Loading...
05.b PW Report - Wayne Erickson Maintenance Staff Report Date of Meeting: 9/14/2026 For: PRC From: Charles Fischer – Director of Public Works Subject: Wayne Erickson Tour Questions Public Works has been requested to answer a few concerns from the PRC Tour which took place at the Wayne Erickson Ballfield earlier this year. Below is the list of concerns and responses: 1. Noticed disrepair to concession stand The storage building ‘concession stand’ is on our schedule to be power washed and painted. This building is no longer a concession stand as it does not meet any food sale or prep code requirements. Public Works has been requesting a pavilion/storage garage be built at this location and to be included in the CIP within the next five years. We will keep this current building usable as a storage space until a more suitable structure is budgeted for. 2. Conduit around bleachers and stand does shows wires/ Outlet on concession stand does not have cover The exterior outlets located on the building and behind the backstop bleachers have been repaired. 3. One corner of bleachers is balances on a blocks, should that be fixed? All of the bleacher systems rest on treated 2x4’s to separate the aluminum from the concrete surface below. 4. Players benches have heaved The players benches are heaved and due to the installation type and location between the two fences causes a difficulty in replacing the benches. Public Works has been searching for an alternative bench style and installation type and will complete the replacement when a better option is selected and rental equipment is available to complete the work.