Loading...
5.b) Administrators reportc SCANDIA Staff Report Date of Meeting: November 6, 2017 To: Parks & Recreation Committee From: Neil Soltis, Administrator Re: Parks updates Comprehensive Plan — At the Comprehensive Plan Open House held on Tuesday, October 24 a map of the future land use in Scandia was presented based on input from the survey and focus groups and comments from the City Council. One of the requirements is that the City's plan provide for the growth as projected by the Metropolitan Council. The growth through 2040 is projected at roughly 1,000 residents or 450+ households. In order to maintain the rural nature of the community, the plan provides for most of the growth to be concentrated in the expanded village neighborhood district around the current downtown core and in a new village neighborhood district on the east side of Big Marine Lake. Moving forward there should be discussion by the PRC as to how to best meet the recreational needs for all age groups living in these areas where the population density will have the greatest change. Bike trails — At the previous PRC meeting the question was raised regarding the possibility of using excess road funds from the planned 2018 road improvement projects for providing for expanded road shoulders to accommodate biking. Below is a summary of the cost to add shoulders to the locations requested. A detailed estimate that was prepared by the Ryan Goodman follows this report. Addl. CostforW Road Cost Paved shoulders Total Cost Oakhill 1,103,700 Meadowbrook 476,900 228t h 528,380 2,108, 980 5 976,850 5 1085,830 0 x b o ro 5 672,400 5 748,300 5 1,420, 700 Park Improvement Fund — A 10/31/17 update of the balance in the Park Improvement Fund is provided. Note that the City Council has approved 1 additional minor subdivision where there will be a $6,000 park dedication fee and another is likely in November. If all of the funds are received in 2017 the balance owed to the Capital Improvement Fund would be reduced from $29,000 as of 1/1/2018 to $17,000. Grants — Ryan Goodman provided us with information on the Tony Hawk skateboard grants as a potential source of funding to replace the equipment. Unfortunately the grant limits expenditures to new skateparks and with concrete features. Volunteer projects — In 2017 the City created a volunteer policy. In 2017 volunteers were used for buckthorn removal at Wind in the Pines and painting the bleachers at the lighted ballfield. The policy calls for volunteer opportunities to be proposed by staff, committees, commission, or the council. A listing of potential volunteer opportunities will be presented to the City Council for approval. Once approved, City staff will promote those opportunities. It would be helpful if the Committee would identify volunteer opportunities in the City's developed and undeveloped parks. Lilleskogen Veterans Memorial — After the last PRC meeting, Dave Wilson of the Veterans Memorial Committee requested approval to install an information stand at the Veterans Memorial. A picture of a similar information stand located in Forest Lake is shown below. The request was approved based on the agreement with the Committee and the Lions Foundation. °UrPresent . `Al B O LTO N Comprehensive Plan Proposed Future Land U! ;e ® & MENK J' SCANDIA Scandia, Minnesota October 2017 Real People. Real Solutions. PRELIMINARY CONSTRUCTION COST ESTIMATE 2018 STREET IMPROVEMENTS SCANDIA, MN ADD 4' PAVED SHOULDER OCTOBER 2017 Segment A: Oak Hill Rd/Meadowbrook Ave N/228th St N (Hwy 97 to Lofton Ave N) 18,050 LF 3.5 Ml ESTIMATED TOTAL ITEM QTY UNITS UNIT PRICE PRICE 1 Embankment Fill/ Road Support/Common Excavation 21400 CY $8.00 $171,200.00 Driveway Culvert Replacement 1320 LF $50.00 $66,000.00 2 3 Class 5 Aggregate Base 7770 TN $15.00 $116,550.00 4 Bituminous Pavement 4060 TN $70.00 $284,200.00 5 Bituminous Driveway Patching 230 TN $100.00 $23,000.00 6 Concrete Driveway Patching 70 SY $80.00 $5,600.00 7 Aggregate Driveway Patching 830 TN $20.00 $16,600.00 8 Clear and Grub 1 LS $20,000.00 $20,000.00 9 Cross Culvert Extensions 1 LS $25,000.00 $25,000.00 10 Ditch Grading 36100 LF $3.00 $108,300.00 11 Restoration (Topsoil, Seed, Blanket, Fertilizer) 6.7 AC $12,000.00 $80,400.00 12 Water Quality Improvements 1 LS $60,000.00 $60,000.00 Total Segment A $976,850.00 Segment 8: Oxboro Ave N/Old Marine Trail (Oakhill Road to Olinda Trail) 13,750 LF 2.7 Ml ESTIMATED TOTAL ITEM QTY UNITS UNIT PRICE PRICE 1 Embankment Fill/ Road Support/Common Excavation 16300 CY $8.00 $130,400.00 $51,000.00 2 Driveway Culvert Replacement 1020 LF $50.00 3 Class 5 Aggregate Base 5920 TN $15.00 $88,800.00 4 Bituminous Pavement 3100 TN $70.00 $217,000.00 5 Bituminous Driveway Patching 120 TN $100.00 $12,000.00 6 Aggregate Driveway Patching 770 TN $20.00 $15,400.00 7 Clear and Grub 1 LS $30,000.00 $30,000.00 8 Cross Culvert Extensions 1 LS $20,000.00 $20,000.00 9 Ditch Grading 27500 LF $3.00 $82,500.00 10 Restoration (Topsoil, Seed, Blanket, Fertilizer) 5.1 AC $12,000.00 $61,200.00 11 Water Quality Improvements 1 LS $40,000.00 $40,000.00 Total Segment B $748,300.00 Notes: - This construction cost estmenat was based on bidding/constructing the improvements at the same time as the adjacent street. Mobilization, traffic control, and materials testing costs are accounted for in the overall project. Estimate does not include existing road signage relocation, private utilities relocation, miscellaneous landscaping, wetland impacts/mitigation, and additional permitting.