8.f) Public Works Report �o �)
Public Works Activity Report � � �
November 1 through November 30, 2012
� � �����
Tim Kieffer, Maintenance Superintendent ��1���
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
• Cleared brush from ditches in several locations
• Potholed roads
• Graded gravel roads
• Hauled away street sweepings from contractor
• Re-graded Goose Lake Landing
• Repaired culvert on Layton Av
• Took down flags in downtown area
• Cleared fallen tree from road
• Picked up trash along roadside
• Cleaned several culverts
• Picked up dead deer in the ditch
• Put up wreaths and replaced burned out bulbs
• Replaced GFI outlet on light pole
Park&Recreation:
• Took down tennis court nets
Sewer:
• Read pump run times at all of the lift stations
Water:
• Read water meters for Uptown system
Equipment and Building:
• Set up voting booths for election
• Replaced two outside light bulbs on the warming house
• Cleaned vents at the Community Center
• Put up holiday decorations at the Community Center
• Replaced 8 outside light bulbs at the Community Center
Miscellaneous:
• Attended safety training
Management tasks
Street:
• Scheduled timing of street sweeping with contractor
• Reviewed and approved two utility permits
• Met with resident on Layton Av about a culvert issue
• Attended snow and ice conference
• Created three plow route
• Interviewed for seasonal plow drivers
• Prepared information and administered snow plow meeting
• Had contractor remove sediment from culvert outlets
• Had contractor clean catch basins
• Corresponded with MNDOT about a sign issue
Park&Recreation:
• Called in locates for bike route signs
• Scheduled air compressor rental for installation of bike route signs
• Ordered dasher boards for ice rink
Sewer:
• Talked with Elim Church about low flow fixtures
• Contacted Gammelgarden to have representation on the Wastewater Committee
• Had contractor raise access covers on three septic tanks on the Anderson/ Erickson system
• Had contractor remove roots from two septic tanks on the Anderson/Erickson system
• Had electrician fix control panels on the Uptown system
• Worked with contractors on septic tank repairs on the Bliss system
• Prepared letter to send out to Bliss residents about the transition to EcoCheck
• Corresponded with EcoCheck about repairs on the Anderson/ Erickson system
• Corresponded with engineer to calibrate the Uptown Drainfield
Equipment and Building:
• Had electrician wire additionat outlets at the Public Works shop
• Wrote power washer memo
• Scheduled PRV inspection at the Fire Hall
Miscellaneous:
• Met with Stantec to go over GPS unit
2