Loading...
8.f Public Works report -May 2017Public Works Staff Report — May 2017 Roads and Right — of - way ➢ ROW mowing —Y2 completed ➢ Log House Landing — removed soil from drainage swale and dam areas — graded and compacted the road ➢ Haul gravel - Pilar, Paris, Perkins, Oak Hill Way — graded in preparations for dust control ➢ Guard rail weed management ➢ Patching: 240th, 195th, Orwell, Orwell Ct., Meadowbrook, Nolan, 230th, Ogilvie, 230th, 228th ➢ Crack sealing completed by contractors ➢ Mack Truck in for service — DEF system — valves clogged - $1000+ in repairs ➢ Sterling - $1,500 in repairs — alternator, Starter, and cables ➢ Reflectors posted at the end of 205th so boat Launchers don't run into the boulders ➢ Storm drain casting switch — Beehive form installed on Melanie — Other casting was backing up water causing water to flow over the road ➢ Dust control completed by the contractor ➢ Remove tree logs from ROW 195th ➢ Trees down across Rds.: 205th Sam, Pomroy - 11:45 am 5-18-17 Sewer — Water: ➢ Sewer samples for May 2017 were taken at Bliss and Uptown ➢ Uptown Monthly water meter readings were completed ➢ New pump installed @18490 Norell ➢ 17 Gopher State One Call locate requests ➢ Valves switched at the Bliss drain field and sand field to allow others to rest Parks: ➢ Trash cans out to Park facilities for the summer ➢ Buckthorn control of re -sprouting in areas where removed this spring ➢ Monthly Playground Insp. / Skate Park Insp. ➢ Bolens tractor is back — Bad coils - $500 in repairs ➢ WIP — Signage installed — Park Boundary and not a hiking trail signs, Corrections made to the main sign to help keep visitors from trespassing ➢ Rubber repairs to the play set platform ➢ Rotted Boards replace on the bleachers at the lighted field by a contractor ➢ 1 Hay Lake rental ➢ New Mower arrived — Staff thanks the council again for the purchase ➢ WIP - tree removal from the path ➢ Turf Mowing — Seasonal staff has made it through the route twice in May Other: ➢ Monthly maintenance /safety checks done —emergency lights, fire extinguishers, chains, hoist, ladders, eye wash stations and showers. ➢ Safety training 5-10-17 — Monthly training through Safe Assure — Load securement, tie downs, trenching and working around equipment ➢ Right to know training completed for all staff ➢ PT summer staff safety training completed C:\USERS\ADAM\DOCUMENTS\STAFF REPORTS\2017 STAFF REPORTS\MONTHLY STAFF REPORT -APRIL 2017.DOCX