8.f) Public Works Report �o �) Public Works Activity Report � � � November 1 through November 30, 2012 � � ����� Tim Kieffer, Maintenance Superintendent ��1��� (651) 433-5223 t.kieffer@ci.scandia.mn.us Maintenance tasks Street: • Cleared brush from ditches in several locations • Potholed roads • Graded gravel roads • Hauled away street sweepings from contractor • Re-graded Goose Lake Landing • Repaired culvert on Layton Av • Took down flags in downtown area • Cleared fallen tree from road • Picked up trash along roadside • Cleaned several culverts • Picked up dead deer in the ditch • Put up wreaths and replaced burned out bulbs • Replaced GFI outlet on light pole Park&Recreation: • Took down tennis court nets Sewer: • Read pump run times at all of the lift stations Water: • Read water meters for Uptown system Equipment and Building: • Set up voting booths for election • Replaced two outside light bulbs on the warming house • Cleaned vents at the Community Center • Put up holiday decorations at the Community Center • Replaced 8 outside light bulbs at the Community Center Miscellaneous: • Attended safety training Management tasks Street: • Scheduled timing of street sweeping with contractor • Reviewed and approved two utility permits • Met with resident on Layton Av about a culvert issue • Attended snow and ice conference • Created three plow route • Interviewed for seasonal plow drivers • Prepared information and administered snow plow meeting • Had contractor remove sediment from culvert outlets • Had contractor clean catch basins • Corresponded with MNDOT about a sign issue Park&Recreation: • Called in locates for bike route signs • Scheduled air compressor rental for installation of bike route signs • Ordered dasher boards for ice rink Sewer: • Talked with Elim Church about low flow fixtures • Contacted Gammelgarden to have representation on the Wastewater Committee • Had contractor raise access covers on three septic tanks on the Anderson/ Erickson system • Had contractor remove roots from two septic tanks on the Anderson/Erickson system • Had electrician fix control panels on the Uptown system • Worked with contractors on septic tank repairs on the Bliss system • Prepared letter to send out to Bliss residents about the transition to EcoCheck • Corresponded with EcoCheck about repairs on the Anderson/ Erickson system • Corresponded with engineer to calibrate the Uptown Drainfield Equipment and Building: • Had electrician wire additionat outlets at the Public Works shop • Wrote power washer memo • Scheduled PRV inspection at the Fire Hall Miscellaneous: • Met with Stantec to go over GPS unit 2