10g. City Administrator Report1
Staff Report
Date of Meeting: July 21, 2026, City Council Meeting
To: Mayor and City Council
From: Kyle Morell, City Administrator
Re: City Administrator Report
2026 Scandia Wetland Trail Project
The City’s LCCMR proposal was selected to move forward in the review process. I presented it to the
LCCMR committee on June 28. The Committee met on July 31 to determine funding amounts for all
projects. The City received $907,000 of the $998,000 it requested. The project was funded with the
passing of the LCCMR bill last month. Council approved the design and engineering of the trail
network at the September meeting.
Bids were opened on Wednesday, March 11. The bids came in under the engineer's estimate, which
bodes well for the City’s plans to install a parking lot at the tee ball field. The project is scheduled for
construction in 2026. The preconstruction meeting is scheduled for the week of April 20, with work
beginning the last week of April or the first week of May.
The sidewalk along Olinda was poured this week. Trail paving was completed in May. The boardwalk
will be installed in early 2027.
The City Engineer will have the most up-to-date project report for you at the meeting. Once the pay
request is approved, the City will apply for reimbursement from the DNR.
Bliss Sewer Project
The City has been awarded 80% grant funding for the project. The remaining 20% will be a low-interest
loan from the Clean Water Revolving Fund. The project was put out for bid in January. Bid opening
was pushed back to February 18. The low came in under the engineer’s estimates. The City has held the
preconstruction meeting. Work will begin in May, with infrastructure installation. The project will be
finished in the fall when the new building arrives.
The City Engineer will have the most up-to-date project report for you at the meeting. Council approved
the GO Bond to cover the loan portion of the project award on their July Work Session. The City has
1
applied for its first draw from PFA. This draw will reimburse the City for the contractor's first pay
request and engineering on the project dating back to April of 2021.
Gateway Trail Project
Contracts have been signed. Utilities are being relocated. Notice of this work was sent to the property
owners on Friday, unfortunately, not before markings began. The trees within the easement were cut in
the last week of March. The preconstruction meeting was held on April 15. Work on clearing the
easement will begin in May. Country Road 52 was closed on June 8 for the road realignment and tunnel
installation. It will remain closed all summer and reopen in September.
The City will seek to secure short-term financing to fund the project at its June Council meeting. The
LCCMR funds are reimbursable, and the City does not have sufficient funds to make timely payments to
the contractors while awaiting reimbursement from the State. A short-term loan will be needed to
bridge the financial gap. I will have more information on this in May.
The Council will be asked to approve short-term financing for the Gateway Project at Tuesday night's
meeting. That financing will be used to pay the contractor while the City waits for reimbursement from
LCCMR. Peterson Companies will have its full crew on site to begin work on the trail on May 18.
Oakhill Road (CR 52) will be closed from June 8 through Labor Day for tunnel installation and road
realignment.
July 15 Update from Engineer
Peterson Companies started grading the North side of the road from 0+00 – 3+00. They are currently
building this section of the road back up with select granular and aggregate base
JP Concrete has poured the North headwalls face around the box culvert along with the second and
fourth 27’ sections of the wall going NW. They will be pouring the remaining North headwall
sections this Friday
Peterson Companies has continued working on cutting and capping the sheet piles. They are 80%
complete with this now
Peterson Companies placed the 36” RCP at station 13+00
The South box culvert excavation will start tomorrow
July 7 Update from Engineer
Peterson Companies started grading the trail down to subgrade grade this week. They have graded
from roughly station 48+00 – 39+00. They will farm this material as needed to help it dry out
JP Concrete has now poured all of the North headwall footing and the bearing ledge that the box
culvert is placed on. A couple more sections of the North headwall will be poured later this week
Peterson Companies will cut and cap the sheet piles on site to grade this week
Peterson Companies is placing the box culvert at station 14+50 for this project today. The last
section of the wall will be placed after it has been cut to the correct length
The South box culvert excavation will start either later this week or early next week
Pay application 2 for this project is finalized and ready for payment at July’s council meeting
The City Engineer will have the most up-to-date project report for you at the meeting. Once the pay
request is approved, the City will apply for reimbursement from the DNR.
1
Right-of-Way Planting Exemption Permit
Staff is still working on this document. We should have something in the coming months.
2027 Budget
Staff continues to work on the 2027 budget. The Capital Improvement Committee will meet on July 23
to review those funds. A draft preliminary budget will be presented to Council in August.