5.k) Staff Report - 2014 Patching ProjectTo: City Council From: Tim Kieffer, Director of Public Works Date: May 20, 2014 Staff Report kpo 4" SCANDIA Re: 2014 Bituminous Patching Project Background: Last year staff solicited bids for bituminous patching as a separate project in the hopes of obtaining better prices. The project included removal of existing bituminous and poor sub -base soils. New aggregate and bituminous was then placed. Bigger patches were contracted out and city staff performed smaller repairs. Proposal: Similar to last year, large repairs within the 2014 sealcoat area will be contracted. However, instead of full depth, a 1-inch overlay will be used on 205th Street. Severe cracking and raveling has occurred but bituminous movement is minimal. Therefore, staff believes the sub -base to be adequate so a surface repair will be used to cover deficiencies and re- establish the crown. An overlay will allow for needed repairs while increasing the quantity of work. Sections of Oakhill Road will also receive a 1-inch overlay. Fiscal Impact: The 2014 budget has $300,000 for contractual road maintenance. The low base bid is $34,280. Options: 1) Award the 2014 Bituminous Patching Project to T.A. Schifsky & Sons for $34,280. 2) Do not award the Bituminous Patching Project. Recommendation: Option 1 Attachments: Location of project Bid results