2. LED lighting upgrades at Community BuildingJUWEnergya One -Stop Efficiency Shop
121 P 111513 L I. x N A T W A e. Building Energy Efficiency Program
Lighting System Analysis
Cost Saving Recommendations
Customer Report
July 7, 2017
Property Address:
City of Scandia
14727 209th St N
Scandia, MN 55073-8503
Prepared for:
Neil Soltis
City of Scandia
14727 209th St N
Scandia, MN 55073-8503
Ph: (651) 433-2274 Fax: (651) 433-5112
Cell: (651) 245-2654
Page 1 Customer Report (07/07/2017 10:15) Program ID# 73696
Prepared by Lighting Specialist:
ce e ••
Mark Rader
Mobile:
(612) 518-3245
Center for Energy and Environment
Phone:
Center for Energy
and Environment
212 3rd Avenue North, Suite 560
Fax:
(612) 335-5888
www.mncee.org
Minneapolis, MN 55401
E-mail:
mrader@mncee.org
Program Coordinator:
- Audits
Kristen Funk
Mobile:
- Financing
Center for Energy and Environment
Phone:
612-335-3487
- Contractors
212 3rd Avenue North, Suite 560
Fax:
612-335-5888
- Rebates
Minneapolis, Minnesota 55401
E-mail:
kfunk@mncee.org
Page 1 Customer Report (07/07/2017 10:15) Program ID# 73696
Xcelwgr One -Stop Efficiency Shop
NR:r ■11 iN N L N IT N At IN t- Summary of Recommended Lighting Upgrades
Lighting Upgrades Estimated Estimated
Costs Annual Savings Payback
Total Installed Cost Before rebate $33,285.00
Utility ' • $5,068.77
Your Final Cost After rebate $28,216.23 $3,240.22(x) 8.7 years
b Rebate equals 15% of installed cost. (Including special orders)
*Job must be completed and invoices submitted within 90 days or by 10/01/2017, whichever comes first. One -Stop
reserves the right to withdraw this rebate offer after expiration. You may request an extension, which includes re -
verification of eligibility, kW/kWh savings, installation costs, estimated rebate, and program rules by One -Stop.
CEE Financing Option
Estimated monthly savings $270.02(x)
Monthly loan payments at 3.9% for 60 month term S527.42 (b) 9.8 years
(b) Estimate based on a loan amount of $28,498.40, including a $282.16 loan origination fee. Mortgage, (Including Loan
flood and title fees may apply. The loan term has a maximum of 5 years, with monthly payments not less Financing Charges)
than the estimated monthly savings. Final terms and conditions set by lender upon loan approval.
Utility Cost Analysis Demand (KW) Energy (KWh) Annual Cost CO2 (lbs)
Existing Lights 19.545 36,282 $4,489.62 61,680
New Lights 5.618 8,742 $1,249.40 14,862
Estimated Savings 13.927(a) 27,540 $3,240.22(a)4 46,818*
How do CO2 emissions affect me and my business? ¶ Rising concentrations of greenhouse gasses (GHG) produce an increase in the
average surface temperature of the Earth over time. Rising temperatures produce changes in precipitation patterns, storm severity, and sea
level commonly referred to as "climate change." ¶ Carbon dioxide (CO2), methane, nitrous oxide and four groups of fluorinated gases (sulfur
hexafluoride, HFCs, PFCs and CFCs) are the major GHG. In the U.S., GHG emissions come primarily from the combustion of fossil fuels in
energy use. CO2 emissions from coal-fired electricity generation comprise nearly 80 percent of the total CO2 emissions produced by the
generation of electricity in the U.S. ¶ Installing energy-efficient lighting and implementing other conservation measures that reduce electric
energy use significantly reduces GHG emmissions and mitigates global climate change. Read more at: www.eia.doe.gov or www.epa.gov
(a) Savings estimates are based on standard engineering calculations and are NOT guaranteed. Your actual savings may be higher or lower
depending on various factors, including how you operate your lights and other electric equipment in your building. Electric Utility Rates =
$0.0620/KWh and $13.11/KW, where Demand cost savings occurs primarily during the summer months peak rate hours of 9am to 9pm.
(12 [-24,-24 ] [0] [00,00] [00] [True] [9.740KW] )
City of Scandia
Program ID# Xcel Acct# 14727 209th St N
Page 2 Customer Report (07/07/2017 10:15) 73696 302413054 Scandia, MN 55073-8503
II#FINSIOLN IT INTI#N
One -Stop Efficiency Shop
Recommended Lighting Projects
Area F: Kitchen (New)
Page 3 Customer Report (07/07/2017 10:15)
City of Scandia
Program 1D# Xcel Acct# 14727 209th St N
F-7-3-6-96--11 302413054 Scandia, MN 55073-8503
Schedule Name
Installed
Estimated
Recommended Lighting System Upgrades
& Hours/year
Cost
Annual
Selected
of Operation
(Without Rebate)
Savings
Area A: Community Room
10 Hrs/Week
$7,715.55
$910.41
d❑
Project: #1
521 hrs/yr
Incl Special Order
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
60 110 T8 4'32 E44L-Exist
60 30 LED 015W Linear-T8-w/Ballast-4' 2L w/ new ballast
and Socket Bar Kit to 2L
10 Hrs/Week
$507.61
$24.28
0
Project: #2
521 hrs/yr
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
16 18 CFL -S Reflector 018W 1 L
16 10 LED 01 OW BR 1L
Area B: Heritage Room
10 Hrs/Week
$1,208.37
$86.30
Project: #3
521 hrs/yr
Incl Special Order
Qty Watts EXISTING Luminaire Qty Watts NEW Luminaire
7 110 T8 4' 32 E44L-Exist 7 45 LED 015W Linear-T8-w/Ballast-4' 3L w/ new ballast
and socket bar
Area C: Heritage Room -Bathroom Entryway
10 Hrs/Week $322.06 $5.12 ❑d
Project: #4
521 hrs/yr
Qty Watts EXISTING Luminaire Qty Watts NEW Luminaire
3 19 CFL Q 18E1 1 L 3 10 LED 010W Retrofit 1 L -Can Kit
Area D: Heritage Room -Women's RR
Project: #5
10 Hrs/Week
$198.51
$10.62
❑�/
521 hrs/yr
Incl Special Order
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
2 30 LED 015W Linear-T8-w/Ballast-4' 2L w/ new ballast
2 58 T8 4'32 E2 -2L -Exist
10 Hrs/Week
$141.56
$9.48
❑d
Project: #6
521 hrs/yr
Incl Special Order
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
1 110 T8 4'32 E44L-Exist
1 60 LED 015W Linear-T8-w/Ballast-4' 4L w/ new ballast
Area E: Heritage Room -Men's RR
10 Hrs/Week $172.63 $12.32 ❑d
Project: #7
521 hrs/yr Incl Special Order
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
1 110 T8 4'32 E44L-Exist
1 45 LED 015W Linear-T8-w/Ballast-4' 3L w/ new ballast
and socket bar
Area F: Kitchen (New)
Page 3 Customer Report (07/07/2017 10:15)
City of Scandia
Program 1D# Xcel Acct# 14727 209th St N
F-7-3-6-96--11 302413054 Scandia, MN 55073-8503
II#FINSIOLN IT INTI#N
One -Stop Efficiency Shop
Recommended Lighting Projects
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed
Cost
(Without Rebate)
Estimated
Annual
Savings
Selected
Project: #8
Qty Watts EXISTING Luminaire
10 Hrs/Week
521 hrs/yr
$2,123.42
Incl Special Order
$142.26
❑�/
Qty Watts NEW Luminaire
15 60 LED 015W Linear-T8-w/Ballast-4'4L w/ new ballast
15 110 T8 4' 32 E4 -4L -Exist
Area G: Kitchen (Old)
Project: #9
10 Hrs/Week
521 hrs/yr
$397.02
Incl Special Order
$21.24
❑d
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
4 58 T8 4'32 E2 -2L -Exist
4 30 LED 015W Linear-T8-w/13allast-4' 2L w/ new ballast
Area H: Vestibule
Project: #10
Qty Watts EXISTING Luminaire
1 110 T8 4'32 E4 -4L -Exist
60 Hrs/Week $172.63 $22;83 ❑d
3,128 hrs/yr Incl Special Order
Qty Watts NEW Luminaire
1 45 LED 015W Linear-T8-w/13allast-4' 3L w/ new ballast
and socket bar
Area I: Men's and Women's RR
Project: #11
Qty Watts EXISTING Luminaire
60 Hrs/Week
3,128 hrs/yr
$397.02
Incl Special Order
$39.34
❑d
Qty Watts NEW Luminaire
4 58 T8 4'32 E2 -2L -Exist
4 30 LED 015W Linear-T8-w/13allast-4' 2L w/ new ballast
Area J: Neil's Office
Project: #12
41 Hrs/Week
2,138 hrs/yr
$580.65
Incl Special Order
$121.77
❑d
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
4 110 T8 4' 32 E4 -4L -Exist
2 110 T8 4'32 E4 -4L -Exist -REMOVE
4 60 LED 015W Linear-T8-w/13allast-4' 4L w/ new ballast
Area K: Board Room
Project: #13
12 Hrs/Week
626 hrs/yr
$4,621.59
Incl Special Order
$317.82
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
12 110 T8 4'32 E4 -4L -Exist
6 110 T8 4'32 E4 -4L -Exist -REMOVE
12 30 LED 030W 1 L-NewFix-2x4
Area L: Office
Project: #14
60 Hrs/Week
3,128 hrs/yr
$3,108.16
Incl Special Order
$379.41
❑d
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
8 110 T8 4'32 E4 -4L -Exist
4 110 T8 4'32 E4 -4L -Exist -REMOVE
8 30 LED 030W 1 L-NewFix-2x4
Area M: Exterior Pole Lights
Page 4 Customer Report (07/07/2017 10:15)
City of Scandia
Program 1D# Xcel Acct# 14727 209th St N
F-7-3-6-96--11 302413054 Scandia, MN 55073-8503
II#FINSIOLN IT MITI#N
One -Stop Efficiency Shop
Recommended Lighting Projects
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed
Cost
(Without Rebate)
Estimated
Annual
Savings
Selected
Project: #15
Qty Watts EXISTING Luminaire
8 295 MH 250W STD1 1 L
Exterior
4,380 hrs/yr (Night -Only)
$7,901.60
I Incl Special Order
$451.88
❑d
Qty Watts NEW Luminaire
8 87 LED Area Light 87W
Area N: Exterior Building Mounted Lights
Project: #1 ti
Exterior
4,380 hrs/yr (Night -Only)
$2,462.67
$484.73
❑d
Qty Watts EXISTING Luminaire
7 295 MH 250W STD1 1 L
Qty Watts NEW Luminaire
7 40 LED 40W 1 L New Wall Pack Fixture
Project: #17
Exterior
4,380 hrs/yr (Night -Only)
$1,253.95
Incl Special Order
$200.41
Qty Watts EXISTING Luminaire
Qty Watts NEW Luminaire
3 295 MH 250W STD1 1 L
3 49 LED 49W 1 L New Wall Pack Fixture
Totals (Including special orders)
$33,285.00 $3,240.22 7
Page 5 Customer Report (07/07/2017 10:15)
City of Scandia
Program ID# Xcel Acct# 14727 209th St N
73696 302413054 Scandia, MN 55073-8503
Xcelwgr
119Fr11SIOLN IT MULTI#N
One -Stop Efficiency Shop
Customer Participation Agreement
I, the undersigned, agree that to the best of my knowledge the lighting schedule below accurately describes how the lights are
operated at the facility listed in this document. I understand that the energy or cost savings reflected in this analysis are estimates,
and that Center for Energy and Environment (CEE) and Xcel Energy do not guarantee that a specific level of energy or cost savings
will result from the implementation of energy conservation measures or the use of products funded under this program. I also give
CEE permission to submit, on my behalf, all Xcel Energy rebate and financing forms required for the One -Stop Efficiency Shop
program.
I understand that all electrical code violations that are found during the lighting system inspection or during installation must be
brought up to code at the customer's expense. Costs for correcting code violations are NOT included in the installation costs
quoted in this document.
I understand that my lighting contractor must contact the auditor in order to participate in the One -Stop Program, and that I WILL
NOT BE ELIGIBLE FOR THE REBATE UNLESS MY CONTRACTOR CONTACTS THE AUDITOR. (One -Stop Auditor:
Mark Rader, Cell Ph. (612) 518-3245)
By signing below I certify that I have read, understand and will comply with the attached "One -Stop Efficiency Shop RULES and
REQUIREMENTS", and that I can not apply for other rebates offered by Xcel Energy or any other energy -efficiency program
towards lamps or lighting work covered by this agreement.
Select One
❑ Financed
❑ Cash
Lighting Schedules
Signature Neil Soltis Date
Customer Cost: $28,216.23 (Including special orders)
Your lighting savings are based on the following average hours of operation
Lighting Schedule :Name=
Mon
Tues
Wed
Thur
Fri
Sat
Sun
10 Hrs/Week
2.0 hrs
2.0 hrs
2.0 hrs
2.0 hrs
2.0 hrs
521 hrs/yr
12 Hrs/Week
2.0 hrs
2.0 hrs
2.0 hrs
2.0 hrs
2.0 hrs
2.0 hrs
626 hrs/yr
41 Hrs/Week
8.0 hrs
8.0 hrs
8.0 hrs
8.0 hrs
9.0 hrs
2,138 hrs/yr
60 Hrs/Week
12.0 hrs
12.0 hrs
12.0 hrs
12.0 hrs
12.0 hrs
3,128 hrs/yr
Exterior
12.0 hrs
12.0 hrs
12.0 hrs
12.0 hrs
12.0 hrs
12.0 hrs
12.0 hrs
4,380 hrs/yr
Page 6 Customer Report (07/07/2017 10:15)
City of Scandia
Program ID# Xcel Acct# 14727 209th St N
F -7 -3 -6 -96 --ll 302413054 Scandia, MN 55073-8503
The One -Stop Efficiency Shop® lighting efficiency program ("One -Stop Program"), administered by Center for Energy and Environment
("CEE") and funded through Xcel Energy, offers cash rebates to eligible small business customers ("Participant") who purchase and install
qualifying energy-efficient lighting products in existing buildings.
The intent of the One -Stop Program, operating as a Minnesota Conservation Improvement Program (CIP), is to incentivize Xcel Energy's
customers to install energy efficient equipment earlier than they would have otherwise by defraying a portion of the cost of the retrofit. To
ensure that the program operates as intended, the Participant must have a financial stake in the transaction and the Participant's Project Cost
must be greater than zero to receive a One -Stop Program rebate.
Participant Qualifications
Stop Program rebates apply only to qualified Xcel Energy customers with a valid commercial electric account in Xcel Energy's Minnesota
;e territory that meet One -Stop Program eligibility requirements. The Vendor or Participant must verify with a CEE consultant that an
Energy account is eligible for One -Stop Program rebates before committing to, purchasing equipment for or implementing a project. To
mine if a business qualifies for the One -Stop Program please contact CEE at (612) 244-2427.
Eligibility Requirements
1. Rebate items must be installed at the Xcel Energy electric account
listed on the application.
2. All equipment must be new. Used or rebuilt equipment is not
eligible for a rebate.
3. All removed lighting equipment (lamps, ballasts and fixtures) must
be properly recycled, and cannot be sold or reused at another location.
Documentation may be required to ensure compliance with proper
disposal of equipment.
4. Energy-efficient equipment must result in an electric load reduction.
5. Xcel Energy and CEE recommend Illuminating Engineering Society
(IES) light levels. Participant is responsible for approval of final light
levels.
6. Rebates are offered for interior lighting, exterior canopy lighting,
soffit fixtures, wall pack fixtures, parking garage and parking lot
lighting. Rebates will not be issued for street lighting. Most screw-in
compact fluorescent lamps (CFLs) are not eligible for rebates.
7. Lamps or other equipment that have already been rebated through
any other Xcel Energy rebate programs are ineligible for a rebate
under the One -Stop Program. This includes upstream programs that
provide incentives to manufacturers, distributors and retailers to sell
products at a discounted price.
8. CEE reserves the right to disallow a rebate if it determines, in its
sole judgment, that the lighting technology is inappropriately applied
or light levels are inadequate. Contact your CEE consultant to
determine qualification of custom or specialty lighting projects.
9. Equipment must be purchased, properly installed and fully
operating prior to submitting an application for a rebate.
Vendor Responsibilities
10. The "Vendor" is any person or company that is consulting on the
project, selling the project to the participant, completing the work
and/or supplying the materials. Vendor is an independent contractor
and not an agent or representative of Xcel Energy or CEE, has no
authority to bind Xcel Energy or CEE, and is solely responsible for
sub -contractors the Vendor hires to do some or all of the work and/or
supply materials.
11. The Vendor must clearly communicate to the Participant the
purpose and requirements of the One -Stop Program, including
eligibility requirements for lighting rebates. The Vendor must involve
the CEE consultant in communications with the Participant, and must
keep the CEE consultant fully informed regarding all details of the
transaction.
12. Vendors are responsible for reviewing, signing and returning the
Contractor Report to CEE before materials are ordered. By signing
the Contractor Report, the Vendor represents and warrants that the
transaction complies with these Rules and Requirements and that the
project specifications in the Contractor Report are accurate,
acceptable and will be installed as specified.
13. Any inaccuracies concerning project specifications must be
reported immediately to a CEE consultant so they can be addressed,
the rebate recalculated if necessary and a revised report issued to the
Vendor and the Participant.
14. Vendor must contact a CEE consultant whenever there are
changes to the project so that equipment eligibility can be confirmed
and the rebate value can be re -calculated if necessary.
15. CEE will not be responsible for changes in the rebate value if the
Vendor does not sign and return the Contractor Report, and report:
inaccuracies in the Contractor Report; changes in the equipment to be
installed; or changes in the project during construction.
Rebate Calculations
16. Rebate values are based on CEE's calculation of electric demand
(KW) and energy (kWh) savings. Hours used for calculation of the
kWh savings must be an accurate representation of the Participant's
operating schedule.
17. Electric demand and energy savings are calculated using lighting
efficiency baselines established by the Energy Independence and
Security Act (EISA). EISA standards apply to most T12 and
incandescent lighting technologies today, and will apply to other
technologies as efficiency requirements continue to be phased in.
18. If an Xcel Energy lighting rebate was previously assigned to this
account and the rebated lighting was subsequently converted to a less
efficient lighting system, a One -Stop consultant must review the
situation to determine the correct baseline energy use for calculating
the rebate.
19. Rebates are based on the energy use of the equipment actually
installed at the site and the Participant's Project Cost. Rebates will
be recalculated if the final equipment and Participant's Project Cost
is different than originally approved by CEE.
20. Rebates cannot exceed 60 percent of the Participant's Project
Cost, unless otherwise specified by the One -Stop Program. The
minimum rebate paid is $5.00.
21. "Participant's Project Cost" means the Participant's financial
obligation for the lighting retrofit based on the total project cost less
any and all Deductions, regardless of when these Deductions are
received.
Page 7 Customer Report 07/07/2017 10:15 Program ID# 73696
22. "Deductions" means anything of value received by the Participant
that reduces the Participant's actual out-of-pocket cost for the lighting
retrofit including, but not limited to: labor or material donations;
monetary donations; labor or material cost deductions; grants; awards,
rebates; or any other assistance of monetary value provided, directly
or indirectly, by the Vendor, its agents or representatives to reduce the
Participant's actual financial obligation for the lighting project.
23. The following types of financial transactions are not allowed as
methods of payment by the Participant for the lighting project: barter,
in-kind donations and performance contracting.
24. All Deductions must be separately itemized on the final invoice
submitted to CEE. The Participant's Project Cost must be greater than
zero to receive a One -Stop Program rebate.
Invoice
25. The Vendor must submit an accurate, complete and transparent
final invoice for the completed lighting retrofit. All parties involved in
the project, including the Participant and CEE, must have a clear
understanding of the scope of work and associated project costs,
including any Deductions that have been applied.
26. Invoice(s) submitted must include: (1) itemized quantity,
manufacturer's make and model numbers for each material item, (2) a
lump sum amount for both material and labor, and (3) grand total
project cost. In some cases, original equipment manufacturer (OEM)
specification sheets may be requested for verification or clarification.
27. The Vendor must provide the Participant an invoice that reflects
the same financial information that is submitted to CEE, including any
Deductions that have been applied.
Verification
28. CEE reserves the right to inspect Participant's facility(ies) for
installation of materials listed on this rebate application and will need
access to survey the installed project. Participant must keep a sample
of any and all types of equipment removed for a period of three (3)
months after receiving a rebate from Xcel Energy. If the inspection
determines that Participant did not comply with these Rules and
Requirements, any rebate received by Participant must be promptly
returned to Xcel Energy.
29. Vendor agrees to promptly provide CEE with such additional
documentation and information as may be necessary to verify
compliance with these Rules and Requirements, such as copies of
cancelled checks or other relevant receipts/records as proof that the
Participant paid the amount reflected on the invoice. Rebates for that
project will not be paid until all requested documentation and
information is provided and verified.
Rebate Application and Payment
30. One -Stop Program rules and rebate eligibility requirements are
subject to change. It is the Participant's and Vendor's responsibility to
verify with CEE that estimated rebates are still valid before
committing to, purchasing equipment for or implementing a project.
CEE will not pay a rebate for projects where the invoice is submitted
more than 12 months after the start of the project.
31. Xcel Energy and CEE are not responsible for any lost, late, stolen,
ineligible, illegible, misdirected or postage -due mail. All completed
rebate applications and other submissions in connection with the One -
Stop Program become the property of Xcel Energy and CEE and will
not be returned.
32. In cases of deferred payment, CEE reserves the right to process
the rebate only when full payment is received by the Vendor from the
Participant. All financed and alternate payment plans must be
documented with detailed, legally obligating and signed contracts.
CEE reserves the right to disallow any payment plan that its staff
determines is not in compliance with the program design intent and
rules.
33. Rebates will not be disbursed until the project is fully installed
and verified.
34. The rebate check will be sent to the Participant (i.e., Xcel Energy
account holder) listed on the rebate application, unless otherwise
authorized by CEE. Xcel Energy will issue rebates in the form of
checks, not utility bill credits.
35. Once completed paperwork is submitted and approved, rebate
payments are usually made in 6 to 8 weeks.
Special Notices
36. Xcel Energy and CEE reserve the right to refuse payment or
participation in the One -Stop Program if the Participant or Vendor
violates program design intent, rules and procedures. Xcel Energy and
CEE are not liable for rebates promised to Participants as a result of a
Vendor misrepresenting the program.
37. The One -Stop Program is subject to 60 days notice of
cancellation. The Participant and Vendor are responsible for checking
with a CEE consultant to determine whether the program is still in
effect and to verify program requirements.
38. CEE RESERVES THE RIGHT TO DISQUALIFY NON-
COMPLIANT VENDORS FROM PARTICIPATION IN THE
ONE-STOP PROGRAM.
Disclaimers
Xcel Energy and CEE:
39. Do not endorse any particular vendor, manufacturer, product or
system design by offering these rebates;
40. Will not be responsible for any tax liability imposed on the
Participant as a result of the payment of rebates;
41. EXPRESSLY DISCLAIM ALL WARRANTIES, EXPRESSED
OR IMPLIED, AND ANY IMPLIED WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR PARTICULAR
PURPOSE WITH RESPECT TO ANY PRODUCTS, EQUIPMENT,
MATERIAL OR WORKMANSHIP PROVIDED, SUPPLIED OR
INSTALLED IN CONNECTION WITH THE ONE-STOP
PROGRAM. Warranties, if any, are between Participant and
equipment manufacturer(s) and/or Vendors.
42. Are not responsible for the disposal of removed lighting
equipment (lamps, ballasts and/or fixtures) replaced as a result of
this program, when required for optimum lighting performance;
43. hi no event shall be liable for any indirect, special, incidental,
consequential or punitive damages arising out of or relating to
administering the One -Stop Program;
44. Do not guarantee that a specific level of energy or cost savings
will result from the implementation of energy conservation measures
or the use of products funded under this program.
For more information, contact cee:'
CEE at (612) 244-2427. Center for Energy
and Environment
CEE FACET, Program Rules # 130326
Page 8 Customer Report 07/07/2017 10:15 Program ID# 73696
D&G Electric, Inc.
6491 381st St
North Branch, MN 55056
Phone # 651-674-6145
Fax # 320-358-0146
E-mail dave@dandgelec.com
Name / Address
Scandia Community Center
14727 209St N
Scandia MN 55073
Estimate
Date
6/21/2017
Estimate #
1522
Project
Qty Description Cost Total
Retrofiting Existing lights / Adding New Fixtures
Community Room
retrofit 60 - 4 lamp 4'T8 with 60 - Led 4'T8
retrofit 16 - can / track heads with 16 - Led 1OBR30
Heritage Room:
retrofit 7 - 4 lamp 4'T8 with 7 - Led 4'T8
Heritage Room- Bathroom Entryway
retrofit 3 - 18W Biax with 3 - LRXR6
Heritage Room- Women's Bathroom
retrofit 2 - 2 lamp 4'T8 with 2 - Led 2 lamp 4'T8
retrofit 1 - 4 lamp 4'T8 with 1 - Led 4 lamp 4'T8
Heritage Room- Men's Bathroom
retrofit 1 - 4 lamp 4'T8 with 1 - Led 3 lamp 4'T8
Kitchen - New
retrofit 15 - 4 lamp 4'T8 with 15- Led 4 lamp 4'T8
Kitchen - Old
retrofit 4 - 2 lamp 4'T8 with 4- Led 2 lamp 4'T8
Vestibule
retrofit 1 - 4 lamp 4'T8 with 1- Led 3 lamp 4'T8
Men's restroom
retrofit 2 - 2 lamp 4'T8 with 2- Led 2 lamp 4'T8
Women's restroom
retrofit 2 - 2 lamp 4'T8 with 2- Led 2 lamp 4'T8
Neil's Office
Replace 6 -4 lamp 4'T8 with 4 - Led 4 lamp 4'T8
33,285.00 33,285.00
Page 1 Total:
D&G Electric, Inc.
6491 381st St
North Branch, MN 55056
Phone # 651-674-6145
Fax # 320-358-0146
E-mail dave@dandgelec.com
Name / Address
Scandia Community Center
14727 209St N
Scandia MN 55073
Qty
Description
Board room
Replace 18 -4 lamp 4'T8 with 12 - Led 2BLT$ 30L
Office
Replace 12 -4 lamp 4'T8 with 8 - Led 2BLT$ 30L
Exterior Lights
8 - led pole light Heads
3 - led building mounted led (Led 3 50K)
7 - led building mounted led (Led 2 50K)
Estimate
Date
6/21/2017
Estimate #
1522
Project
Cost Total
Total:
Page 2