Loading...
8.e) Building Official/Maintenance Supervisor ' � �� Council Report January 2011 Steve Thorp Scandia Building Official/Maintenance Supervisor BUILDING INFORMATION: #Permits issued: January= 5 YTD=S #New residential units: 0 YTD=S Totals for January 2011 Valuation=$20,667.00 YTD=$20,667.00 Permit Fees=$461.50 YTD=$461.50 a) Plan Review Fees=$0 YTD=$0 b) Other Fees=$0 YTD=$0 Tota1 Fees Generated=$461.50 YTD=$461.50 CODE ENFORCEMENT/ZONING ACTIONS: • TOTAL ENFORCEMENT ACTIONS: 108 1. court action: 0 2. actively pursuing: 25 3. closed cases: 83 • new cases: 2 for the month of January; • 6 Exterior Storage violations, 12 potentially dangerous dog and 6 miscellaneous cases, 1 case involving Scenic Riverway violations which will require a permit for cutting of trees. *Exterior Storage: No more than one `shipping container' can be stored in a side yard or rear yard for a period of no more than 6 months while remodeling occurs on the property- subject to setback requirements. PUBLIC WORKS EQUIPMENT: • The new Ford F250 regular cab has arrived and may possibly be in operation by the February Council meeting. STREETS: • Snow plow meeting on February 8th 2011 was conducted and a consensus was reached on the policy by the entire Council. The public works crew will be notified of the expectations for snow removal. SAFETY: • Weekly meetings as well as monthly Safety committee meetings to attain OSHA compliance; • Plow truck operators checklist is being developed for the pick up trucks and will be along the lines of the MNDOT requirements for the larger trucks. SEWER/WATER: � A second round of collection samples will be taken from the Elim parking lot lift tank, weather permitting; • The grant money from the MN Dept of Health was turned down, I am in contact with the source water protection unit as well as the drinking water protection unit at the State. We should be able to reapply this spring. BUILDINGS: • The salt shed is up except for the fabric door which has been ordered and should arrive soon. Presently we have about 70 tons of salt stored and ready to be used. PARK MAINTENANCE: COMMUNITY DEVELOPMENT PLANNING: • Tii Gavo is working with the WC Soil Conservation District and CMSC Watershed District to finish up with their items so that the project can be completed early spring of 2011. Addressing the drainage system will be the main focus of the Developer along with the punch list given them by our Engineer; • An application has been submitted for a variance to build a residence on an existing nonconforming lot on Big Marine Lake. The variance will probably be for lake setback and lot size but the applicant is researching his options and has asked to be placed on the April Planning Commission agenda; • Questions have been generated regarding the placement of a residence on a vacant platted lot on Bone Lake. The lot is approximately 5 acres with 4 of those across Melanie Trail and 1 acre being on the lake. It seems they may also make the April agenda if a variance is needed. ZONING: ENGINEERING: • The placement of new power poles has begun by Excel Energy on the western side of Scandia. These are the mid-height poles that are about 70' high and angle across the City from south of 97/Manning to Sea Lake. PARKS: DAILY ACTIVITIES • Building and Zoning inspections; • Coordinating projects for Public Works; • Review of permits for the excavation into the ROW by Utility companies. • Resident interaction including phone calls, emails and in person regarding zoning,planning and building issues as well as calls regarding street maintenance; • Continuing education to maintain certifications for Wetland Conservation Act, Building Official, Water Operator and other licenses that may be required; • Traimng for the implementation of the sign reflectivity requirements ongoing; • Safety training per the League of MN Cities Insurance Trust. City of Scandia Code Official's Report November 2010 PERMITS Permit# Date Address Owner Work Valuation 11-001 1/5/2011 10665 213th St N Ro owski fumace $3,500.00 11-002 1/6/2011 12700 181st St Nolen furnace $5,000.00 11-003 1/14/2011 14071 Scandia Tr Bastiaens water heater $4,000.00 11-004 1/21/2011 14003 202nd St Johnson basement finish $2,000.00 11-005 1/31/2011 19091 La on Ave Salmela window re lacement $6,167.00 $20,667.00 FEES Permit Fee Plan Review Fee Other Total Permit# 11-001 $99.50 $99.50 �I 11-002 $113.50 $113.50 � 11-003 $49.50 $49.50 �, 11-004 $99.50 $99.50 �I 11-005 $99.50 $99.50 $461.50 Letters of Credit Name Purpose Date issued Initial amount Current balance Expiration Tii Gavo construction 6/28/07 $ 1,514,344.00 $ 65,000.00 6/28/2011 auto-renewal Tii Gavo landsca e 6/28/07 $ 177,687.00 $ 120,000.00 6/28/2011 auto-renewal Old Marine Estates im rovements 7/23/08 $ 5,300.00 $ 5,300.00 7/23/2011 Childers variance 12/6/05 $ 30,000.00 $ 5,000.00 6/6/2011