Loading...
8.d Engineering UpdatesSCANDIA Engineering City of Scandia QLENK Engineering Updates 1/16/2018 Comprehensive Plan Update ➢ Project website (https://www.bolton-menk.com/clients/scandia/index.html) ➢ Presented Land Use, Housing and Parks chapter to Planning Commission on 1/2/18 ➢ Water Resources, Transportation and Implementation chapters will be presented in March ➢ Public Hearing tentatively scheduled for April • 2018 Street Project ➢ Work completed to date includes; topographic survey, private utility coordination, wetland delineation/approval, culvert inspections, and coordination with the Washington County projects. ➢ As a separate agenda item a formal request has been prepared, "Authorize Preparation of Plans and Specifications". • Miscellaneous ➢ 2018 Tree Sale • Each Spring the Washington Conservation District holds a tree sale for county landowners to purchase high quality trees at a low cost for urban and rural conservation purposes, such as windbreaks, reforestation, erosion control, and food and cover for wildlife. Order at the link below, orders and payment must be received by April 9, 2018. • http://www.mnwcd.org/land/trees ➢ 2017 City Engineer's Conference • 1 will be attending the City Engineer's Conference January 24tH -26tH Some of the topics presented at the conference will include: engineering cost analysis of compliance with water quality standards and rules for municipal stormwater and wastewater systems, strategies in project communications, stormwater reuse and groundwater recharge, 3D design technology, survey innovation, and asset management. ➢ See everyone at Vinterfest!! ➢ Response received from Washington County on our submittal of comments related to the Draft five-year Capital Improvement Plan shown below: WasWngton .��ouraty Office of Administration Molly F. ❑'Rourke, Counly Administraror Kevin Catid, Deputy AdrykI nlStrator December 12, 2x17 RECEIVED DEC 1 8 2017 Ryan Goodman, P.E, City Engineer cfTYOF SCANDIA City of Scandia 14727 201" Street North P.O. Box 128 Scandia, MN 55073 RE: Draft Washington County 2018 — 2422 Capital Improvement Plan (CIP) Comments Dear Mr, Goodman - Thank you for your comments dated November 21, 2017 conoeming the Washington County 2018 - 2022 Draft CI P. Cur responses, when appropriate, to your comments are as follows, Pavament Maintenance on County State Aid Highway (CSAH) 15 IManning Avenue) and Intersection Improvement at CSAH 15 and Trunk Highway {TH) 97 (Scandia Trail N) Weare currently tentatively planning that CSAH 15 from CSAH 4 (1704h Street North) to the North County Line would receive pavement replacement work in the 2020 — 2021 timeframe. This is approximately 7.1 miles of pavement rehabilitation representing over $2.4 million of improvements to the CSAH 15 corridor. We concur that it would be advantageous to construct an intersection improvement at the intersection of CSAH 15 and TH 97 at the same time or in a way that compliments this planned pavement rehabilitation work. Since TH 97 is a State Highway, the Minnesota Department of Transportation (MnOOT) has jurisdiction over this intersection, including the type and timeframe for any intersection improvements. We would recommend the County and Cityjointly approach MnDOT in 2018 to discuss how we could best evaluate the feasibility of an intersection improvement here in the timeframe mentioned. Trail Development in Northern Washington County The County's 2030 Comprehensive Plan identifies an east -west regional trail corridor — the Glacial Hills Regional Trail travelling adjacent to CSAH 4 which, along with the Central Greenway Trail travelling along CSAH 15, would connect Big Marine Park Reserve with William O'Brian State Park, as well as connect to a planned future extension of the Gateway State Trail. It is expected that this same vision will be carried forward in the County's 2040 Comprehensive Plan. However work on the trail master plans, the first phase in actually developing these trails, is not expected to begin until atter 2022. We do look forward to continuing to discuss these regional trails with the City, and appreciate the support. Again, thank you for your support of the County's 5 -Year Capital Improvement Plan. The Cty of Scandia has.been and continues to be a valued partner in the planning, design and construction of cbUnty cipl% infrastructure improvements. We value our relationship and look forward to working together to implement the projects planned in this CIP, and develop potential future projects. Sincerely, Molly gRourke County Administrator C: Washington County Board of Commissioners Don Theisen — Public Works Director Wayne Sandberg — Public Works Deputy Director I County Engineer