7.d) Trails Costshttps://capitolfax.com/summary.pdf
Cost Per Mile
New Construction Extra Cost for 1 Single Additional Lane on Rural
Arterial $449,088.12 - Shoulders - 5'
Two Directional 12' Shared Use Path $175,461.90
Rails to Trails project 12' width $162,515.68
Sidewalk construction' 5' one side 4 inch depth $119,568.82
http://www.fdot.gov/programmanagement/Estimates/LRE/summary.pdf
Cost Per Mile
Two Directional, 12' $331,914.18
Shared Use Path
Rails to Trails project $306,954.53
(12' width)
Sidewalk
construction; 5' one
side, 4 inch depth
Mid -Block Crossing
x
$155,261.80
$120,051.93
Composite Report
Composite Report
Composite Report
Composite Report
Table 6. Gonoral neoh ssional trail enmanwtinn most amoimmms
TRAIL VMTt4
M811 S A ACING
CNWACtiS
CAST PER IWIIL
3-104 Tram
natural
4 sdt soil and light
458,000
to no vegetation
4 large rocks or
413,200
h-vy vegetation
10*" Tram
crushed aggregate.
4 sdi soil and Ight
41,37.000
4 -inch depth
to no vegetation
4 large rocks or
4548,000
heavy vegetation
10i00t Tram
asphalt
4 soh soil and light
4S125.000
to no vegetation
4 large rocks.
45300.000
heavy
vegetation, or
wet sorts
111FamTrmat
corscaete
4 soft soil and light
4S 188.000
to no vegetation
4 large rocks and
4S600,000
heavy vegetation
6 Feat Tram wm Grads
a fished aggregate
4 soft soil and light
4542250
5apar adnrt orore M
to no vegetation
road Vaikk Read
4 large rocks and
4558.100
heavy vegetation
WC& com! u - .' ln4i mIIt Mavato
Ram rnw rleh e N ,Amrn
Trym A V.K9.Sf17M
'Wort Rant oortrartor im Moes: rima nxMV trail mu. Umbng aro clearing traN oktlung wnn ertssmon Comms Instaiwx orr slw berm
rerpval. mayor root rcrnwam. Due prepV9Wk mase M"W Lala ane spea4 ane 1trW srnootnng. rating or nnhming. Hauling any ream orf
W Rall will be edre.