4.a 11 Scandia C6 SWPPP 2 of 2L a I 0 C: ro U I r\ 00 N i c a� E I U 0 i Y i L v A 1 O Ln O N SWPPP NOTES 1. PROJECT DESCRIPTION - THE NATURE OF THIS PROJECT WILL CONSIST OF ADDING ONTO AN EXISTING SCHOOL, ROAD CONTINUATION AND ASSOCIATED UTILITIES. 2. SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS: 1. INSTALL VEHICLE TRACKING BMP & CONCRETE WASHOUT 2. INSTALL SILT FENCE AS SHOWN 3. STRIP AND STOCKPILE TOPSOIL 4. GRADE SITE 5. INSTALL UTILITIES & STORM WATER MANAGEMENT DEVICES 6. FINAL GRADE SITE & REMOVE SEDIMENT FROM BASIN/INLETS 7. INSTALL THE BITUMINOUS & CONCRETE WORK 8. SEED AND MULCH AND LANDSCAPING 9. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL. 3. SITE DATA: TOTAL DISTURBED AREA: 2.5 AC PRE -CONSTRUCTION IMPERVIOUS AREA: 0.3 AC POST -CONSTRUCTION IMPERVIOUS AREA: 0.5 AC AREA OF DISTURBANCE: 2.5 AC GENERAL SOIL TYPE: HSG B, FROM SOILS BORING LOGS & GE-OTECH SOIL SURVEY, SILTY SAND WITH CLAYEY SAND BELOW AND SANDY LEAN CLAY BELOW THE CLAYEY SAND 4. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS. 5. ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7) OR MORE DAYS SHALL BE STABILIZED BY SEEDING OR SODDING (ONLY AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT CONTROL MEASURE. AT A RATE nF 1.5 TIMES STANDARD SEEDING FINAL STABILIZATION TO BE DONE PER LANDSCAPE PLAN, SEE SHEET 1-1-1. 6. ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET. DENOTES SLOPES GREATER THAN 3:1. ALL 3:1 SLOPES TO BE STABILIZED WITH EROSION CONTROL BLANKET 7. ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE ARE STABILIZED. 8. TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT AMOUNT nF SILT, CLAY, OR ORGANIC COMPOUNDS ARE EXEPMT EX: CLEAN AGGREGATE STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES. 9. SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF NOT POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE B M P'S. 10. SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 11. THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR INSPECTIONS OR AS -BUILT DRAWINGS VERIFYING PROPER CONSTRUCTION OF THE BMPS. 12. THE -OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE AND IS RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR (CONTRACTOR) WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE FOR PARTS II.B., PART II.C, PART II.B-F, PART V, PART IV AND APPLICABLE cnNSTRUCTinN ACTIVITY REQUIREMENTS FOUND IN APPENDIX A, PART C. OF THE NPDES PERMIT AND IS JOINTLY RESPONSIBLE WITH THE -OWNER FOR COMPLIANCE WITH THOSE PORTIONS OF THE PERMIT. 13. TERMINATION OF COVERAGE -PERMITTEES) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ONE OR MORE OF THE FOLLOWING CONDITIONS HAVE BEEN MET: A. FINAL STABILIZATION, PER NPDES PERMIT PART IV.G. HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE. B. TRANSFER OF OWNERSHIP AS DESCRIBED IN THE PERMIT. 15. INSPECTIONS A. INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS REQUIRED. B. EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24 HOUR RAIN EVENT. C. STABILIZED AREAS: ONCE EVERY 30 DAYS D. FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION. E. INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING OF THE NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S) CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR PERIOD. 16. MINIMUM MAINTENANCE A. SILT FENCE TO BE REPAIRED, REPLACED, SUPPLEMENTED WHEN NONFUNCTIONAL, OR 1/3 FULL; WITHIN 24 HOURS B. SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE VOLUME. REMOVAL MUST BE COMPLETE WITHIN 72 HOURS OF DISCOVERY. C. SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN DAYS D. CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED WITH 24 HOURS. E. PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER FOR ALL EVENTS GREATER THAN %" IN 24 HOURS 17. THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL CONTROL OF THE SITE. 18. OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS, AND REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES NOTICE OF TERMINATION. 19, SWPPP MUST BE AMENDED WHEN: A. THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE B. INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING WATER QUALITY STANDARDS. C. THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES nR IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT. D. AT ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE, THE MPCA MAY DETERMINE THAT THE PROJECT'S STORMWATER DISCHARGES MAY CAUSE, HAVE REASONABLE POTENTIAL TO CAUSE, OR CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE SWPPP DOES NOT INCORPORATE THE APPLICABLE REQUIREMENTS IN PART III.A.8., (IMPAIRED WATERS AND TMDLS). IF A WATER QUALITY STANDARD CHANGES DURING THE TERM OF THIS PERMIT, THE MPCA WILL AKE A DETERMINATION AS TO WHETHER A MODIFICATION OF THE SWPPP IS NECESSARY TO ADDRESS THE NEW STANDARD. IF THE MPCA MAKES SUCH DETERMINATION(S) OR ANY OF THE DETERMINATIONS IN PARTS III.B.1.-3., THE MPCA WILL NOTIFY THE PERMITTEE(S) IN WRITING. IN RESPONSE, THE PERMITTEE(S) MUST AMEND THE SWPPP TO ADDRESS THE IDENTIFIED CONCERNS AND SUBMIT INFORMATION REQUESTED BY THE MPCA, WHICH MAY INCLUDE AN INDIVIDUAL PERMIT APPLICATION. IF THE MPCA'S WRITTEN NOTIFICATION REQUIRES A RESPONSE, FAILURE TO RESPOND WITHIN THE SPECIFIED TIMEFRAME CONSTITUTES A PERMIT VIOLATION. 20. CONCRETE WASHOUT A. CONTRACTOR TO PROVIDE PREFABRICATED CONCRETE WASH-OUT CONTAINER WITH RAIN PROTECTION PER PLAN. B. CONCRETE WASH-OUT TO BE IDENTIFIED WITH SIGNAGE STATING "CONCRETE WASHOUT AREA DO NOT OVERFILL". C. CONCRETE WASHOUT WATER NEEDS TO BE PUMPED WITHIN 24 HOURS OF STANDING WATER IN WASHOUT AREA. D. ALTERNATE: PORTABLE TRUCK MOUNTED PUMP RECOVERY SYSTEM, OR PORTABLE TRUCK MOUNTED PULL BEHIND WASH TANK. 21. IN THE EVENT OF ENCOUNTERING A WELL nR SPRING DURING CONSTRUCTION CONTRACTOR TO CEASE CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER. 22. PIPE OULTETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. 23. FINAL STABILIZATION FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACVTIVITIES HAVE BEEN COMPLETED AND THAT DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF THE EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. ALL TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT SHALL BE REMOVED FROM PERMANENT CONVEYANCES AND SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO DESIGN CAPACITY. 24. TEMPORARY SEDIMENTATION BASINS A. THE TEMPORARY SEDIMENTATION BASINS SHALL BE CONSTRUCTED AND MADE OPERATIONAL PRIOR TO DISTURBANCE OF 10 OR MORE ACRES DRAINING TO A COMMON LOCATION. B. TEMPORARY SEDIMENTATION BASINS ARE REQUIRED PRIOR TO RUNOFF LEAVING THE CONSTRUCTION SITE OR ENTERING SURFACE WATERS WHEN 10 OR MORE ACRES OF DISTURBED SOILS DRAIN TO A COMMON LOCATION. THE BASIN MUST PROVIDE 3,600 CUBIC FEET nF STORAGE BELOW THE OUTLET PER ACRE DRAINED. IF HYDRAULIC CALCULATIONS ARE AVAILABLE, THE TEMPORARY SEDIMENTATION BASIN MUST PROVIDE A STORAGE VOLUME EQUIVALENT TO THE 2 -YEAR, 24-HOUR STORM, BUT IN NO CASE LESS THAN 1800 CUBIC FEET PER ACRE DRAINED. THE TEMPORARY SEDIMENTATION BASIN MUST BE CONSTRUCTED AND MADE OPERATIONAL CONCURRENT WITH THE START OF SOIL DISTURBANCE UP GRADIENT OF THE POND. THE TEMPORARY SEDIMENTATION BASIN SHALL BE DESIGNED TO PREVENT SHORT CIRCUITING. THE OUTFALL SHALL BE DESIGNED TO REMOVE FL-OATABLE DEBRIS, ALLOW FOR COMPLETE DRAWDOWN OF THE POND FOR MAINTENANCE ACTIVITIES, AND HAVE ENERGY DISSIPATION. THE EMERGENCY SPILLWAY SHALL BE STABILIZED. C. TEMPORARY SEDIMENTATION BASINS SHALL BE SITUATED OUTSIDE nF SURFACE WATERS AND ANY REQUIRED BUFFER ZONE, AND MUST BE DESIGNED TO AVOID DRAINING WETLANDS, UNLESS THE IMPACT IS IN COMPLIANCE WITH THE REQUIREMENTS OF THIS PERMIT. D. EXCESSIVE SEDIMENT -LADEN WATER THAT IS NOT PROPERLY FILTERED WILL NOT BE PERMITTED TO DISCHARGE FROM SIRE. 25. DEWATERING AND BASIN DRAINING A. TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING SHALL BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. THE TEMPORARY OR PERMANENT BASIN MAY DISCHARGE TO SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT THE NUISANCE CONDITIONS WILL NOT RESULT FROM THE DISCHARGE. DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FROM EROSION AND PROPER VELOCITY DISSIPATION PROVIDED. B. ALL WATER FROM DEWATERING OR BASIN -DRAINING ACTIVITIES MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN THE RECEIVING CHANNELS OR ON DOWN SLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND. C. IF FILTERS WITH BACKWASH WATERS ARE USED, THE BACKWASH WATER SHALL BE HAULED AWAY FOR DISPOSAL, RETURNED TO THE BEGINING OF THE TREATMENT PROCESS, OR INCORPORATED INTO SITE IN A MANNER THAT DOES NOT CAUSE EROSION. BACKWASH WATER MAY BE DISCHARGED TO SANITARY SEWER IF PERMISSION IS GRANTED BY THE SANITARY SEWER AUTHORITY. 26. POLLUTION PREVENTION A. BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UNDER COVER TO PREVENT DISCHARGE OR PROTECTED BY AN EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. B. PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS MUST BE UNDER COVER. C. HAZARDOUS MATERIALS AND TOXIC WASTE MUST BE PROVIDED TO PREVENT VANDALISM. D. SOLID WASTER MUST BE STORED, COLLECTED AND DISPOSED OF IN COMPLIANCE WITH MINN. R. CH 7035. E. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R. CH 7041. F. DISCHARGE OF SPILLED OR LEAKED CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED SHALL BE PREVENTED USING DRIP PANS OR ABSORBENTS. SUPPLIES SHALL BE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD MUST BE AVAILABLE FOR RECOVERED SPILLED MATERIALS. 27. DESIGN CALCULATIONS SEE STORMWATER REPORT FOR INFILTRATION SYSTEM DESIGN. 28. CONSTRUCTION OF FILTRATION BASINS A. NO HEAVY TRAFFIC ON FILTRATION AREAS. CONSTRUCTION TO BE DONE WITH MINIMAL COMPACTION COMPACTION TO FILTRATION AREAS. IF COMPACTION IS ENCOUNTERED, BASIN SOILS FOR THE FIRST & MUST BE REMOVED & RELAID. B. INFILTRATION SYSTEMS MUST NOT BE EXCAVATED TO FINAL GRADE UNTIL THE CONTRIBUTING DRAINAGE AREA HAD BEEN CONSTRUCTED AND FULLY STABILIZED UNLESS RIGOROUS EROSIN PREVENTION AND SEDIMENT CONTROLS ARE PROVIDED(PART III.D.1.C.). C. WHEN AN INFILTRATION SYSTEM IS EXCAVATED TO FINAL GRADE (OR WITHIN THREE (3) FEET OF FINAL GRADE), THE PERMITTEE(S) MUST EMPLOY RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO KEEP SEDIMENT AND RUNOFF C-OMPLETELY AWAY FROM THE INFILTRATION AREA. THE AREA MUST BE STAKED -OFF AND MARKED SO THAT HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT WILL NOT COMPACT THE SOIL IN THE PROPOSED INFILTRATION AREA. D. Tn PREVENT CLOGGING OF THE INFILTRATION -OR FILTRATION SYSTEM, THE PERMITTEE(S) MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, SMALL SEDIMENTATION BASIN, nR WATER QUALITY INLET (E.G., GRIT CHAMBER) TO SETTLE PARTICULATES BEFORE THE STORMWATER DISCHARGES INTO THE INFILTRATION OF FILTRATION SYSTEM. 30. POST CONSTRUCTION - THE WATER QUALITY VOLUME THAT MUST BE RETAINED ON SITE BY THE PROJECT'S PERMANENT STORMWATER MANAGEMENT SYSTEM DESCRIBED IN PART III.D. SHALL BE ONE (1) INCH OF RUNOFF FROM THE NEW IMPERVIOUS SURFACES CRATED BY THE PROJECT. SEE PART III.D.1. FOR MORE INFORMATION ON INFILTRATION DESIGN, PROHIBITIONS AND APPROPRIATE SITE CONDITIONS. 31. RESPONSIBILITIES A. THE OWNER MUST IDENTIFY A cnNTRACTOR WHO WILL -OVERSEE THE SWPPP IMPLEMENTATION AND THE PERSON RESPONSIBLE FOR INSPECTION AND MAINTENANCE: B. THE OWNER MUST IDENTIFY THE A PERSON WHO WILL BE RESPONSIBLE FOR LONG TERM OPERATIONS AND MAINTENANCE OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM: 32. TRAINING REQEMENTS - THE PERMITTES(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE BEEN TRIANED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS. 1. WHO MUST BE TRAINED: 1.1. INDIVIDUAL(S) PREPARING THE SWPP FOR THE PROJECT 1.2. INDIVIDUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWWP AND INDIVIDUALS(S) PERFORMING INSPECTIONS AS REQUIRED IN PART IV.E. ONE OF THESE INDIVDUAL(S) MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA. 1.3. INDIVIDUAL(S) PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES. 2. TRAINING CONTENT: - THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THIS PERMIT FOR THE PROJECT. AT LEAST ONE INDIVIDUAL PRESENT ON THE PERMITTED PROJECT SITE (OR AVAILABLE TO THE PROJECT SIRE IN 72 HOURS) MUST BE TRAINED IN THE JOB DUTIES DESCRIBED IN PART III.F.1.B. AND PARTI I I. F.1.C. 3. THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA NPDES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFESHER-TREINING MUST BE ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS PERMIT. UNIVERSITY OF MINNESOTA William Sharbono Design of Construction SWPPP (May 31 2020) 33. LIST OF CONTACTS TILE NAME COMPANY PHONE NUMBER OWNER TBD FOREST LAKES SCHOOLS TBD PROJECT MANAGER VICKI VAN DELL LOUCKS ASSOCIATES 763-424-5505 SWPPP DESIGNER BILL SHARBONO LOUCKS ASSOCIATES 763-424-5505 CONTRACTOR TBD TBD TBD SITE MANAGER TBD TBD TBD * MPCA 24HR. HAZARDOUS SPILL HOTLINE: 651-649-5457 OF 80420798 NOTES: 1. PLACE BOTTOM EDGE OF FENCE INTO 6 IN DEEP TRENCH AND BACKFILL IMMEDIATELY. 2. POSTS SHALL BE: • 6 FT MAX. SPACING. • 2 IN X 21N HARDWOOD, OR STANDARD STEEL T -TYPE FENCE POSTS. • 5' MIN. LENGTH POSTS, DRIVEN 2 FT INTO THE GROUND. 3. ATTACH FABRIC TO WOOD POST WITH A MIN. OF 5, 1 INCH LONG STAPLES. 4. ATTACH FABRIC TO STEEL POST WITH A MIN. OF 3 ZIP TIES IN TOP 8 INCHES OF FABRIC. GEOTEXTILE FABRIC PER MNDOT 3886 f � 6" LE :R 886 6" I i _� c VVMJnw NOTES: 1. ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA -1 OR CA -2 COURSE AGGREGATE. (WASHED) 2. A GEOTEXTILE FABRIC MAYBE USED UNDER THE ROCK TO PREVENT MIGRATION OF THE UNDERLYING SOIL INTO THE STONE. LOUCKS PLATE No. In LoUCKS ROCK CONSTRUCTION 3003 ENTRANCE DRAWN 2/2016 1- In LOUCKS SIGN 0 15'(MIN) n M_ 24"X36"X3/4" PLYWOOD PAINT PLYWOOD FACE WHITE WITH 4"MIN. STENCILED LETTERS PAINTED BLACK 87REATED 4"X4" POST MIN. 2FT HIGH SOIL BERM 4 d WASHOU4EA'MU�T BE IMPERMEABLE. a CONTRACTOR TO CONSTRUCT APPROPRIATE MIN. 8" DIA IMPERMEABLE CONTAINMENT SYSTEM & I BID LOGS REMOVE/PUMP LIQUID ONCE THE LEVEL d EXCEEDS TWO-THIRDS OF THE SURROUNDING BARRIER Q Q d d a d � CONTRACTOR TO PLACE THE CONCRETE WASHOUT AREA NEAR THE CONSTRUCTION ENTRANCE MINIMUM DOUBLE STITCHED SEAMS ALL AROUND SIDE PIECES AND ON FLAP POCKETS FRONT, BACK, AND BOTTOM TO BE MADE FROM SINGLE PIECE OF FABRIC CONCRETE WASHOUT INLET SPECIFICATIONS AS PER THE PLAN DIMENSION LENGTH AND WIDTH TO MATCH FLAP POCKET -8 LOUCKS PLATE NO. 3005 DRAWN 2/2016 12" OVERFLOW HOLES 2„ (2" X 4" HOLE SHALL BE HEAT CUT INTO ALL FOUR SIDE PANELS) 1(2 FILTER BAG INSERT (CAN BE INSTALLED IN ANY INLET TYPE WITH OR WITHOUT A CURB BOX) NOTES: SEE SPECS. 2573, 3137, 3886 & 3891. MANUFACTURED ALTERNATIVES LISTED ON Mn/DOT'S APPROVED PRODUCTS LIST MAY BE SUBSTITUTED. 1O ALL GEOTEXTILE USED FOR INLET PROTECTION SHALL BE MONOFILAMENT IN BOTH DIRECTIONS, MEETING SPEC. 3886. O2 FINISHED SIZE, INCLUDING POCKETS WHERE REQUIRED SHALL EXTEND A MINIMUM OF 10 INCHES AROUND THE PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL. O3 INSTALLATION NOTES: 3.1. DO NOT INSTALL FILTER BAG INSERT IN INLETS SHALLOWER THAN 30 INCHES, MEASURED FROM THE BOTTOM OF THE INLET TO THE TOP OF THE GRATE. 3.2. THE INSTALLED BAG SHALL HAVE A MINIMUM SIDE CLEARANCE OF 3 INCHES BETWEEN THE INLET WALLS AND THE BAG, MEASURED AT THE BOTTOM OF THE OVERFLOW HOLES. 3.3. WHERE NECESSARY THE CONTRACTOR SHALL CLINCH THE BAG, USING PLASTIC ZIP TIES, TO ACHIEVE THE 3 INCH SIDE CLEARANCE. FLAP POCKETS SHALL BE LARGE ENOUGH TO ACCEPT WOOD 2 INCH X 4 INCH OR USE A ROCK SOCK OR SAND BAGS IN PLACE OF THE FLAP POCKETS. MARTIN PE VZNER ENGINEERING 8o3o Old Cedar Ave. S Bloomington, MN 55425 Voice: 952"854-r876 Fax; 952-854"1948 KRECH, O'BRIEN, MUELLER & ASSOCIATES, INC architecture Structural Engineering Interior Desig 6115 Cahill Avenue Inver Grove Heights Minnesota 55076 651.451.4605 fax 651.451 .0917 kornainc(@komainc.com . LroucKs PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. I hereby certify that this plan, specification or report was prepared by me or under my sof ion and that I am a duly Licen es I En r under the laws of the at f M n sota A ' c J ell - PE 1v is o. 41352 Date 6/19/17 CITY SUBMITTAL Z N O ,L P:O PROJECT: 16174 DRAWN BY: GAJ CHECKED BY: VJV DATE: 6/20/2017 REVISIONS: 6/19/17 Bid Pack 1 6/20/17 City Submittal LOUCKS PLATE NO. LOUCKS PLATE NO. SWPPP In DUCKSSILT FENCE 3000 min LQUCKS INLET PROTECTION - 3013 PRE -ASSEMBLED OR MACHINE SLICED FILTER BAG INSERT 2 OF 2 DRAWN 2/2016 DRAWN 2/2016 Cu