Loading...
7.a)1) Quote Results Letter• = BO LTON 8L M F== N K , I NCB Consulting Engineers & Surveyors 2035 County Road D East • Suite B • Maplewood, MN 55109-5314 Phone (651) 704-9970 • Fax (651) 704-9971 www.bolton-menk.com May 2, 2014 Honorable Mayor and City Council City of Scandia 14727 209t" Street N Scandia, MN 55073 Re: Quote Results Lilleskogen Park/Odell Ave North Concrete Work Dear Mayor and Council: Solicitation of Quotes for the Lilleskogen Park/Odell Ave North Concrete Work have been received and the results are as follows. The work outlined in the base bid, includes removal and replacement of curb and gutter on Oak Hill Road and installation of curb around the inner island of the parking lot project at Lilleskogen Park. Alternate No. 1 work includes, removal and replacement of the existing damaged sidewalk panels along Odell Avenue North between Scandia Trail North (Highway 97) and 205t" Street North. The following is a summary: Contractor Base Quote Alternate No. 1 Total Knife River Concrete $7,250.00 $2,062.50 $9,312.50 Kassa Construction $8,555.00 $2,100.00 $10,655.00 Curb Masters, Inc $9,492.50 $2,906.25 $12,398.75 Landmark Concrete, Inc $9,780.00 $2,437.50 $12,217.50 Interstate Companies $10,890.00 $3,187.50 $14,077.50 New Look Contracting, Inc $11,324.50 $2,812.50 $14,137.00 Remackel Outdoor Services Inc $15,900.00 $3,750.00 $19,650.00 Based on the summary above, if the City Council wishes to award the Project to the lowest quote, then Knife River Concrete should be awarded the project on the Total Base Quote and Alternate No. 1 in the amount of $9,312.50. If you have any questions, please feel free to contact me at 612-597-7140. Sincerely, BOLTON & MENK, INC. 4" J . 'd- Ryan J. Goodman, P.E. City Engineer Enclosure DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer