Loading...
10.c3 2050 Comp PlanMemo July 21, 2026 Mayor Kronmiller and Members of the City Council Kyle Morell, City Administrator City of Scandia 14727 209th St. N. Scandia, MN 55073 RE: Proposal for Planning Assistance – 2050 Comprehensive Plan Update Dear Mayor Kronmiller, Members of the City Council, and Administrator Morell : The City of Scandia is seeking a scope of work for preparation of the 2050 Comprehensive Plan. With our extensive experience and deep understanding of municipal planning, we are ready to help Scandia navigate the process and deliver a practical, useful document that will guide land use and infrastructure decisions for many years. Our commitment to creating safe, sustainable, and beautiful communities aligns with your city's vision. Scope of Work Bolton & Menk staff have facilitated, prepared, and implemented comprehensive plans for a variety of clients and for many decades. This scope provides a high level of what we can provide to Scandia with refinements made after we are chosen to complete the work. Assumptions This quote is based on the following assumptions: • The process will be led by city staff with review by the Planning Commission during its regular meetings. • Community engagement is not included in the scope, but options have been provided that can be selected and incorporated. • Specific system plans/technical analyses, such as Parks Plan, Utility Plans, or Transportation Plans, are separate documents and are not part of this proposal. • The scope does not include high-level visioning but rather is an update to the existing plan to meet the minimum requirements established by the Metropolitan Council. • The existing 2040 Comprehensive Plan will be used as a starting point for the updated document and portions that can be reused will be updated and incorporated into the new document to minimize the cost to the city. Task 1: Project Initiation and Project Management Project Kickoff: The Bolton & Menk project team will attend a project kickoff meeting with the City of Scandia staff to discuss the needs and finalize the scope of work. 2050 Comprehensive Plan July 21, 2026 Page 2 Issue Identification: Understanding the issues and expectations of staff is essential in defining where our efforts should be focused. We expect the city staff as well as elected and appointed officials to provide insights and desired outcomes and any community-specific items to be considered. Project Management: This process involves regular coordination and updates to the staff, to review progress and provide direction. Planning Commission and City Council Review: We will provide updates of the chapters to the Planning Commission and City Council as part of their regular monthly meetings. We anticipate this will coincide with Bolton & Menk’s regular attendance of Planning Commission and City Council meetings and the time allotted for this task is for preparation of materials. Task 2: Community Engagement Community engagement services were removed from the scope and compiled as separate options. Once the City Council determines the desired community engagement, Bolton & Menk’s role will be incorporated into the agreed-upon scope. We can provide additional engagement such as additional commission meetings, an open house, or in-person pop-up events. Details on additional costs and timing will be discussed. At all of the in-person and online engagement opportunities, we can provide materials/handouts in other languages at additional cost. Depending on availability, we may also be able to have staff present to speak to residents in multiple languages if that is desired. Details on additional services and costs to be discussed. Task 3: Introduction, Goals, and Vision We will review the existing Comprehensive Plan and work with staff to identify any desired updates. We will have a discussion with Planning Commission and City Council to confirm the updated vision and goals. Task 4: Demographics We will draft a new chapter of demographics and community composition to meet minimum requirements of the Metropolitan Council. • Community Designation Map • Population Projections from Met Council • Employment Projections from Met Council • Demographic Profile (ethnicity, age, disabilities, poverty, vehicle access) Task 5: Land Use We will draft a new land use chapter that builds on the existing Comprehensive Plan to include minimum requirements of the Metropolitan Council. • Existing Land Use Map and Table • Future Land Use Map and Table 2050 Comprehensive Plan July 21, 2026 Page 3 • Description of Each Land Use Category with Density Range • Forecasted Growth Table with Density • Text to Support the Proposed Growth and How Growth will be Managed • Redevelopment and Infill Map and Table • Historic and Cultural Asset Inventory and Policies • Solar Resource Policy • DWSMA Review, Map, and Policies Task 6: Housing We will draft a new housing chapter to meet minimum requirements of the Met Council. • Housing Unit Affordability Table • Housing Type Table • Household demographics • Affordable Housing Need (determined by Met Council) • Map of Subsidized Housing Units and Summary • Housing Needs Narrative • Affordable Housing Opportunity Table • Housing Implementation Plan Task 7: Transportation We will draft a new transportation chapter to meet minimum requirements of the Metropolitan Council. • Functional Classification Map • Principal and Minor Arterial Map, Lanes, Volumes • Safety Analysis • Transit Map and Description • Biking Network Map • Climate and Natural Systems- Vehicle Miles Traveled Reduction Plan and Green House Gas Emission Reductions Plans • TAZ Map and Analysis Task 8: Water Resources – Wastewater We will draft a new wastewater chapter to meet minimum requirements of the Metropolitan Council. • Private Communal Treatment Systems Maps • Septic (SSTS) Map and Description/Management Task 9: Water Resources- Water Supply We will draft a new water supply chapter to meet minimum requirements of the DNR and Metropolitan Council. • DWSMA Table of Risks by Land Use 2050 Comprehensive Plan July 21, 2026 Page 4 • Water Resource Goals and Strategies • Private Well Information and Comment Response • Local Water Supply Plan Including Map and Future Growth • Water Supply Policies and Strategies • Water Demand Forecast and Differences • Future Demand Strategies and Improvements • Water Appropriation Description, Strategies, and Comments • Emergency Preparedness Task 10: Water Resources- Surface Water We will draft a new surface water chapter to meet minimum requirements of the Metropolitan Council. The City of Scandia last updated their Local Surface Water Management Plan in 2019. • Physical Environment + WMO Plans • Drainage Areas, Volume, Rates, and Rate Control • Problem Assessment • Implementation Plan/Program • Official Controls • Implementation Program - Schedule, Cost, Funding Source • CIP Table Task 11: Parks and Trails We will draft a new parks and trails chapter to meet minimum requirements of the Met Council. • Park/Trail Map and Description • CIP for Parks Task 12: Climate We will draft a new climate chapter to meet minimum requirements of the Met Council. • Greenhouse Gas Inventory Provided by Metropolitan Council • Minimum One Strategy for Reducing Greenhouse Gas Emissions from each Sector • Estimated Greenhouse Gas Emissions Impact for Each Strategy Using Metropolitan Council’s Provided Tool • Flood and Heat Vulnerability Assessment and Strategies • Strategies for Increasing Food System Resilience Task 13: Natural Systems We will draft a new natural systems chapter to meet minimum requirements of the Met Council. • Map of Natural Systems • Opportunities for Protections • Protection Improvement Goals 2050 Comprehensive Plan July 21, 2026 Page 5 • Protection Strategies for Goals Task 14: Implementation We will draft a new implementation chapter to meet minimum requirements of the Met Council. • Identified City Code Changes • Zoning Map and Category Descriptions • CIP • Local Controls Task 15: Preliminary Submittal, Public Comment and Plan Revisions We will submit the draft plan to the Metropolitan Council for a preliminary review. We have budgeted 38 hours for plan revisions and to address Metropolitan Council comments prior to the public comment period. We will then review and respond accordingly to public comments. Task 16: Plan Adoption Public Comments: This process involves final adoption of the plan. We will prepare adjacent and affected jurisdiction review materials. We will respond to public comments. Accessibility: Bolton & Menk staff will endeavor to use best practices for document accessibility. However, additional accessibility considerations may be desired for maps and tables found in the plan. Converting those documents into an accessible format will add to the cost of this effort. We are happy to amend the scope to address accessibility however it is desired by the community. Planning Commission Public Hearing: Bolton & Menk staff will attend a public hearing at the Planning Commission to present the final draft 2050 Comprehensive Plan and to answer questions. City Council Approval: Bolton & Menk staff will attend the City Council meeting to present the final draft 2050 Comprehensive Plan and answer questions. Estimated Fees Bolton & Menk estimates the fee to complete the above scope of work is approximately $82,000. A breakdown of the estimated hours and fee is as follows: Task 1: Project Initiation and Management 60 hours $9,980 Task 2: Community Engagement 0 hours $0 Task 3: Introduction, Goals, Vision 14 hours $1,920 Task 4: Demographics 19 hours $2,609 Task 5: Land Use 61 hours $8,849 Task 6: Housing 29 hours $4,029 Task 7: Transportation 53 hours $10,080 Task 8: Water Resources – Wastewater 47 hours $7,748 2050 Comprehensive Plan July 21, 2026 Page 6 Task 9: Water Resources – Water Supply 28 hours $4,169 Task 10: Water Resources – Surface Water 52 hours $8,369 Task 11: Parks and Trails 37 hours $5,305 Task 12: Climate 18 hours $2,631 Task 13: Natural Systems 25 hours $3,650 Task 14: Implementation 31 hours $4,964 Task 15: Preliminary Submittal, Public Comment, and Plan Revisions 38 hours $6,094 Task 16: Plan Adoption 12 hours $1,740 Total Estimate 524 hours $82,137 In recognition of the continued partnership between Bolton & Menk’s Planning team and the City of Scandia, we offer a $5,000 fee reduction. We hope that shows our appreciation for the opportunity to do this work and for the great collaboration we enjoy with the city’s team. Additionally, Bolton & Menk is pleased to offer that if the scope and fee are agreed upon, this work can be performed without an additional contract through our existing contract for On -Call Planning Services as an Additional Service. Bolton & Menk will tr ack the project separately from the ongoing planning and zoning work done with the city for ease of fee tracking and invoicing. The agreed upon scope would be established as an amount not to exceed and would be billed monthly. Thank you for the opportunity to provide these services to the City. I will serve as your project manager on this project. Please feel free to contact me with any questions. I can be reached at (651) 506-7474 or TJ.Hofer@bolton-menk.com. Sincerely, T.J. Hofer Planner II BOLTON & MENK, INC. Cc: Jeff Matzke, Community Planning Project Manager– Bolton & Menk Attachments A. Scope of Work B. Community Engagement Options Client: City of Scandia Project: 2050 Comprehensive Plan Task No.Work Task Description Pr i n c i p a l / C S M Pr o j e c t Ma n a g e r / S r . Pl a n n e r Pl a n n e r En g a g e m e n t Sp e c i a l i s t GI S Tr a n s p o r t a t i o n Pl a n n e r Wa t e r Re s o u r c e s Sr . T r a f f i c En g i n e e r La n d s c a p e Ar c h i t e c t u r e - Pa r k s Su s t a i n a b i l i t y Pr o j e c t M a n a g e r Pl a n n e r / E n v i r o n me n t a l P l a n n e r (s u s t a i n a b i l i t y ) Wa s t e w a t e r Total Hours Total Cost 1.0 Project Management 8 29 23 0 0 0 0 0 0 0 0 0 60 $9,548 2.0 Community Engagement 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 3.0 Introduction, Goals, and Vision 0 4 10 0 0 0 0 0 0 0 0 0 14 $1,916 4.0 Demographics 0 3 12 1 3 0 0 0 0 0 0 0 19 $2,546 5.0 Land Use 0 17 31 1 12 0 0 0 0 0 0 0 61 $8,578 6.0 Housing 0 6 18 1 4 0 0 0 0 0 0 0 29 $3,942 7.0 Transportation 0 8 8 1 4 26 0 2 0 1 2 1 53 $10,018 8.0 Water Resources - Wastewater 0 7 2 1 1 0 25 0 0 0 1 10 47 $7,929 9.0 Water Resources - Water Supply 0 5 10 1 1 0 11 0 0 0 0 0 28 $4,258 10.0 Water Resources - Surface Water 0 7 2 1 1 0 41 0 0 0 0 0 52 $8,790 11.0 Parks and Trails 0 7 13 1 2 0 0 0 9 0 0 1 33 $4,691 12.0 Climate 0 4 9 1 2 0 0 0 0 1 1 0 18 $2,578 13.0 Natural Systems 0 5 12 1 4 0 0 0 0 1 2 0 25 $3,563 14.0 Implementation 1 14 11 1 0 1 1 0 1 1 0 0 31 $4,867 15.0 Preliminary Submittal, Public Comment and Plan Revisions 1 8 12 0 4 4 4 1 4 0 0 0 38 $6,026 16.0 Plan Adoption 0 5 7 0 0 0 0 0 0 0 0 0 12 $1,724 Total Hours 10 129 180 11 38 31 82 3 14 4 6 12 520 Average Hourly Rate $212.00 $174.00 $122.00 $134.00 $142.00 $222.00 $172.00 $238.00 $144.00 $205.00 $161.00 $173.00 Subtotal $2,120 $22,446 $21,960 $1,474 $5,396 $6,882 $14,104 $714 $2,016 $820 $966 $2,076 Total Fee $80,974 Detailed Cost Estimate Bolton & Menk, Inc. Client: City of Scandia Project: 2050 Comprehensive Plan Type of Public Engagement Total Hours Total Cost On-line survey (SurveyMonkey Results only, no analysis) 14 $2,132 Survey Analysis 10 $1,304 On-line storymap on website 10 $1,536 Community Engagement Plan and coordination 12 $1,834 Content Materials for Events, website (Meeting in a Box) 18 $2,728 Special Area Concept Plan Engagement 26 $3,722 Input ID (online mapping and comments) 27 $4,120 Stakeholder Meetings/Workshops (3) 33 $4,671 Public Engagement Options