4.a 12 Scandia C7 Utility Plan27
i
0
:_
fuU
V)
i
N
00
N
In
;_
I
U
O
0
i
L
U)
'i
5 -
CL
0
d -
Ln
r,
1-40
N
TCI
State Highway No. 97
d
Scandia Trail North
FES E W/RIPRAP
-c,-INV-102715
`1 I TEL ML
TEL TEL ALL a
TEL TEL TEL-
*'TR 5"TR
• s"TR • 4"TR
TR �Ak"TR �Ak"TR x
TR „I" �rx x x x
x�x x
x x x
INV -1029.06 II
17 I
INV -1029.67
6"TR
10 �
LANDSCAPE 1 2 �
11 •2"T
• 4"TR • 4 TR
132"TR
132"TR
INV -1031.05
INV=1031.52
TEl T& Ta TEL TEL
393' 18" HDPE @ 0.44% TEL
�- x x _ x -
OCS
RIM=1032.30
INV=1029.38
79'- 6" PVC
PERFORATED
DRAINTILE
INV=1029.38
FPS W/RIP RAP D
35' 18" HDPE @ 0.25
15" NYLOPL
RIM -1037.5
INV -1032.9e)
UU IL I IVI L �_ U.UIAQ
15" NYLOPLAST CB
RIM -1037.5
I NV -1032.96
88' 15" HDPE @ 0.32%
15" NYLOPLAST INLET
RIM -1037.5
INV -1032.75
64' 12" HDPE @ 0.44%
v
oIII I I 138' T6" DRAIN
YTR 10"TRs'TR �ILE @ 1.0%-
15 NYLOPLAST CB
RIM -1037.5
+ STMH
RIM -1036.62 INV -1033.04
INZ028.82 12'PVC« << /g
/ 6"TR
6"TR
UTILITY NOTES
L'
BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS ASSOCIATES.
2.
ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED
<
0�6 <
� MH 1036.40
STANDARD UTILITIES SPECIFICATION OF THE CITY ENGINEERS ASSOCIATION OF
INV_1032.20
1
J
r
)0�5�
6
4.
J,lp"TR
132"TR
132"TR
INV -1031.05
INV=1031.52
TEl T& Ta TEL TEL
393' 18" HDPE @ 0.44% TEL
�- x x _ x -
OCS
RIM=1032.30
INV=1029.38
79'- 6" PVC
PERFORATED
DRAINTILE
INV=1029.38
FPS W/RIP RAP D
35' 18" HDPE @ 0.25
15" NYLOPL
RIM -1037.5
INV -1032.9e)
UU IL I IVI L �_ U.UIAQ
15" NYLOPLAST CB
RIM -1037.5
I NV -1032.96
88' 15" HDPE @ 0.32%
15" NYLOPLAST INLET
RIM -1037.5
INV -1032.75
64' 12" HDPE @ 0.44%
v
oIII I I 138' T6" DRAIN
YTR 10"TRs'TR �ILE @ 1.0%-
15 NYLOPLAST CB
RIM -1037.5
+ STMH
RIM -1036.62 INV -1033.04
INZ028.82 12'PVC« << /g
/ 6"TR
6"TR
UTILITY NOTES
1.
BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS ASSOCIATES.
2.
ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED
AND INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS, THE CITY AND THE
STANDARD UTILITIES SPECIFICATION OF THE CITY ENGINEERS ASSOCIATION OF
MINNESOTA (CEAM), 2013 EDITION. HDPE PIPE CONNECTIONS INTO ALL CONCRETE
STRUCTURES SHALL BE MADE WITH WATER TIGHT MATERIALS, UTILIZING AN A-LOK OR
WATERSTOP GASKET OR BOOT, CAST -IN-PLACE RUBBER BOOT, OR APPROVED EQUAL.
WHERE THE ALIGNMENT PRECLUDES THE USE OF THE ABOVE APPROVED WATERTIGHT
METHODS, CONSEAL 231 WATERSTOP SEALANT, OR APPROVED EQUAL WILL ONLY BE
ALLOWED AS APPROVED BY THE ENGINEER. ALL SANITARY SEWER MAIN LINE SHALL BE
SDR 35. ALL SANITARY SEWER SERVICES SHALL BE SDR 26.
3.
SEE SHEETS C8 AND THE CONTRACT SPECIFICATIONS FOR SPECIFIC UTILITY DETAILS AND
uEL
UTILITY SERVICE DETAILS.
- _ 4.
ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL
PER THE REQUIREMENTS OF THE CITY. ALL COMPACTION SHALL BE PERFORMED PER THE
REQUIREMENTS OF THE CEAM SPECIFICATION.
5.
THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48
HOURS PRIOR TO PERFORMING ANY EXCAVATION OR UNDERGROUND WORK.
6.
ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED
GRADES WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY
OWNERS. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS
REQUIREMENTS FOR TRAFFIC LOADING.
7.
PROPOSED PIPE MATERIALS:
7.1.
STIORM SEWER HDPE 12" - 24" DIAMETER.
8.
STORM SEWER PIPE SHALL MEET OF EXCEED AASHTO M294 MINIMUM PIPE STIFFNESS PER
ASTM D2412 60PS1 FOR 8"-18".
9.
PROPOSED GAS, TELEPHONE & ELECTRIC SERVICES ARE APPROXIMATE LOCATIONS ONLY.
COORDINATE EACH SERVICE WITH THE UTILITY OWNER AND GENERAL CONTRACTOR. IF
ANY PROPOSED SERVICE LOCATION VARY SIGNIFICANTLY OR CONFLICT, THE ENGINEER
MUST BE NOTIFIED PRIOR TO THE INSTALLATION OF THE SERVICE.
10.
THE REMOVAL OF EXISTING SERVICES WITHIN THE CONSTRUCTION LIMITS SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR AND UTILITY OWNER. ADDITIONAL
SERVICES MAY EXIST.
11.
ALL WATER SERVICES MUST BE INSTALLED AT A 7.5 -FT BURY DEPTH.
11.1.
INSULATE ALL CROSSINGS INVOLVING WATER AND SEWER.
UTILITY NOTES
1. PVC SANITARY SEWERS MUST MEET ONE OF THE FOLLOWING ASTM STANDARDS: D3034,
F789, D2665, OR F891. ASTM D2241 PIPE MAY BE USED FOR SEWERS 6 -INCH AND LARGER.
THE INSTALLATION MUST COMPLY WITH ASTM D2321, WHICH REQUIRES INSTALLATION BY
OPEN TRENCH ON A CONTINUOUS GRANULAR BED (SEE CURRENT MINNESOTA RULES,
PART 4714).
2. RCP STORM SEWERS MUST COMPLY WITH ASTM C76 (SEE CURRENT MINNESOTA RULES,
PART 4714).
3. HIGH-DENSITY POLYETHYLENE (HDPE) STORM DRAINS MUST COMPLY WITH CURRENT
MINNESOTA RULES, PART 4714:
3.1. PIPES 4 -INCH TO 10 -INCH IN SIZE MUST COMPLY WITH AASHTO M252.
3.2. PIPES 12 -INCH TO 60 -INCH IN SIZE MUST COMPLY WITH ASTM F2306.
3.3. ALL FITTINGS MUST COMPLY WITH ASTM D3212.
3.4. WATER -TIGHT JOINTS MUST BE USED AT ALL CONNECTIONS INCLUDING STRUCTURES.
INLET 4. ALL JOINTS AND CONNECTIONS IN THE STORM SEWER SYSTEM SHALL BE GASTIGHT OR
WATERTIGHT (SEE CURRENT MINNESOTA RULES, PART 4714). APPROVED RESILIENT RUBBER
JOINTS MUST BE USED TO MAKE WATERTIGHT CONNECTIONS TO MANHOLES,
CATCHBASINS, AND OTHER STRUCTURES.
5. WATER SERVICE LINES MUST BE INSTALLED AT LEAST 10 -FEET HORIZONTALLY FROM ANY
MANHOLE, CATCHBASIN, OR OTHER SOURCE OF CONTAMINATION, MEASURED FROM
OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (SEE
CURRENT MINNESOTA RULES, PART 4714).
6. THE BOTTOM OF WATER SERVICE PIPES LOCATED WITHIN 10 -FEET OF THE SEWER
CROSSING MUST BE AT LEAST 12 -INCHES ABOVE THE TOP OF THE SEWER. WHEN THIS IS
NOT FEASIBLE, THE SEWER PIPE MUST BE CONSTRUCTED OF MATERIALS LISTED IN
CURRENT MINNESOTA RULES, PART 4714. THE WATER SERVICE SHOULD NOT CONTAIN
ANY JOINTS OR CONNECTIONS WITHIN 10 -FEET OF A CROSSING.
7. ALL PORTIONS OF THE STORM SEWER SYSTEM LOCATED WITHIN 10 -FEET OF THE BUILDING
OR WATER SERVICE LINE MUST BE TESTED IN ACCORDANCE WITH CURRENT MINNESOTA
RULES, PART 4714.
MARTIN PE VZNER
ENGINEERING
8o3o Old Cedar Ave. S
Bloomington, MSI 55425
Voice: 952"854-1876
Fax: 952-854-1948
I IC�A
KRECH, O'BRIEN,
MUELLER & ASSOCIATES,INC
Architecture Structural Engineering Interior Desig
6115 Cahill Avenue
Inver Grove Height
Minnesota 55076
651.451.4605
fax 651.451.091
komainc@komainc.com
.. LOUCKS
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
CADD files prepared by the Consultant for this project are instruments
of the Consultant professional services for use solely with respect to
this project. These CADD files shall not be used on other projects, for
additions to this project, or for completion of this project by others
without written approval by the Consultant. With the Consultant's
approval, others may be permitted to obtain copies of the CADD
drawing files for information and reference only. All intentional or
unintentional revisions, additions, or deletions to these CADD files
shall be made at the full risk of that party making such revisions,
additions or deletions and that party shall hold harmless and indemnify
the Consultant from any & all responsibilities, claims, and liabilities.
I hereby certify that this plan, specification or report was
prepared by me or under my rdire on and that
I am a duly Licen es OlEn r under the
lawsAID.kw
A '
41352
Date 6/19/17
CITY
SUBMITTAL
24'TR oa.v / 0 87.7 Y - r Y Y� y V
so'rR 134' 12" HDPE @ 0.44% J
f 0
15" NYLOPLAST CB C
RIM -1036.7
+I NV -1033.63
173' 12" HDPE @ 0.44 (,
+ Z
------- - Q ccz
o J CL Z �. o
W�0
-N-
0 40 80 J Ln
UJ
%7%=
SCALE IN FEET J ~ M
ZLn _
V� v
CALL BEFORE YOU DIG!
Gopher State One Call
TWIN CITY AREA: 651-454-0002
TOLL FREE: 1-800-252-1166
WARNING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING
UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR
SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48
HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS,
PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE
CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING
CONSTRUCTION AT NO COST TO THE OWNER.
PROJECT: 16174
DRAWN BY: GAJ
CHECKED BY: VJV
DATE: 6/20/2017
REVISIONS:
6/19/17 Bid Pack 1
6/20/17 City Submittal
UTILITY PLAN
C7