10.d2 Olinda Trail Pedestrian Crossing - Authorize Solicitation of Quotes 14727 209 th St. N., Scandia, Minnesota 55073 Phone (651) 433 -2274 Fax (651) 433 -5112 http://www.ci tyof scandia.com May 19, 2026 Honorable Mayor and City Council 14727 209th Street N Scandia, MN 55073 Re: Olinda Trail Pedestrian Crossing Request to Authorize Preparation of Plans and Specifications Dear Mayor and Council: Based on ongoing discussions with City Staff and Washington County, an Olinda Trail pedestrian crossing north of the 209th Street Intersection has been approved. In order to receive the best pricing for this work, we request that the City Council authorize the solicitation of quotes for this project. The project scope includes the following (and can be seen in the drawings at the end of this report): • Removing and replacing concrete curb and gutter both east and west of Olinda Trail N. • Removing and replacing existing concrete sidewalk with new pedestrian curb ramps. • Installing Washington County approved crosswalk blocks. This project will promote walkability and connectivity between Gammelgarden, the Water Tower Barn Project, and Scandia’s downtown. The anticipated total cost for this project is $50,000.00. The anticipated project schedule is as follows: Authorize Solicitation of Quotes May 19, 2026 Receive Quotes June 10, 2026 Consider Contract Award at City Council Meeting June 16, 2026 Construction July - September 2026 Please do not hesitate to contact me with any questions regarding this project at 651-308-1491. Sincerely, Isiah Bubany, P.E. Project Engineer Enclosures: Pedestrian Crossing Layout U OEOEOEOEOEOEOEOEOEOEOEOE O E OE OE X X X X X XXXXXXX OE OE OE OE C C C P C CI T Y HA L L (2 4 X 2 4 ) W1 - 4 R (3 0 X 3 0 ) W1 1 - 2 A (3 6 X 3 6 ) W1 1 - 2 A (3 6 X 3 6 ) W1 6 - 7 P R (2 0 X 1 6 ) W1 6 - 7 P R (2 0 X 1 6 ) AH E A D W1 6 - 9 P (2 4 X 1 2 ) AH E A D W1 6 - 9 P (2 4 X 1 2 ) W1 1 - 2 (3 0 X 3 0 ) W1 1 - 2 (3 0 X 3 0 ) W3 - 1 A (3 0 X 3 0 ) CROSSWALK PER DETAIL WC-9005 ON SHEET C1.01 SHEET B o l t o n & M e n k , I n c . 20 2 6 , A l l R i g h t s R e s e r v e d c H: \ S C N D \ 2 5 X 1 4 0 7 3 5 0 0 0 \ C A D \ C 3 D \ P e d e s t r i a n C r o s s i n g D W G s \ 1 4 0 7 3 5 C 7 0 1 . d w g 5/ 1 3 / 2 0 2 6 1 2 : 2 6 : 0 8 P M DESIGNED DRAWN CHECKED CLIENT PROJ. NO. ISSUED FOR DATENO.SCANDIA, MINNESOTA OLINDA TRAIL N (CSAH 3) PEDESTRIAN CROSSING 25X.140735.001 0 QUOTE 05/19/20263507 HIGH POINT DRIVE NORTH BLDG. 1 - SUITE E130 OAKDALE, MN 55128 Phone: (651) 704-9970 Email: Oakdale@bolton-menk.com www.bolton-menk.com R R C7.01 SIGNAGE AND STRIPINGFEETSCALE 0 25 50 HORZ. NOTES: 1.ADVANCED NOTIFICATION SIGNAGE IS REQUIRED TO BE PLACED AT EACH END OF THE STREET 7 DAYS PRIOR TO THE START OF CONSTRUCTION. 2.THE CONTRACTOR SHALL PROVIDE ACCESS FOR RESIDENTS AND DELIVERY PERSONNEL AT ALL TIMES DURING CONSTRUCTION. 3.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM AND BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE MN MUTCD. 4.ALL TRAFFIC CONTROL DEVICES SHALL HAVE RETROREFLECTIVE SHEETING. 5.THE CONTRACTOR SHALL FURNISH, INSTALL, MAINTAIN AND REMOVE ALL TRAFFIC CONTROL UPON COMPLETION OF WORK. 6.THE CONTRACTOR WILL BE REQUIRED TO REMOVE STRIPING AS NEEDED PRIOR TO COMPLETING THE CROSSWALK ON OLINDA TRAIL N (CSAH 3). ALL STRIPING REMOVAL COSTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR CROSSWALK INSTALLATION 7.THE CONTRACTOR WILL BE REQUIRED TO FLAG CONSTRUCTION OPERATIONS, AS DIRECTED BY THE ENGINEER ON ALL COUNTY STREETS.