5.c) Nov. 2017 PW Staff reportSCANDIA
November 2017 report
PW Staff report:
December 4, 2017
• Monthly safety checks done on playgrounds and skate park
• Sign - Playground Safety - City Hall playground - installed
• Playground sign for City Hall playground — arrived — install next week
• Rink board renovations complete
• Lilleskogen Park — Woodchips added at infiltration bay —W. side
• Soil added along side walk to minimize drop off hazard
• Sign - "No River Access" for WIP —installed
• Warming House pre -season cleaning done
• Preparations for path to connect City Hall area with the T -ball field