Loading...
5.c) Nov. 2017 PW Staff reportSCANDIA November 2017 report PW Staff report: December 4, 2017 • Monthly safety checks done on playgrounds and skate park • Sign - Playground Safety - City Hall playground - installed • Playground sign for City Hall playground — arrived — install next week • Rink board renovations complete • Lilleskogen Park — Woodchips added at infiltration bay —W. side • Soil added along side walk to minimize drop off hazard • Sign - "No River Access" for WIP —installed • Warming House pre -season cleaning done • Preparations for path to connect City Hall area with the T -ball field