developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may
have some disadvantages because they may give a false sense of objectivity or precision to the priority
setting process. Others use simpler systems,or simply do not try to compare projects that are like"apples
and oranges." There is no accepted system or"industry standard" for prioritizing projects.
The Capital Improvement Committee developed the following priority rating system in 2008, which was
also used for the 2009 update:
A Critical or urgent, high-priority projects that should be done if at all
possible;a special effort should be made to find sufficient funding for all
of the projects in this group.
B Very important,high-priority projects that should be done as funding
becomes available.
C Important and worthwhile projects to be considered if funding is
available; may be deferred to a subsequent year.
D Less important, low-priority projects; desirable but not essential.
N/A Used for replacements of existing equipment.
Project Highlights by Department
Administration—A study of city meeting and office space needs is proposed for study in 2010, with
funding for implementation to be determined later. Several pending projects (no date or cost
estimate) are also listed (a community sign, improvements to the Annex, and City Hall expansion.)
Community Center Replacement of flooring is proposed for 2010. The only other project in the
2010-2014 time frame is an irrigation system (2013.)
Fire—Most of the Fire Department projects are replacements of equipment and Fire Hall
components (HVAC, roof, well pump, etc.) In 2010, Rescue 5179 will be replaced. The chassis
was purchased in 2009, and the build-out of the truck and debt financing for the project will be
competed in 2010. In 2011, a Fire Chief s vehicle is proposed, as is a contribution to fund a new
civil defense siren in the Big Marine Lake Park Reserve. The siren project is dependent upon
Washington County's re-evaluation of their master plan for the park, and the eventual location and
timing of a planned campground. Major equipment replacements are planned in 2012 and 2013
(Tanker 5177 and Engine 5280, respectively.).
5
Ice Rink—The Zamboni will need to be replaced at some time, currently listed for 2014.
Parks and Recreation—Lilleskogen and Wind in the Pines Parks, the priority projects of the Park
and Recreation Committee, are proposed for funding over the next several years. Availability of
funds from the Park Capital Improvement Fund will be a major limiting factor. A grant that would
have funded some work in Lilleskogen in 2010 was not approved, so it has been moved to 2011 and
later years.
Requests for improvements to the lighted ball field have been added; renovation of the infield has
been listed for 2012 and other improvements (restrooms, scoreboard, etc.) are listed in the
"pending" list. No cost estimates have been prepared for either of these projects. The list of
projects for 2015 and after includes two park projects: an athletic field and playground equipment,
both at Hay Lake/ Lions Park. Other"pending" projects added include trail acquisition and
development and playground replacements.
A project to construct a new, permanent skateboard park (PR-005) was added in 2008, as a
"pending" project. In the short term, the portable equipment used on the hockey rink was replaced
in 2009.
Public Works—Paving most of the remaining gravel roads is the largest single project in the CIP
(PW-001, $1.775 million.) Based on direction given by the City Council at its August, 2009 budget
workshop, the plan shows that design would begin no earlier than 2012 with most construction in
2013. The next largest item is the street maintenance program (PW-002) to implement the
Pavement Management Plan, as noted above.
The remaining Public Works projects represent replacements for major pieces of equipment. The
next major purchase would be a dump truck/ plow replacement in 2012.
Capital Improvement Program Summary and Project Data
The following worksheets were prepared using Plan-It, a software tool purchased to assist with the
capital improvements planning process. Many additional reports can be produced to display this
infoiniation, if desired. Summary data sheets show the projects proposed in each year from
2010through 2014, as well as by department and proposed funding source.
6
City of Scandia, Minnesota
Capital Improvement Program
2010 thru 2014
PROJECTS BY YEAR
Project Name Department Project# Priority Project Cost
2010 1
City Meeting/Office Space Study Administration A-001 3 18,000
Community Center Interior Improvements—Flooring Community Center CC-001 3 10,000
Rescue 5179 Replacement Fire F-010 n/a 177,336
Wind in the Pines Park Parks and Recreation PR-002 3 12,000
Street Maintenance Program Public Works PW-002 1 250,000
Tiger Ditch Rear Mower Replacement Public Works PW-007 n/a 17,000
Total for 2010 484,336
201J
Fire Chiefs Car Fire F-004 3 15,000
Civil Defense Siren,Big Marine Lake Park Reserve Fire F-009 2 15,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 12,300
Street Maintenance Program Public Works PW-002 1 600,000
Tiger Boom Mower Attachment Replacement Public Works PW-008 n/a 22,000
Total for 2011 664,300
201J
Tanker 5177 Replacement Fire F-011 n/a 180,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 143,075
Lighted Ball Field Improvements--Infield Parks and Recreation PR-007 3 0
Street Paving Public Works PW-001 2 385,000
Street Maintenance Program Public Works PW-002 1 600,000
1997 Ford 8000 Dump Truck w/Plow Replacement Public Works PW-006 n/a 140,000
Total for 2012 1,448,075
20�
Irrigation System Community Center CC-004 4 10,000
Engine 5180 Replacement Fire F-012 n/a 245,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 47,500
Street Paving Public Works PW-001 2 1,390,000
Street Maintenance Program Public Works PW-002 1 600,000
Ozark Ave.Extension Public Works PW-003 3 333,333
Total for 2013 2,625,833
20�
SCBA Cylinder Replacements Fire F-005 1 20,000
Zamboni Replacement Ice Rink IR-002 n/a 40,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 36,000
Street Maintenance Program Public Works PW-002 1 600,000
1999 JD-6410 Tractor Replacement Public Works PW-009 n/a 60,000
2002 Sterling Dump Truck w/Plow Replacement Public Works PW-010 n/a 140,000
Total for 2014 896,000
For Planning Commission Public Hearing,,Norcniber I,2110Y Thursdrr, October 2Y, 'llpy
7
Project Name Department Project # Priority Project Cost
GRAND TOTAL 6,118,544
Vol Pbnnu-ng Commission Public Hearing. November 1._ 0v Thursday. Octobe 11'y
8
City of Scandia, Minnesota
Capital Improvement Program
2010 flirt! 2014
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2010 2011 2012 2013 2014 Total
1Capital Improvement Fund
City Meeting/Office Space Study A-001 3 18,000 18,000
Civil Defense Siren,Big Marine Lake Park Reserve F-009 2 15,000 15,000
Ozark Ave.Extension PW-003 3 333,333 333,333
Capital Improvement Fund Total 18,000 15,000 333,333 366,333
Debt Service Fund I
Street Paving PW-001 2 385,000 1,390,000 1,775,000
Street Maintenance Program PW-002 1 350,000 350,000 350,000 350,000 1,400,000
Debt Service Fund Total 350,000 735,000 1,740,000 350,000 3,175,000
Equipment Replacement Fund
SCBA Cylinder Replacements F-005 1 20,000 20,000
Rescue 5179 Replacement F-010 n/a 177,336 177,336
Tanker 5177 Replacement F-011 n/a 180,000 180,000
Engine 5180 Replacement F-012 n/a 245,000 245,000
Zamboni Replacement IR-002 n/a 40,000 40,000
1997 Ford 8000 Dump Truck w/Plow Replacement PW-006 n/a 140,000 140,000
Tiger Ditch Rear Mower Replacement PW-007 n/a 17,000 17,000
Tiger Boom Mower Attachment Replacement PW-008 n/a 22,000 22,000
1999 JD-6410 Tractor Replacement PW-009 n/a 60,000 60,000
2002 Sterling Dump Truck w/Plow Replacement PW-010 n/a 140,000 140,000
Equipment Replacement Fund Total 194,336 22,000 320,000 245,000 260,000 1,041,336
-----------------
General Fund
Community Center Interior Improvements--Flooring +CC-001 3 10,000 10,000
Irrigation System CC-004 4 10,000 10,000
Fire Chiefs Car F-004 3 5,000 5,000
Street Maintenance Program PW-002 1 250,000 250,000 250,000 250,000 250,000 1,250,000
General Fund Total 260,000 255,000 250,000 260,000 250,000 1,275,000
Grants/Donations 1
Fire Chiefs Car F-004 3 10,000 10,000
Lilleskogen Park Improvements PR-001 2 12,300 12,300
Grants/Donations Total 22,300 22,300
......-_-. .
Other/TBD I
For Planning Commission Public Hearing. November 1. 21)i19 Thtnsdur,October 20,'(IUJ
9
Source Project# Priority' 2010 2011 2012 2013 2014 Total
Lighted Ball Field Improvements-Infield PR-007 3 0 0
Other/TBD Total 0 0
Park Improvement Fund I
Lilleskogen Park Improvements PR-001 2 143,075 47,500 36,000 226,575
Wind in the Pines Park PR-002 3 12,000 12,000
Park Improvement Fund Total 12,000 143,075 47,500 36,000 238,575
GRAND TOTAL 484,336 664,300 1,448,075 2,625,833 896,000 6,118,544
For Plaurring Commission Public Hearing.Nor,3mber! _011a Thursrlqr Oclnb,r 29, ?rlUy
10
City of Scandia, Minnesota
Capital Improvement Program
2010 thru 2014
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2010 2011 2012 2013 2014 Total
Administration
City Meeting/Office Space Study A-001 3 18,000 18,000
Capital Improvement Fund 18,000 18,000
Administration Total 18,000 18,000
[Community Center I
Community Center Interior Improvements--Flooring CC-001 3 10,000 10,000
General Fund 10,000 10,000
Irrigation System CC-004 4 10,000 10,000
General Fund 10,000 10,000
Community Center Total moo° 10,00 20,000
Fire
I
Fire Chiefs Car F-004 3 15,000 15,000
General Fund 5,000 5,000
Grants/Donations 10,000 10,000
SCBA Cylinder Replacements F-005 1 20,000 20,000
Equipment Replacement Fund 20,000 20000
Civil Defense Siren,Big Marine Lake Park Reserve F-009 2 15,000 15,000
Capital Improvement Fund 15,000 15,000
Rescue 5179 Replacement F-010 n/a 177,336 177,336
Equipment Replacement Fund 177,336 177,336
Tanker 5177 Replacement F-011 n/a 180,000 180,000
Equipment Replacement Fund 180,000 180,000
Engine 5180 Replacement F-012 n/a 245,000 245,000
Equipment Replacement Fund 245,000 245,000
Fire Total 177,336 30,000 180,000 245,000 20,000 652,336
Ice Rink
I
Zamboni Replacement IR-002 n/a 40,000 40,000
Equipment Replacement Fund 40,000 40,000
Ice Rink Total 40,000 40,000
Parks and Recreation I
Lilleskogen Park Improvements PR-001 2 12,300 143,075 47,500 36,000 238,875
Grants/Donadons 12,300 12,300
Park Improvement Fund 143,075 47,500 36,000 226,575
Wind in the Pines Park PR-002 3 12,000 12,000
For Plariniog CoNimisioN Public Heariv.Norember I, 201,2 Thiri-schiv,Oceobei 2Y. 2310Y
11
Department Project# Priority 2010 2011 2012 2013 2014 Total
Park Improvement Fund 12,000 12,000
Lighted Ball Field Improvements-Infield PR-007 3 0 0
Other/7BD
0 0
Parks and Recreation Total 12,000 12,300 143,075 47,500 36,000 250,875
(Public Works I
Street Paving PW-001 2 385,000 1,390,000 1,775,000
Debt Service Fund 385,000 1,390,000
1,775,000
Street Maintenance Program PW-002 1 250,000 600,000 600,000 600,000 600,000 2,650,000
Debt Service Fund 350,000 350,000 350,000 350,000 1,400,000
General Fund 250,000 250,000 250,000 250,000 250,000 1,250,000
Ozark Ave.Extension PW-003 3 333,333 333,333
Capital Improvement Fund 333,333
333,333
1997 Ford 8000 Dump Truck w/Plow Replacement PW-006 n/a 140,000 140,000
Equipment Replacement Fund 140,000
140,000
Tiger Ditch Rear Mower Replacement PW-007 n/a 17,000 17,000
Equipment Replacement Fund 17,000
17,000
Tiger Boom Mower Attachment Replacement PW-008 n/a 22,000 22,000
Equipment Replacement Fund 22,000 22,000
1999 JD-6410 Tractor Replacement PW-009 n/a 60,000 60,000
Equipment Replacement Fund
60,000 60,000
2002 Sterling Dump Truck w/Plow Replacement PW-010 n/a 140,000 140,000
Equipment Replacement Fund 140,000 140,000
Public Works Total 267,000 622,000 1,125,000 2,323,333 800,000 5,137,333
GRAND TOTAL 484,336 664,300 1,448,075 2,625,833 896,000 6,118,544
For Planning Commission Public Hearing Aoe eniher 1.00'I Thursday,O,lobar 2Y. 00Y
12
City of Scandia, Minnesota
Capital Improvement Program
2015 t iu 2019
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2015 2016 2017 2018 2019 Total
Administration 1
Building Official Vehicle Replacement I A-002 n/a 15,000 15,000
Equipment Replacement Fund 15,000 15,000
Administration Total 15,000 15,000
Community Center I
Community Center Roof Replacement CC-003 2 22,000 22,000
General Fund
22,000 22,000
Community Center Total 22,000 22,000
Fire I
l
Fire Station HVAC Replacement F-001 2 15,000 15,000
General Fund 15,000
15,000
Fire Department Radio Replacement F-003 1 60,000 60,000
Equipment Replacement Fund 60,000
60,000
Fire Chiefs Car F-004 3 15,000 15,000
Equipment Replacement Fund 15,000 15,000
Grass Rig 5175 Replacement F-013 n/a 46,200 46,200
Equipment Replacement Fund 46,200
46,200
Fire Total 61,200 75,000 136,200
-------- -----------------
Public Works I
Pickup w/Plow Replacement PW-004 n/a 25,000 25,000
Equipment Replacement Fund 25,000 25,000
John Deere Tractor Mower w/Broom&Blower Replace PW-005 n/a 25,000 25,000
Equipment Replacement Fund 25,000 25,000
Tiger Ditch Rear Mower Replacement PW-007 n/a 17,000 17,000
Equipment Replacement Fund 17,000 17,000
Tiger Boom Mower Attachment Replacement PW-008 n/a 22,000 22,000
Equipment Replacement Fund 22,000
22,000
Public Works Total 25,000 22,000 42,000 89,000
GRAND TOTAL. 61,200 25,000 22,000 132,000 22,000 262,200
For Plalihi,g Cnmmi.siou Public He,rrmg.,Vn,,'u,6ci 1,200V Thursday.Oeio/' / 'i, 'llrJl
13
City of Scandia, Minnesota
Capital Improvement Progicair
2020 lhru 2024
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2020 2021 2022 2023 2024 Total
Community Center I
Community Center HVAC Replacement CC-002 2 30,000 30,000
General Fund 30,000 30,000
Community Center Total 30,000 30,000
;Fire
I
Replacement of Fire Dept.Air Compressor F-002 1 30,000 30,000
Equipment Replacement Fund 30,000 30,000
SCBA Cylinder Replacements F-005 1 20,000 20,000
Equipment Replacement Fund 20,000 20,000
SCBA Air Pac Replacements F-006 1 60,000 60,000
Equipment Replacement Fund 60,000 60,000
Fire Hall Roof F-007 2 80,000 80,000
General Fund 80,000 80,000
Tanker 5178 Replacement F-014 n/a 132,000 132,000
Equipment Replacement Fund 132,000 132,000
Fire Total 80,000 50,000 60,000 132,000 322,000
Public Works
I
John Deere Tractor Mower w/Broom&Blower Replace PW-005 n/a 25,000 25,000
Equipment Replacement Fund 25,000 25,000
1997 Ford 8000 Dump Truck w/Plow Replacement PW-006 n/a 140,000 140,000
Equipment Replacement Fund 140,000 140,000
Tiger Boom Mower Attachment Replacement PW-008 Ma 22,000 22,000
Equipment Replacement Fund 2Z000 2Z000
Public Works Total 47,000 140,000 187,000
GRAND TOTAL 80,000 50,000 90,000 179,000 140,000 539,000
For Plunhilw Colimiissimi Publi, Hearing, Norembo I. 2(1(1Y Thursday, OctI,c1
14
City of Scandia, Minnesota
Capital Improvement
Program
2025 thru 2029
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project Priority 2025 2026 2027 2028 2029 Total
Administration I
Building Official Vehicle Replacement A-002 n/a 15,000 15,000
Equipment Replacement Fund 15,000 15,000
Administration Total 15,000 15,000
......____...-_--
Community Center
Community Center Roof Replacement CC-003 2 8,000 8,000
General Fund 8,000 8,000
Community Center Total 8,000 8,000
Fire I
Fire Chiefs Car F-004 3 15,000 15,000
Equipment Replacement Fund 15,000 15,000
SCBA Cylinder Replacements F-005 1 20,000 20,000
Equipment Replacement Fund
20,000 20,000
Fire Well Pump Replacement F-008 2 30,000 30,000
Equipment Replacement Fund 30,000 30,000
Engine 5176 Replacement F-015 n/a 290,000 290,000
Equipment Replacement Fund 290,000 290,000
Fire Total 305,000 50,000 355,000
------------------------
Public Works
I
Pickup w/Plow Replacement PW-004 n/a 25,000 25,000
Equipment Replacement Fund
25,000 25,000
Tiger Ditch Rear Mower Replacement PW-007 n/a 17,000 17,000
Equipment Replacement Fund
17,000 17,000
Tiger Boom Mower Attachment Replacement PW-008 n/a 22,000 22,000
Equipment Replacement Fund 22,000 22,000
1999 JD-6410 Tractor Replacement PW-009 n/a 60,000 60,000
Equipment Replacement Fund
60,000 60,000
2002 Sterling Dump Truck w/Plow Replacement PW-010 n/a 140,000 140,000
Equipment Replacement Fund 140,000 140,000
Public Works Total 157,000 25,000 82,000 264,000
GRAND TOTAL 305,000 157,000 90,000 90,000 642,000
For Planning Commission Public Hearing,Norenrber 1,009 Thursday. October'u, 7009
15
City of Scandia, Minnesota
Capital Improvement Program
PENDING PROJECTS
I Includes projects with a 'Status'set to 'Pending')
Project Name Department Project# Priority Project Cost
Pending
Communty Center Expansion/City Hall Administration A-005 3 0
Annex(Old Fire Hall)Improvements Administration A-003 4 0
Community Sign Administration A-004 4 0
Second Fire Station Fire F-016 3 0
Fire Chiefs Car Replacements Fire F-0048 n/a 20,000
Children's T-Ball Field Improvements Parks and Recreation PR-013 4 0
Bone Lake Park Improvements Parks and Recreation PR-012 4 0
Big Lake School Park Improvements Parks and Recreation PR-011 4 0
Playground Equipment Replacement-Ballfield Parks and Recreation PR-010 n/a 25,000
Playground Equipment Replacement-Community Center Parks and Recreation PR-009 n/a 25,000
Lighted Ball Field Improvements Parks and Recreation PR-008 4 0
Trail Acquisition and Development Parks and Recreation PR-006 3 0
Skateboard Park Parks and Recreation PR-005 2 75,000
Playground Equipment Hay Lake/Lions Shelter Parks and Recreation PR-004 4 25,000
Hay Lake/Lions Park Athletic Field Parks and Recreation PR-003 4 39,000
GRAND TOTAL 209,000
l-or Plnnrillw Co)/ /Ssion i'(!!i, /-1coring ,Aol cnrN-r /. 20()Y TI hind,,, *lobo-C,20011
16
^
Equipment Replacement Fund
2010 - 2029
All Equipment Replacements
Project Year Useful Cost
Department # Description Purchased Life Year Estimate
Administration A'002 Building Official Vehicle 2008 10 2018 $15.000
Administration A'002 Building Official Vehicle 2018 10 2028 $15.000
Fire F'002 Air Compressor 2001 20 2021 s30.000
Fire F'003 Fire Department Radios 2007 10 2018 $60.000
Fine F'803 Fire Department Radios 2018 10 2028 $60.000
Fire F'004 Fire Chiefs Car 2000 7 2016 $15.000
Fire F'004 Fire Chiefs Car 2016 7 2023 $15.080
Fine F'005 SC8ACy|indeve 2007 7 3014 $20,000
Fire F'005 SC8ACy|indera 2014 7 2021 $20.000
Fine F'005 SCBACy|indene 2021 7 2028 $20.000
Fire F'006 SCBA Air Peuo 2007 15 2022 $60.000
Fire F'008 Well Replacement 2008 20 2028 %30.000
Fire F'010 R*acue517Q 1990 20 2000/2010 $220.000
Fire F'011 Tonker5177 1992 20 2012 $180.000
Fire F'012 Engino5180 1988 25 2013 $245.000
Fine F'013 Grass Rig 5175 1995 20 2015 $46.200
Fire F'014 Tanker5178 2003 20 2023 s132.000
Fire F'015 Engine517O 2000 25 2025 $290.000
Ice Rink |R'2 ZambnniR*p|aooment 25 2014 $40.000
Public Works PVV'004 F350 Pickup w/P|ow 2008 10 2018 $25.000
Public Works PVV'004 F35O Pickup wVP|ow 2018 10 2038 $25.000
Public Works PVV'005 John Deere Tractor Mower w/Broom & Blower 2002 7 2009 $25'000
� Public Works PVV'005 John Deere Tractor Mower w/Bnoom & Blower 2009 7 2016 $25000
Public Works PVV'005 John Deere Tractor Mower w/Broom & Blower 2016 7 2023 $25.000
Public Works PVV'005 John Deere Tractor Mower w/Bnoom & Blower 2023 7 2030 $25.000
Public Works PVV'008 1QQ7 Ford 8000 Dump Truck wYP|ovv 1997 12 2012 $140.000
� Public Works PVV'006 1097 Ford 80O0 Dump Truck w/P|ow 2012 12 2024 $140.000
� Public Works PVV'007 Tiger Ditch Rear Mower 2002 8 2010 $17.000
Public Works PVV'007 Tiger Ditch Rear Mower 2010 8 2018 $17.000
Public Works PVV'007 Tiger Ditch Rear Mower 2018 8 2026 $17.000
Public Works PVV'008 Tiger Boom Mower Attachment 2005 6 2011 $22.000
Public Works PVV'008 Tiger Boom Mower Attachment 2011 8 2017 $220OO �
. �
Public Works PVV'008 Tiger Boom Mower Attachment 2017 G 2023 $22.000
Public Works PVV'008 Tiger Boom Mower Attachment 2023 S 2020 $22.000
Public Works PVV'009 1QA8JD'041UTractor 1900 15 2014 G60.000
Public Works PVV'009 1AQ9JD'6410Tractor 2014 15 2029 $60.000
Public Works PVV'010 2O02 Sterling Dump Truck w/P|mw 2002 12 2014 $140.000
Public Works PVV'010 2002 Sterling Dump Truck w/P|mw 2014 12 2026 $140.000
Public Works 1988 John Deere Grader 1908 20 Do Not Replace
Public Works 1AS5GK4C Pickup w/ Plow 1908 10 Oo Not Replace
$2,482,200
Equipment Replacement Fund
2010 - 2019
Replacements by Department
Administration/
Year Building Fire Parks/ ice Rink Public Works
17,000
177,336 2010
2011 22,000
1
180,000 40,000
2012
2013 245,000
2014 20,000 40,000 200,000
2015 46,200
15,000 25,000
2016
2017 22,000
2018 15,000 60,000 42,000
2019
$15,000 $743,536 $40,000 $468,000
1.18% 58.71% 3.16% 36.95%
Replacements by Department
2010 - 2019
Administration/
Building
1%
Public Works
37%
liii
Fire
59%
Parks/ Ice Rink
3%
18
Equipment Replacement Fund Cash Flow
2010 - 2019
Year End
Total $ Fund
Year Replacements Funding Balance
2010 $194,336 $280,000 $114,482
2011 $22,000 $80,000 $172,482
2012 $320,000 $80,000 -$67,518
2013 $245,000 $80,000 -$232,518
2014 $260,000 $80,000 -$412,518
2015 $46,200 $80,000 -$378,781
2016 $40,000 $80,000 -$323,781
2017 $22,000 $80,000 -$265,781
2018 $117,000 $80,000 -$317,781
2019 $0 $80,000 -$237,781
Equipment Replacement Fund
2010 - 2019
$400,000
$300,000
,z1
$200,000 -
$100,000
,41,4
$0 141 - f I
2010 2011 2, 2 2013 2014 2015 2016 2017 2018 2019
-$100,000
-$200,000
-$300,000
-$400,000
-$500,000
Year Total $ Replacements
Funding
...9irm.Year End Fund Balancej
19
•
City of Scandia
Capital Improvement Program
2010 - 2014
Project Data Sheets
Planning Commission
Public Hearing Draft
November 1, 2009
f
Capital Improvement Program 2009 thru 2013
Department Public Works
City of Scandia, MVlinnesota Contact Morrison
Type New
Project# PW-011
Project Name Salt/Sand Shelter Useful Life 20 years
Category Buildings
Priority B:High priority
Total Project Cost: $20,000
Description
Salt/sand structure at Public Works facility. (Assumes fabric structure, using existing concrete slab and walls.)
Justification
Allows us to have supplies on hand and make fewer trips to pick up loads during snow events, and protect it from the
elements. Improves safety for staff, and for public through more efficient snow removal operations during major snow
events.
Expenditures 2009 2010 2011 2012 2013 Total
Construction/Maintenance 20,000 20,000
Total 20,000 20,000
Funding Sources 2009 2010 2011 2012 2013 Total
Capital Improvement Fund 20,000 20,000
Total 20,000 20,000
For Planning Commission Public Hearing,November 1, 1009 Friday, October 30,1009
Capital Improvement Program 2010 dint 2014
Department Administration
City of Scandia, Minnesota Contact Administrator
Type Unassigned
Project# A-001
Useful Life 15 years
Project Name City Meeting/Office Space Study
Category Buildings
Priority C: Worthwhile
Total Project Cost: $18,000
Descdpdon
hnprove/expand/remodel meeting space for City Council and office space for administrative staff.
Architectural study would review:
Phase 1: $3,000 to study reconfiguration of city office space only
Phase 2: Long-term needs (10-20 years) for expanded building on Community Center site and study possible
remodelling of Annex (old Fire Hall) $15,000
Justification
Existing office space is inefficient and lacks separation of public and private areas.
Short and long-term "permanent" solutions are needed to the space issue solved temporarily by relocation of the sheriff
deputy to the Fire Hall.
Need to plan for long-term expansion needs for meeting space,public service, employee work areas and storage.
Expenditures 2010 2011 2012 2013 2014 Total
Planning/Design 18,000 18,000
Total 18,000 18,000
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Improvement Fund 18,000 18,000
Total 18,000 18,000
For Planning Commission Public Hearing, November 1,2009 Friday, October 30,2009
7-2
•
Capital Improvement Program 2010 thru 2014
Department Community Center
City of Scandia, Minnesota Contact Administrator
P Type Maintenance
Project# CC-001
Useful Life 20 years
Project Name Community Center Interior Improvements--Flooring
----... Category Buildings
Priority C: Worthwhile
Total Project Cost: $10,000
Description
Replace flooring in all public areas of Community Center.
2008 estimates-- hall, bar, kitchen & heritage room:
* Vinyl tile-- $6,000
* Ceramic-- $15,000
* Laminate-- $23,000
* Carpet-- $10,000
Replace flooring in Office and Board Room areas-- $3,000 est.
Justification
Updating and refreshing interior spaces is necessary to keep center attractive and suitable for hosting public and private
events. Flooring in public areas is aging and has not been replaced since the building was constructed.
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 10,000 10,000
Total 10,000 10,000
Funding Sources 2010 2011 2012 2013 2014 Total
General Fund 10,000 10,000
Total 10,000 10,0oo
For Planning Commission Public Hearing,November 1, 1009 Friday, October 30,1009
Capital Impmvement Program 2010 thru 2014
Department Community Center
City of Scandia, Minnesota Contact
Type improvement
Project# CC-004
Useful Life I years
Project Name Irrigation System
Category Buildings
Priority D: Low priority
Total Project Cost: $10,000
Description
Lawn irrigation system for Community Center/Warming House site and for Public Works Garage/Fire Hall site.
Justification
Improve lawn care/appearance of primary public facilities.
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 10,000 10,000
Total 10,000 10,000
Funding Sources 2010 2011 2012 2013 2014 Total
General Fund 10,000 10,000
Total 10,000 10,000
For Planning Commission Public Hearing,November 1, 1009 Friday,October 30,2009
Capital Improvement Program 2010 thru 2014
Department Fire
City of Seandia, Minnesota Contact Fire Chief
Type New
Project# F-004
i Useful Life 7 years
Project Name Fire Chiefs Car
J Category Equipment/Vehicles
Priority C: Worthwhile
Total Project Cost: $45,000
Deserlplion
Purchase multi-purpose vehicle:
1. Chiefs car for direct response to emergencies.
2. Use as command vehicle at scene.
3. Transport personnel for non-emergency meetings and training out of the area.
Justifiesdon
Eliminate use of personal vehicles for Fire Dept business
Expenditures 2010 2011 2012 2013 2014 Total Future
EquipNehicles/Fumishings 15,000 15,000 30,000
Total 15,000 15,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
General Fund 5,000 5,000 30,000
Grants/Donations 10,000 10,000 Total
Total 15,000 15,000
For Planning Commission Public Hearing,November I,2009 Friday,October 30,2009
(s')
Capital Improvement Program 2010 thru 2014
Department Fire
City of Scandia, Minnesota Contact Fire Chief
Type Replacement
Project# F-005
Useful Life 7 years
Project Name SCBA Cylinder Replacements
Category Equipment/Vehicles
Priority A:Urgent,high priority
Total Project Cost: $60,000
Description
Replace SCBA cylinders that have reached the end of serviceable life. (2014, 2021,2028)
Justification
Necessary equipmenbt with OSHA mandated useful life.
Expenditures 2010 2011 2012 2013 2014 Total Future
EquipNehicles/Fumishings 20,000 20,000 40,000
Total 20,000 20,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Equipment Replacement Fund 20,000 20,000 40,000
Total 20,000 20,000 Total
For Planning Commission Public Hearing, November 1,1009 Friday,October 30,2009
'7
Capital Improvement Program 2010 thru 2014
Department Fire
City of Scandia, Minnesota Contact Administrator
Type New
Project# F-009
Useful Life 40 years
Project Name Civil Defense Siren, Big Marine Lake Park Reserve
Category Equipment'Vehicles
Priority B: High priority
Total Project Cost: $15,000
Description
Partner with Washington County and potentially May Township to upgrade civil defense siren in Big Marine Lake Park
Reserve.
Justification
Public safety for park and lake users, lakeshore residents and semi-public recreation facilities (such as Vets Camp,
Camp Lakamaga)on Big Marine Lake,
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Improvement Fund 15,000 15,000
Total 15,000 15,000
For Planning Commission Public Hearing,November 1,2009 Friday,October 30,2009
Capital Improvement Program 2010 thru 2014
Department Fire
City of Scandia, Minnesota Contact Fire Chief
Type Replacement
Project# F-010
Useful Life 20 years
Project Name Rescue 5179 Replacement
�.. — Category Equipment/Vehicles
Priority N/A
Total Project Cost: $220,000
Description
Replacement of Rescue 5179-- purchase chassis in 2009, build out rescue truck in 2010.
Justification
Prior Expenditures 2010 2011 2012 2013 2014 Total
42,664 EquipNehicles/Fumishings 177,336 177,336
Total Total 177,336 177,336
Prior Funding Sources 2010 2011 2012 2013 2014 Total
42,664 Equipment Replacement Fund 177,336 177,336
Total Total 177,336 177,336
For Planning Commission Public Hearing,November 1,2009 Friday, October'30,2009
,2
Capital Improvement Program 2010 thru 2014 Department Fire
City of Scandia, Minnesota Contact Fire Chief
Type Replacement
Project# F-011
Project Name Tanker 5177 Replacement Useful Life 20 years
-------- Category Equipment/Vehicles
Priority N/A
Total Project Cost: $180,000
Description
Tanker 5177 Replacement (2012)
Justification
Expenditures 2010 2011 2012 2013 2014 Total
EquipNehicles/Fumishings 180,000 180,000
Total 180,000 180,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Replacement Fund 180,000 180,000
Total 180,000 180,000
For Planning Commission Public Hearing,November 1, 2009 Friday,October 30,2009
Capital Impmvement Program 2010 thru 2014
Department Fire
City of Scandia, Minnesota Contact
Type Replacement
Project# F-012
Useful Life 25 years
Project Name Engine 5180 Replacement
Category Other
Priority N/A
Total Project Cost: $245,000
Description
Engine 5180 Replacement (2013)
Justification
Expenditures 2010 2011 2012 2013 2014 Total
Equip/Vehicles/Furnishings 245,000 245,000
Total 245,000 245,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Replacement Fund 245,000 245,000
Total 245,000 245,000
For Planning Commission Public Hearing,November 1,2009 Friday, October 30,2009
/1
Capital Improvement Program 2010 thru 2014
Department Ice Rink
City of Scandia, Minnesota Contact
Type Replacement
Project it IR-002
Useful Life 25 years
Project Name Zamboni Replacement
Category Equipment/Vehicles
Priority N/A
Total Project Cost: $40,000
Description
Replacement of(used) Zamboni for outdoor ice rink
Current machine good for 5 years 2014)
Justification
End of useful life of existing equipment.
Expenditures 2010 2011 2012 2013 2014 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2010 2011 2012 2013 2014 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 40,000
For Planning Commission Public Hearing, November 1, 2009 Friday,October 30, 2009
1?
Capital Improvement Program 2010 thru 2014
Department Parks and Recreation
City of Scandia, Minnesota Contact Park and Rec Committee
Type Improvement
Project# PR-001
Useful Life 20 years
Project Name Lilleskogen Park Improvements
Category Park Improvement
Priority B:High priority
Total Project Cost: $263,675
Description
Preliminary Cost Estimate from Lilleskogen Park Plan, January 2007 & estimates from SRF Inc., April 2008
Phase 1, 2009 ($24,800)
1. Site surveying and engineering for water control structure: $13,800
2. Construction/earthwork: $10,000
3. Weed Management: $1,000
Phase 2, 2011
4. Vegetation Restoration $12,300
Phase 3, 2012 ($143,075)
5. Site utilities: $8,000
6. Bituminous and concrete pavement and boardwalk: $130,075
7. Electrical (parking lot security lighting) $5,000
Phase 4, 2013 ($47,500)
6. Vegetation removals ($21,500)
7. Landscaping/vegetation restorations ($26,000)
Phase 4, 2013 ($36,000)
8. Site furnishings (picnic shelter, tables, benches, signage etc.)
Justification
#1 priority of Park and Recreation Committee
Park is gateway to village center; connection to pedestrian trails, accessible to school.
Prior Expenditures 2010 2011 2012 2013 2014 Total
24,800 Construction/Maintenance 12,300 143,075 47,500 15,000 217,875
Total EquipNehicles/Furnishings 21,000 21,000
Total 12,300 143,075 47,500 36,000 238,875
For Planning Commission Public Hearing,November 1, 2009 Friday,October 30. 2009
/
Capital Improvement Program 2010 thru 2014
Department Parks and Recreation
City of Scandia, Minnesota Contact Park and Rec Committee
Prior Funding Sources 2010 2011 2012 2013 2014 Total
24,800 Grants/Donations 12,300 12,300
Total Park Improvement Fund 143,075 47,500 36,000 226,575
Total 12,300 143,075 47,500 36,000 238,875
For Planning Commission Public Hearing,November I, 2009 Friday, October 30,2009
/ C
�
2010 thru 2014
muvurm*n/ Parks and Recreation
City of Scandi0L so Contact r^mand x� n�cv�n�
[ -----' ---- --�--------------- ---
' p'�'*� �0�0�Z Type Improvement
Project Name Wind in the Pines Park Useful Life zo'mrs
�— ---- ------ --- ---- ------------ Category Park Improvement
Priority cwonm°m|e
Demoiipdmn Total Project Cost: m/3,000
Trail Improvements— $1,000
Natural Resources Management 9|un— $l0,0U0
Signagc/furuinbiogo— $2,000
Justincation
Second pdoirtyof Park and Recreation Committee.
Stairs/trail improvement needed to allow use of steep trail without erosion and keep users from trespassing on private
property.
p'i»' Expenditures 2010 2011 2012 2013 2014 Total
1.000 Planning/Design 10.000 10.00
Tvm| Equip8/ hidov/Fumi»hingn 2.00 2.00
Total 12,000 12,000
yr|v, Funding Sources 2010 2011 2012 2013 2014 Total
1.000 Park Improvement Fund 12.000 12.000
Total Total 12.000 12.000
For Planning Commission Public Hearing, November/.mor Friday,October/n.moo
/�.
/ /
Capital Improvement Program 2010 thru 2014
Department Parks and Recreation
City of Scandia, Minnesota Contact
Type Maintenance
1 Project# PR-007
Project Name Lighted Ball Field Improvements-- Infield Useful Life 20 years
------..—_.__--- —_—� Category Park Improvement
Priority C: Worthwhile
Total Project Cost: $0
Description
Grade and rebuild infield to correct drainage; grade and plant trees behind west outfield fence. (Cost undetermined.)
Justification
Requested by Scandia Softball Association.
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 0 0
Total 0 0
Funding Sources 2010 2011 2012 2013 2014 Total
Other/TBD 0 0
Total 0 0
For Planning Commission Public Hearing,November 1, 2009 Friday,October 30,2009
Capital Improvement Program 2010 thru 2014
Department Public Works
City of Scandia, Minnesota Contact Engineer
Type Improvement
Project# PW-001
Useful Life 20 years
Project Name Street Paving
Category Road Paving
Priority B:High priority
Total Project Cost: $1,775,000
Descdpdon
Pave remaining approximately 5.5 miles of gravel roads (Pilar, Paris, Pennfield, Perkins; 185th, Oakgreen, Old Marine
Trail.). Minimum of 20% of total cost (portion of bituminous) to be assessed to benefited property owners per policy.
$1,775,000 Total cost over 2 years.
Year 1 (2012) ($385,000)
-- Culvert replacement $100,000
-- Engineering/surveying/wetland permitting $250,000
-- Easement acquisition $35,000
Year 2 (2013) ($1,390,000)
-- Engineering/Admin etc. $300,000
-- Construction $1,070,000
-- Financing costs $20,000
Justification
Policy to pave existing gravel roads; decreased maintenance costs for pavement vs. gravel roads.
Expenditures 2010 2011 2012 2013 2014 Total
Planning/Design 250,000 300,000 550,000
Land Acquisition 35,000 35,000
Construction/Maintenance 100,000 1,070,000 1,170,000
Other
20,000 20,000
Total 385,000 1,390,000 1,775,000
Funding Sources 2010 2011 2012 2013 2014 Total
Debt Service Fund 385,000 1,390,000 1,775,000
Total 385,000 1,390,000 1,775,000
For Planning Commission Public Hearing,November 1, 2009 Friday,October 30, 2009
/ 7
Capital Improvement Program 2010 thru 2014
Department Public Works
City of Scandia, Minnesota Contact Engineer
Type Maintenance
Project# PW-002
Useful Life Variable
Project Name Street Maintenance Program
-_-_, Category Road Reconstruction
Priority A:Urgent,high priority
DescriptionTotal Project Cost: $2,843,800
Ten-year rehab. Program including crack sealing and seal coat, reclaim and overlay,reconstruction, as recommended by
2008 Pavement Management Plan (2009-2018, expenditures yet to be determined.)
Justification
Maintain investment in paved roadways. Assumes new assessment policy allowing debt financing of significant portion
of rehabilitation and reconstruction program.
Prior Expenditures 2010 2011 2012 2013 2014 Total
193,800 Construction/Maintenance 250,000 600,000 600,000 600,000 600,000 2,650,000
Total Total 250,000 600,000 600,000 600,000 600,000 2,650,000
Prior Funding Sources 2010 2011 2012 2013 2014 Total
193,800 Debt Service Fund 350,000 350,000 350,000 350,000 1,400,000
Total General Fund 250,000 250,000 250,000 250,000 250,000 1,250,000
Total 250,000 600,000 600,000 600,000 600,000 2,650,000
For Planning Commission Public Hearing, November 1,1009 Friday, October 30,1009
Capital Improvement Program 2010 thru 2014
Department Public Works
City of Scandia, Minnesota Contact Engineer
Type New
Project# PW-003
Useful Life 20 years
Project Name Ozark Ave. Extension
Category Road Construction
Priority C: Worthwhile
Total Project Cost: $333,333
Description
New street segment from end of existing Ozark Ave. to CR 52 (Oakhill) .33 miles (2013)
ROW Acquisition, Construction all related improvements-- $lmillion per mile.
May be partially assessed(?)
Justification
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 333,333 333,333
Total 333,333 333,333
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Improvement Fund 333,333 333,333
Total 333,333 333,333
For Planning Commission Public Hearing, November I,2009 Friday,October 30,2009
Capital Improvement Program 2010 thru 2014
Department Public Works
City of Scandia, Minnesota Contact Morrison
Type Replacement
Project# PW-006
Useful Life 12
Project Name 1997 Ford 8000 Dump Truck w/Plow Replacement
Category Equipment/Vehicles
Priority N/A
Total Project Cost: $280,000
Description
1997 Ford 8000 Dump Truck w/Plow Replacement (2012, 2024)
Justification
Expenditures 2010 2011 2012 2013 2014 Total Future
EquipNehicles/Fumishings 140,000 140,000 140,000
Total 140,000 140,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Equipment Replacement Fund 140,000 140,000 140,000
Total 140,000 140,000 Total
For Planning Commission Public Hearing,November 1,2009 Friday, October 30,1009
_, 0
Capital Improvement Pmgram 2010 thru 2014
Department Public Works
City of Scandia, ISEnnesota Contact Morrison
------------ -- — ------- --' Type Replacement
Project# PW-007
Project Name Tiger Ditch Rear Mower Replacement Useful Life 8
Category Equipment/Vehicles
Priority N/A
Total Project Cost: $51,000
Description
Tiger Ditch Rear Mower Replacement (2010, 2018, 2026)
Justification
Expenditures 2010 2011 2012 2013 2014 Total Future
Equip/Vehicles/Furnishings 17,000 17,000 34,000
Total 17,000 17,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Equipment Replacement Fund 17,000 17,000 34,000
Total 17,000 17,000 Total
For Planning Commission Public Hearing,November 1,2009 Friday,October 30, 2009
6,2
Capital Improvement Program 2010 thru 2014
Department Public Works
City of Scandia, Minnesota Contact Morrison
Type Replacement
Project# PW-008
Useful Life 6 years
Project Name Tiger Boom Mower Attachment Replacement
Category Equipment/Vehicles
Priority N/A
Total Project Cost: $88,000
Description
Tiger Boom Mower Attachment Replacement (2011, 2017, 2023, 2029)
Justification
Expenditures 2010 2011 2012 2013 2014 Total Future
EquipNehicles/Furnishings 22,000 22,000 66,000
Total 22,000 22,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Equipment Replacement Fund 22,000 22,000 66,000
Total 22,000 22,000 Total
For Planning Commission Public Hearing,November 1,2009 Friday,October 30,2009
Capital Improvement Program 2010 thn4 2014
Department Public Works
City of Scandia, Minnesota
Contact Morrison
Type Replacement
Project# PW-009
Useful Life 15 years
Project Name 1999 JD-6410 Tractor Replacement Category Equipmerw Vehicles
Priority N/A
Total Project Cost: $120,000
Description
1999 JD-6410 Tractor Replacement (2014, 2029)
Justification
Expenditures 2010 2011 2012 2013 2014 Total Future
EquipNehicles/Fumishings 60,000 60,000 60,000 I
Total 60,000 60,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Equipment Replacement Fund 60,000 60,000 60,000
Total 60,000 60,000 Total
•
For Planning Commission Public Hearing,November 1,2009
Friday, October 30,2009
,_);
Capital Improvement Program 2010 thru 2014
Department Public Works
City of Scandia, Minnesota Contact Morrison
Type
4 PW-010 Replacement
Useful Life 12
Project Name 2002 Sterling Dump Truck willow Replacement
—_— --- —___--- —1 Category Equipment/Vehicles
Priority N/A
Total Project Cost: $280,000
Description
2002 Sterling Dump Truck w/Plow Replacement (2014, 2026)
Justification
Expenditures 2010 2011 2012 2013 2014 Total Future
EquipNehicles/Fumishings 140,000 140,000 140,000
Total 140,000 140,000 Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Equipment Replacement Fund 140,000 140,000 140,000
Total 140,000 140,000 Total
For Planning Commission Public Hearing,November 1, 1009 Friday,October 30,1009
,"