8.d) City Engineer Report 8, �� � � Cit of Scandia � � ` y ENG/NEER/NG UPDA TE December 18, 2012 The purpose of this update is to provide information on current projects and engineering in Scandia. Updated information is shown in italics. Pavement Manaaement Plan Uadate • We have been working wifh Tim Kieffer on priority mod�cations to the Pavement Management Plan, a draft 2013 sea/coat/patching list, and a six-year master seal coat plan. Anderson/Erickson Sewaqe Treatment Svstem • A draft policy for future connections will be presented at the January 10, 2013 Wastewater Advisory Committee meeting. • Working with Tim Kieffer and EcoCheck on list of repairs that need to be completed in the near future. • The fall 2012 monitoring well sampling has been completed. The fall testing indicated elevated levels of ammonia. We will need to continue sampling the monitoring wells. Uptown Wastewater Svstem Improvements • Final punch-list items remain. Tim Kieffer is tracking this project. CSAH 3/Olinda Trail Curb and Sidewalk Reqlacement Proiect • Work is substantially complete. Tii Gavo • The Conservation District has issued a certificate of compliance. The CMSCWD has requested some additional information from the developer regarding the drainage features. • City staff reviewed the site in October. Most of the items on the Final Inspection Notice have been addressed by the Developer. The remaining items can be completed in the spring of 2013. At that time, the City can complete a comprehensive review of the project(including landscaping) and consider a reduction in the project sureties. Bone Lake Fish Barrier (CLFLWD Proiect) • Tim will work with the watershed on a patch and seeding inspection in the spring. Goose Lake Ravine Stabilization Proiect(CMSCWD Proiect) • Tim will work with the watershed on a seeding inspection in the spring. GIS and Mappinq • We are working with Tim on a G/S infrastrucfure inventory and mapping issues. We have loaned Tim a GPS unit(no charge) for comp/eting a sign inventory. • We worked with Tim to prepare snow plowing route maps for use by the plow drivers. Other • Have been in contact with a resident on 196"'St. regarding a drainage issue. • Worked with prope►ty owner conceming new sewer connection in Bliss area. • Merry Chrisfmas and Happy Holidays to everyone. We/ook forward to a great 2013. City of Scandia-Engineering Update