Loading...
7.d) Trails Costshttps://capitolfax.com/summary.pdf Cost Per Mile New Construction Extra Cost for 1 Single Additional Lane on Rural Arterial $449,088.12 - Shoulders - 5' Two Directional 12' Shared Use Path $175,461.90 Rails to Trails project 12' width $162,515.68 Sidewalk construction' 5' one side 4 inch depth $119,568.82 http://www.fdot.gov/programmanagement/Estimates/LRE/summary.pdf Cost Per Mile Two Directional, 12' $331,914.18 Shared Use Path Rails to Trails project $306,954.53 (12' width) Sidewalk construction; 5' one side, 4 inch depth Mid -Block Crossing x $155,261.80 $120,051.93 Composite Report Composite Report Composite Report Composite Report Table 6. Gonoral neoh ssional trail enmanwtinn most amoimmms TRAIL VMTt4 M811 S A ACING CNWACtiS CAST PER IWIIL 3-104 Tram natural 4 sdt soil and light 458,000 to no vegetation 4 large rocks or 413,200 h-vy vegetation 10*" Tram crushed aggregate. 4 sdi soil and Ight 41,37.000 4 -inch depth to no vegetation 4 large rocks or 4548,000 heavy vegetation 10i00t Tram asphalt 4 soh soil and light 4S125.000 to no vegetation 4 large rocks. 45300.000 heavy vegetation, or wet sorts 111FamTrmat corscaete 4 soft soil and light 4S 188.000 to no vegetation 4 large rocks and 4S600,000 heavy vegetation 6 Feat Tram wm Grads a fished aggregate 4 soft soil and light 4542250 5apar adnrt orore M to no vegetation road Vaikk Read 4 large rocks and 4558.100 heavy vegetation WC& com! u - .' ln4i mIIt Mavato Ram rnw rleh e N ,Amrn Trym A V.K9.Sf17M 'Wort Rant oortrartor im Moes: rima nxMV trail mu. Umbng aro clearing traN oktlung wnn ertssmon Comms Instaiwx orr slw berm rerpval. mayor root rcrnwam. Due prepV9Wk mase M"W Lala ane spea4 ane 1trW srnootnng. rating or nnhming. Hauling any ream orf W Rall will be edre.