Loading...
8.f) Public Works October 2012 �. -�) Public Works Activity Report - � � � October 1 throu h October 31 2012 � � � � g , Tim Kieffer, Maintenance Superintendent ��1:Zlr �� (651) 325-5218 t.kieffer@ci.scandia.mn.us Maintenance tasks Street: • Picked up garbage along roadside • Mowed ditches • Graded gravel roads • Cleared trees and brush around City sign on Scandia Tr. • Fixed street light outage Park&Recreation: • Mowed parks and building properties • Replaced two light globes at Hay Lake • Picked up materials for bike route • Put skateboard equipment in cold storage • Took out dock at Goose Lake landing • Cleared trails at Lilleskogen Park Sewer: • Read pump run times at all of the lift stations • Performed pump down test on Bliss Lift Station 1 • Put new stickers with emergency numbers on control panels for the Uptown and Anderson/ Erickson systems Water: • Read water meters for Uptown system • Took water samples for lead testing Equipment and Building: • Organized the old maintenance shop • Had re-call done on Mack dump truck(203-11) • Worked on water service for old maintenance shop • Organized offices at the Community Center • Replaced light bulbs in front office at the Community Center • Replaced hydraulic tank on Sterling dump truck(202-02) • Replaced parking lot light at the Community Center � Replaced tires on Ford F-350 pick-up(102-08) • Prepared equipment for snow removal operations • Recycled steel and iron • Winterized seasonal equipment Management tasks Street: • Attended pre-con meeting for Olinda Tr. curb replacement • Wrote Tree Trimming Policy • Talked with resident on 188`h St about brush in the right of way • Talked with resident on 205`h St about rocks in the right of way • Had final inspection for the Bone Lake Fish Barrier Project • Met with resident about a driveway permit • Met with contractor about a culvert issue on Layton Av. • Met with engineer to discuss 2013 road projects Park&Recreation: • Looked for light globes for Hay Lake • Marked out trails at Lilleskogen Park • Drove bike route to determine exact location of signs • Met with Ice Rink Maintenance Worker Sewer: • Had contractor instatl new access risers and covers at the Community Center and Warming House • Worked with Elim Church to get an easement for the Uptown Lift Station • Attended walk through of Uptown Improvements • Corresponded with engineer about the Anderson/Erickson System • Corresponded with EcoCheck about Anderson/Erickson repairs • Scheduled well sampling for the Anderson/Erickson system • Met with contractor about an utility permit on 189`h St. • Worked with contractor on Anderson/Erickson septic tanks Equipment and Building: • Scheduled annual inspection and maintenance of furnaces and water heaters • Scheduled deliveries for construction and metal dumpsters • Obtained quotes and wrote brush cutter memo • Obtained quotes and scheduled replacement of tires for the Ford F-350(102-08) • Obtained quotes for power washer Miscellaneous: • Attended pre-con meeting for the Goose Lake Ravine Project • Met with the watershed to discuss erosion problems 2