9.e Discussion on proposals for patchingBolton & Menk is an equal opportunity employer.
\ NOTES:
\ 1. PROJECT LIMITS WILL BE MARKED BY THE CITY.
r+
2.
PROVIDE 48 HOUR NOTICE PRIOR TO STARTING
WORK TO ALLOW TIME FOR CITY TO MARK
In
PROJECT LIMITS.
rt
3.
4.
FILL RUTS WITH PAVER -LAID LEVELING COURSE.
COMPACT LEVELING COURSE WITH PNEUMATIC
z
= TIRED ROLLER.
BITUMINOUS PATCH
0
TYPE SP 9.5 WEARING COURSE MIXTURE (2,8) [SPWEA230B].
2" TYPE SP 9.S WEARING COURSE MIXTURE (2,B) I5PWEA230BI
6" CLASS 5 AGGREGATE BASE
A TYPICAL SECTION
CLASS 5 AGGREGATE BASE E", PAVE 3.5"
LOCATION MAP
adowk rook Ave. N.
LEVELING COURSE
(NO,RTHBOUND LANE ONLY)
EVELING 0 RSE
NORTHBOUND LP
c%
L
a --F
Ln
M
fV
N
rt
Z
BITUMINOUS PATCH
CITY OF SCANDIA FIGURE 1
2017 PATCHING PROJECT
I -E FEET
H:\SCND\N13113789\CAD\C3D\2017 PATCHING -SCAN DIA.DWG DATE: 4/28/2017 COMM:
N
W
01
i
ui
cn
m
D
Ln
+-+
00
M
N
LOCATION MAP
CITY OF SCANDIA
2017 PATCHING PROJECT
H:\SCND\N13113789\CAD\C3D\2017 PATCHING -SCAN DIA.DWG
DATE: 4/28/2017 COMM:
m
CONSTRUCTION JOINT
COURSE + 1.5" OVERLAY
�Q
Z
LJ
Q
J
0
J
O
FIGURE 2
NOTES:
1. PROJECT LIMITS WILL BE MARKED BY THE CITY.
z
J
2. PROVIDE 48 HOUR NOTICE PRIOR TO STARTING
O
WORK TO ALLOW TIME FOR CITY TO MARK
L1J
PROJECT LIMITS.
>
M
3. FILL RUTS WITH PAVER -LAID LEVELING COURSE.
Q
!�
4. COMPACT LEVELING COURSE WITH PNEUMATIC
z
TIRED ROLLER.
Q
5. MILL 1.5" DEEP - 4' WIDE CONSTRUCTION JOINT
J
AT EACH END OF OVERLAY TO TIE INTO EXISTING
0
BITUMINOUS.
z
6. OVERLAY WITH 1.5" WEARING COURSE
(SP W EA230B).
LOCATION MAP
CITY OF SCANDIA
2017 PATCHING PROJECT
H:\SCND\N13113789\CAD\C3D\2017 PATCHING -SCAN DIA.DWG
DATE: 4/28/2017 COMM:
m
CONSTRUCTION JOINT
COURSE + 1.5" OVERLAY
�Q
Z
LJ
Q
J
0
J
O
FIGURE 2