8.f) Public Works October 2012 �. -�)
Public Works Activity Report -
� � �
October 1 throu h October 31 2012 � � � �
g ,
Tim Kieffer, Maintenance Superintendent ��1:Zlr ��
(651) 325-5218 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
• Picked up garbage along roadside
• Mowed ditches
• Graded gravel roads
• Cleared trees and brush around City sign on Scandia Tr.
• Fixed street light outage
Park&Recreation:
• Mowed parks and building properties
• Replaced two light globes at Hay Lake
• Picked up materials for bike route
• Put skateboard equipment in cold storage
• Took out dock at Goose Lake landing
• Cleared trails at Lilleskogen Park
Sewer:
• Read pump run times at all of the lift stations
• Performed pump down test on Bliss Lift Station 1
• Put new stickers with emergency numbers on control panels for the Uptown and Anderson/
Erickson systems
Water:
• Read water meters for Uptown system
• Took water samples for lead testing
Equipment and Building:
• Organized the old maintenance shop
• Had re-call done on Mack dump truck(203-11)
• Worked on water service for old maintenance shop
• Organized offices at the Community Center
• Replaced light bulbs in front office at the Community Center
• Replaced hydraulic tank on Sterling dump truck(202-02)
• Replaced parking lot light at the Community Center
� Replaced tires on Ford F-350 pick-up(102-08)
• Prepared equipment for snow removal operations
• Recycled steel and iron
• Winterized seasonal equipment
Management tasks
Street:
• Attended pre-con meeting for Olinda Tr. curb replacement
• Wrote Tree Trimming Policy
• Talked with resident on 188`h St about brush in the right of way
• Talked with resident on 205`h St about rocks in the right of way
• Had final inspection for the Bone Lake Fish Barrier Project
• Met with resident about a driveway permit
• Met with contractor about a culvert issue on Layton Av.
• Met with engineer to discuss 2013 road projects
Park&Recreation:
• Looked for light globes for Hay Lake
• Marked out trails at Lilleskogen Park
• Drove bike route to determine exact location of signs
• Met with Ice Rink Maintenance Worker
Sewer:
• Had contractor instatl new access risers and covers at the Community Center and Warming
House
• Worked with Elim Church to get an easement for the Uptown Lift Station
• Attended walk through of Uptown Improvements
• Corresponded with engineer about the Anderson/Erickson System
• Corresponded with EcoCheck about Anderson/Erickson repairs
• Scheduled well sampling for the Anderson/Erickson system
• Met with contractor about an utility permit on 189`h St.
• Worked with contractor on Anderson/Erickson septic tanks
Equipment and Building:
• Scheduled annual inspection and maintenance of furnaces and water heaters
• Scheduled deliveries for construction and metal dumpsters
• Obtained quotes and wrote brush cutter memo
• Obtained quotes and scheduled replacement of tires for the Ford F-350(102-08)
• Obtained quotes for power washer
Miscellaneous:
• Attended pre-con meeting for the Goose Lake Ravine Project
• Met with the watershed to discuss erosion problems
2