7.f) PW Activity Report January 2014Public Works Activity Report
January 1 through January 31, 2014
Tim Kieffer, Public Works Director
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
Sewer:
Performed snow and ice control operations
Performed tree trimming operations
Read pump run times at all of the lift stations
Responded to two STEP alarms on the Bliss system
Plowed drainfields
Park and Recreation:
Water:
Maintained ice rinks
SCANDIA
Constructed additional thin ice signs for the aeration system on Goose Lake
Installed trail sign at Hay Lake Park
Set up aeration system on Goose Lake
Installed Vinterfest sign at the corner of Olinda Tr and Scandia Tr
Replaced GFI on the hockey rink light pole
Set up for Vinterfest
Read water meters for Uptown system
Equipment and Building:
Performed monthly OSHA inspections
Waxed office floor at Public Works
Took down holiday decorations at the Community Center
Inspected tables at the Community Center
Replaced garage door opener at the warming house
Organized the Public Works shop
Fixed toilet at the Community Center
Miscellaneous:
Located City utilities
Management tasks
Street:
Sewer:
Corresponded with engineer about future road improvements
Met with Connexus to have trees topped along power lines
Corresponded with EcoCheck about the Bliss system
Corresponded with contractor about upgrades to the 201 system
E-mailed the County and MPCA about improvements to the drainfields
Park and Recreation:
Attended several meetings about Vinterfest
Scheduled the replacement of two light bulbs at the hockey rink
Talked with PRC member to have tree removed at Lilleskogen Park
Equipment and Building:
Corresponded with vendors to develop new plow truck
Corresponded with the building official, Midwest Exteriors, and Encompass about the
Community Center roof
Miscellaneous:
Interviewed Maintenance Worker applicants
Worked with Bolton & Menk to update the City's GIS map
Worked on Job Hazard Analysis (JHA) and Lock Out Take Out (LOTO) procedures
2