Loading...
10.e Public Works Staff-Report Staff Report Date of Meeting: 05/19/2026 For: Mayor and City Council From: Charles Fischer – Director of Public Works Subject: PW - Staff Report Roads/ ROW Extensive pot hole filling was competed on 240th St between Olinda Trail and Hwy 95. This stretch of roadway is shared with Franconia Township and is slated to be reconstructed in 2027. Additional ROW repairs are scheduled to be complete after the last heavy rain event of 2” a few weeks ago. Areas that were still soft from the spring eroded where water collected and ran off the road surface. The spring Calcium Chloride applications are complete. Parks The Wayne Erickson field spring maintenance was completed prior to the first rental of the season. Each spring the field is visually looking better, but the infield will need additional material added by the end of this season or in the spring next year. An estimate of around 100 tons of material will need to be hauled in to rebuild the crown in the infield and added to shallow areas where field mix is at minimal depth to continue maintenance. Sewer Public Works responded to an alarm in the Bliss system on a residential property and found a failed pump. The tanks were pumped down and the new pump was installed the next morning. Residents continue to have questions about who is paying for individual repairs and pumping. Public Works will send out another mailer with an upcoming billing cycle to remind users of our system maintenance responsibilities and emergency contacts when there is an alarm or concern with the system serving their property. Equipment The public work loader is down and in for repair of the axle. The shift linkage failed and caused damage within the gear box. The equipment repair budget will be impacted greatly with this repair. Final costs are to be determined. Although the repair line item will be impacted the overall general public works budget will be able to absorb the cost.