8.f) PW Activity Report February 2014Public Works Activity Report
February 1 through February 28, 2014
Tim Kieffer, Public Works Director
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
Sewer:
Performed snow and ice control operations
Performed tree trimming operations
Removed wreaths from Uptown street lights
Read pump run times at all of the lift stations
Responded to two STEP alarms on the Bliss system
Plowed drainfields
Replaced STEP pump on the Bliss system
Park and Recreation:
Water:
Maintained ice rinks
Monitored aeration system on Goose Lake
Cleaned up after Vinterfest
Read water meters for Uptown system
Equipment and Building:
SCANDIA
Performed monthly OSHA inspections
Replaced clutch, bearing, and starter on the Swenson Sander
Performed annual ladder inspections
Replaced both headlights and repaired exhaust leak on the Ford Dump Truck (201-97)
Miscellaneous:
Attended staff meeting
Management tasks
Street:
Sewer:
Corresponded with engineer about the 2014 seal coat project
Corresponded with EcoCheck about the Bliss system
Corresponded with contractors about upgrades to the 201 system
Created a 201database to track maintenance
Park and Recreation:
Talked with the watershed district about the rain and butterfly gardens at Lilleskogen Park
Equipment and Building:
Met with vendor to develop utility truck
Corresponded with the building official about the Community Center roof
Miscellaneous:
Administered skills test for Maintenance Worker applicants
Met with the League of Minnesota Cities