Loading...
9.b) Geotechnical Services Quotes Soil Borings ReportBOL_TON & MAN K, iNC. Consulting Engineers & Surveyors 2035 County Road D East • Suite B • Maplewood, MN 55109-5314 Phone (651) 704-9970 • Fax (651) 704-9971 www.bolton-menk.com May 15, 2014 Honorable Mayor and Council City of Scandia 14727 209th Street N Scandia, MN 55073 RE: Geotechnical Services - Soil Borings & Report / Recommendation for Award Dear Honorable Mayor and Council: Quotes have been obtained to perform soil borings as identified on the attached soil boring location maps. To give the City flexibility of awarding the work, the quotes have been separated into three parts. Shown below is a summary of quotes obtained. Testing Company Award - Individual Parts Award - All Parts Northern Technologies, Inc. Part 1 - $2,650 Part 2 - $2,350 Part 3 - $2,550 $2,400 cost reduction offered Total - $7,550 Total - $5,150 Testing Company Award - Individual Parts Award - All Parts American Engineering Testing Part 1 - $1,950 Part 2-$1,180 Part 3 - $2,890 no reduction offered Total - $6,020 Total - $6,020 Testing Company Award - Individual Parts Award - All Parts Braun Intertec Part 1 - $2,609 Part 2 - $2,024 Part 3 - $3,175.50 $500 cost reduction offered Total - $7,808.50 Total - $7,308.50 Based on the summary above, if the Council wishes to award the project and to obtain the best overall pricing, our recommendation would be to award Part 1, Part, 2, and Part 3 to Northern Technologies, Inc. in the amount of $5,150.00. If there are any questions in regards to the information above, please call me at 612-597-7140. Sincerely, BOLTON & MENK, INC. Ryan J. Goodman, P.E. City Engineer Enclosures: Soil Boring Location Maps & Quotes for Geotechnical Services DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer 1 I H1MON inN3A-V- iNint il1lIV210311AI11VUIN3J NISNOJSIM /i I O Z 0 a om a cc O as O m ZV 0ci C m c J Z 0 oz 09 i Z O a F i a Z a 3 z Z o R{VER z w 0 S.T. CROIX ow mJo J J ow 0 Z N 5 O m~ J Z og / a: cc o oaca mZQo m o Z M O •-i N tYf H H H d' CC K a a a � N O i a z 0 Z z 'o Q C7 Z o w d� a z z 0 N I s i NORTHERN TE May 15, 2014 City of Scandia c/o Bolton and Menk Attention: Katie Warner 2035 County Road D East, Suite B Maplewood, MN 55109-5314 RE: Proposal for Geotechnical Services Scandia 2015 Street Improvements Project Scandia, Minnesota NTI Proposal P4245 INC. We are pleased to submit our proposal to perform Geotechnical Services requested for the above referenced project. The purpose of the 2015 Street Improvements Project is to collect representative soils samples, analyze the soil and groundwater conditions and to furnish a factual geotechnical engineering report for each Part to assist the City with reconstructing the respective roads with an appropriate new pavement thickness section. The reports will not include design or construction recommendations. The proposed project consists of reconstructing bituminous streets in three areas (Parts) of Scandia. Part 1 consists of two project areas: one located in the northwest corner of Scandia and one in the east -central portion of Scandia. Part 2 consists of an area in the south-central portion of Scandia. Part 3 consists of an area in east -central Scandia. The City of Scandia wants to evaluate the existing bituminous pavement section thicknesses and determine the type of subgrade soil for reconstruction purposes. Figures 1 and 2 provided by Bolton and Menk define each of these areas. The City has not yet determined if the subsurface exploration and reporting will be performed separately for each Part or concurrently/combined for all Parts (1, 2, and 3) at one time. SCOPE OF WORK The following is our proposed work scope based on the request for proposal provided by Bolton and Menk. NTI will mark the proposed boring locations in the field. A diagram of such locations has been provided by Bolton and Menk. 6588 141-1 Ave NW 7403 19f Street S 1408 Northland Drive #107 3522 4d, Avenue S 5150 Highway 2 E 830 S 481h Street Ramsey, MN 55303 St. Cloud, MN 56301 Mendota Heights, MN 55120 Fargo, ND 58103 Minot, ND 58701 Grand Forks, ND 58201 763.433.9175 320.654.9409 763.433.9175 701.232.1822 701.818.8486 701.219.0920 763.323.4739 fax 763.323.4739 fax 651.389.4190 fax 701.232.1864 fax 701.232.1864 fax 701.775.3774 fax Proposal for Geotechnical Services Scandia 2015 Street Improvements Project Scandia, MN NTI will contact the Minnesota "One -Call" system for clearance of public utilities within the areas of the soil borings. NTI will provide a private locator should it be necessary. The cost of a private locator is a reimbursable expense and is not included in our fee. NTI will then mobilize a truck mounted drill to the site to drill 14 standard penetration test (SPT) soil borings for Part 1, 9 SPT borings for Part 2, and 5 SPT borings for Part 3. All borings in Part 1 and Part 2 will be advanced to nominal depths of 4 feet below existing grade. Borings in Part 3 will terminate at minimum depths of 4 feet and 10 feet below existing grade. The 10-foot borings may be advanced more than 10 feet if necessary to reach the shallower of either bedrock or groundwater. Based on well logs from a publically available resource, we anticipate bedrock to be 10 feet or less below existing grade in the Part 3 area. Bolton and Menk's Figures 1 and 2 illustrate the proposed boring locations. The lineal feet of drilling proposed at this time is 56 feet for Part 1, 32 feet for Part 2, and 50 feet for Part 3. The total for all three Parts will be 138 lineal feet. Borings may be terminated early if soil/bedrock conditions resulting in practical auger refusal are encountered prior to the proposed termination depths. If soft soils, fill or organic soils are encountered near termination we will continue drilling a reasonable depth until a minimum of five (5) feet of suitable foundation soils are observed. If each Part is performed separately, then the drilling program for each individual Part will take less than one day to complete. If all three Parts are combined into one drilling program, it will take one day to complete. We will make you aware of these field activities before proceeding to the site to allow you the option to notify any pertinent parties prior to NTI's field work. NTI has assumed that there is reasonable access to the proposed borehole locations. This would include slopes suitable for traversing with a geotechnical drill rig, safe working distances from overhead utilities, removal of site obstructions that prohibit access to the proposed borehole locations, etc. In addition, drill rig access to the proposed boring locations may result in cracking of onsite pavements or sidewalks and rutting of site soils. NTI will take reasonable precautions to prevent such damage but repair and final restoration shall be performed by others at no charge to NTI. We understand that basic safety measures for traffic control including work ahead signage and safety cones will be adequate for the anticipated low volume residential streets. NTI will provide safety cones and work ahead signage for traffic control and safety purposes. Existing pavement and base aggregate thicknesses will be measured in the boreholes. Soil sampling in the borings will be performed at continuous 2-1/2 foot intervals to their respective termination depths of 4 or 10 feet dependent on the project requirements. Soil sampling will be performed in general accordance with ASTM D 1586. A geotechnical engineer will visually classify field -collected samples in accordance with ASTM D 2488. Each soil sample's color, relative moisture, SPT N- value, relative density, consistency and estimated compressive strength will be documented on soil boring logs. 0 Minneapolis/St. Paul • St. Cloud 9 Fargo • Grand Forks • Minot Proposal for Geotechnical Services Scandia 2015 Street Improvements Project Scandia, MN We will measure for the presence of groundwater or lack thereof when we complete each soil boring. We will backfill and compact the soil borings with soil cuttings or high solids bentonite grout to comply with current Minnesota Department of Health Regulations. Each boring located in pavement will be patched with cold -patch asphalt. We will perform laboratory tests on selected soil samples, this may include: 1. Moisture tests 2. Gradations Upon completion of the field and laboratory work, a factual geotechnical engineering report will be prepared. The report will include the logs of the borings, the location drawing provided by Bolton and Menk and the results of the field and laboratory tests. The report will also include a summary of- 1 . Bituminous pavement thickness 2. Aggregate base thickness 3. Type of subgrade soil and moisture conditions 4. Depth to groundwater (if encountered) 5. Additional notes that may be beneficial for pavement design and construction NTI's engineers are also available to provide additional geotechnical guidance to the design team, evaluate value engineered alternatives, review earthwork, groundwater control, and other civil plans and specifications as an additional service. NTI's engineers, special inspectors and technicians are available to provide construction and materials testing services once the project construction begins. This provides professional continuity of services throughout the design and construction of the project. DELIVERABLES NTI will provide two (2) paper copies and a PDF of the final report to the client. COST If each Part is performed separately with 3 drill rig mobilizations and 3 separate reports, we will perform each respective Part for the following fixed fees: Part 1 (14 borings x 4 feet = 56 lineal feet):.......................$2,650 Part 2 (8 borings x 4 feet = 32 lineal feet) :........................$2,350 Part 3 (1 boring x 4 feet, 4 borings x 10 feet = 44 lineal feet :... $2,550 TOTAL...............................................................$79550 If all 3 Parts are performed under one authorization (one trip to stake/one trip for locate meet/one drill rig mobilization), and can be combined into a one single report, we will perform Parts 1, 2, and 3 for a total fee not to exceed $5,150, resulting in a net cost savings to the City of $2,400. aMinneapolis/St. Paul • St. Cloud • Fargo • Grand Forks • Minot Proposal for Geotechnical Services Scandia 2015 Street Improvements Project Scandia, MN If additional drilling footage on a started boring is required to reach competent non -organic native soils we will invoice at a rate of $18/foot. SCHEDULE Upon receiving authorization to proceed, the field work will typically begin in approximately 5 to 10 business days and will take less than 1 day to complete for each Part but will depend on the final scope package selected by the City. The final report(s) will be issued to Bolton and Menk and the City of Scandia within 5 to 10 business days of completion of field work for each respective Part. ACCEPTANCE Please indicate your acceptance of this proposal by signing on the signature block below, and returning a copy to us. The attached General Conditions are an integral part of this proposal. This proposal is effective until June 30, 2014. We thank you for the opportunity of submitting this proposal and look forward to working with you through both the design and construction phase of this project. If you have any questions regarding this proposal please contact the undersigned at 763-433-9175. NORTHERN TECHNOLOGIES, INC. CITY OF SCANDIA `f7 7� Ryan T. Menter, P.E. By: Project Engineer 6, ' �-2l' Printed Name: Ryan M. Benson, P.E. Regional Manager/ Principal Engineer Title: Attachment: General Conditions Date 0 Minneapolis/St. Paul • St. Cloud • Fargo • Grand Forks 9 Minot AMERICAN ENGINEERING TESTING, INC. May 15, 2014 City of Scandia c/o Ms. Katie Warner, P.E. Bolten & Menk, Inc. katiewa@bolton-menk.com RE: Proposal for Pavement Engineering Services 2015 Street Improvements Scandia, MN Dear Ms. Warner: CONSULTANTS • ENVIRONMENTAL • GEOTECHNICAL • MATERIALS • FORENSICS Per your request, we are submitting this cost proposal for evaluation of several streets in Scandia, Minnesota. The purpose of this new pavement engineering work is to evaluate the thickness and structural condition of the existing pavement and subgrade. This letter is intended to define our scope of work, present an estimate of our fees, and provide our anticipated schedule. Scope of Services- Part 1 • Field locate and mark 14 locations at the approximate locations provided by you. Notify Gopher State One Call to locate public utilities. • Drill and sample 4-inch diameter pavement cores through the existing pavement. • Perform direct push soil borings to an approximate depth of 4 feet each. • Obtain samples of subsurface soils for materials classification and determination of water and/or organic content. • Backfill boring holes and patch with bituminous patching mixture. • Prepare a factual report providing descriptions of drilling, sampling, testing and classification methods, summary of bituminous layer thickness, and summary of aggregate base thickness and textural classification. Scope of Services- Part 2 • Field locate and mark 9 locations at the approximate locations provided by you. Notify Gopher State One Call to locate public utilities. • Drill and sample 4-inch diameter pavement cores through the existing pavement. • Perform direct push soil borings to an approximate depth of 4 feet each. • Obtain samples of subsurface soils for materials classification and determination of water and/or organic content. • Backfill boring holes and patch with bituminous patching mixture. • Prepare a factual report providing descriptions of drilling, sampling, testing and classification methods, summary of bituminous layer thickness, and summary of aggregate base thickness and textural classification. 550 Cleveland Avenue North I St. Paul, MN 55114 A Phone 651-659-9001 j Toll Free 800-972-6364 j Fax 651-659-1379 ! www.amengtest.com IAAlEEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. 2015 Street Improvements, Scandia, MN Ms. Katie Warner, P.E. Page 2 of 3 Scope of Services- Part 3 • Field locate and mark 5 locations along 2051h Street North to Log House Landing as shown in the sketch you provided. Notify GSOC to locate public utilities. • Perform 5 auger borings to depths ranging from 4 feet for the eastern boring to 10 to 12 feet minimum (up to 21 feet maximum) for the central borings and to groundwater or bedrock (up to 21 feet maximum) for the two eastern borings. • Obtain samples of subsurface soils for materials classification and determination of water and/or organic content. • Backfill boring holes per Minnesota Department of Health requirements and patch with bituminous patching mixture. • Prepare a factual report providing descriptions of drilling, sampling, testing and classification methods, summary of bituminous layer thickness, and summary of aggregate base thickness and textural classification. Add Alternate As an add alternate, we recommend that the roads be tested with a falling weight deflectometer (FWD). The FWD is a standard roadway testing procedure that allows the roads to be evaluated for road carrying capacity along their entire length. Used together, the FWD and soil borings allow us to accurately measure the strength of the roadway at 1/10`h mile intervals and determine whether there are any structural concerns in any part of the roadway that may need to be addressed prior to rehabilitation. The use of this technology will provide a much more accurate assessment of areas of instability. We have attached data sheets that describe our FWD testing. Fees Our services will be performed on a lump sum basis as follows: Part 1 - $1,950 Part 2 - $1,180 Part 3 - $2,890 Add alternate for FWD testing for Parts 1, 2, and 3 - $1,400 Schedule Based on our current schedule and weather permitting, we can perform the coring and soil borings within two weeks of obtaining a notice to proceed. Our reports will follow within two to three weeks of performing the field work. If work is authorized by May 23, 2104, we would complete our reports before July 28, 2014. 2015 Street Improvements, Scandia, MN Ms. Katie Warner, P.E. Page 3 of 3 Terms and Acceptance Our services will be performed per the attached three -page Service Agreement. Please indicate your acceptance of this proposal by endorsing the enclosed copy and returning it to us. The original proposal is intended for your records. Remarks The scope of work defined in this proposal is intended for geotechnical purposes only, and not to explore for the presence of extent of environmental contamination at the site. However, we will note obvious contamination encountered. If you have questions or need additional information, please contact me at 651.603.6618. Sincerely, American Engineering Testing, Inc. Melanie Fiegen, PE Pavement Engineer Office Phone: 651.603.6618 mfiegen@amengtest.com Attachments: 3 page Service Agreement PROPOSAL ACCEPTANCE BY: Signature: Printed Name: Date: May 14, 2014 Mr. Ryan Goodman, PE City of Forest Lake c/o Bolton & Menk, Inc. 2035 County Road D East, Suite B Maplewood, MN 55109 Re: Proposal for a Geotechnical Exploration Various Roadways Scandia, Minnesota Dear Mr. Goodman: Braun Intertec Corporation 1826 Buerlde Road Saint Paul, MN 55110 Proposal QTB004499 Phone: 651.487.3245 Fax: 651.487.1812 Web: braunintertec.com Braun Intertec respectfully submits this proposal to complete subsurface investigations for various City streets located in Scandia, Minnesota. Our Understanding of Project Per your emails and provided sketches (attached), we understand that the City of Scandia is proposing to reconstruct various City streets as part of the City's annual maintenance program. It was requested that soil borings be performed in three separate parts. As identified on the sketches provided by Bolton & Menk: ■ Part 1 includes fourteen soil borings to a depth of four feet ■ Part 2 includes nine soil borings to a depth of four feet ■ Part 3 includes one soil boring to a depth of four feet and four soil borings to a minimum depth of ten feet. As discussed with Ms. Katie Warner of Bolton & Menk, for the 4-foot deep borings, it is more cost- effective to perform pavement cores and hand augers. This also provides more precise measurements of pavement materials. Therefore, it is our intent to perform 24 pavement cores and hand augers in lieu of the four -foot soil borings in all three of the project areas. From our review in Google Earth, it appears the streets have a bituminous surface and do not have concrete curb and gutter. Purpose The purpose of the subsurface investigations at the identified locations is to determine the bituminous and aggregate base thicknesses, if present, and to classify the underlying soils. On 205th Street North, the intent of the deeper soil borings is to identify pavement materials and underlying soils, as well as to determine the depth of either groundwater or bedrock. A A,/idOE Providing engineering and environmental solutions since 1957 City of Scandia Proposal QTB004499 May 14, 2014 Page 2 Scope of Services The following tasks are proposed to help achieve the stated purpose. If unfavorable or unforeseen conditions are encountered at any point during the completion of the tasks that lead us to recommend an expanded scope of services, we will contact you to discuss the conditions before resuming work. Traffic Control Based on our review of MnDOT traffic volume maps, it appears the streets to be investigated are low - volume, rural routes. As such, we are assuming that flagging will not be required. To alert motorist and protect our field crew, we will use traffic warning signs. The cost for traffic control has been included in our budget. Site Access, Staking and Utility Clearance Based on the sketches provided, we assume that exploration locations will be accessible with a truck - mounted drill rig. Given the intended exploration depths, a utility locate is anticipated for both the pavement cores/hand augers and soil borings. Depending on access requirements or potential utility conflicts, our field crew may slightly alter the exploration locations from those proposed to facilitate accessibility. Prior to drilling, we will contact Gopher State One Call and arrange for notification to the appropriate utility vendors to mark and clear the exploration locations of public underground utilities. You or your authorized representatives are responsible to notify us before we begin our work of the presence and location of any underground objects or private utilities that are not the responsibility of public agencies. Pavement Cores and Hand Augers At the identified locations, we will conduct twenty-four (24) pavement cores and hand augers to measure pavement and aggregate thickness, and to identify underlying soils. Hand auger borings will be performed to a maximum depth of 48 inches below the existing pavement surface. We have budgeted the following hours to perform this work: ■ Part 1-9.0 hours ■ Part 2 — 6.0 hours ■ Part 3 — 3.0 hours We will repair the coreholes with a cold -mix bituminous patch as appropriate. The cores will be submitted to our lab for total thickness measurements and a review of bituminous material condition. Penetration Test Borings At the specified locations on 205th Street North, we will perform a total of four standard penetration tests (SPT) borings to maximum depth of 10 feet below the roadway surface. As requested, borings will be terminated if groundwater or bedrock is encountered prior to a depth of 10 feet. The thickness of the bituminous surfacing layer and the aggregate base layer (where it can be determined) will be measured and recorded. Penetration tests will be performed and samples will be gathered at 2 1/2-foot vertical intervals to the depth of termination. BRauN I NTE RTEC City of Scandia Proposal QTB004499 May 14, 2014 Page 3 If groundwater is encountered in the boreholes, the depth where it is observed will be recorded on the boring logs. Borehole Abandonment Minnesota Well Code requires sealing of any boring or core that encounters groundwater and is either greater than 25 feet deep or penetrates a confining layer. Based on the intended exploration depths, we do not anticipate the need to seal the boreholes. The boreholes will be backfilled with the auger cuttings and the pavement will be patched. Sample Review For the borings performed on 205th Street North, soil samples will be returned to our laboratory and will be visually classified and logged by a geotechnical engineer. Reporting Data obtained from the pavement cores, hand auger borings, and soil borings will be used to prepare a letter that includes: ■ Summary of the pavement core and hand auger results, including a description of the underlying soils. ■ Boring logs describing the materials encountered on 205th Street North, including bituminous and aggregate base thickness estimates. The depth to groundwater and/or bedrock will be identified. ■ A sketch of the exploration locations. ■ A discussion of the measured pavement thicknesses and subsurface soil types. Our final letter will be delivered electronically to you. If a hard -copy is needed, please let us know. Depending on authorization, if more than one area is authorized, results will be provided in one comprehensive document. Additional Services If borings need to be extended beyond their termination depths, or if additional soil borings are requested, we will charge an additional $15 per lineal foot beyond the originally intended drilling footage (40 feet). Additional site mobilization will be charged at $292 per day. If additional pavement cores/hand augers are requested, we will charge $165 per location. BRAUN NTE RTEC City of Scandia Proposal QTB004499 May 14, 2014 Page 4 Cost and Invoicing We will furnish the services described in this proposal for the following estimated fees: ■ Part 1— $2,609.00 ■ Part 2 — $2,024.00 ■ Part 3 — $3,175.50 Total for Parts 1, 2 and 3 - $7,808.50 A tabulation showing our estimated hourly and/or unit rates associated with our proposed scope of services is also attached. It should be noted that there are efficiencies gained by authorizing all project areas. If all areas are authorized, the costs associated with warning signs, trip charges, and site layout will be reduced providing a cost reduction of approximately $500. We would be happy to meet with you and discuss our proposed scope of services further, clarifying the various scope components, or to discuss how the scope may be adjusted to meet your project requirements. Our work may extend over several invoicing periods. As such, for work that is performed during the course of each invoicing period, we will submit partial progress invoices. Schedule We anticipate the field explorations can be completed within two weeks of authorization. Soil borings on 205th Street North will be performed on May 28, 2014. We understand that the final report is requested by July 28, 2014 and we anticipate that our final letter will be delivered prior to that date. If our proposed scope of services cannot be completed according to this schedule due to circumstances beyond our control, we may need to revise this proposal prior to completing the remaining tasks. General Remarks We appreciate the opportunity to present this proposal to you. It is provided in duplicate so the original can be retained for your records and the copy can be signed and returned to us. Please return the signed copy in its entirety. BRAUN f NTE RTEC City of Scandia Proposal QTB004499 May 14, 2014 Page 5 The proposed fee is based on the scope of services described and the assumptions that our services will be authorized within 30 days and that others will not delay us beyond our proposed schedule. We included the Braun Intertec General Conditions, which provide additional terms and are a part of our agreement. To have questions answered or schedule a time to meet and discuss our approach to this project further, please call Amy Grothaus at 651.261.7122. Sincerely, BRAUN INTERTEC CORPORATION AmyJ. Gro a , Project Engineer obertJ. Ja s , PE President/Principal Engineer Attachments: Cost Estimate General Conditions (9/1/13) Project Area Sketches, provided by Bolton & Menk The proposal is accepted, and you are authorized to proceed. Authorizer's Firm Authorizer's Signature Authorizer's Name (please print or type) Authorizer's Title Date B R A U N INTERTEC