8.f) Public Works Activity Report-September 2012 .
Public Works Activity Report � - � �
September 1 through September 30, 2012 � � � �
Tim Kieffer, Maintenance Superintendent ��i1���
(651) 325-5218 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
• Repaired two driveways on Melanie Tr. due to culvert reptacements
• Graded 237`h St.
• Repaired street sign at 238�'St. and Morgan Av.
• Weed whipped along sidewalk at Oakhill Ct. and Oakhilt Rd.
• Picked up trash in ditches at several locations
• Removed fallen trees in the ditches at several locations
• Shouldered 237`"St. after paving was performed
• Re-graded Pilar Rd.due to washout
• Mowed ditches
Park&Recreation:
• Mowed and weed whipped all parks and building properties
• Trimmed trees around the Community Center
• Landscaped around the Community Center dala horse
Sewer:
• Read pump run times at all of the lift stations
Water:
• Read water meters for Uptown system
Equipment and Building:
• Prepared cold storage building and Community Center for Taco Daze
• Prepared vehicles for Taco Daze
• Brought hazardous chemicals to Washington County
• Replaced water pump, belt,and PTO shaft on the John Deere 6410 tractor(302-99)
• Resolved issues from mock OSHA inspection
• Performed monthly OSHA inspections
Management tasks
Street:
• Met with resident on Pilar Rd.
• Coordinated the street stripping with contractor
• Wrote a Mailbox/Right of Way and Driveway Permit article for the newsletter
• Got quotes for 237th St. paving project and supervised the work
• Met with resident on 199th St.
Sewer:
• Corresponded with engineers about the Uptown system
• Corresponded with EcoCheck about the Uptown and Anderson/Erickson systems
• Corresponded with Xcel about the Uptown drain field
• Had base elbow replaced on pump 2 at Bliss lift station 2
• Wrote a letter to residents on the Anderson/Erickson system about tank inspections
• Met with resident on 188th St about his tank
• Corresponded with contractor to have risers and castings replaced at the Community Center
• Wrote a memo selecting a pumping contractor
• Attended pre-con meeting for the Uptown improvements
• Corresponded with contractor about a pump replacement on Langly Av.
Equipment and Building:
• Met with cutting edge vendor to request quotes
Miscellaneous:
• Worked on budget amendments
• Gave new City Administrator a tour of the City