8.f Public Works Staff Report - Nov. 2017
Public Works Staff Report – November 2017
Roads and Right – of - way
Trees – 3 on the road – sawed 220th, 195th, and Pomroy
Gravel roads – Graded Pilar one last time -12-4-17
197th project completed
ROW – Culverts – checking locations for the 2018 road projects
ROW Brushing – 2018 road improvement areas, Oakhill Rd.,
Meadow Brook, 228th, 230th, Kirk Ave., currently in the Old Marine –
Orwell area
Winter – First de-icing event 11-13-17 - Truck and equipment
preparations /repairs completed – PW is ready
Sewer – Water:
November sewer samples were taken at Bliss
201 - October Monthly DMR completed
Uptown - Monthly water meter readings completed
Uptown – Eco Pods – A request is submitted for the Manufacturer to
cover replacement of failed product
Bliss Septic pumping – Land applied12-8-17 / 12-15-17
201 – Bliss – three calls Lift station #1 – Pump # 2 non-functioning –
receiving quotes for replacement and upgrades to the connections
and check valves
12 Gopher call requests
Parks:
Monthly safety checks done on playgrounds
Rink board renovations complete
Rink flooding - daily FT staff ; PT – seasonal - evenings
Lilleskogen Park – Woodchips added at infiltration bay –W. side, soil
along walk to back fill side walk – finish work in the spring, STS –
continued buckthorn removal
Path mowed to connect City Hall area with the T-ball field
Other:
Holiday decorating set ups – City Hall
Voter set up / take down – City Hall
Heat tape above entrance installed – City Hall
Holiday decorations up on street lights