Loading...
8.c) 2014 Bracht AOP submitttal to City 1-23-14January 2014 BRACHT BROS., INC. 2014 APPLICATION FOR THE ANNUAL OPERATORS PERMIT SCANDIA, MN Consulting Civil Engineers Sunde Engineering, PLLC. 10830 Nesbitt Avenue South • Bloomington, Minnesota 55437-3100 Phone: (952) 881-3344 • Fax: (952) 881-1913 • E -Mail: info(& sundecivil. com APPLICATION FOR ANNUAL OPERATORS PERMIT BRACHT BROS. INC SAND AND GRAVEL MINING OPERATION CITY OF SCANDIA WASHINGTON COUNTY, MINNESOTA INTRODUCTION The following Annual Operators Permit (AOP) application is submitted on behalf of Bracht Bros., Inc. (Bracht Bros.) in compliance with the City of Scandia's Ordinance No. 103 and Chapter 4 of the Development Code: Mining and Related Activities Regulations, Section 6, adopted by the City of Scandia on August 28, 2007. Bracht Bros. own and operate a gravel mining and processing operation in the City of Scandia, MN. Mining of sand and gravel at the site predates any type of permitting requirements. However, prior to the incorporation of Scandia in 2006, the site was issued five year permits from Washington County as well as annual permits from New Scandia Township. The City of Scandia issued a Conditional Use Permit (CUP) for the site in the spring of 2008. Site activities over the past couple of years have been predominantly reclamation activities consisting of establishing final grades, placing topsoil and establishing vegetation. Small amounts of material have been removed from existing stockpiles that were located on the site, but there were no active mining or processing activities in 2013. Establishment of final grades and placement of topsoil was completed in 2013. Approximately 20-30 tons of landscape boulders ad approximately 60 tons of oversized rock remain on the site to be hauled out in 2014. All areas have been seeded except for one small area east of the haul road, which will be seeded in the spring of 2014. The final reclamation activity will be the removal of the dismantled washplant, which is scheduled to be completed in the spring of 2014. II. ANNUAL REPORT A. Compliance with CUP: Updated Copy of Application Material: A bound recompilation of all of the information and plans submitted to the City during the CUP process is on file at the City. 2. Watershed District Permit: A Watershed District Permit was obtained for the site and is on file at the City. Monitoring Wells: Three monitoring wells have been installed at the site. Groundwater level data is included as Attachment 2. Bracht Bros., Inc. Page 1 2014 Annual Operator's Permit Application January 21, 2014 4. Groundwater Monitoring Plan: An approved groundwater monitoring plan is on file at the City. 5. Production Well Records: Records of the production well are kept and will be provided to the City upon request as required in the CUP, however, the production well has not been used for several years. 6. Washplant Operation: Records of when the washplant operates are kept to identify when the production well is pumping. The washplant was dismantled in 2010 in conjunction with site reclamation activities and is anticipated to be removed from the site in 2014. Depth of Excavation: Excavation has remained above 920 ft above mean sea level. Excavation activity was completed a few years ago. Final reclamation grades have been achieved over the entire site with minimum elevation of 924.8 verified by Landmark Survey in October of 2013. 8. Groundwater Analysis: Groundwater is sampled and analyzed for Diesel Range Organics (DRO) as indicated in the groundwater monitoring plan. DRO was not detected in the 2013 sampling event. Results are included as Attachment 1. If gasoline is stored on site in the future, GRO will also be added to the analyte list. 9. MN County Well Index: There are no wells on file in the County Well Index (CWI) that are located in the area depicted on the Site Plan: A CWI Figure is on file at the City which shows the location of the CWI wells in the vicinity of the Site. This information was also provided on Figure 2 of the CUP application materials. 10. Truck Hauling Signs: A truck hauling sign with the distance to the access road was installed on the westbound approach to the site. A supplement sign was added to the existing trucks hauling sign indicating the distance to the entrance. 11. Old Marine Trail: Bracht Bros. discourages trucks from using Old Marine Trail except when necessary for local hauling. 12. Dust Control Plan: A dust control plan is included as Item B5 of this application. This is the same dust control plan previously approved for the site. 13. Wetlands: A fifty foot buffer area from the wetlands is permanently marked in the field. There will be no future disturbance of vegetation of mining activity within the setback area. 14. Updated Reclamation Plan: Current reclamation progress is indicated on the attached Site Plan. 15. Final Elevations: The reclamation grades have been achieved over the entire site and are illustrated on Sheet C1, Final Reclamation Grades. The lowest elevation of the reclaimed site is greater than ten feet above the highest water level of record (December 2008) in MW -1 and MW -3 (not the perched water system as defined by MW -2). Bracht Bros., Inc. Page 2 2014 Annual Operator's Permit Application January 21, 2014 B. Operating Conditions: The site has limited operations associated with the final stages of reclamation. No further mining or processing is occurring on the site. The limited activity is in accordance with operating conditions regulated by Section 7 of the Scandia Ordinance 103. Setbacks: No mining, stockpiling or land disturbance activities, with the exception of berming take place within the setback areas. Minimum setback areas are maintained as follows: • 50 feet from an adjoining property line • 200 feet from an occupied structure existing on May 20, 2008. • 100 feet from any contiguous property subdivided into residential lots of 5 acres or less • 100 feet from any road right-of-way. 2. Fencing: The entire site is fenced with 3 strand wire fencing. Locking metal gates are located at the site access points. Hours of operation: The Site is operated from 7:00 a.m. to 7:00 p.m. Monday through Friday except holidays. Extended hours may be required periodically for situations such as emergencies, accelerated work schedules or weather delays. Extended hours were not requested in 2013. If operations are required beyond the 7:00 a.m. to 7:00 p.m. hours, or on Saturdays, Sundays or holidays, prior permission will be obtained from the City of Scandia in accordance with procedures set forth in Ordinance No. 103. 4. Screening: Landscaping has been completed in accordance with plans approved by Washington County in 1991. There are a number of berms located around the property and trees planted around the perimeter of the property provide screening from adjacent land uses. Many trees were planted in the 1980's which have become well established and provide excellent screening of the site. No additional screening activities are planned for 2014. Dust control: This plan addresses dust control measures which are implemented at the gravel mining Site. Stripping Operations: No longer applicable Mining and Processing Operations: No longer Applicable C. Dust Control on 185th Street North and Old Marine Trail: • 185th Street: The operator has provided dust control on 185th Street North as needed. This has been accomplished in cooperation with the City of Scandia when the site was active. The City of Scandia applied calcium chloride Bracht Bros., Inc. Page 3 2014 Annual Operator's Permit Application January 21, 2014 treatments as needed and then invoiced Bracht Bros. for their portion of the dust control application. The operator agrees to continue this method of dust control on 185th Street North. However, in the current final reclamation phase of the operation, no significant truck traffic will be generated. • Old Marine Trail: The CUP requires that the operator discourage trucks from using Old Marine Trail. Therefore, only if there is a local job requiring a substantial number of loads would it be necessary for the operator to provide dust control on Old Marine Trail. In that event, the operator will contact the City prior to beginning the job to determine appropriate dust control requirements. 6. Noise: All activities are conducted so as to be in accordance with all Federal, State and City noise standards. Depth of excavation: No additional excavation will occur. Minimum reclamation elevation is greater than 920' above mean sea level, ten feet above regional groundwater table. 8. Site clearance: There will be no clearing at the Site in 2014. Appearance/condition: All buildings, plants and equipment at the Site are maintained in a neat condition. Weeds and other unsightly or noxious vegetation are controlled as necessary to preserve the appearance of the reclaimed areas. 10. Sanitary Facilities: Portable sanitary facilities are provided in the operating areas. 11. Waste Disposal: Waste generated from the operation is disposed of in accordance with Federal, State and City requirements. 12. Water Quality Monitoring: An approved groundwater monitoring plan is on file for the site. Water quality testing results for MW -1 are included as Attachment 1. DRO was not detected in the 2013 monitoring event. Water level measurements from 2013 are included in Attachment 2. 13. Fuel and Chemical Storage: All fuel stored on site is stored in accordance with Federal and State standards. 14. Contingency Response Plan: In the event of a fuel leak or spill, immediate action will be taken. If the spill or leak is active, measures will be taken to control or stop the spill. Available on-site equipment (loaders, dozers) will be used to contain and recover the spill. Additional cleanup equipment and personnel will be called in for assistance as necessary. 15. Added Provisions: The operator will comply with other such reasonable requirements that the City may find necessary to adopt for the protection of health, safety and welfare and/or prevention of nuisance. Bracht Bros., Inc. Page 4 2014 Annual Operator's Permit Application January 21, 2014 16. Processing: No further processing to be conducted on the site. 17. Recycling: No recycling activities occurred on-site in 2013. Recycling is not anticipated in 2014. 18. Trucking Operations: The site accesses 185th Street North, a gravel city street. All loads leaving the site are loaded in accordance with State law. Loose material is cleaned from the truck and tires prior to exiting the facility. 19. Asphalt Plants: No asphalt plants are operated at this site. B. Annual Activity Activity in 2013 was limited to reclamation work including removal of stockpiles. There will be no further mining, crushing or washing at this site. Bracht Bros. intends to complete all reclamation in 2014. 1. Amount of gravel removed from the site in 2013: 4,515 tons 2. Amount of add -rock brought onto the site in 2013: 0 cy 3. Amount of recycled asphalt brought to the site in 2013: 0 cy 4. Amount of recycled concrete brought to the site in 2013: 0 cy Area reclaimed and type of reclamation (In 2013): Final reclamation grading has been completed. Slopes were graded to a minimum of 4:1. Reclamation grades are a minimum of ten feet above the water table. On-site black dirt was placed as topsoil and the area has been seeded with the exception of a small area east of the haul road. (See C1, Final reclamation Grades. 6. Average number of trips hauling material to and from the site per day for the season: In 2013 a total of 238 truck loads were hauled from the site. Based on 180 operating days, this was an average of less than 2 loads per day. C. Description of operating conditions planned for the coming year: 1. During the 2014 mining season, all that remains will be the final seeding of the area east of the haul road and the removal of the dismantled equipment..A small amount of landscape boulders and oversized rock will be hauled from the site. 2. Site Plan: Ci is attached which illustrates the reclamation condition of the site based on a survey by Landmark Surveying in October, 2013. 3. Aerial Photo: A 2013 aerial photo is attached. Bracht Bros., Inc. Page 5 2014 Annual Operator's Permit Application January 21, 2014 4. Reclamation: Final grading and application of topsoil has been completed. The majority of the site has been seeded. Reclamation activity in 2014 will consist of seeding one small remaining area and removal of dismantled equipment from the site and removal of the small volume of marketable material that currently remains on-site . 5. Operating Conditions for 2014: Anticipate completing reclamation activities as described above. D. Inspection: The City conducts an annual Site inspection. III. CERTIFICATION I certify that the plans, specifications or reports for the above described facility were prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. Kirsten Pauly Reg. No. 21842 Date: January 21, 2014 Bracht Bros., Inc. Page 6 2014 Annual Operator's Permit Application January 21, 2014 Attachment 1 — Water Quality Testing Results Bracht Bros., Inc. 2014 Annual Operator's Permit Application January 21, 2014 ;ace Analytical Field Services Division January 2, 2014 Ms. Natalie Fitzpatrick Bracht Brothers, Inc. 8303216 th Street North Forest Lake, MN 55025 RE: Pace Project No. 13-1171 Client Project ID: Scandia Dear Ms. Fitzpatrick: Gravel Pit Monitoring Well Dec. 2013 Pace Analytical Services, Inc. 1700 Elm Street SE, Suite 200 Minneapolis. MN 55414 Phone. 612.607 1700 Fax: 612.607 6444 www.pacelabs.com Enclosed are the results of analyses for sample(s) received by the laboratory on December 18, 2014 from the monitoring well at the Scandia Gravel Pit site for 2013. The analytical result for DRO on the well was Not Detected. The invoice will be sent separately. Results reported herein conform to the most current NELAC standards, where applicable, unless otherwise narrated in the body of the report. If you have any questions concerning this report please feel free to contact me. Sincerely, David J. Anderson Project Manager (612) 607-6377 State of Minnesota Laboratory No. 027-053-137 m aceAnalXical www.pacelabs.com ANALYTICAL RESULTS Pace Analytical Services, Inc. 1700 Elm Street - Suite 200 Minneapolis, MN 55414 (612)607-1700 Project: 13-1171,BRACHT BROTHERS-SCANDI Pace Project No.: 10252763 Sample: MONITORING WELL Lab ID: 10252763001 Collected: 12/18/13 12:35 Received: 12/18/13 14:25 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. WIDRO GCS Analytical Method: WI MOD DRO Preparation Method: WI MOD DRO Diesel Range Organics ND mg/L 0.10 1 12/18/13 09:56 12/21/13 23:05 Surrogates n-Triacontane (S) 86 %. 50-150 1 12/18/13 09:56 12/21/13 23:05 638-68-6 Date: 12/24/2013 12:06 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Qual Page 5 of 10 aceAnalytical" www.pacelabsxom QUALIFIERS Project: 13-1171,13RACHT BROTHERS-SCANDI Pace Project No.: 10252763 DEFINITIONS Pace Analytical Services, Inc. 1700 Elm Street - Suite 200 Minneapolis, MN 55414 (612)607-1700 DF - Dilution Factor, if reported, represents the factor applied to the reported data due to changes in sample preparation, dilution of the sample aliquot, or moisture content. ND - Not Detected at or above adjusted reporting limit. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL -Adjusted Method Detection Limit. PRL - Pace Reporting Limit. RL - Reporting Limit. S - Surrogate 1,2-Diphenylhydrazine (8270 listed analyte) decomposes toAzobenzene. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean -Up U - Indicates the compound was analyzed for, but not detected. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270. The result reported for each analyte is a combined concentration. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited analytes. TNI - The NELAC Institute. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 12/24/2013 12:06 PM without the written consent of Pace Analytical Services, Inc- Page 7 of 10 Attachment 2 - Groundwater Elevations MW -1 Top of Casing TOC 940.17 Ground - Depth to water Water Elevation Date ft btoc feet 30 -Dec -08 29.50 910.67 19 -Mar -09 30.33 909.84 14 -Apr -09 30.23 909.94 7 -Jun -09 30.58 909.59 12 -Aug -09 30.87 909.30 29 -Oct -09 31.67 908.50 2 -Jun -09 31.25 908.92 22 -Aug -10 32.25 907.92 18 -Nov -10 32.67 907.50 21 -Jun -11 32.46 907.71 28 -Sep -11 31.50 908.67 13 -Dec -11 31.54 908.63 15 -May -12 31.58 908.59 21 -Aug -12 32.25 907.92 5 -Dec -12 32.17 908.00 2 -Jul -13 32.50 907.67 29 -Aug -1 3 28.75* 911.42 18 -Dec -13 32.16 908.01 MW -2 Top of Casing TOC 967.49 Depth to Ground- water Water Elevation Date ft btoc feet 30 -Dec -08 35.25 932.24 19 -Mar -09 36.33 931.16 14 -Apr -09 36.54 930.95 7 -Jun -09 35.38 932.11 12 -Aug -09 36.67 930.82 29 -Oct -09 36.83 930.66 2 -Jun -09 37.67 929.82 22 -Aug -10 36.83 930.66 18 -Nov -10 36.33 931.16 21 -Jun -11 35.50 931.99 28 -Sep -11 - - 13 -Dec -11 31.35 909.22 15 -May -12 31.08 909.49 21 -Aug -12 - 907.49 5 -Dec -12 37.83 929.66 2 -Jul -13 - - 29 -Au -13 32.83 907.75 18 -Dec -13 32.50 908.08 MW -3 Top of Casing (TOC)* 933.37 Depth to Ground- water Water Elevation Date (ft btoc feet 30 -Dec -08 22.92 910.45 19 -Mar -09 23.83 909.54 14 -Apr -09 23.63 909.74 7 -Jun -09 23.89 909.48 12 -Aug -09 23.83 909.54 29 -Oct -09 24.33 909.04 2 -Jun -09 25.00 908.37 22 -Aug -1 0* 32.42 908.16 18 -Nov -10 32.88 907.70 21 -Jun -11 30.63 909.95 28 -Sep -11 31.25 909.33 13 -Dec -11 31.35 909.22 15 -May -12 31.08 909.49 21 -Aug -1 2 33.08 907.49 5 -Dec -12 34.21 906.37 2 -Jul -13 32.58 908.00 29 -Aug -13 32.83 907.75 18 -Dec -13 32.50 908.08 * Possible error * raised to 940.578 july 30, 2010 Bracht Bros., Inc. 2014 Annual Operator's Permit Application January 21, 2014 ,P% jr i om. i i vp� -4=�I! 8 51 I-OSIaNslaw 4 #88-121 T. ,R. ,S. DRAWING:Mirslensp6tlwgslBracMBrolM1ers=4A0P1C1-Fina1 Recl—h- Conditi— NEWAtl LAYOUT:—plen XREF: 2001E3; XREF: Kirs—Signature Sund EngirnP�� CONSULTING CIVIL ENGINEERS 10830 NESBITT AVENUE SOUTH BLOOMINGTON MINNESOTA 554373100 (952)881-3344 TELEPHONE (952)881-1913 FAX BRACHT BROS., INC. 2014 ANNUAL OPERATORS PERMIT SCANDIA, MINNESOTA DATE REVISION I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED 2PROFtEAL ENGINEER UNDER THE LAWS O THE OF MINNESOTA. irs[en Pauly DATE: 222,2014 REG. NO.: 21842 INFORMATION: PROJECT NO.: 88-121 DRAWN BY: CHECKED BY: KP APPROVED BY: KP SCALE: Graphic DATE: 96p WOODED AREA �0 950 n PROPERTY LINE 980 \vl� NOTES: 1. TOPOGRAPHY WITHIN SITE FROM UPDATED SURVEY BY LANDMARK SURVEYING, INC. 0Q 0 DATED OCTOBER 8, 2013. TOPOGRAPHY OUTSIDE OF MINING LIMITS COLLECTED FROM n 0 9s 9$Q BUFFER AREA MINNESOTA LiDAR DATED 2011. 2. BOUNDARY FROM SURVEY BY LANDMARK SURVEYING, INC. DATED 4-6-81, AND LAND o�9Q SWAP DESCRIPTIONS RECORDED DEC. 1, PEM Z 1989. 9'13"W 0 3. BERM, WASHPLANT AND SEDIMENT POND P MB 1315.34' 5 LOCATIONS ARE FROM AN AERIAL PHOTOGRAPH TAKEN APRIL 16, 1996 o OBTAINED FROM THE WASHINGTON COUNTY 9�0 WOODED AREA µ oM DSURVEYORS Reclamation Complete =" O DEPT. 4. A THREE STRAND BARBED WIRE FENCE 960 9S0 SURROUNDS THE SITE. s0 Q9 Reclamation MW -3 5. BACKFILLING AND SLOPING TO 4:1 MINIMUM SLOPES 970 Complete 970 6. BOUNDARIES OF RECLAMATION ACTIVITY ARE GENERAL IN NATURE AND HAVE NOT BEEN FIELD VERIFIED 7.1 to No 0 7. TOP OF EXITING PRODUCTION WELL IS 940.7 60- 6�to Existing o" 440' " FEET �j 924.8 feet Production (Low Point) ' Well 0 a 100 66 + tO 1 MW 1 Backfi led and s °57'10' Slope , to be 2 - WETLANDS FROM NWI MAP RECLAMATION COMPLETE f Seed d 2014 I 10 TO BE SEEDED IN 2014 / WOODED AREA Reclamation til �omplete 1 O W 0 Q�riG+ z MW -2 0� I C 990 50 g6p q � Driveway to _ $p Remain 0 980 1 W D D P UB 10 o�`bQ 9711 0 - 66' RIGHT -OF -WA 980 Boundary information from survey by 100 0 100 200 Landmark Surveying. SCALE IN FEET #88-121 T. ,R. ,S. DRAWING:Mirslensp6tlwgslBracMBrolM1ers=4A0P1C1-Fina1 Recl—h- Conditi— NEWAtl LAYOUT:—plen XREF: 2001E3; XREF: Kirs—Signature Sund EngirnP�� CONSULTING CIVIL ENGINEERS 10830 NESBITT AVENUE SOUTH BLOOMINGTON MINNESOTA 554373100 (952)881-3344 TELEPHONE (952)881-1913 FAX BRACHT BROS., INC. 2014 ANNUAL OPERATORS PERMIT SCANDIA, MINNESOTA DATE REVISION I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED 2PROFtEAL ENGINEER UNDER THE LAWS O THE OF MINNESOTA. irs[en Pauly DATE: 222,2014 REG. NO.: 21842 INFORMATION: PROJECT NO.: 88-121 DRAWN BY: CHECKED BY: KP APPROVED BY: KP SCALE: Graphic DATE: DESCRIPTION: FINAL RECLAMATION CONDITIONS SHEET NO: C1