9.a) Uptown Sewer System Master Plan, Part 1 , Meeting Date: 07/19/2011 Agenda Item: t�� L�: � City Council Agenda Report City of Scandia 14727 209`" St. North Scandia, MN 55073 (651)433-2274 Action Requested: Receive the Uptown Sewer System Master Plan report from Bolton and Menk. Deadline/ Timeline: N/A Background: • The Council approved an agreement with Bolton and Menk for the Uptown Sewer System Master Plan at its April 2011 meeting. � Letters have sent to building owners and tenants served by the Uptown system, inviting them to attend the meeting. Recommendation: I recommend that the Council receive and discuss the report. Attachments/ • Report Materials provided: Contact(s): Brian Malm, P.E., Bolton& Menk, lnc. (507) 625-4171 ext. 1264 Prepared by: Anne Hurlburt, Administrator (uptown sewer system report) Page 1 of 1 07/14/11 7/19/2011 7 ntroduct►on Uptown Was�ewater Systern • P�an ob�e�t;�es MaStel'P�ari —Assess the current condition, perfc-mance,and capacity of the system —Forecast future costs of maintenance and repairs te preperly manage:he system City of Scandia, MN �u�v 2o1i ''� t%� tci�v7t T�_ � �_�_�,� ' - � , __., ��,- [.��.��et,� F,_,� -��_� �,_,�K „� - Introduction Existing Sy-stem Description • Report Organizatior� -Existing5ystem Description ' Subsurface Sewage Treatment System (SSTS) -Existing system Evaluat�e� (New name for septic systems, MPCA initiated) - EvaluatiOn of Future Regu�atory P.equi;e��erts -GrdVlty C0��2CtiOtl$2w2f - Future System Replacemen;and Expans or Evzicafion -Four Pump St8ti0ns -Operation and Mainterance�C&W;Reccmrrienca'�o�� -Fourte2n Stptic TankS(1,000-3,000 gallonsj -Cost Estimates -Drainfield -Wastewater Budget Rev:ev: .Gravity Fed with Drop Boxes - Discharge Grdirance Recommenca:',ons �Nine Trench Laterals(2,Z50 ft of trenchi �6,750 square feet of absorption area �Small reserve drainfield adjacent to Communin Center �,i �� !40^ft cf trench) �( \:�IiL\ ��-�c, ���,..,-.,..,,_,,,..: ,�,c Sl�\1'll1A .�vc .�,-c,�a�.�_.,..�.< ��..,c ,�,.\ Existing System Description — J- r ��xW U�.. ■ Businesses Served ,� �,;� '¢ -Uptown Area '� � ,s„y',.,,�, � �� �Schmitt Mall(Edward Jones,Scandia Famiiy Dental, s,��'s ` ,�, � +�`- o�"owlm';. Scandia Hair Design,Health inwran[e�JIarL Superior ���.�_ , and Preservation.,Vdilkersoo Associates Scandia a CFiropr� t:cCi�,nc) � , �», �� �Yoga Hus - - i � .� ? ` �P,$,BAutc `�: ---�� �Scand:o Cz`e '.'" �' . �".�,°^•�.M^^.�^ .Anyo Salon , , _.; ,.: . - . ,._ ' � �Scandia Veterinary Clinic :'� :.`.�S sC L�����.UL� ,���� ��. n�..� ��� �� tic.��i�i.a N��,����x�,��_tiK ��� 1 7/19/2011 Eaisting System Description E�isting System Description ■ Businesses Served ■ '�-��story -Church -i495-Uptown Collection System and Originai 6 �Elim Lutheran Church Lateral Drainfield Constructed �Elim Church Parsonage - i999-Community Center Connected to System -�ommunity Center - 2001-Gammelgarden Connected to Syste,r .Scandia Community Center,/City Hal� -1999-2001-O�iginal Drainfield Expander�r 9 �Maintenance Shop �aterals �WarmingHouse ■ Fermit Design Flow-4,060 gpd(Washirgton -Gammefgarden Museum County) �Gammeigzrden Museum and Visi!orc Center �=� ►=� � � �CSVt�l.i ao�Tr._�...F-�.,K u�_ �i.�.'�� 11 ac��_To r.�..�_.r�.� �� ��y��� '-• a�4� �� ..�tlh€� .e- F3 t ; -� � � r �'� :� a�'����'���'�-#;�';: ����* � � ;.�` \:= ` ,�;y ��� ;k���,�, M1.� �= . ` - _:��e:.���r.�..� �"T�;�`^.�y��.r . �=� - F ,,. ., ��'�� � ��y+ �� �^-'�?'S^^I �� ,lr �.,• ��Gf�'\G d ~ [.�s}�� ' . . �M! ', . a s " .�� � { � ,', q �' `i ��.'3 '�s. . 7;`4��..,,.. � r7� '� '� F 9�'�_�����q¢ � �'1�� 'y� � L ;,..�..} . •, ..i� �!''7�� �> ,,y� �'� '�iy�� z' .�-'Y'''�j''. 31� � . .�'�°�"t"�s> !r.• `� J. "l ��X: � � �'.[ . :4t�..':t -�+" �. �� `� ' � �Y;,_��Y�=0� � :��. j� �„�,�. .:� . 1�.��' -� _y' . : � � � A � �r .��W� ' �i '`� <.� � ' m » ,_ . 6ti� ,,,� ��.y -�i ��-��; e",�' � A"+� �' `,,� � ,j,,� rt ; y ,,T ,� ���� . . ,'� , � � " d..� . o. r'... ..�'�,"�y,�- .�` ~� yyl�,r�.� "!���',_ "'� ` a..*� fr�i�`*�`�1�.i,�r; � _ - �`, �'y, f -.r+ . ��� ' � �� �•_ � �.r �._.� �- - =< ������ ; .•,�..�._ = r .�..,. .�..�, - - — -- - -- . _.,_ �� -- _ __ _. __ _ _ _ _ .; .., St.�.1CllL� F,���_. _.> .,. ,.-.�_,. �� SG1�lll,a �,� � ..,. . ._.� ..� 3[r _.=. "�•' ,l � 3�,7d� �'+�!` ��S'� i� \ 3:'ti �'�' ��"' "� J�"�� . � �s� ! ,y� }; � � / }`: �w' �s� i+*f� iy 1���� s�� �� - � '' �� -'.i`r ��`� .,y.�..'�� ����, �� �� �+'�} '!'�u':'Fs� `!'� � . _ , s: � .��i .:� ..,z �� , '' F � C✓ � �.. -��� '_�y �.a�' .-.. �' �;�t f'�'� ,� ��S'`'�:' '�'��"' t`4+•��'+s'.�� �iy-; - .� / ��� .. , . .. .� . . � �!� �/'� `"'. '�F� � �* ,��g� �: � • k � �t � � . " � '�� 'r � • r , ` •c�I ��` . � �„p��� r`�j�� a, :�`t' t /� �� �r�s s '� �`� � �I � � ,�� �•� j�, M �'`� ^ � ' .� - E � .. �d-,_ .�� ,, x, - � � _ : - � -- �� _ . � �� „�„ � ¢� , �:�` t„�'� � _�. � ; f� � � - /t �-�x , ��_ - �� r £ : .. • - ,, _ �;t , _ . � - � ��� _ w�tr,,..�: ' �� b'�q�'`'?`''"�. - ,,� / ;!��.���`` �r. . l.� � � F t'�`',.-��.`� � ,,t ,� .�t'_;, �';-��`� �¢' � , � �It4H•' . `�`�_ . .� �.,- �-1 � +r- ��. , �. — =' - — ;=_ - 1 ...�.i` : -=" _ � : : -- -:__..---'�,.'— ? _._ �._._-�-�- M .� �,; � �_-�.�,���� ��� �. . � � , .K ,,,�_� � �L���.=..t; ��� �_ . . � _ „_�-I �-� � 2 7/19/2011 Fipure 3.1�Totsl Annuel Flow �a�sting Svstem Evaluation ,d�.eo._,.,,�,.,�., • Design flows - " —Flow �Average Dai!y Row;A�F;—gailons per cay(gpJ) �I�iaximum Day Flow(MDFj—gpd �facility Design based on ADF,but must take intc ' _ . accountthe MDF —Flovds measured in system by 2 methods �VJater Meter Use .rurr.e Sta;io�,Ever.'Coar:;er ::.� F� 'r�.c�.'�.^:...�.:n.a�i.:� .� �-.-�, ..�. �-�.�K �.�- . .. . . . tiC:\\Ul�� H...�_T�> n.�.,�,�-�,,,. ��.� Figure3,2-io[alMonc'.yFlow Figure3.3 ANmge'Da:lyFlow I� r I� ' � 17,� ������� ; - �r� �� ������ , /� � ���� � � I ` i ," � ; ����'�� �� ��� l �'��� �b� �� �� � � iA �� U �,�� � "�^ ' ��� � „ t � l � � �.I ` � I 4 � � Y �� �e� .x� :� � k - 5�_��,�,�_. .� ��� r�� r_� �-�.K ,� w�����nU� ��,�t_ << <.� ,,, Figure 3.4�Average Daily Flow Uptown Pu mp Sution Eaisting S��stem E�-aluation ■ Design Flows � , ; —f�leasured Flows � I .Vdater meter data shov,�s ADF appro>_2,OOG gpd � I ' �Vdater meter data not accurate representatior - �'!�I • Doesn't include lnflow and infilta� n ll��� � . . . »Flowtodrainfeldartifualp low ��� I • Includes outdoor water use I�I l.' '� qI� I ', - »Flow:odrefnfieldartiticiallyhigh ��.!���� � �������� (� �� ��� � I i 'i �'I'`7J.. �?ump station data is better representatior f ,,l �I �80%offlow in system goes to Uptown Pump Siation ' N � ..� _ �Uptown Pump Station has Event Counters 6� 'a f F' 2 '� i� . � - . . . S1:1��U1-� gc>�.To�s�..,. ...< ��,,- - — tilL�iU.I eo�,-o_� .����K ��� 3 7/19/2011 Existing S3�stem Evaluation Existing System Evaluation ■ Design Fiows ■ Design Flows —Measured Flows —Measured Flo�v�. .Data doesn't correlate well �Pump data is unreliable �Groblems �Can't determine actual I&i mntrlb�tion • Event munter dependent on pump-out volume �v��ater meter data neeas tC b2 7dj�5t�d:O 2C.OUnt f0' • Pump-out volume dependent on tloat position I&I—Peaking faCtor,typiCally 4 x ADF • =ioats�rkeiv�na�gea��,Far�zo�o,aaca p��o���cnz������zrd —Flows can be estimated using typicaf ficw rates for `�E �``E� e�,�t`�E� :�z"`�� ����o:'�€'` similar uses MPCA Rules Ch 7080 � rr,. ���ztlan a €purnc ,g � � --Original design flow dat�is availabie �� w"=S �c.�.�i�i,a a�> .��._ =�-��_ ��, s�i�s;r l a��T��__,ti. ,-_,K ���_ FiQure 3.5-Desiyn flow Comparisan � ExiSting S��stem E�-aluation ■ Design Flows _ —�✓iPCA Ch.?Q&0 flows are estimates onfy : � — Jriginal Design flows are estimates only , , —� ecommend using lNater fJ�e;er Catz`er HDF,add �+ ���eaking facter of 4 Fcr��DF _ � _§.=� ��� l_ �'� ■ ■ t� �� s�,�>.utn �_�,..To _e�.,���K �N scicn:�� �� _,�-,�_._ F-,�,� .r,,_ ��isting S�-stem ��-aluation T:�ble 3.1 " Drsi n Ra��. ,,,,,,,,,,"i`�;,���° ■ '��,tastewater Strengtn a,��� :.,�n:,�i, .i:�.���������u:�, eio.,J�-�un ti,.,,,�iur� —BOD—BiochemicalOxygenQemar,d— t,i; ,,,,n�i����<i� i;��zrd ��i;�,.;,i milligrams/Iiter�mB/�) �'"""':'=•` ��0�njid n�"'`�"� .f��easure of oxygen depletion of wastewate� c:����„�,i,::,�a���� si_�e :us,�,i n,�,�������,���c.���•� ��o_.� ��u,.�,i —TSS—TotalSuspendedSolids—mg/! ���:,rnu,c.H,�o„� i+'..p,t ;nx_p.� �.fJieasure of the quantity of soGds in the wastevrue� ���:�i�s•«�, '��'-fi�:v� '>':cv�� —FOG—Fats,Oils and Grease—mg/I Itu.�I��n'u I n:A1,:i.wed Fla���< . �'d�e�sure of the quan�ity of fats,olls,ano grease��n the P;.�hu�_F:�:i,�i=J .,,.�_ewater �'�..,. �..n.. �� f� � � ����,::. F��� T�.�K� . ,_�� .�,�� � ��..;.�:��. A� � _ ���. � �-1 �-� 4 7/19/2011 Fig�.e s.e-wa:cewa�e�rna,a�ce,�:c��s xisting System E��aluation ■ Wastewater Strengt� -Typical Values �BOD—i40-220mg/�, >i;Gr�gii=f-'�IghSVe;gth �755—4�-GS m�/I,>60mg/I=High Strength - � �FOG—iD-2�r-;g/I,>25 mg/I=High Strength � fr e . ._ . �-.�� " �C::, -�'"-�'1 E3�". :.` �� ''� � . ... -"_. �. .. ' tirn'.l\iR��i_1 -.c�. _..�.�..F ��... �r.,_ !,(.:1\UL\ � � �o n, r-..K �.� EYistinb C�-stem E�aluation Existing �ystem ���aluation ■ 'leastewater Strength ■ Compliance Inspection -Uptown and Commuri�y Certer Tanks nave hig� -Four Issues wa5tewater Strength �Hydraulic Performance -Drainfield tank BOD reading may be an anomaly, • Noa�:�naBe cog,o��d o,s�rta�E watE�,���a����, but high wastewater strength is expected building< ��ank Integrity and Safety Compliance —Cveral!;high s?re.r;�h IS IIOt UIl2�p2Cted giV21l • Notankleakage,coversmustbesafe :;Nsi�rea^,���__ , _...,�,-r�ercfai ki[ches�s .SoilSeparation Compiiance 3-ft ofvertical separation(i5%reduction allcm�e�'� �Operating Permit and Nitrogen Bf�iP Cempi;3nce�r,Ot N;;i��cabie;c;F;:., , ;e^., ��'�` i"�i ���\I.aa..I:1 r.�c Tc>_e.�.. _..� ���= tiC,1AllL1 .�< _ -c,-__<. .F,��-_ �, Eaisting S�-stem E��aluation E�:isting Sy°stem Evaluation ■ Compliance Inspection ■ Compliance Inspection — Results —Results .Hydraulic Ferformance .Aaordingto Pete 6anzel,VJzshington County • compuam Ordinante will not require replacement,upgraoe,cr �Tank Integrity and Safety Complian-e repair • compiiant .Soil separation was adequate at time of desigo ano �Soil Separation Compliance verified by County staff • Non-compliant based on soil borings • Soi!borings show pe�iodic satura:ior 1�'-b4" �System is Non-Compliant ';"x �'� bl:_1��«��DL�1 Ac> ,u .�,�.� �,�. ���- tiC:AAlll�l r�o�T<�..r...�r-��K ��,, 5 7/19/2011 Existir►g System Evaluation Existing System Evaluation • Performance Issues and Problem� ■ Fprformance fssues and Probiems -Powdered Soap - Garage floor drain,R&B Nut:: -Septic Tank Backwashing - �uaternary Ammonia -Septic Tank Pumping�requeney ar,d Reu;�; -- 'von-sewage in septic tanks(bard-aids, rags, I:eeping traws,etc.) -I&I in Uptown Tank 2 -`,ecurity of tank covers(Warming Ho.;se tark; -Siightly Elevated pH level<_-Cieaners bottles,etc.) -Uptown Pump Tank Ficat Con`gura�ion and -�h'arming House pump tank cantroL 'imited volu�ne - �Grsonage tank surchargir�� �+'�� �� 5('.AADL! ��� �c,�,. ,r......_ �r._ •,CASil�f.�l .a��_rc.�r�a�..�.-tik �.,,-_ '�� Existing S3-stem E��aluation Existing System E��ti�luation ■ Performance Issues and Problems ■ Existing Drainfieid Evaluatior, -Possible footing tile in Community Center tank -Existing drainfield absorption area=6,75C sf -Niaintenance shop floor drains, co,-vert te ho!d!ng -Drainfield soil texture-sandy clay loam tank -Design loading rate=0.45 gpd/sf -Sapling trees in drainfield are2 -Design ADF of 2,026 gpd requires 4,502 sf -7a��k access covers bu!led, not secure drainfield area -MDF of 7,525 gpd requires 16,744 sf _For maxi-- :ro d?y fl��r.�,d�alrfie!d is uridersized �� �� SC1'tibt:1 �z, �-y :_�_�=���< ���- -'�t)l.1 �,c _ _�r_..,�..��. ��, _ ' Ea�sting S��stem Eraluation E�isting Syst�.� E��al�ation ■ Existing Drainfiefd Evaluation ■ _r,isting Drainfield Evaluation -Drainfield has potential to be overwhelroed or - righ strength wastewater may czuse drainfie�d tc maximum flow days plug -Equalization tank would hold surge flow on - ?re-treatment to reduce wastewater strength is :naximum day and slowly meter it out ever=everai ecommended(aerobic tank,fiRer,etc.) day5 �t�bie:hieister'�3ar�a�aerobi�pre-treatmen;un�.�; -`i0;000 gai equalization tank required ;5iom�c�ob�cs FasT system? � � ,-w ti.-M �...� � .-� c-* _ �,�- ,.. .�, �)I.1 �r-, ..�...:�. ..�.,�� �:��_._ :.�.AtiPf 1 .��� - -- <-: � �,,.,,� :�������.�� ��I L�____�. ,�.��������w.� i 6 7/19/2011 Existing System Evaluation Existing System Evaluation • System Life Remaining ■ System Life Remaining —Typical septic system life is 20-years —Shortcomings in any area car cause premature —fd;a�ny systems fall earliec maoy sy�tems las±much failure icr,ger —Soil treatment system is a fiiter — Life is based on —Large particles removed by septic tank ��es�gn —Pre-treatment(if present)further removes solids .Instaliation —Remaining solids,as well as viruses and .����y ragerr�r.� pathogens,are removed by soil o°� '�' .� ��_�:�``.�.::n.�i� A ,T,->,���F_�_,< ,�.: ,r.i•�i,i� ����Ta.h ti=. K ��_ E�isting System Evaluation Existing S�stem E�aluation • System Life Remaining ■ System Life Remaining —�ong term failure mecharism is ciogging o`:the scil —Pocus instead on what you can con±rel now by SOIICIS �Design(modifications z<_,�ece�sar��,e.g.pre'�ea'me^c) — Easy to teil when system has failed :�se ied�cacion of users� —Difficult/Impossible to determine percentage of ���,�anagement(oroper o&m; clogging at some intermediate point —Assignin€a vaiue to remaining!ife i�.ro±possibi� �:,- `'.�"S' i�`i .�5�(.-.A\��a�;F.A r�o�Tv_e��.n�-_.�< .��- - � - � ��.��1\���a�a�:11,1 �c._,�r...>�.<�,�.. ,r.- Eaisting System E��aluation Future Regulatar��Requirements • "r,ecommended Improvements ■ Operating Permit - install equalization tank(manages flows)ano pre- -Washington Coun:y�rd,r-o�-�ce no�a�requires treatment(reduce waste strength) Operating Permit - Replace pump controls at Warming House -��Erating P2rrYtit will r2qUire - Raise access risers and instail new access covers o^5 tcnks .i✓,znagerr:e^;P',zr!0&N�a� zt Community Center,3 tanks at 6ammelgarden .Compiiarce I�__ - ;nstall run time meters in Uptown Pump?ank,and .;eporting Community Center Pump Tank �f�otificatlo^, - Instail new,larger pump tank and pumps for Uptown P�,�mp .�Isdosure o`sv<;em'�-r:lc- Tank ` �?rohibited discharges - Convert Maintenance Shop tank to holding tcnk ��� � � �� 5�C�1�;�..�..N:A �.,o�Tv .._ ���,K ���c �i�.l:�� 1��)lA A���_-.�cr,....,,��K ���r_ 7 7/19/2011 Future Regulatory Requirements Future Regulatory Requirements ■ Nitrogen Treatment ■ `�itrogen Treatment -New MPCA Rules and Washington CountY - Nitrogen is a problem in groundwater when it Ordinance require nitrogen reduction for systems reaches an aquifer used for drinkir,�wa.er v�ith flew>2,500 gpd - Cause<_"hlue ba6y syndrome" -- 2,500-5,000 gpd with potential aquifer impact- no limit,but nitrogen Best Management Practice fBMP)must be used - :5,000 gpd-Nitrogen must be reduced to 10 mg/I af property line, monitoring weils,testing required �'� "�i,��'� tir.:1Al�]A t�<��T�-> . w �, �,� �� �_ .,C.A�i; �� _ .-y..t.,. _,..... ,��� �� � � � Future RegulatorY Requirements Future Regulatory Requirements I ■ N�trogen Treatmt,�< < ';ow do we Measure Nitrogen v4;ogen Cycle(Hc��v� �ocen Is Remove�.r.,m i�.'\v� - io=.al Kjeldahl Nitrogen(TKN; N, ����brna-Or�cni:N .n����;riflcacion - NitraSe+Nitrite Nitrogen(NO3!NO�i • oBa���n�croec�-�es�ce��ei�e�ompos�n�n=,a����-,����z -?�otal Nitrogen(TN)=NO3/NO2-TI:N � Fmmonie r Oxygen i Nitrifying Bederia-)Nitrne • rdrtnte�Nierirying Bacteria�Nltrate • Nrtrogen Sampling Results �nenitr(flcetion —T;pical TN LevelS=50-60 mg/I • Nitrate e Carbon Source tanoxic,no oxygen;=�.�, , ,,�_ .-_-��ttem NO3/NO2 levels all below C 2�i�/; � ���.:trificationJDenitrificatior,reactioe is ve�. E e ._es,em TKN levels ranged from 9.5-7i.4 mg!�•. • Flow dependent .^�--nlnfield Tank TKN=729 mg/I • pHtlependent ..rJicates high TN levels • lemperature depenaci�; . . • AlkaLnity dependen! �I�,�.^,ri ication tarc!ng place in system,net uner,pectc-a • Need car6on 5ource c,,..e.i�[�i,��...e..����c c�'ter�z�c�C s-i�,_r�..r �;:� �meiha��cl� �,� .�C.1'til�ld v�.� ,c> F.....�i �,K �i.,- c(-.l\llL1 ��_Toi��i..+v--ruK i�_,c_, �r� w.�em�a�sra�vs� �� ��� Future Regulatary Requirements Future Regulator_y Requirements • Nitrogen Treatment ■ Phosphorus Treatment - Adding NitrOgen Bh1F i_ncl oifricult,somev.hat expensi��� -<5,000 gpd-Phosphorus treatment not currently (pretreatment unit sud-ss eerobic tank would qualif��) reqUlY2C1 - Reducing Nitrogen to 10 mg/I at property line can be very d:�`�cult and expensive ->5,000 gpd�Surface water with phosphorus .�Sepends upon ievel of natu2l soil nitrifiwtion/denitrifica:icr SLdf1C�8fC�'� Ph05(JhOfUS f2C�UCtI0i1 I'YIdY be .Depends on existing groundwater flow and potential for d��,l_��:��r required - �.eJa.!rg Nitrogen to 10 mgJl at end of pipe Is very -FuturC PhoSphOruS limit unlikely,treating to di`i�c�lt,expens�ve and management incens��ve specifc end of pipe limit would be very expensive x..,, �x -� � e< <�-_._�.,,.�,��k ����� �tic e���itt F�� ,<._._ „� ,��< ,���.� �.����!-� � �es� I r�� �r.n9rx�::.�w�t..tizt�.�w: $ 7/19/2011 Future System Replacement and Expansion ■ Future System Rep'�acemert ��nt —Soils report shows suitable area west nf existing °�"""'°'°"m" ��,«,,.�� drainfield C1e,�o�a •--'-- ,,,,�n, —Mound system required due to soils , y--Y - V '-�' -- --'�'ri,Frr ,+�'. — fvlound designed for 2;026 gpd would be 3'2-ft � ' :�.i-`, '"' __,�.�_—� - �oenm.,ow .�aKpeuu� �� ��_;1AFl}.� ��,�.Tc....r_ ,i�.�...�,. ;.,:-. �%'� 51�.�11�11 �-,�� �y .x�.. �_�.. ,�,_ `�'�'.�;,� � � • ��.�:: �„� � �,� ' �. � .ov, r•.c..r.� __ .��g:uh . 1/ �3�, � � . .._ nx �i} . .. . � . j� i�" ��a. . {�•' '� �T�. . .�� F, � ,�.�-� . .r• �- � ,r,x.,., ;,,?�;-� �g�{�'��� ���� �--� ,t :�''`3�'' wA��M �� ------ — --- ,�,` P• ,` ' s r�"� � ,.+' r f �, :4,� 1,� � r'� t `';;d:,� �� y;: �'A�'�;�::�fA�i..� .r��'%a'� :.�"e_�`'� Y`. � . .�!fti�'%'�if'�.5,`'4�G�K'�4�y'A'�.. , ►� ... . ,-^--- T .._......... _. .. ... `�(',1X��)L1 . �-�. . . -_�._ _�.;�., -��K ��,c :�_'.:�.l:..l� �-��, ,�.�,._�_,�-���. , _ Future System Replacement and Future System Replacement and Expansion Expansion ■ Future System Expansion ■ Future System Expansion -Appears to be area west ano r�crtl� of exlstin€ -Subsurface water movement folfows siope of land drainfield to expand system Co the north —However,expanding to these areas wouid —Contour Loading Rate=Flow Rate/Systerr� Length jeopardize the ability to replace system —Contour loadfng zte—E gal;ft —V�'ater moves not only vertically,but aiso iateraliy downhill —Slope in drainfield area is apprex.5%north tc the wetland :.:� .`�C ,:�_.:.`�;..�.t_A ��. . �_e.ti ,_.� ��..- �l.A`:�I �rl�1 do�_,-o.,n.�.F ti� �.� _ 9 7/19/2011 Future System Replacement aod r -� E.xpansion � � Future Syster� ;-xpan�.ic�n ,,, -Stacking systems upstream of each other mcreases the contour loading rate . Con➢guntlon 2 ,�a� J�;�c-��sc dov✓r,stream systern to overload(sec�� co�r9�.�eo�, a; of id� h,iill . ..�ClN=600 pyC*.t pal'li ��M 10 CLR:600 qPtl-�30 9allh SO fi F� 1'i�;urc 5.1-Con[nur Lo:�dfnq Nute F\:�mplc I �{� � SC:�_A151.1 ��.� �•_ --s.„ �.�.� ��,_ SC.'1.`�1.t sc.Tcs-..c�..,..-�_K ��-.�_ �r �II� �� Future System Replacement and i � Expansion PlanView .�,,.R�r � � �, �°��u" �, ■ �.�_��are System Expansion __ � �— — -=an t expan to t e west��vltrcut u�� ��.Zati�-�g t iai ro �i "" , � ��- i�„-„�,,, z-ea for system replacement , >., �,o - Can't expand north of existing system because " � =—�"=' t`,at would"stack"the systems «R=��.,��,n� F�.�y ^�.�= qr�-� �wam* -Conciusion-system can't be expanded, additional ,�a .;sers(e.g.Hilitop Water Company Building)can't r� added te sy�tem F'iR�u�v�.?-Conim�r LuadinR Hitlu I�:�amplr? . ¢ -eu,in� �'si j�"-� �t.'��I)1.1 .•�. -- �-- �..-,��� �r�_ Sl�.1V7tI_1 aoi_Tcx..�r.nF ti.< ��� ��� � ,,,�' ' Operation and Maintenance . Recom rnendations -- ■ GenerUl r Pro,Fr 0&M is essentiai to maximiz^�g�vstem lifie ����� � r' y E� _ sh e ritten C&M procedures .r �' „� y;� "��,f�,�,��.� �� "�'" —Dec rr�ent and record G&M activities � � � f ��• �Y` �-� e�,�;,' ` .� � � � �� �� 1, �` � f �`�, '� < <� � ', ./�'". � v' „ . Y� �� � t � �� ,� .� *.'.'e � ���"';" � ��4�#�-`x , .. . . ...4'i - - , _ ,�„-' -... ..,. .__ . .�-.� p.�2 A� �:�,,�, �� , ,_ �.._i � � ;�„�,, g� ,�_ - , r�� ,�_�-1 _�� �� � ,o 7/19/2011 Operation and Maintenance Operation and Maintenance Recommendations Recommendations ■ Septic and Pump TGnks ■ Septic and Pump 7anks -Tanks must be checked, mirimum every 3 year_ -�;Iso measure sludge in pump tanks and pump -Measure sludge and scum,check for leaks,pump ���hen s!udee comes within 1-inch c`pumE1 Irtake when sludge+scum is 25%of tank depth � �, •-.4ctual pump-out frequency should be based or� _ },�_-j '�^°°�^� measurements — - Measure sludge+scum !egularly for next ycar _.� - estabiish baseline for pumping frequency i-=�`�'w�.A�: - Initial recoirmendation es�ur�;e pumping ip tanks/year - . "r,$ i,� ..,,..M,a. .., �,,......�,. ,�� '�\t.��l:� �� _ ��_, .. .� r_�_ �i,- - __.. � • tii:\\I)1�1 �;. � .-. ,.� ,_,- .�,- � - Operation and Maintenance Operation and Maintenance Recommendations Recommendations ■ Pumps and Controls • Fumps and Controls -Check floats,contro;s, ard alarm at same time -Fiow rate used to calculate system flows tanks are checked -Changes in pump flow rate can indicate problems -Observe pumps for noisy operation(voitage and with pump, motor,discharge piping,va�ves or amp check optionalj forcemain Iplug or brEat<i -Read run time meters(event counters in interi�I � ,; -- � .;aeallyeveryday ����'" �'r�== �I.�inimum every week ;:�;�� .Need to estabiish actual maximum day flov4; _ �!�'�"� '�� ���� -F:,m,p-down test to measure pump flow rate- � �-� {�.�_ '�,��� � Y ti<��_,�>..:.�.,�-;-,n �'' anno II �� �c<��i>i�� �N �'� .. �.��..�:�.��i.� _— , a�� -<�,k_ ,�,_� .�._ ���� Operation and Maintenance Operation and Maintenance Recommendations Recommendations ■ Soil Treatmert AreG ■ ;oil Treatment Area —Drop Boxes —Check for surfacirg effluent -Inspection Pipes � w„ -Remove trees -Check drop boxe<_ '"`"==-...�'_;"�,;,M^ -!Vo vehicle traffic -Check inspectio^ -�"-'��� � -Mow sparingly,only when dry ,^,ipes for pondir.g ��' �'i�-� F �.;�,,`-�--�_,-. - liminate sur face runo ff across drainfield - P o n d i n g i s i n d+c a t i on --, =.__-- � -Eliminate surface ponding(from rainfal!j cn of system loading °�°a� " �� drairfield �<� ��� . F �:;, �;-� , . __:� ,.�.M�m,�,..�.� ;,r . _ . . .� ;�_�tint� N:_�� -<, ;.:,., � , .. ' .. , x.��in_� d���T�x.��.,,�.,�.. ��� 11 7/19/2011 Operation and Maintc:nance Recommendations C ost Estimates ,.,�.�,.� ■ 0&M Task Summary � """" ,,,�,,,�,.,,.,,�,, ,,���,'.,,., ,_a � , '1 IW6.1 �y.. .,� �iry Anll' 4ti����ini.in _.�r, :--; '�- 1 ���,t �_'.",:.. ���N\5 ti�.. I 1�: . ._.. __. ... 1 A I J.rii. }'•.- _. i_' � . .. — . 1 � �..�1�1 iq I 1 I . _ ..� . � - � T ....��� . . � \ ,., ��- �i I I��.I I'. ' .� � .. . I� ��.i�i(��� � I �rI�.A I t .in�n�l ..il� .I�.:i��l. 7�� ." 1__ � - ,... . ,.i �� ... � . _1.��.� .._.... . '.- ..�„�. . . .., . 11 I .�� — . . ', — 1 �I 'I' '.I N.:.1�� .�_ .--- ,_._ . ...... ..__" �� iii: ,�iii, 1 I .ii ...u�..4 �� I i� � __—�� _ i J I I �I.nl�l� " � w. , �i... .m...x�, in�i �4.,���� in,,i�.��� n„�,�i� . . . .. .___._.._._._.... �"� !� ti/�_��111J�1 rac>i'r�m._vcr.�`c ir�_ SC�:�\'{i(.\ �c��TC�--.�� rrr. iiv"_ �l� � Cost�stimates Cost Estimates i�i.. ^.:L �...�,�. . .. . . .... . .,.i � ...._. v:...�, x. i..l.ti � �i� i. �u.:l lw .-i�,.-_ ..._.., -�.... .�. � i�, ... . ... ,. . ..� . .... � .... � ..,. . .._.. �i�� ....� �..� ..'� "�ii -�.� Ir.n 1• . , � . f. . .. . _ ,:�. . .... _ ._. '. _ _— � ... .� � .._. . ... .nv� ... ' � _ .ii� ... uu� � i�:�n, ��n � n�. ._... _... -•_ __... nn +.ni 1 ^1 __T.i _ — ` i�i,, i .. � _.— ' _'_._. _ .__ ...__ .Y ... �. .... . ��i _ �. . ;� � ...�: ��..�. ��.. �-r.. M� �'� ti1.1'\i)I:\ E.<�_-c� .,-r,.,r �.,r �ti �:l�.l\U11 F3c�. .c:_� . ,.,..�. �� �_ �' Cost Estimates Wastewater Budget Review,Enterprise Fund and User Rate Recommendations ,,,,,,,_, • General ,,,,,,,_�`,�:��„'.:'�:��;�,�_.,���,��. —Past practice has been to total annual , .-,,,,,�_._ � ,,,,, � . ,���. �.. " expenditures and allocate them on a percentage '° '" basis based on water useage—billed annualty -� '';+ —Goal is to implement enterprise fund,more - r y traditional utility billing system — �„' ' "' -- ,: �.,= —More predictable cests for system users -- ---- -- "� —Annual Costs � �:,.. ;.., --_. __ ___._.- r. �0&M Cosis �DebtService oe Imprevem��e�i> i�� �►'�4 � �;cis��i� ��� _,_.. _ < _�<,� � ����:.n�...� �,._- ��,.��.��-,-_�� ,��_� r���rr��e �� �re 12 i 7/19/2011 �'astev��ater Budget Review, Enterprise Wastewater Budget Review, Enterprise Fund and liser Rate Recommendations Fund and User Rate Recommendations �1�AA�N.' x I Ili, �.it�\n, .�.1� .., i.., .� .. i.i`i. �:\�1\1� 1�•N 11�nxinl �M•� � � � ,. ���. ��y,i. ,i�„�.�.� ,. . i � .. .. M 1 . � :..��- J .T.ii I � 4N 1. �J.F� ..._.._. �...�'1� I ...., _. . h�H-i�� —.... 1 i�.�'� � - � �. � ♦_. '.. .� .�r.,..;,.� . . —__.._. _'_',��.�. I .ii:nl .._11A..._... 1 IV. _ . . . _.. . . . �.�..,,. .., n ,�.. ......:.. . . . . . ... liil�t. I��.n.. ,.��. . .i. �i ii.��� ..� . ,n !ry �S—+� �r..��1�1�1 ��n �c ....F-,_�. � ,. S(��VISL1 �_��.-_. _� .., � �r�-_ �� � ��� Wastewater Budget Review,Enterprise Wastewater Budget Re��iew,Enterprise Fund and User Rate Recommendations Fund and User Rate Recommendations • Rate Philosophy -�YPica!system --- . ., — �sase Rate-Covers`,��-c_: .- ,, � JseageRate-Cove,,.ar�:a::�e.,___ ;,,� , -Two Options �,;'..: ';`� �""'" �. , , . .��'gh Base Rate,Low Use Ra c- �_ �..„� ...�. e. .,,...„��� - - I,�, .. ,., . • Base rate covers fiKetl co<;: - � � :- ..,.� ,,.... ' USCf COSt IS IE55 IOW tlEpf�'�;:��'�' '."' „'. � - _. � if Flowe reduce,fixed ms� � .�, .00c�e_ ,;,, " •• �'_ow Base Rate,High Use hate ������ �.� � � �,�� • Base 2te does not caverfixec c�r:�� ���� �� �� "' - � ��'�- � ������ • More dosel�e� 'ates pre�i 'i-^c - � � � � �r-� • If flow=redu e �ined cc�s: a e .. �.^� '°� JC.�:.I)1_� .�� �_rcy� .� �-:�_,.� :���_ � . SL 1�,1)LA _a ,.��,_ _ ��,.� ���- -� �+�11 �� �i�ImqleRNv/�awr04: Wastewater Budget Review,Enterprise Wastewater Budget Review,Enterprise Fund and Lser Rate Recommendations Fund and User Rate Recommendations - • Proposed Improvement Fir-�ar�cing , -Total Cost-$112,000 -10-yrs,4%Interest „��.,. ,,.° .,.;,,. -Gebt Service-$13,809 �.. ,,.�., ��� � �:���., �� :x �.� ���.,��x:1 �� , __ ._ � , � �� ��rn� ���, .�,-. , ,�K ��. _ �:... 13 r t 7/19/2011 Wastewater�udget Review,Enterprise Wastewater Budget Review,Enterprise Fund and User Rate Recommendations Fund and User Rate Recommendations u, ,,.,� '.�� ' �;���` .'�"°�'�„ ,'. " � __ ��„ „� ,.; ,,, ...u.:< �,< ;;, ,...;.. �� . ,. �. �_-.. �._ �K n�:A�Of.� �c� ,�.�_,. �,._ �� �- til'.l'.= ;1 ac—�..To R .r�=�....-. ,�� . � ' Discharge Ordinance Recommendations ■ 0,c!inance should be modified to re`lect current conditions, billing system, reguiatior,s, �I.tCStlOil5� e:c. ■ ��ecific recommendations are included in the report. -resen:e�b�, BaltOr & Nienk, InC. -__,.___ k.., s,_ i►.w e�� 1/�.1\UL\ r-y, ..-> ...rs�-.ri.- u� . " i1j y�. ..ro�r_�.. ..Hr. ,..��� e� ve ,• , 14 � � � � 1 1 1 " i ' 1 U ptow n Wa stewate r Syste m M a ste r P I a n for CityofScandia, MN %; :� � �% � ;, � �. � � � , 1 ����►1V�� ' ' � . ,,� � , . � �`� '� � * � ,,;�, ,�, � � � � , � ��p ,�� �. ��..� ��+jz �� : n� t` a� ' �����y r+ �"�"�.� �,t� .. . � . . i�� , .�� ��,,�i ,,.. � a� `:'�.w'#.#3:'e�fi��x�i. �.w�� " a . �t , . °�C': �k�" ��I�,�] � �'x,Fl � �� *�y ���� �t7 � � � W � y � �,� ��\ � I� � � '' � b"` j°��i &�h` ;Y�'` I n � +�K., �' � ;� . : I . � '�� x � ,ef����.y��� � i r # � , � �� � ;,� �: , � _ .. .. -r .� Submitted Bv: Bolton & Menk, Inc. 2035 County Road D East Suite B Maplewood, MN 55109-5314 July 2011 BMI Project No. N11.103386 J • • • • • • • • � � UPTOWN WASTEWATER SYSTEM MASTER PLAN � • City of Scandia, MN � � JULY 2011 � � N 11.103386 � � � I � ', � � � � � � � � � � • I hereby certify that this plan,specification or report was prepared by me or under my direct supervision,and that I • am a duly Licensed Professional Engineer under the laws of the State of Minnesota. • �i��� � Signature: Typed or Printed Name: Brian P.Malm,P.E. • Date 7/14/11 Reg.No. 40457 � � � � � Ciry of Scandia—N11.103386 Page i � Uptown Wastewater System Master Plan Prepared by Bolton &Menk,/nc. � � � _ __ __ L, � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � e • • • • • • • • • • • , • . � � � � � • TABLE OF CONTENTS • 1.0 INTRODUCTION .............................................................................................................. l • l.1 Purpose and Scope................................................................................................................. 1 • ].2 Report Organization............................................................................................................... ] • 2.0 EXISTING System ............................................................................................................. 2 • 2.1 Description of Existing Wastewater System..........................................................................2 • 3.0 EXISTING SYSTEM EVALUATION.............................................................................. 3 • 3.1 Design Flows and Wastewater Strength................................................................................3 • 32 Compliance Inspection......................................................................................................... 13 • 3.3 Performance Issues and Problems........................................................................................ 14 • 3.4 Existing Drainfield Evaluation............................................................................................. ]6 • 3.5 System Life Remaining........................................................................................................ l7 • 3.6 Recommended Improvements.............................................................................................. 18 � 4.0 FUTURE REGULATORY REQUIREMENTS............................................................... ]8 � 4.1 Operating Permit.................................................................................................................. 18 ` 4.2 Nitrogen Treatment.............................................................................................................. 19 • 4.3 Phosphorus Treatment..........................................................................................................20 � 5.0 FUTURE SYSTEM REPLACEMENT AND EXPANSION EVALUATION................ 21 « 5.1 Future System Replacement Evaluation..............................................................................21 ! 5.2 Future System Expansion Evaluation..................................................................................21 � 6.0 OPERATION and MAINTENANCe RECOMMENDATIONS...................................... 23 � 6.l General.................................................................................................................................23 � 6.2 Septic and PumpTanks.........................................................................................................23 � 6.3 Pumps...................................................................................................................................25 � 6.4 Soil Treatment Area(Drainfield).........................................................................................26 � 6.5 O&M Task Summary...........................................................................................................27 � 7.0 COST ESTIMATES ......................................................................................................... 28 � 7.1 General.................................................................................................................................28 � 7.2 Wastewater Treatment Improvements.................................................................................28 � 8.0 WASTEWATER BUDGET REVIEW, ENTERPRISE FUND AND USER RATE � RECOMMENDATIONS.............................................................................................................. 31 • 8.1 General.................................................................................................................................31 • 8.2 Operation and Maintenance Cost Recommendations..........................................................31 • 8.3 User Rate Recommendations...............................................................................................32 � � City of Scandia-N11.103386 Page ii � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, /nc. � � r � � � � � � � � � � � � � � � � � � � i � • � ! • � • • � � • r • • • • • • • • • • � ` � � � � • 9.0 DISCHARGE ORDINANCE RECOMMENDATIONS ................................................. 37 • 9.1 General.................................................................................................................................37 • 9.2 Recommendations................................................................................................................37 � � • LIST OF FIGURES Figure � Number Page � 3.1 Total Annual Flow 5 • 3.2 Total Monthly Flow 6 3.3 Average Daily Flow 7 � 3.4 Average Daily Flow Uptown Pump Station 8 ` 3.5 Design Flow Comparison l0 • 3.6 Wastewater Characteristics 12 5.1 Contour Loading Rate Example 1 22 * 5.2 Contour Loading Rate Example 2 22 • 1 Overall System Plan Appendix • 2 Drain�eld Area Appendix 3 Community Center and Gammelgarden Appendix � 4 Uptown Area and Church Appendix • 5 Drainfield Area Improvements Appendix � � � � LIST OF TABLES � Table • Number Page • 3.1 Design Flows 11 6.] O&M Task Summary 27 � 7.1 Cost Estimate Recommended Improvements 29 � 7.2 Cost Estimate Existing Drainfield Replacement 30 � 8.1 Annual O&M Costs 31 . 8.2 Histarical Annual O&M Costs 32 • 8.3 Estimated Sewer Charges—High Base, Low Use Rate 33 • 8.4 Estimated Sewer Charges—Low Base, High Use Rate 34 � 8.5 Estimated Sewer Charges with Improvements—High Base, Low Use Rate 35 8.6 Estimated Sewer Charges with Improvements—Low Base, High Use Rate 36 � � � � � � Ciry of Scandia—N11.103386 Page iii • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � + � � + � � � � � � � � � � � � � � + � s • • • • • • • • � � . � � � � � . APPENDIX -Soil Boring Report and Logs � -Rate Calculations � -Raw Flow Data • -Sampling Data -Design Flow Calculations � -Existing System Evaluation Design Calculations � -Compliance Inspection Forms � -As-Built Drawings of System from County Permitting Files -Example Ordinance—Credit River Township, Scott County � -Example Ordinance—201 System, City of Scandia � -O&M Checklists � -Septic Tank Maintenance Reporting Form -Area Drinking Water Well Information � � � � � � � � � � � � � � � � � � � � � � � � � � Cit��of Scandia—NI l.103386 Page iv • Upion�n Waste�rater S��.stem Master Plar� Prepared b�•Bolton c�Menk, Inc. � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � s • • • • • • • • • • � • • . � � � � � 1.0 INTRODUCTION � 1.1 Purpose and Scope � The primary objective of the Uptown Wastewater System Master Plan is to evaluate the � current system and to recommend a course of action to maintain the current system's ` condition, capacity and performance while planning for future repair, replacement and � possible expansion of the system. Specific plan objectives include the following: � � Assess the current condition, performance, and capacity of the system, including: � • • Identify current users of the system, their wastewater characteristics, impact on the � system, and potential for expansion or upgrade among current users � • Estimate the impact of inflow and infiltration (I&I) on the system � • Make recommendations for operation and maintenance to improve and preserve the • system's condition and to extend the life of the current system • • Review the wastewater budget and make recommendations regarding the � . development of a wastewater enterprise fund and appropriate user rates • Forecast future costs of maintenance and repairs to properly manage the system, � • including: . • Make recommendations for controlling or prohibiting undesirable discharges to the • system and recommend implementation strategies including ordinance language � • Prepare a description, cost estimate, and time table for future replacement of the � system, including evaluation of the City-owned drainfield expansion site � • Estimate the potential for growth and new service connections, including evaluating � the feasibility of expanding system capacity � • Assess the impact of likely regulatory changes on the system, with cost impacts ` � • 1.2 Report Organization • To adequately address the major areas that were evaluated, this report is organized into � nine sections as follows: � • 1. Introduction • 2. Existing System � � City of Scandia-NI1.103386 Page 1 � Uptown Wastewater S��stem Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � i • • � � � � • 3. Existing System Evaluation • 4. Evaluation of Future Regulatory Requirements . 5. Future System Replacement and Expansion Evaluation � 6. Operation and Maintenance Recommendations � 7. Cost Estimates � 8. Wastewater Budget Review, Enterprise Fund and User Rate Recommendations � � 2.0 E:XISTING SYSTEM � 2.1 Description of Existing Wastewater System � T'he existing wastewater treatment system for the Uptown WW System is a soil based � sizbsurface sewage treatment system (SSTS), or septic system, consisting of a gravity � a�llection sewer with four lift stations, fourteen septic tanks ranging in size from ],000- � gallons to 3,000 gallons, and a gravity fed drainfield with nine drop box fed trench � laterals (2,250 ft of trench) comprising 6,750 square feet of absorption area. The system � also includes a small four lateral (400 ft of trench) reserve/backup drain�eld located � . acijacent to the Community Center. The collection system can be divided into four areas: • the Uptown Area, the Church, the Community Center, and the Gammelgarden Museum. I . Tl1e following businesses/buildings are served by the system in each area: 'i � • Uptown Area ' � o Schmitt Mall� � o Yoga Hus ' i o R&B Auto � o Scandia Cafe • o Scandia Store and Deli � • o Anyo Salon . o Scandia Veterinary Clinic • • Church � o Elim Lutheran Church + o Elim Church Parsonage � • Community Center � o Scandia Community Center/City Hall � � � Consists of multiple businesses in two buildings;Edward Jones,Scandia Family Dental, Scandia Hair Design, • Health Insurance Mart,Superior Land Preservation,Wilkerson Associates,Scandia Chiropractic Clinic � Ciry of Scan�dia—NI1.103386 Page 2 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk,Inc. � � � � � � � � � � � � � � � � � � � � � � � � � � � � i � � ` � � � � � � � � � � � � � � � � � � • o Maintenance Shop • o Warming House � • Gammelgarden Museum � o Gammelgarden Museum and Visitors Center � The Uptown collection system and original six lateral drainfield serving the Uptown and � Church areas were constructed in 1995. The Community Center was connected to the � system in 1999 (presumably at this time the existing drainfield at the Community Center � was relegated to reserve/backup status). In 2001, the Gammelgarden Museum was • added to the system. At some point in either 1999 or 2001, the drainfield was expanded • from six laterals to the current nine laterals. Washington County records show the total � • pe:rmit design flow for the system to be 4,060 gpd. • Figures 1-4 in the appendix show the configuration of the existing system. ` � 3.0 E)tISTING SYSTEM EVALUATION � 3.1 Design Flows and Wastewater Strength • De�sign of a wastewater treatment facility is based on two primary factars, the wastewater � • flow and the wastewater loading or strength. Flow is typically measured in gallons per . da.y (gpd) and the facility design is typically based on the Average Daily Flow (ADF). � Wastewater strength typically measured based on the following parameters: Biochemical � Oxygen Demand (BOD), Total Suspended Solids (TSS). BOD is the measure of the � ox��gen depletion demand of the wastewater, while TSS is largely a measure of quantity � of solids in the wastewater. Typical residential wastewater strength characteristics prior � to any type of treatment are as follows: � � • BODS - 270-400 mg/1 � • TSS - 300-400 mg/1 � Fol:lowing treatment in a properly sized septic tank, residential strength wastewater is � expected to have the following characteristics: � . • BODS - 140-220 mg/1 • TSS - 45-65 mg/1 � � � � � City of Scandia—N11.103386 Page 3 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, /ne. � � � � � � � � � � � � ` S � � � � � i • � • • • • • • • • • i • • � • � � • • • • • • • • � � � • F'roviding additional pre-treatment with aerobic septic tanks can reduce BOD and TSS to: � I • • BODS < 25 mg/1 • TSS < 30 mg/1 � '', � In addition to wastewater flows and strength, wastewater contains viruses and pathogens ' � that must be removed prior to discharge. In soil based treatment systems, viruses and ' � p�athogens are naturally removed in the soil beneath the drainfield. Depending upon the � strength of the wastewater discharging to the drainfield, and the texture of the soil • b�eneath the system, a thickness of 1 to 3 feet of unsaturated soil beneath the system is • r��quired to sufficiently remove viruses and pathogens from the wastewater. The distance � • b�etween the elevation at which periodic saturation occurs (also referred to as the � r�estrictive layer) in the soil and the bottom of the drainfield system is referred to as the � separation distance. � Although the City of Scandia is not currently required by permit to monitor flows for the � • system, water use data is collected through water meter readings for billing purposes. ` � � � � � � � � � � � � � i • • • • • � Ciry of Scandia—N11.103386 Page 4 � Uptown 4b'astewater System Master Plan Prepared by Bolton &Menk, /nc. � � � � � � � � � � � � � � � � � � � � � + + � � � � � � � � � � � � � i • • • • • • • • • � � � • F�igure 3.l shows the total annual flow for the system based on water meter readings for � • the entire system from 2004 to 20]0. � , Figure 3.1 - Total Annual Flow • (Based on Water Meter Data} • soo 000 __ __ � � ; � ' • 7°°'°°° , _i —. . , ---r , i i • { _ I 60D,000 . _— � _ - - — � • __ � I • SQ0,000 --- - � ,^ _ � a � . =-° 400,000 _ -- • � � ', • — — t Water Use Data(From Water Meter Readings) 300,000 ;� � • , • z�,� '�._ -- — — • • 100.000 , --- _ __ • , , , i • � > _ _ _ _ . _____- 0 0 0 0 0 0 � • ?. ? ?� T T > T N N fo N N f0 m > > J 3 7 7 � � C C C C C C C f0 N 19 � f0 � f0 s • � • • • � • • • • • • � City of Scandia—NI 1 J03386 Page S • Uptown l�astewater System Master Plan Prepared by Bolton &Menk,Inc. � � � � � • Figure 3.2 shows the total monthly flow for the system based on water meter readings for � � • the entire system from January 2004 to June 2011. � � Figure 3.2 -Total Monthly Flow • (Based on Water Meter Data} 160.000 _ __ , � . _ __. _ . • ( I � � � � � _. __ , .; 140,000 • – I � . .. ,_. .: . ._ _ _; • � ._ � . �. �_ . , . _ . _ 120,000 - -- . , • i , � I I • ipp.ppp t- - � • _--+-- --�- - • I i j I , � . . . . �I . ' , a i; I I � ' � ; '° 80 000 _ �--�- _ � r �_� . ' _ �. __. a _ � � I I � � I, I ' • LL � I � I ' � I �,, I 1 � I � i ( —Monthly Fiow(gal) , � � � 60.000 �� � L __ � , ; I � � • -- ; , ; } i � , , ; • ao,00a __ , . ; _ . ___ , , ' -- - i � � ; I i i � i ,, '_---- — � zo.000 � �__ . , , � ' , ! � , � , � , i , � _ _ _ o � + • Q Q Q Q � �, �, � � � � �n � � � � ro o0 00 0o m rn m m o 0 0 0 .. � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .� •+ .� � 7- - 7� � T _ 7- � T - T � A _ T v T _ T � ? - A � ? - 7� � ? - • �o `o_ 3 � f`o a. � .a r`o `o_ � � r`o a � � r`a a � � r`o n � � r`a n � � `m n � a � � c ¢ � � � ¢ ^ ° c a ^ ° c a � � c a � � c a � � c a �° O f0 O �° O �° O �° O �° O �° O �° • • • • • � • • • • � • . � City of Scandia-NI1.103386 Page 6 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � � � � � � � � � � � , � � � � � � � � � � � � i • • • • • • � � � � � � Figure 3.3 shows the ADF based on water meter readings for the entire system from • January 2004 to June 2011. � � Figure 3.3-Average Daily Flow � (Based on Water Meter Data) • 5.� . • I I , ' I 1 � 4.500 - -�- - � ; � � i I • 4,000 - ; � • I I • 3,500 -�-- ' j � � , , � i , � , • i 3,000 T ._ .__ _ _ ! � i � , ! I � � � � f I !I I a � � 2,500 i � i t - - - -t- -�- • o �, , , � � i 'I � LL � r I �. II �y ' , i - t • , i i I i i —AverageDailyFlow(gpd) 2,000 ' - - - - + � � , - � ' +� � � • � � , -� , ,___ '' ,. � , � , , � � , � , • i.soo ; _ -- ,---,-- I i i I � � � ; ; I � ; � , , � 1 I � � � � ; � , ; , i.000 - -�- — —--� +- i i ! ' � � i l ; , � � • soo I _ � � I i I I i I • � I !, i ', � ' � � , I i � � i I � � ', � ; T _j � I 0 =—� ��__� �-�-�---� - - - - - - $- - - • Q v v v �n �n �n �n io � � �n n n n n oo m o0 0o m m m rn o 0 0 0 � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .-. -. -+ �. _ > v 7- - ?, � ?, - ? � > - ?� � A - 7. � ? = T � �. - ? � T - • m n � n `m Q � n `m `o_ � � `m n � a m a � � r`o n � � `m `o_ � � m a � Q -` o � Q � o � Q � o � Q � 0 3 Q � o � Q � o � Q -' g � Q C C C C C C C C ^D O ry O N O N O N O N O N O N • � As the figure indicates, ADF based on water meter data is in the 2,000 gpd range. � However, water meter data is not always an accurate representation of wastewater flow. � Water meter data will not indicate whether the system is receiving inflow and infiltration � (I&I) (clean surface water or groundwater entering the system). In addition, water meter � data also includes exterior water use (e.g. lawn watering) which does not contribute flow � to the sewer system. A better measure of wastewater flow is flow data from pumping � • stations. � Of the four pumping stations in the system, the Uptown pump station receives the � majority of the flow from the system (80%). The Uptown pump station control panel � � City of Scandia—N71.103386 Page 7 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � • includes event counters, which record each time the pumps turn on. If the pump-out � • volume for each pumping event is known, the event counter readings can be used to • estimate flow to the pump station. Figure 3.4 shows a comparison of the water meter � flows and the pump station flows for the Uptown pump station. � � Figure 3.4 - Average Daily Flow Uptown Pump Station � 8,� , � � � � , , • �,00a _ � _ . : I__�_ � � � i � � . � ` � � 6,000 - i � �_ -- - ; _ - , _ i ; i i � ; � i ; � �� s.000 --+--� � � . ,— �__ � _ ' � � � � I , I a ea " 4.Q00 ,_ _� .. _. . _ —.. . _ , _ � 0 I • " � � ; ! � � —Average Daily Flow Pump Data(gpd) • 3� ,___ 'i i_ �_� t_ I { ;_ ' f __� —Average Daily Flow Meter Data(gpd} � � I i � I i � � I � ! I I I 2,000 ' �. -_ _�_ _ «- .. _ �... �.__ + _ .. ....Y, _ • ' il � i � I • Li�Q , 1 . . .. .� . 1 �r. � . . .... ..7 Ij I � I � • I �I �'�, �. , ', I�i �''., , � ,. . , III . . . , � O � �I �- • v v v �n �n �n � �n � n � i. oo m co m rn m o 0 0 .: � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 > T � T 7� T T 7� ?� T ?� � ? A � ?� T T ?� N 6/ N W N W f0 W f0 U N W N W f0 � � � � � � 3 � � � � � � � � � � � � � � � � • c E c E c E c E � E c E c E c rp w tp ai tp ai lo a �v ai io ci m w to � Q � Q � Q � Q � a � a � a � • Vf V1 N ✓1 V1 N Vf • As the figure shows, the data does not correlate very well, and little conclusion can be � • drawn from the pump data. There are two likely reasons the data is unreliable. First, , calculation of flow based on event counters is dependent on the pump-out volume. The � pump-out volume is set based on the distance between the on and off float in the pump � station. If the pump-out volume is known for the entire reporting period then the flows � should be accurate. However, if the float positions have changed over time and the � current pump-out volume is different than in the past, then the flows can't be calculated � accurately. Figure 4.2 assumes that the pump-out volume was constant over the 7-year � reporting period. However, we understand the one of the pumps was changed out in the � � Ciry of Scandia-N11.103386 Page 8 � Uptown Wastewater System Master Plan Prepared by Bolton&Menk, Inc. � � e • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • � � � • fall of 2010. Given that the floats are tied to the pump discharge piping, it is likely that � � the pump-out volume was changed at that time. This would make all of the data prior to ` that invalid. The second likely reason the data is unreliable is that the event counter � method of ineasuring flow does not take into account the fact that water is often flowing � into the pump station during pumping events at variable rates. This makes the actual I � pump-out volume impossible to calculate with event counters. A more accurate method I � of ineasuring flows in a pump station is to incorporate elapsed time meters (ETM's). , � ETM's record the amount of time each pump runs in minutes. Since the flow rate of the S pumps in gallons per minute (gpm) can easily be calculated and does not significantly • change over time, the total flow pumped from the station can be accurately calculated. � � Since the pump data for the largest portion of the system is not reliable, it is difficult to � determine whether I&I in the system is signi�cant. Based on our on-site observations, , experience with collection systems of this type, as well as the observations of City staff, � • we suspect that there is some I&I contribution to the system, and the flow calculations for ' • any replacement or expansion of the system should take this into account. This is � typically done by applying a peaking factor(typically 4) to the measured ADF flows to � obtain a Maximum Day Flow (MDF). � • In addition to the water meter flow data for the system, we also have the original design • flow data. In the absence of ineasured flow data, MPCA rules Chapter 7080 for SSTS � require that flows be estimated using typical flow rates for similar businesses. Figure 3.5 � show the design flow rates for the system using the original design data, 2010 measured � flows, and Chapter 7080 estimated flows. � � � � � � � � � � � � Ciry of Scandia-N11.103386 Page 9 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, lnc. � � � � � � � � � � � � � � � � � � � � � � + 0 • • • • • • • • • • • • • • • • • • • • • . � � � � � Figure 3.5 - Design Flow Comparison • i2,000 � � • . _._. � . _ � . . . m . n • 10 000 � _' • ,_ : ''. • 8.� _ • � ! ' � ° 6.000 . t _ {_ _ _— a � ' ', o I 1L . � '", l0 I _ ...... . .... .. . . [Q :. � II O I • . . . _ ... � ��. ., Q ',� � .._-a.- (ri ,' 4,000 — - ---- - ----- 1 __ . • � � ■Original Design Flow � . ... ... . N .__ ... .. .n �... . ,. rv ��� m I m o � o � � �2010 Measured Flow 2,000 � ry , o ,a � i • �. � r' m � o ��� � � o o ........ ■Ch 7080 Estimated Flow N Q � . rv � � � � , ry O � , �D • N ry � � N �.. � � rv � � m . � . :�_� L1_ o .. � � � � � � � � � � = Q v � o -� o � '° w � _ � � �� • � m E r° � v � °c° E L � d • N � � E E m ro O � � � v � • o U � �n y 10 � c • � W U �n � • c E E • u • • As the figure shows, there is a significant difference in the flow for each scenario. Since � both the original design flow, and the Chapter 7080 flows are purely estimates, we will � use the measured flows as a basis for the calculations in the remainder of this plan as � follows: � � � � � � � � � � � � Ciry of Scandia—N11.103386 Page 10 � Uptown Wastewater System Master Plan Prepared by Bolton&Menk, Inc. � � � � � � � � � � � � � � � � , � � � � � � � � � � � � � � � � � � � � i • • • • • • • • � � � � � � Table 3.1 � Design Flows � Uptown WW System � Average Daily Maximum Day • Flow (ADF)* Flow (MDF)** • Uptown & Church 1502 gpd 6010 gpd � Parsonage 150 gpd 600 gpd • Gammelgarden 51 gpd 205 gpd Community Center 180 gpd 720 gpd � Warming House 142 gpd 568 gpd � Total System 2026 gpd 7535 gpd � *Based on 2010 Measured Flows � ** Peaking Factor=4 � i As previously mentioned, in addition to flow, wastewater strength is a significant factor • in the design of a wastewater treatment system. In order to determine the wastewater � • strength, samples were taken throughout the system and sent to a lab for analysis. The • samples were analyzed far BODS, TSS, Fats Oils &Grease (FOG), Nitrate + Nitrite • Nitrogen, Total Kjeldahl Nitrogen (TKN), Dissolved Oxygen (DO), pH, and � Temperature. Figure 3.6 shows the results for BOD, TSS, and FOG for each tank � sampled, as well as the flow associated with each tank. � � � � � � � � � � � � � � � City of Scandia—N11.103386 Page 11 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � Figure 3.6 - Wastewater Characteristics • ■CBODjmg/Ij ^ 2,000 • ■T55(mg/I) � �. • FOG(mB�l _ _ __ _ - _ _ __- -�- _' 1,800 • ■2010 Average Daily Flow to Tank(gpd) ~ , • o o D o 1,600 • _ ___ _ __ _ _ _ _ _ _ � 1,400 • � _ _ _ _ _ _ _ _ __ _ __ __ _ 1,200 � � • __ O _ _ __. _ _ _ - - : 1.000 "_ � • ~ 0 • _ _ _ ;. 800 � _- _ __ __ _ _ _ _ _ _ _ _ �i • I _ _ __ _. _ _ _ _-- N -._.._- i 600 • I • _. _ -- --_ _ _ __ _ - -_ _. __ . - __ _ _ _ - - 400 � � � m N • � � m � � � fV . �K.. .. ...N..ti..Q . .. .. ..... � ....... � ... ResidentialStrength<=170mg/I � . � '� 200 • K+ '" k � o � �n^ " � � ro ry�,y ti U1 �ll V I� ResidentialStrength<=5pmg/I .,. � • Residential5trength<=25mg/I �.. ___ - � ._,.._ __ ..___ __.� . � • Uptown Pump Uptavn Fump Uptown Tank 1 Uptown Tank 2 ParsonageTank Gammelgarden Community Community DrainfieldTank Tank(48" Tank(48'" (3,OOOgal) (1,200ga1) (],OOOgaI) Tank1(1,000 CenterTankl Center7ank2 1(1,SOOgalj Diameter) Diameterl gall (1,SOOgaI) (1,SOOgalj � � All of the samples with the exception of the Uptown Pump Tank were taken on 6/1/11 • and 6/14/l 1. The Uptown Pump Tank samples were taken on 10/1 l/]0 and 4/l9/11. As • the figure shows the overall wastewater strength for the Uptown tanks and Community � • Center tanks are elevated. We understand that the Uptown tanks were pumped on • 5/23/l 1,just prior to sampling. This may account for the lower waste strength levels in � the Uptown Tank 2. The extremely elevated BOD level in the Drainfield Tank is cause � for concern. Additional sampling is recommended to verify that the result is not an � anomaly. Overall, the elevated waste strength is not unexpected given the nature of the � wastewater sources which include commercial kitchens. � � TKN levels for the samples ranged from 9.5 to 77.4 mg/1 with the Drainfield Tank � sample (representing the flow from the entire system) yielding a result of 72.9 mg/1. All � of the nitrate+nitrite levels were all less than 0.2 mg/1. TKN added to the nitrate+nitrite + levels yields Total Nitrogen. Total nitrogen levels in residential strength septic tank + � City of Scandia—N11.103386 Page 12 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk,Inc. � � � � � � effluent are typically in the 50-60 mg/1 range, so the level at the Drainfield Tank is � • elevated. The low nitrate+nitrite level is not unexpected as the wastewater is not aerated • at any point in the system. Further discussion on nitrogen levels is included in Section 4. � 3.2 Compliance Inspection • As a part of our field investigations completed on 6/1/11 and 6/14/11, we completed a � • compliance inspection for the system in accordance with MPCA rules and Washington • County Ordinance. A copy of the compliance inspection form is included in the � appendix. MPCA rules dictate that four issues be addressed in a compliance inspection: � • • Hydraulic Performance • o The system must not allow sewage to discharge to the ground surface, a � tile, or surface waters. In addition, the system must not cause sewage to � back up into a dwelling or establishment. � • Tank Integrity and Safety Compliance � o Septic tanks in the system must not constitute a seepage pit or leak below � their designed operating depth. In addition, tank covers and maintenance ! access holes must be structurally sound and not allow someone to fall into • the tank. � � • Soil Separation Compliance • o For systems constructed prior to April 1, ]996 and not in Shoreland or � Wellhead Protection Areas, the system must have 2-ft of vertical � separation from periodically saturated soil. For systems constructed after � April 1, 1996 or system in Shoreland or Wellhead Protection Areas, the � system must have 3-ft of vertical separation (15% reduction allowed in S Washington County Ordinance). � ` • � Operating Permit and Nitrogen BMP Compliance • o If the system has an Operating Permit or Nitrogen BMP, it must be in � compliance with the provisions of the permit and the BMP must be � properly operating. � � � � Ciry of Scandia-N11.103386 Page 13 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk,Inc. � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � i � i • � • • • • • • • • • • • � � � • Our review of the drainfield area did not reveal evidence of surfacing sewage or any tile � � or surface water outlet. All of the tanks were inspected prior to pumping and video • inspected following pumping, and there was no evidence of leaking. The system does not • have an Operating Permit or Nitrogen BMP device, so on three of the four issues the � system is compliant. However, the soils investigation revealed that the drainfield � (portions of which were constructed after April 1, 1996) does not have the required 3-feet �� � of vertical separation. According to the soil borings and soils report included in the �' � appendix, borings 1-7 (shown on Figure 2), which were completed on the perimeter of � the drainfield, reveal depths to periodic saturation ranging from 12" to 34". Since the • drainfield is a below grade trench system it is not possible for the system to have the • required 3-ft separation. Therefore, according to MPCA rules, the system is non- � • compliant. However, since the system is permitted through Washington County, Chapter • 4 of the Washington County Ordinance controls. According to Pete Ganzel at � Washington County, paragraph 4.3(9) of the Ordinance would apply to this situation. � Since the system is not an imminent threat to public health, was constructed under a � permit issued by the County, and the vertical separation was verified at the time of � installation, the County will not require the system to be upgraded, repaired, or replaced. � � 3.3 Performance Issues and Problems � Based on our field observations completed on 6/1/1 1 and 6/14/1 l, review of existing data � provided by the City and County, and discussions with City staff, following is a summary � of performance issues/problems with the existing system: � � • Uptown Tank 1 has large chunks of soap in it. This is likely the result of ! powdered soap use in one of the upstream users. Users should switch to non anti- � bacterial liquid soaps to prevent this. • • Septic tank pumping has not always included backwashing. Backwashing the • tank is essential to ensure maximum removal of sludge and scum from the tank. � • • Frequency of septic tank pumping appears to be random, with little or no • documentation or record keeping. Sludge and scum in the tanks should be • measured on a regular basis and a regular pumping schedule should be developed � based on sludge and scum measurements. � � � Ciry of Scandia—N11.103386 Page 14 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � S � � � � � � � � � � � � � � � � � � S � � � � � � � � � � , � � � � � � � � � � � � � a � � � • � Uptown Tank 2 shows evidence of possible I&I. Relatively high dissolved � � oxygen levels in the tank, considerably reduced wastewater strength compared to • upstream tank indicate possible surface water inflow. Upstream connections � should be checked for possible roof drain or footing tile connections. � • Slightly elevated pH levels in all tanks may be an indication of excessive use of � ammonia or cleaners. Users should minimize use of ammonia and cleaners or � switch to more septic friendly alternatives. • • F7oat system in Uptown Pump Tank is in a strange configuration. The high water • alarm is disabled and the high water/lag pump float is set at the same elevation as � • the off float. This may have been done on purpose to force dual pump operation • on every pump cycle rather than the standard alternating pump arrangement to . maximize the flow rate. If the pumps are undersized for the peak flow rates, they � should be replaced with larger pumps capable of pumping the required flow rate � and the float arrangement should be returned to a standard three float � arrangement. The volume of this tank is very limited as it is a standard 48-inch � diameter manhole rather than a pump tank. This can cause the pumps to cycle � frequently which increases wear and tear on the pump. A larger pump tank is • recommended. � • • Garage floor drains from houses or vehicle maintenance facilities are prohibited • by MPCA and EPA. R&B Auto is a vehicle maintenance facility and has a floor + drain in the service area that has been temporarily/manually plugged. The � integrity of this plug should be verified and if necessary, the floor drain should be � permanently plugged. � � The Scandia Store/Deli uses quaternary ammonia for disinfection of dishes and � utensils. Quaternary ammonia is especially hard on septic systems as it kills the • bacteria necessary for proper wastewater treatment in the septic tank. The Deli • should switch to a more septic friendly disinfectant such as chlorine or iodine. � � • A few of the septic tanks observed had a proliferation of band aids, rags, straws • and other non wastewater items in them. Septage from septic tanks is pumped by • licensed maintainers and either land applied at approved sites or delivered to � municipal wastewater treatment plants. The presence of such non wastewater � � � Ciry of Scandia—N11.103386 Page I S � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � i • • • • • • • • • • • • • • � i • • • • • • • • • � • • • • • • • • • • • • • � � � � • items in the septage presents a problem for disposal. Users should avoid flushing � • non wastewater items down the drain. • • The Warming House pump tank cover is not secure and it appears that youths � using the adjacent skating rink have been tampering with the cover and dumping � bottles and other trash in the tank. The tank cover should be secured to prevent 'I � tampering. ' � • The Warming House pump tank controls are outdated and include a junction box �I � located inside the pump tank. The junction box is covered in roots and the pump � tank itself is experiencing severe root intrusion. The pump tank controls should � • be replaced with an updated control panel. • • The Parsonage Tank showed evidence of surcharging. If the residents of the • home report that sewage backup has occurred in the past or is a problem, tank � maintenance frequency and water use should be evaluated, and the City should � consider installing a high water alarm on the tank. � • A strange, small diameter(2") ABS pipe appears to be discharging into � Community Center Tank 2. The source of this pipe should be investigated and if � it is a clear water source, the pipe should be re-routed. • • The Maintenance Shop tank appears to be connected to floor drains inside the � • shop. Since this would constitute a prohibited discharge, and staff reports water • use in the shop is minimal, this tank should be disconnected from the system and � be used as a holding tank. � • The sapling trees growing in the drainfield area should be cut as their roots have � the potential to clog the drainfield pipe. � • Access covers to several of the septic and pump tanks at the Community Center � and Gammelgarden sites are buried and are not secure. The covers should be • raised and new castings should be installed to prevent accidental or unauthorized � • access to the tanks. � � 3.4 Existing Drainfield Evaluation � As discussed in Section 2, the existing drainfield is a gravity fed trench drainfield system. � There are nine drop boxes feeding 4-inch perforated pipe laterals bedded in rock. The • total drainfield length is 2,250 ft. It is assumed that the trench width is 3-ft and that there � • Ciry of Scandia—NI1.103386 Page 16 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, /nc. • � � ` � � � � � � � i • • • • • � � � � • • � • � • • � • • • • • • • • • • • • • • • • � � � � • is 12-inches of rock beneath the pipes. This equates to 6,750 sf of drainfield trench area. r � Based on the soils repart, the soils in the drainfield area are variable in texture, with a � layer of sandy clay loam being the most limiting condition. This soil texture relates to a � design loading rate of 0.45 gpd/sf. For the ADF of 2,026 gpd, the required drainfield area � is 4,502 sf. Therefore, for the average daily flow, the drainfield has adequate capacity for � treatment. However, at the MDF of 7,535 gpd, the required drainfield area is 16,744 sf. � Therefore, for the maximum day flow, the drainfield is undersized. � � If pre-treatment were added to the system, the wastewater loadings would be reduced and � the design loading rate would go up to 0.60 gpd/sf. At the MDF this would reduce the � required drainfield area to ]2,558 sf, which is still larger than the existing drainfield size. � . This tells us that during most days, the drainfield is of adequate size to serve the existing � system. However, there are days when the flow rates have the potential to overwhelm the � drainfield. To prevent this, and equalization tank is recommended to store the additional � flow and slowly meter it out when the flow rate is reduced. The required equalization , tank size for the system is 10,000 gallons. The equalization tank would include pumps � and a control panel that would allow the drainfield to be dosed with a timer at regular • intervals, which will prevent overloading the drainfield. � � In addition, as noted above, the strength of the wastewater flowing to the drainfield is � high. This may cause the drainfield to plug prematurely. A pre-treatment unit such as an • aerobic tank is recommended to reduce the BOD and TSS levels prior to discharging to � the drainfield. � � 3.5 System Life Remaining � A typical septic system is expected to have a design lift of 20-years. This figure is often • debated, and for good reason as there are many systems that fail earlier than 20-years, • and there are many systems that last longer than 20-years. The reasons for this are many. � • The life of a septic system is dependent upon four main factors; design, installation, use, • and management. If a system is designed properly, installed properly, used properly, and � managed properly it can be expected to last for at least 20-years, and likely much longer. � A shortcoming in any of these four factors may cause a system to fail prematurely. � � � City of Scandia—N11.103386 Page 17 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk,Inc. � � � � � � � � , � � � � � � � � � � � � � i • • • � • • • i • • � � • • • • � • • • • • • r � � � • A soil based treatment system is basically a�lter. Large particles are removed from the � � wastewater by the septic tank. Further removal of solids may occur in pretreatment � devices such as aerobic tanks or engineered filters if they exist. Final treatment of the � wastewater occurs in the soil itself. Ultimately, the long term failure mechanism in a soil � based treatment system is clogging of the soil by the remaining solids discharged to the � soil. Obviously when a system is completed clogged, it is easy to diagnose because the � system will not accept water. However, it is difficult, if not impossible to determine to � what percentage a system is clogged at some intermediate point in its life cycle. • Therefore, assigning a value to the remaining life of a system is really not possible. � � It is possible to tell whether a system was designed and installed properly, and it is � possible to tell whether a system is being used and maintained properly. If there are � shortcomings in any of these areas they can and should be corrected to maximize the � remaining life of the system. � � 3.6 Recommended Improvements � To address the some of the more pressing issues highlighted in Sections 3.1 and 3.2 we � recommend that the following improvements to the existing system be considered: � r • Install equalization tank and aerobic pre-treatment unit at the existing drain�ield I � • Replace the pump controls at the Warming House pump tank II • • Raise access risers and install new access covers on six tanks at the Community I � • Center and three tanks at the Gammelgarden . • Install run time meters in the control panel for the Uptown Pump Tank and the • Community Center Pump Tank � • Install new, larger pump tank and pumps for the Uptown Pump Tank � • Convert the Maintenance Shop tank to a holding tank � � 4.0 FUTURE REGULATORY REQUIREMENTS � 4.1 Operating Permit � In 2009, Washington County adopted a new SSTS ordinance which incorporated the new � MPCA SSTS rules. A significant new part of this ordinance is the requirement that � systems serving food, beverage, or lodging establishments that discharge high strength � � � City of Scandia—N11.103386 Page 18 � Uptown Wastewater System Master P[an Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � � � � � S � � � � � � � � � � � � � � � � � � � � � � � � � � � � • waste to the soil obtain an Operating Permit from the County. The Operating Permit � • must include: � • System maintenance requirements, including frequency of maintenance � • • Operational requirements • • Compliance limits and boundaries • • Reporting frequency � • Requirement that permittee notify the County when the permit requirements are � not met. Corrective action must be taken as directed by the County � • Disclosure of the location and condition of the soil treatment system • • A stipulation of acceptable and prohibited discharges � � • As a part of the Operating Permit, a Management Plan detailing the necessary operation • and maintenance requirements far the system will need to be developed. � 4.2 Nitrogen Treatment , The recently updated MPCA Rules and Washington County ordinance include provisions � for nitrogen reduction in septic systems with design flows greater than 2,500 gpd. • Systems with design flows between 2,500-5,000 gpd that have the potential to impact the , water quality of an aquifer(including shallow private well aquifers) are required to � ', � employ a nitrogen reducing best management practice (BMP). For these systems there is I • no nitrogen limit,just the requirement to install a nitrogen reduction device. Systems • with design flows greater than 5,000 gpd are required to reduce nitrogen levels such that � the total nitrogen level at the system property boundary does not exceed l0 mg/1. � . Nitrogen exists naturally in wastewater in two forms, organic nitrogen and ammonium. . Ammonium is created through the bacterial decomposition of organic nitrogen. When � wastewater is aerated (air is added), niMfying bacteria converts the ammonium to nitrite � and then nitrate. Full conversion from nitrite to nitrate is dependent upon an adequate � amount of nitrifying bacteria and enough air. If the wastewater is then placed in an � anaerobic (lack of air) environment and if enough bacteria is present, the nitrate will be � converted to nitrogen gas, which will naturally disperse. This conversion of ammonium � to nitrogen gas is referred to as the nitri�cation/denitrification process. Unfortunately, � � � Ciry of Scandia—N11.103386 Page 19 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � a • • • • • s • • s � M • � • s • � • • • � � • � � • • • � � s � � • • � • • � • • � • � � � • although partial nitrification occurs fairly regularly in wastewater collection and � � treatment systems, including septic systems, full nitri�cation and denitrification is � difficult to achieve. It is dependent upon several factors including, but not limited to � temperature, alkalinity, pH, bacteria, and flow rate. Achieving denitrification often � requires the addition of chemicals such as methanol, ethanol, or other proprietary carbon � sources. � . As noted in Section 3, total nitrogen levels for the system were 73 mg/1, and ` nitrate+nitrite levels were less than 0.2. Literature suggests that typical effluent total � nitrogen concentrations for residential septic tank effluent are in the range of 50-60 mg/1. � While some nitrification/denitrification may occur naturally in the soil and some dilution � from upgradient groundwater may occur , given the high total nitrogen concentration and � lack of nitrification currently occurring in the system, significant reduction in nitrogen • levels for the system will likely require some level of nitrogen treatment. � � If, as a part of the new operating permit requirement, Washington County requires that � the system comply with the new ordinance nitrogen requirements a nitrogen BMP may be • required. If it is determined that the system may have an impact on the water quality of • an aquifer, and given that the design flow is greater than 2,500 gpd and less than 5,000 � i gpd, a nitrogen BMP, such as an aerobic treatment device, would be required. � If design flows increase above the 5,000 gpd mark, or if more stringent groundwater • monitoring well or end of pipe regulatory limits are enacted, a full • nitrification/denitrification treatment system may be required. � � 4.3 Phosphorus Treatment • Current regulations only require phosphorus treatment when a system with a design flow � over 5,000 gpd has the potential to impact a surface water with a phosphorus standard in � • place. Phosphorus would only be required if a phosphorus standard were placed on the . existing wetland adjacent to the system. � � � � � . Ciry of Scandia—NI I J03386 Page 20 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk,Inc. � a . � � � � � � � � � � � � � � � � � � � � � � � � i • • • • � i • • • O • � • • ! • • � � � � � • 5.0 FUTURE SYSTEM REPLACEMENT AND EXPANSION EVALUATION � . 5.1 Future System Replacement Evaluation • Based on the soils report, the proposed drainfield expansion area located west of the � existing drainfield is suitable for construction of a replacement drainfield system as • needed in the future. However, given the level of periodic soil saturation found, a trench � system would not be allowed. Instead, a mound system would be required. Based on the � limiting soil texture of sandy clay loam, and assuming that pre-treatment and an � equalization tank are provided prior to construction of the replacement drainfield to � reduce flow rates and wastewater strength, a mound designed for an ADF of 2,026 gpd � would require an area 372-ft long by 41-ft wide. A possible configuration and location • for a future replacement drainfield is shown on Figure 5. � w 5.2 Future System Expansion Evaluation � As shown on Figure 5, there is adequate area available to construct a replacement system � in the expansion area west of the existing drainfield. There also appears to be an area • north of the existing drainfield that would be available for replacement or expansion. � • However, an expansion of the existing drainfield cannot be constructed without . jeopardizing the ability to replace the existing system in the future. To understand this it , must be understood how the wastewater discharged through the drainfield moves through ' � the soil. Wastewater discharged to a soil treatment system not only moves down , � vertically through the soil, there is also considerable lateral movement. This is due to � several factors including land slope and the presence of variable soil texture and � consistency beneath the drainfield. In the case of the Uptown WW System drainfield, the � slope of the land is approximately 5% towards the existing wetland adjacent to the • treatment system. This means that in general the subsurface water movement will be to • the north towards the wetland. In soils of the type that exist in the drainfield area (sandy � � clay loam), the recommended linear(or contour) loading rate is 6 gal/ft. This means that • no more than 6 gpd should be applied along the contour for each foot of contour length. • To determine the length of the system, the design flow is divided by the contour loading � rate. This is illustrated in Figure 5.1 below: � � � � � City of Scandia—NI1.103386 Page 21 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � ` � � � � � � � � � � � � � i • • • • • � � � • • • • � • • • � • r � � � � ` � � • Septic tank • {�nfiiguration 2 - � `� � ,,/': � - -� 10o rt ; ' ,�� � Configuration 1 i- • CLR=600 g�d= 6 gallft ---T� • -�iooft � zo� • CLR=600 gpd=30 gallft • 20 ft ` Figure 5.1 — Contour Loading Rate Example 1 � As shown on the figure, configuration 1 has a large width and a narrow length resulting � • in a contour loading rate of 30 gal/ft. Con�guration 2 has a narrow width and a long � length resulting in the desired contour loading rate of 6 gal/ft. Configuration 1 has a high � potential of overloading the soil and experiencing a"breakout" of sewage downslope. � , In the same manner, "stacking" a system upstream of another has a similar effect as ! Configuration 1 in Figure 5.1. As shown in Figure 5.2 below, "stacking" a system • downstream of another can result in a larger than desired contour loading rate. � � � + � � � . Septic tank 50' . ��--`'����� � • =�- -- ---�- � � • -- - �` ;� • �-- : _,; , �� � - CLR=600 gpd=12 gal/ft • �_--'" 5 ft � _ - __ � � Figure 5.2— Contour Loading Rate Example 2 ! � Ciry of Scandia-N11.103386 Page 22 � Uptown Wastewater System Master Plan Prepared by Bolton&Menk, lnc. � � � � � � � � � � � � � � � � � � � � � � � � � � � � , � ` � � � � � S i • • � • i ! • • • � � � � • With this in mind, although there is space to expand the drain�ield to the west and add � � new users to the system, doing so would eliminate the ability to construct a replacement . drain�ield either uphill or downhill of the expansion drainfield. In addition, although � there appears to be space to expand the drainfield downhill to the north of the existing . drainfield, doing so would preclude the use of the existing drainfield. Therefore, it is our � determination that there is not available area to expand the existing drain�ield and add � new users to the system without eliminating the City's ability to replace the existing � drainfield in the future. � � 6.0 OPERATION AND MAINTENANCE RECOMMENDATIONS � 6.1 General � As discussed in Section 3, proper operation and maintenance of the system is essential to � maximizing its life. It is recommended that the City establish written operation and � • maintenance (O&M) procedures and implement them immediately. This section will • make recommendations on the types of O&M activities that should be undertaken and � recommend frequencies for the activities. These O&M activities should be completed by � qualified professionals. Industry standard checklists for recording the various O&M tasks � are provided in the Appendix. � � 6.2 Septic and PumpTanks � The septic tank performs the first step of the wastewater treatment process. It is a � watertight tank that provides the primary treatment in a septic system. As sewage enters � the septic tank, those solids that are heavier than water settle to the bottom, forming a � sludge layer, and those solids lighter than water float to the top, forming a scum layer. i Between the sludge layer on the bottom and the scum layer on the top is a clear zone • from which the outlet baffle takes the relatively clear effluent and allows it to flow out • into the soil treatment system. Periodically, the contents of the tank must be pumped out � • and disposed of. If the solids on the bottom, or the scum layer on the top build-up to a � point that they flow out of the tank and into the soil treatment unit, they can quickly clog � the soil treatment system, causing failure. � � The components of the septic tank includes an inlet baffle, an outlet baffle or effluent � filter, inspection pipes, and an access or cleaning manhole for each compartment of the � � Ciry of Scandia—NI 1.103386 Page 23 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � ! � � � � ` � � � � � � � � � � � � � � � , � � � � � � � � ` � � � � * � � � � r � � � � � ` tank. The inlet baffle ensures that entering wastewater becomes mixed with the liquid � � contents of the tank to begin bacterial breakdown of arganic materials and separation of 'I ,, solids. The inlet baffle also prevents the floating scum layer from floating back and �''� � clogging the inlet pipe. � • The outlet baffle or effluent filter ensures that only liquid is able to leave the tank and ! enter the soil treatment system (drainfield). If the scum layer reaches the outlet pipe, the • pipe would quickly become plugged and scum in the drainfield would cause it to fail. � • Inspection manholes are typically located above the inlet and outlet of the tank, however, • on older tanks there may be only one manhole located either at the inlet, outlet, or center • of the tank. These manholes allow for inspection of inlet and outlet pipes and baffles. � Clogs in the inlet or outlet pipes can be unplugged through the inspection manholes. � When operating, the septic tank is always "full" to the level of the bottom of the outlet � pipe. � � MN Rules Chapter 7080 require that septic tanks be checked for leakage and that the � accumulation of sludge and scum be measured regularly but in no case less frequently � than every 3 years. There are several septic tanks of varying size and receiving varying � flows and wastewater strengths in the system. Although MN Rules require that the tanks � be pumped at a minimum every 3 years, it is likely that most of the tanks in the system • will need to be pumped with greater frequency. The actual frequency should be • determined by regularly measuring the scum and sludge depth in the tanks and � . calculating the amount of time it is taking for the tanks to fill up. This time will vary . based on the flow rate, wastewater strength, and tank size. MN Rules require that the • tanks be pumped when the scum and sludge depth reached 25% of the tank depth or when � the sludge layer is closer than l2-inches to the bottom of the outlet baffle or when the i bottom of the scum layer is closer than 3-inches to the bottom of the outlet baffle. For � the O&M costs included in Section 8, we assumed that an average of 10 of the l4 tanks � in the system will need to be pumped every year. Over the next year, it is recommended , that the City purchase a "sludge judge" and measure the sludge and scum depth in the • tanks on a monthly basis to establish a baseline for how fast the tanks are filling. After � � � � Ciry of Scandia-Nl 1.103386 Page 24 • Uptown Wastewater System Master Plan Prepared by Bolton&Menk, lnc. � � � � � � � � ` , � � , � � � � � � � � s • • w • • • • � • • � • t • • � • • • • • • � . � � � • collecting this data, a more accurate determination on the frequency of tank pumping can � i be made. ! Pumping should be completed by a business licensed by the MPCA as a certified � Maintainer. It is important that the maintainer follow industry standard procedures when • pumping the tanks, including mechanical mixing and/or backflushing. Since the sludge � • and scum in the tank are separated from the clear water, simply pumping the tank will not • completely remove the accumulated sludge and scum. The sludge and scum must be � mixed prior to pumping to ensure maximum removal of sludge and scum. If only clear � water is pumped from the tank, the purpose of pumping the tank is defeated. The Septic e Tank Maintenance form included in the Appendix should be completed by the certified � Maintainer and submitted to the City within 30 days in accordance with MN Rules � Chapter 7083.0770 subp. 2. ` � In addition to checking for leaks, the manhole lids and/or inspection pipes should be � checked to make sure they are secure, and the septic tank baffles should be checked to � make sure they are in place, functioning, and clear of obstructions. These checks should � be made each time the tank is maintained. � � Although the septic tanks should remove the majority of sludge and scum, sludge buildup � does occur in pump tanks over time. Therefore, pump tanks should also be checked for � sludge and scum buildup and the sludge should be pumped out before it comes within ]- • inch the pump intake. The pump controls, floats and alarm should be checked to verify � that they are operating correctly. Run time meters and/or event counters should be ` i verified for operation, read, and recorded. Pump tanks should be checked at the same • time the adjacent septic tank is pumped, and should be pumped at the same time if the � sludge level dictates. Frequency of run time meter recording is discussed below. � • 6.3 Pumps ` The pumps and motors should be checked on a regular schedule as recommended by their • manufacturer. The pumps should be observed to check for noisy operation. If a pump is , noisy, it should be removed for inspection and repair. � � s � Ciry of Scandia—Nl l J03386 Page 25 � Uptown Wastewater System Master P[an Prepared by Bolton&Menk, Inc. � � � � � � � � , � � � � � � � � � � � � � � � � � � � e � • s • • • a � a • � • s • • � • � � � • The pump controls, floats and alarm should be checked to verify that they are operating � � correctly. Faulty floats or a malfunctioning alarm should be immediately replaced. Run • time meters and/or event counters should be verified for operation, read, and recorded. � Ideally, the meters should be read and recorded on a daily basis. This will provide the � best possible data for determining maximum day flows to the drainfield. If this is not + possible, they should be read and recorded on a weekly basis at a minimum. If one pump � shows greater run time than the others, it should be checked for proper operation and � settings. � � Pump-down tests should be conducted on each pump annually to determine the pumping � rate. The pumping rate should be compared to the design rate and/or the previously � determined pumping rate to determine whether any change has occurred. Changes in � pumping rate can indicate a problem with the pump, pump motor, discharge piping • assembly, or forcemain pipe. � � 6.4 Soil Treatment Area (Drainfield) � The soil treatment area (drainfield) consists of 4-inch diameter pipe flowing from the � septic tank to nine drop boxes. Each drop box has 4-inch diameter perforated lateral � pipes that distribute wastewater to the rock filled drainfield trenches. � � The drop boxes function by forcing water to flow out to the 4-inch perforated lateral � pipes serving the drain�eld trenches and flood the trenches prior to overflowing into the • next drop box. The drop boxes have inspection pipes and the pipes connected to the drop • box can be viewed. There will normally be water present in the bottom of the drop box, � • and if the laterals have received flow recently there may be ponding in the pipe and the • water may be flowing to the next drop box. The drop boxes should be inspected to verify � the level of ponding in the lateral pipes (if any) and that the pipes connected to the drop � box are free from obstruction. If the lateral pipes are submerged and there does not � appear to be flow moving to the next drop box, the pipe connecting the drop boxes may � be plugged. The inspection pipes themselves should be checked for damage, have secure � caps that are removable, should extend above grade, and should be repaired as necessary. � � Each drainfield trench has an inspection pipe located at the end of the trench for the � purpose of determining the level of ponding in the drainfield. The level of ponding in , � City of Scandia—Nl l J03386 Page 26 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � � � � i i i • � • • � • • • • i • • i � • • • • • ! • • • � � � � • each drainfield lateral should be checked and the level recorded. It is normal for ponding � � to exist in the drainfield trenches themselves. Under normal operating conditions, the i trenches should have less ponding as you move downstream and it is likely that the last � few trenches will be dry. If all of the trenches have ponding, that is an indication that the � system is overtaxed and may be at or near failure. � a In addition to checking the drop box and trench inspection pipes, the surface and • perimeter of the drain�eld should be checked for surfacing effluent or other signs of ` problems. Trees growing in the drainfield and within 5-ft of the drainfield area should be � cut off at ground level (do not grub stumps or attempt to pull out the roots as this may � damage the drainfield). s � Vehicles should not be allowed on the drainfield and mowing should be done at minimal � intervals and should be completed during dry periods with a push mower to avoid � compaction of the drainfield. � � Surface water from adjacent areas should not be allowed to flow across the drainfield � area and any surface ponding from rainwater on the drainfield should be corrected as � soon as possible. r � 6.5 O&M Task Summary � Table 6.l below shows a summary of the recommended O&M tasks and their frequency. � . Table 6.1 O &M Task Summary � U town WW System � Task Fre uenc • Septic and PumpTank Pumping and Varies, minimum every 3 years � Ins ection Pump and Control Panel Checks Same schedule as septic tank pumping schedule, � minimum once er ear e Pum Down Test Annual • Pum Run Time Meter Readin Recommended dail , minimum once er week Drainfield Inspection Monthly � � i • • � Ciry of Scandia—NI1.103386 Page 27 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, /nc. � � I, � • • • • � • ! • • i • • • • � • • • • • � • • • • • , • � • • ! • • • • i • � • • ! • � � � � � � 7.0 COST ESTIMATES � 7.1 General ! The construction cost estimates presented herein are based on present day construction � � costs (2012). � In order to prepare the preliminary construction cost estimates presented herein, various S material and equipment manufacturers and suppliers were contacted. Published and � unpublished data on costs for similar kinds of construction were also utilized. Increases � • in construction costs due to inflation are not taken into account. The cost estimates • presented here are meant to be used as a guideline for planning purposes. � 7.2 Wastewater Treatment Improvements • Table 7.1 presents a construction cost summary for the recommended system � � improvements. Table 7.2 provides the cost for the existing drainfield replacement. � � � � � � � � � � � � � � � � s • • • � City of Scandia—N11.103386 Page 28 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, lnc. � � � � � � � � � � � � � � � � � � � � � � � � ` � � � � i • w • • � � � • s • • • • • • • , � � � � � Table 7.1 � Cost Estimate � Recommended System Improvements , • Uptown WW System • Item Unit Estimated No. Item Unit Price Quantity Total � Install E ualization Tank And Aerobic Pre-Treatment Unit At Drainfield • 1 Connect To Existin Sewer Pi e EA $200.00 2 $400.00 High Strength Fast 3.0 Aerobic Treatment Uni� � 2 &4,000 Gallon Tank EA $25,000.00 1 $25,000.00 3 2"Forcemain Pi e LF $I5.00 30 $450.00 � 4 4"Pvc Sewer Pi e LF $20.00 30 $600.00 • 10,000 Gallon Equalization Tank,Pumps& 5 Panel -Main Drainfield EA $27,000.00 1 $27,000.00 � 6 F&I Septic Tank Effluent Filter EA $300.00 1 $300.00 � 7 Turf Restoration LS $1,000.00 1 $1,000.00 Subtotal $53,050.00 • 15%Contin enc $7,957.50 • Total Estimated Construction Cost $61,007.50 En ineerin &Cil Administration $12,201.50 • Total Estimated Cost $73 209.00 � Re lace Controls-Warmin House Pum Tank 1 Re lace Controls-Warmin House $1,800.00 $1,800.00 $1,800.00 $1,800.00 • Subtotal $1,800.00 15%Contin ency $270.00 � Total Estimated Construction Cost $2,070.00 �, En ineerin &Cit Administration $414.00 Total Estimated Cost $2,484.00 � Raise Access Risers And Install New Se tic Tank Covers • Raise Access Risers And Install Secure Tank 1 Covers At Communit Center EA $600.00 6 $3,600.00 � Raise Access Risers And Install Secure Tank • 2 Covers At Gammel arden EA $600.00 3 $1,800.00 3 Turf Restoration LS $500.00 1 $500.00 � Subtotal $5,900.00 • 15%Contin enc $885.00 Total Estimated Construction Cost $6,785.00 � En ineerin &Cit Administration $1,357.00 � Total Estimated Cost $8,142.00 Install Run Time Meters In Pum Controi Panels � Install Dual Run Time Meters In Uptown • 1 Pum Tank EA $300.00 1 $300.00 Install Dual Run Tim Meters In Community � 2 Center Pum EA $300.00 1 $300.00 Subtotal $600.00 � ]5%Contin enc $90.00 S Total Estimated Construction Cost $690.00 En ineerin &Cit Administration $138.00 � Total Estimated Cost $828.00 � � � City of Scandia—N71.103386 Page 29 . Uptown Wastewater System Master Plan Prepared by Bolton &Menk,Inc. � � ! • • • ! • • • • • • • • • • � r • • • r • � ! • • • • • • • ! • • � • ! • • • • • • • � � � � � Item Unit Estimated � No. Item Unit Price Quantit Total � Install New U town Pum Tank 1 Remove Pum Tank(48" Dia Ma�hole) EA $800.00 1 $800.00 � 2 1,000 Gallon Pum Tank&Pum s-U town EA $13,000.00 1 $13,000.00 • 3 Ex ose And Raise Cleanout EA $200.00 3 $600.00 4 Cleanout Castin EA $250.00 3 $750.00 � 5 Bituminous Patch SY $45.00 75 $3,375.00 • Subtotal $18,525.00 15%Contin ency $2,778.75 • Total Estimated Construction Cost $21 303.75 En ineerin &Cit Administration $4,260.75 � Total Estimated Cost $25,564.50 • Convert Maintenance Sho Tank To Holdin Tank 1 Disconnect Sewer Pi e EA $200.00 I $200.00 � 2 Turf Restoration LS $500.00 1 $500.00 � Subtotal $700.00 15%Contin enc $105.00 � Total Estimated Construction Cost $805.00 • En ineerin &Cit Administration $161.00 Total Estimated Cost $966.00 � Total All Im rovements • Subtotal $80,575.00 15%Contin enc $12,086.25 � Total Estimated Construction Cost $92,661.25 � En ineerin &Cit Administration $18,532.25 Total Estimated Project Cost $ll 1,193.50 � � ` Table 7.2 • Cost Estimate Existing Drainfield Replacement S Design Flow 2,026—Assumes Equalization Tank Already Complete � Uptown WW System • Item Estimated • No. Item Unit Unit Price uantit Total 1 Mobilization LS $2,000.00 1 $2,000.00 � 2 Connect To Existin Sewer Pi e EA $200.00 1 $200.00 3 1,000 Gallon Pum Tank&Pum s EA $13,000.00 1 $13,000.00 � 4 Controls LS $2,000.00 1 $2,000.00 •, 5 2"Forcemain Pipe LF $12.00 450 $5,400.00 6 Zone Distribution Valve EA $500.00 1 $500.00 � 7 Se tic Mound SF $2.50 15,188 $37,970.00 � 8 Turf Restoration LS $2,000.00 1 $2,000.00 Subtotal $63,070.00 � 15%Contin enc $9,460.50 • Total Estimated Construction Cost $72,530.50 En ineerin &Administration $14,506.10 � Total Estimated Pro'ect Cost $87,036.60 � � • City of Scandia—NI I.103386 Page 30 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � , � � � � � � � � � � � � � s • • • • • � • � • • � � • • • • • � � � • 8.0 WASTEWATER BUDGET REVIEW, ENTERPRISE FUND AND USER RATE � RECOMMENDATIONS � 8.1 General • We understand the past practice for the system has been to total the annual expenditures � for the system plus a depreciation expense for the drainfield replacement, and allocate the � • costs on a percentage basis based on each user's percentage of the total water pumped. � Billings are made on an annual basis. This has resulted in unpredictable costs far system � users as well as lack of reserve funds for necessary maintenance and repairs. We ! understand that the City would like to implement an enterprise fund for the system and � establish a more traditional utility billing system. � � 8.2 Operation and Maintenance Cost Recommendations ! The recommended annual operation and maintenance (O&M) costs are based on � personnel, laboratory and testing services, utilities, equipment maintenance, and � miscellaneous operating expenses. Table 6.3 details the recommended O&M costs for � the system. ! � Table 8.1 • Recommended Annual O & M Costs ` U town WW S stem Item Amount �' Salaries, Payroll Taxes, and Em lo ee Benefits $4,427 � Professional Fees $500 • Office Ex ense $100 Utilities $175 � Testin $600 � Licenses $500 • Se tic Tank Pum in - $3,250 � Pum Re lacement- $500 Control Panel Re lacement - $450 � Misc. Su lies - $100 � Re airs, Maintenance, & Sup lies $4,300 • Miscellaneous $l00 Insurance $l50 r TOTAL $10,852 � Variable Costs - $3,425 (Utilities and Septic Tank Pumping) � Fixed Costs - $7,427 r � � � Ciry of Scandia—N11.103386 Page 31 • Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � ! � � � � � � � S � � � � � � � � � � i • • r • r • • • • • • • � � r • For comparison purposes,Table 8.2 shows the historical annual O&M expenditures on � � the system. • Table 8.2 � Historical Annual O & M Costs � U town WW S stem � Year Amount • 1997-98 $2,650 1998-99 $1763 � 1999-00 $3,600 � 2000-01 $2,300 • 200]-02 $2,500 2002-03 $2,700 � 2003-04 $4,900 � 2004-OS $2,l 35 • 2005-06 $2,645 • 2006-07 $2,476 2007-08 $3,309 � 2008-09 $1,469 � 2009-10 $4,738 � � 8.3 User Rate Recommendations � • In a typical water utility rate system there is a base rate and a useage rate. The base rate � is a fixed rate charged to each user regardless of their water use. Ideally, the base rate � should cover the fixed costs in the system, as those costs do not fluctuate with use of the � system. The useage rate is meant to cover the variable costs in the system, such as utility ` costs or other costs that are directly affected by use of the system. Ideally, each user pays � a minimum charge (the base rate) while the remaining charge is dependent upon their � • water use. � For this system we have prepared two options. The first option adopts the philosophy of � covering the system fixed costs with the base rate revenue and the remaining costs with � the useage rate revenue. The second option reduces the base rate and increases the • useage rate to more closely relate to the previous billing system which was completely � • useage based. Since O&M costs will likely increase as time goes on due to inflation, it is � recommended that the City consider rate increases on an annual basis with a rate increase � � � City of Scandia—N11.103386 Page 32 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � i r • • • • • • r • • • • • � • • • • • • • • w • • • • • • • • • • • • r • • • • • • � � � • of 3% as a standard. This will avoid having to consider random large rate increases in the � • future to "catch up" with increasing O&M costs. • Table 8.3 represents the estimated sewer charges for the High Base Rate, Low Use Rate � • option. II � � Table 8.3 I� • Estimated Sewer Charges High Base Rate, Low Use Rate Option � Uptown WW System � Base Rate- $78.00/month � Use Rate - $5.00/]000 gal � Avg. � Avg. Annual Avg. � Monthly Water Monthly Avg. • Water Use* Sewer Annual • User Use* (gal) (gal) Bill Sewer Bill ` • Schmitt Mall �,513 90,156 $115.57 $1,386.78 � Yoga Hus 327 3,924 $79.64 $955.62 � R&B Auto 5,564 66,768 $105.82 $1,269.84 � Scandia Store/Deli/Cafe �9,955 239,460 $177.78 $2,]33.30 � Elim Church & Parsonage �2�600 151,200 $141.00 $1,692.00 � Community Center • 5,490 65,880 $105.45 $1,265.40 • Warming House 4,266 5 l,192 $99.33 $1,191.96 • Gammelgarden 1,570 18,840 $85.85 $1,030.20 • Total 57,285 687,420 $910.43 $10,925.10 � *Based on 2010 Water Use � � � � � � � � � Ciry of Scandia—N71.103386 Page 33 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � • Table 8.4 represents the estimated sewer charges for the Low Base Rate, High Use Rate � • option. � Table 8.4 , Estimated Sewer Charges Low Base Rate, High Use Rate Option � Uptown WW System � Base Rate- $13.00/month � Use Rate - $14.00/1000 gal � Avg. � Avg. Annual Avg. � Monthly Water Monthly Avg. • Water Use* Sewer Annual • User Use* (gal) (gal) Bill Sewer Bill � • Schmitt Mall 7,S l 3 90,156 $118.]8 $1,418.18 � Yoga Hus 32� 3,924 $17.58 $210.94 � R&B Auto 5,564 66,768 $90.90 $1,090.75 � Scandia Store/Deli/Cafe 19,955 239,460 $292.37 $3,508.44 � Elim Church & Parsonage 12,600 15l,200 $189.40 $2,272.80 • Community Center • 5,490 65,880 $89.86 $1,078.32 • Warming House 4,266 51,192 $72.72 $872.69 • Gammelgarden ],570 18,840 $34.98 $419.76 • Total 57,285 687,420 $905.99 $10,871.88 � *Based on 2010 Water Use � � If the proposed improvements discussed in Section 3.6 are implemented the system will � need to support debt service for financing the proposed improvements in addition to the ` annual O&M costs. Assuming the proposed improvement cost of$l 12,000 was financed • for a 10-year period at 4% interest, the annual debt service would total $l 3,809. � • Therefore, user rates would need to be increased to cover the additional costs. � � � � � � Ciry of Scandia—NI 1.103386 Page 34 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � � � � I � � � i • r • • • • • • • • • • � • • • • • • • • • • � � � � Table 8.5 represents the estimated sewer charges for the High Base Rate, Low Use Rate � � option with the additional debt service cost. � � Table 8.5 • Estimated Sewer Charges with Proposed Improvements High Base Rate, Low Use Rate Option � Uptown WW System � Base Rate- $220.00/month � Use Rate - $4.75/1000 gal � Avg. � Avg. Annual Avg. • Monthly Water Monthly Avg. S • Water Use* Sewer Annual • User Use* (gal) (gal) Bill Sewer Bill • Schmitt Mall �,513 90,l 56 $255.69 $3,068.24 � Yoga Hus 327 3,924 $221.55 $2,658.64 � R&B Auto 5,564 66,768 $246.43 $2,957.15 � Scandia Store/Deli/Cafe �9,955 239,460 $314.79 $3,777.44 • Elim Church & Parsonage • 12,600 151,200 $279.85 $3,358.20 • Community Center 5,490 65,880 $246.08 $2,952.93 � Warming House 4,266 S l,l 92 $240.26 $2,883.16 • Gammelgarden 1,570 18,840 $227.46 $2,729.49 � Total 57,285 687,420 $2,032.10 $24,385.25 � *Based on 2010 Water Use � � � ` � � � � � � � � Ciry of Scandia—NI1.103386 Page 35 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, /nc. � � � � � + � � � � � � � � � � � i • • • • • • • � � � • • � r • • r • • i • � • • • • • • � � � � � • Table 8.6 represents the estimated sewer charges for the Low Base Rate, High Use Rate , • option with the additional debt service cost. � � , Table 8.6 • Estimated Sewer Charges with Proposed Improvements � Low Base Rate, High Use Rate Option Uptown WW System � Base Rate- $15.00/month � Use Rate - $33.25/1000 gal � Avg. • Avg. Annual Avg. • Monthly Water Monthly Avg. � • Water Use* Sewer Annual � User Use* (gal) (gal) Bill Sewer Bill � Schmitt Mall 7,513 90,l 56 $264.81 $3,l 77.69 � Yoga Hus 327 3,924 $25.87 $310.47 � R&B Auto 5,564 66,768 $200.00 $2,400.04 � Scandia Store/Deli/Cafe • 19,955 239,460 $678.50 $8,142.05 • Elim Church & Parsonage 12,600 151,200 $433.95 $5,207.40 • Community Center 5,490 65,880 $197.54 $2,370.51 • Warming House 4,266 51,192 $156.84 $1,882.13 � Gammelgarden 1,570 ]8,840 $67.20 $806.43 S Total 57,285 687,420 $2,024.73 $24,296.72 � *Based on 2010 Water Use � � � � � � ` � � � � City of Scandia—NI 1.103386 Page 36 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � w � � � � • • • • • • � � � * • 9.0 DISCHARGE ORDINANCE RECOMMENDATIONS � � � 9.1 General � It is recommended that the City establish an updated Wastewater Discharge Ordinance � applicable to the Uptown Wastewater System. This section will make recommendations � on the content of the updated ordinance. Ordinances for similar systems in Scott County � as well as the City of Scandia were used as a guideline for the recommendations. � � 9.2 Recommendations � It is recommended that the updated discharge ordinance should contain the following � elements: � � • Description of the purpose and intent of the ordinance � • Location and general description of the wastewater system � • Definitions of terms used in the ordinance • • Reference to or adoption of applicable laws, rules, standards, or ordinances of � • other governing bodies or agencies that apply to the system (e.g. Washington . County Ordinance, MPCA rules, etc.) � • Specific description of the various elements of the system defining what parts of � the system are under public ownership and which parts of the system are under � private ownership � • Description of responsibilities of the City and responsibilities of the Users of the � system (e.g. maintenance, problem reporting, meter reading) • • Establishment of the rate system, calculation of user charges, as well as procedure � • and frequency for adjustment of rates ` • Establishment of the method and frequency of billing � • Procedure for dealing with delinquent accounts � • Restriction of new connections to the system � • Restrictions on flow rates for each existing connection to the system (purpose is � to give the City some control when a high water use business replaces an existing • low water use business and creates the potential for the design flow of the system � to be exceeded) � � City of Scandia—NI 1.103386 Page 37 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � � � � � � � � � � � � ` � � � � � � � � � � � ` � � � � � r � � � � � � � � � � � � � � � • Establishment of prohibited discharges to the system (e.g. hazardous materials, � ! non sewage materials, etc.) • • Prohibition of damage to the system (in the form of excessive flow, physical � damage, discharge of prohibited materials,etc.) � • Establishment of a procedure for enforcement of and penalization for violations of � the ordinance � • Provision allowing the City to recoup costs incurred in investigating and • prosecuting violations • • Provision allowing the City the right to amend or change the ordinance � � � � � � � � � S � � � � � � � � � � � � � � � � � � City of Scandia-N11103386 Page 38 � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � �� • • • • • ! � • • • • • i • • r • • • • • • � � • • • • ! • • • • • • ! • � • • • • • • � � � ` � � � � � � � � � � � � � � � � APPENDIX • • • • • • • • • • • • • • • • • • � • � City of Scandia—NI1.103386 Appendix � Uptown Wastewater System Master Plan Prepared by Bolton &Menk, Inc. � � � � � i • • • • • • • • • • • • • • • • • • • • • � • • • • s • • • • • • • • • • • • • i "1 ,n. .�„ '� t, �f'�i y'�' k�,' 'p ' . /' ���`1, `� �` �y•` � \\� ••� .�.1 t }}} � 1i �, % ` � 1`'• � � � �! ' ' y � � t [ � � . �� � w � t�r • , r4/� + .w a v�+ n. . . x� . � I �(� _��. ' \� \ :`1. q �` ' ` "�.�� '� �\ \\ \ j) 1•�,� ..I � ` `� ` `�.� , S �� 1��` �•, -~ � •\ , .:\. �\ Z i � b�. �. . (/ �_ ... . � , �/� ~ ' �1 1: t :(`�, ��� `\`��, \ �� `� •�'�� :\ �i Lt•:-` e' . \. � , � � , I I � 5%�% �: �.'� � � \ �\ _-- ., _ '��� �i�''�� ., � �. �^_, ���� ,�;� ',� � '��zy'�,/, ��', r ` `•,� � �� � ,�'-- '� �. �.'� ��',�T' ..;��..r j�/�` ��� � ..` , \•� �'ay;�_ i9i�...._�_ •,�, , � ' �l���./� a .-'. .- . .. . . '�t ,,- �' °� �� �'4�7,, � "- / � �. k.� ���� �l\� .� � �.���--...-.%' ' _ / , _ -^ta. -J'"'°` `� f � �t. t ? - `'.•.`' A� � `1� .p'. Z � '' � , � �'^� '" � ` '��' � ` { �j � '�', "';,. � ` � � � ���� . „ i �„ I . ,.� , � ,I. � � ��. � " "� � ' ,_/ '��' t-�`� � :.�; � '��--�\ ,�, � � � ! J N L � � „� F�Y , � `� . � ,�I � `.��...�'� ��� ,� ' i � 0 / � »� � � -x �r# �. '� � �_� :;��' � ;`"�, �'_ __ ���t J � � f ,. ' � � �� �/� � .)�i r—--=-�_` ' `'�' fn �w �j ' f� ' � ��. �> ,!� t � �/ � A� � 1 r \�, a �jt � F � ' - r"� �",��Z��'ya--�-�r-- X�t' / �`� 1 ��1 ,� 'Ji�, � a _ �;a _ — \ �� . ,�-..,,�� � ; - ` � , , - _ {� �" � 34 �� _1 ', �.. 1 j��I;� C � �`' ,� r��,� � ' >. .� ,: ' `►' \ , , ,�,j� 1 jr- � Y{b;� �� �'` Er;!'`, _:�,.� �-_ .`� ` w, , f----- ���i�� / � �---__�__--_ '< I�~ U 3 O �°�' \ I', �,�- /� � r� �'%/ y� * -- � v . .�'�`� �^'',r' o . �A����"� Y � Y� - , � :�� � �� ..� , �� � ���'.�` -�—� .. �,.. � ��'� J' � �:� � � � � / � �'' �i � � .�'•�. � �1'i }�� � ^ \,, �t.� ;�'� F ,�.�Z ,T- �, ��� - � ,/�� �� � t 1't�y � ..,; ` ';, �\ .. � �i.. 1` '\�� �. '� �� r� \` y� .� y: :'a��� ` v ��%�f �� ,� � `� � �" \.(r � �" . .. ; I .1� /.�«R!- 'ai '.iR � �' " • .��. v ,5��� yp� ���� ♦ �, \ ' �.+. r ���:� � 1 �'_' : . 1',� L• ��:�r:� e ''� '� �7 �3�`'`��..: �v".i�� Y /�. �. � 1� C" �t. �t � . �� `� µ�, . i k; r � a ` �M � ''�k^- ^ t+ '�._I . ` �! J �''"����''�'���?.��-s-, �r % t' �', '�/ �`5�,��; .'1y� `t �~. ""�'. 3� � *;'� ��� :r:`' �, ', ri� �'.�� ;�� �' - /' � 't„1.������.' . �,-' � � �� �� . , . /"-)�...�r �a �� s s g. 1 � r Y� 1 C , i� � —.r � f��,! r' � /"�1 � '' �rk# � . � , � -�` '� ���''J , _,_ � �J � ��� � ; , �\ � ,� �,`�`� �{j��� ' r' �" � _ ` ,�` 'r . .. *�� r�� �+( `'Crt�}'� }, � k 1`k 1 "� [ i -- 1 � ,� � � �,` _ -.- � R. . ��•���\ \, \� f'� ��' �__.--�--�'�, .a �'4"�� �y � .��� /1 7 y �$�.`�' „-,`.��� � .�\ n f�. ,p.s., ( A r��i/ w� �, V S - -=�_� -- -;� �'� � ,{��,��c� \�� ` 11 � � /�-- ,_/� '��/r�i--;�-�' �...1 Z �� ``�, � y\ � � / ��� . 1 � .� '4 .� \ � \� �\1, ,�,` � r.J—'�—J~� � �{/� " . . � �� — � K� \\ � � ,;;C't, ` A`. � �`,1 �\ � } -� ��..�,• �c , /� "', ,� ` ., "�.•y o m� �` hI ��`�` ' ` �{ �f� ' Y � Z � . � *�. , � y � � ,-- r-"""'----�...�. . _� •�� �� �, r N f�,. ,/It��;i, I,� 1 ��."�. , � r.,� -_r, .� ,�"--,_,,;�' � �y Z � �� � � a ` `�, �� � h ` �G' , , �- �`A`� W � �. � �� �'� � � ` ,/�) �t�Iti� �� .�� �' � '�«` t� '� �" � �' t., ,� �' � � �� �', R �� f , �`)R �'i�i i \ � , ."" li� '� -F, .. c �� 4 � • ! � `,�, '/ � � i � � ! � � �. ' �� y � ��` k a � �,� .�� �,; i „ii'��� �� � � ` .� ' ' l� . g� �!;. � W �� /.� ,,� w � .� r' r \ ill/I! , � ,� ` � � .��a / f r � � '� �`����Ar:.+ O1 z Z � / �� .i, ��l� �,l 1 1\ � .. ` ' �� . f .- C' �� � `�qkfC Z * 2 '� 1 � i. � . .�� � �y'�'�'� 7 �R� � �. � , �,� %,f` J= �n . �,• /�!;j; � � • ` � �, t tt�, .`° , ,�, � '�� ,�,�,�,:;... Q � � , /.- , �f ; � � 4 � �� S ,G �, � �7 . �J ! r� �. .__ f ( �� ` /� . . - . � t!�i .���" �'�,� �,� S `:�'�l`.�Q 1 =2 �, .�. %� �+�►� : r;-�- � �,,, J F �. �' . ..���� .� ,�,.�. J o � ` '� �� � • . !', �', �o � r ��-� j' ( �' /,.. ' ,�::f� ;. �w,- �-��� ti�� ;� � �� `� �e �' t �.J (r ��ti__-< � ~�.. � / J '�.✓, ,'�����•�� `�` �'� � 3 "\a� � r ' 'l, r , I _ ' bpi�j � � /� . '^�: �" � � �ry � r 'I �:l 0 f '!� � rfi t--/ �,.� ✓:i '`�'S 'y".���k'" / � � • ; ' f �•-/ �`- ti\[ • . .�/ . f yKe�i:.-- '�'.. � �' ; ,y" � � � � .X • ��• S�r.*i .' i- i'J l 1}l`1.I J\ ��� { ' q4�.���i�Zi�.�,.+ ��, e....,,a. y_ ,,, �..� .i� �� 1! �y ,�, �.�' . �C% ``/` .- ! ' ,� �°-w�a,. ,'� .'" �. ' . `��I ;�'I ����'�r i � � � _ \� ��,���,/�-t' �.� � ��� �`��!a ' ��t�^ '.�. �' - '��, \�f/ , I 1;1 � �. -- � -°L,JS/� , ` `4 �: t u��� � `�' y` ,_�r i 1 i ' � � � `\� ^.� .� ` �� \\� � � \�� �����` �y� � \ \`� :�j,%l.,f j�:� f�/� ��� ,v r� /J I.�" �`� .. �v, � �:�� �`;c� � . � y ``�' "�'s4,�.`..�� � _,�� ,, % 9' � �,-%,/. - `�.e,� ( ' � , / , y, ` 1�� � � .^�, ,.�",' ' �_ � — ; � t' � ( �' �`. � .�, �-�- —�, .�« - � r � � � . . _ .., �. . .� . � _ � . . ___.__ ._. .� ���� � , —_-���__� _ , _ ! _— ---- 1'�-_�� .�' , r �,r I � �-. .�'� ,, � a ��� �.. �. r . __ - "�=. ' �(, � r � �, t ,•� 1 �� > ` �\ ���, �a . y '•� `_=��_:�-_ �/��,� �� / � I .f,_� 'k � � '��'�' '% '=`~-- r., ! J ( � i .�' . -_ �/ i �� / � ,�' R��. t � S�, � 1 �y � �*:� ti�;�� �/l% "',+ \ � i .� . a .j�` !' � `,` �•: ,�. �� .� ,, _� t . j � ,:O � \ ;' ~ �� y , �� Y, ,*y 1/ � _ /�;t. �;� � �� � � �,`� \1 y' � , - ;:r � �Z' j '. �.. , . . r �. .. , � a ( � ;• � � � ,T \ � � v�� � .� ��, � ;/`, f. `� ` 1 1 � ,� � ` �,- - ��`".i+i., ..� / � � � 1 `��.•;� . � '/,� . � .=J \ ;�-- ' '� ^.ii.� '' ! � � � � \ � � ' �' �� �� -'.�1 '. C , �,� ��/'�, ' � � �. ,1 \ � ! �� �' �`�,. '� i • ��t �„� • ,� `�, �/f '�—��j� !/ � � 1 � � . � j,4\ '�`��\\;` � '} • � ,"~i"�, � /���s; . � �,' j ,/,���j � � ' , I' ��'. � � °';�"a�'� _ ,,,; :� � / f ��`�.�\ ��,h/ / i t i � ,i i .� � 1;' � �� ,�i.��:�i+jt;. � � ��/ � 'r ,� � � �,� ♦ w �m.�\.e �'�ti�� '�-� �°*��� ,�,- � �W�" M� �'`I's`�1 �� �, �� ,'.'�4�� `�:�. �,- �,. ,,'�� � a' '�` �y` d• ., '��' • ` _ .. •:..;, � - r 1 ' f• �, +�'� �,'�{�,�� �'�'�1�` _. � . � r_' �f ;� � ; .�. � , ,�, � �� .� /� / , �, ``\��._y�"- '\ �., /` � � � ' ! ` ( � `` �d� - � _�� s :4 ` � , � ' �� :� / r =f;� � �. � �`� ��`✓� �M �e:� } ';?' ;''� i � .�� �,' :�, �� "�`�"'�`��` �� \•� � /J 1! � 1. i\ �.l ,.., , �� /'' '` , \�� �il^w. � � � � �h. i�. t..:�i . J// � ;� I r' '1 ' '��1; � �1 \� �'��� -.i, .-e� +� •f � y � � � , , i•: � � ..�.� �:, �� � ^�y' �� �'��i � � `. � �,l'� , ` :r`..� h �� ,i•�1 1 '``1 , ���; r�`ry�y'•'�����,.��s :+r+�": �' ,ti+.""._ � ' ' �— '� r ?ia' i 1 �` 'e� '��, y� 1 1,� j 'Ti -� u�� °� ;�.,- ���.; V , i � �� _ 1� �� t r� � � � � ., :,� �..,. �,:�. ,- ` ,� ,. � �._ . �: �,. � �-� ,�. K �»�.�,,; �-.�. ` ''� <' ��� � ���, j�i�'/� ►�� * ,� � f 1 � � a�`��:'� � � ;� � � j� 1 � � � �` �., �'q ;/ � r� ---�-��1 x� � � 1 ( . , r. , �.. � �, �\� /--;'' � ��� ! - `' � ) � L�� � � �jj� , f Y�, 1 (: `�, - � ���\ �� � � ?�' �' �\\ . l', � . ..� f/ / ` I q v� �� � :-"'1 / � \� ,�� ,',�/�' �►_� \z I � �\��� `� (/ �. >� / s y �� ' % � ' ,�, �. � o ,� .•.r� R:S�/� �Ih � � � � \ } �1 ( -�"� j• . ���^-.✓ � r . . � w � .-Y � .� . ' � `� �� �r-� � .-�,� ° , . ; �• ► � J � � ;� � M / ,:. ,� � r/ /, `� � '---�J / �,� . �,� ` ��: %� \ /'. �� � ` ��n ��'f_+ l\ � . �`��\ � �' � � ��'`�'. � '�i, �.�'�',•, g E � ��k.�� � � ` ' L � `Gi� �'.� . J �, �v \ � ' ,1 � ':�r'iCt .'`� � r , ) = c � : � y�.; . :,;� `\. t�• / � ,,� '�', /_ �,�' , s^��`" ,�.p. ) / '4��{�y � S 7^ �• - , ��4. - \`` .. / ' _ .. \ ��,. • `�,//.�-'�S``�`�\�\_.�� "'� ..� }. .,�_„_--/ /i � � �J�f�r, t. ,`���� • � �''� 1 / ti� r ,; �_ , 1 (/ �� .�_ �..- � .�\ ;•Ns; ,, �-..�- o '\\ .�.� i I i � �..r`� M� `` .Q ��`~ �� , e\ �_J �J'� '' ''} �;:�'� t. ♦ �` .�Q{, � � �� . .� � _�� � r� •�� �. ..� � �`/, �r' � ' ' � � ( �..( . � � � � � �;�� .7 +�'�� � .•�� � •,,:, 4 �� � ,� , � ��.\ � � t ,�a�., �,� �, �" 4 , -�� -•- � �.. �. �� .� �� � � -__ � . - � ,� � ., � .,, � ,.��,- , �, � .,� �: �� ,# ` `l\ � C�� � // . �,, ' � \ � � �, '� �_ ` � \ � `� �� ..�� . '`,.t.i*" . „�,�,''.j* ����, ' . ,+. - y 3`1 a� `\� `\\,Dl�\\� �1 � ��., ' �r-.� �+���'`'#;�'*'�r•r I � �„'�.�'' 1 ,'/_-- �, �� � i �4.�i 1 , /� j a , I��� '_"' \�� � `�`i "a�{6„,�� � '� ``� �/ r ,� �•m^, ,/ � ' ' � � �Ct i ���5p� }} I^�r� g . t j �( , • , -!,• '�'���/(. � j:��--�_.�` \��v��� ��11 \ '� �. / {� . �'.�� n.�Z., ' ,"� n R'� . � F3�.t \ \ � ' � ��.� »{w� H o Y•' ! , , ' , `� � � '�.� � —>> )� , I. � '�t ��" � ,�' .�.� 7_�, ;,; �,;,. ��'� � " `: �-._..- ,x, �`� �'� .�•�� /' : . .�$��},.w-^,• �o .�� ' i�f' : ` _" � �:.\ FT r � ,. y,. � .,� �\�K-� � �'� }� �i \ 7E � rf..,.... -, ' "�+C�., Y`.'` 'V"`'4� 4. i`.' .Y� a� �y��� t, . . � ti. r�� 6 �� � �� .� � /��"� . � �i � '�a'� * r � ,- y+��. b ^ a� . ""`-�_ '���. 7 �y=' �r� �f vr .1'� `�� i �!"1�t� `a�,� � �f,, �N > � z . � � • • . • • • • • • • • • � • • � � � • • • • . • • • � • • • . • • • � • • • • • . � ! • • � • • � • • • • • � � • • • • • • • • • � � • • M • • � • • • • • � • • • • • • `�� ��" . . I �,,:,,�, ' y i `,, . + � ;r . . � . �< rw a r ' r • ' � �' � ;, .�.* �� ', �"~x..�. d " ��.�. � `. .�. ' I ` , .� _ .,• .. . , , �- • ;•,� . ' . �. � � • , ; .. � . - :, . ,. . � �. „•. .�. � Y . . t � � � ��� � � '�• � � � � ; ' \ \`; ��;� :` . �.r a \ � ti � '�"�? '` �, . �, � � 1 \ �;` , ` 'y � � ' � ``` �, �` " z ` ` ,, �,4 , � � � � . ti i � �. � . ` , . -, .:, r, +M. 1 � \ ` a �` x` , �' „�y,r, .� � � � :..� \ ,\ r� ��'� 'V. � � �� ,� � l�� 't � � \ . , .., � . � � \\ ,\ � ` � r, , F Y� y��' � Q �\ \ \ _ , � , v.. ".,�'_ !( , .. s � W \ , ,�F�1'� � +R�.: ` ,,.. _y . `` \ 1 ,, `'�t � . .,1� � �' `r; '., .. •,� t. � � � .E j `i 1` � � `,`` �.,t,�.� O a � ��s I i , ` 1 \ ` \ , �` y � � I � � � � � � \\\� w,, S,. �' � Q � � � ,�'��\�` , \ ��`� � U 3 �� ` � � t . � � � � 3 • � t .,��,� ` ,`1`. , : � � ` ..� F o , `t \ ! �,�`���1;, ! '' __-�,\ 1��� ?�� r - , , -• � � ; x i J �, i � !` �, \\`i``` i 1�. � , ^`�� �it �� � � � �1 W 1 � �� � �,� ��•t , �. � t � 1 � \ , _ • � . r"'" w� t� � � �� � , � ..�a.�, a � I 1 ` ; �,\\`, �,�C' :�� ':�T_' �-�:�, , �' �. � ; � ► � f ` � � � 1! t� �\ 1 ,r�«-,, 7�� s'"::� ��:.-��'�;,�,.� i� � ' r ' � / ' � 3 . ti.. „ ,�,, . � ' i / � / ; � , � ' '\ ; �..�}�a3� � ',t��Ya,; � � +.� Ji.w. i f � gr �'t � � _ ' ./ .�` �` i" ti y�.�.� c�._ . r- r . , .. � , , ; "' , ��'� % �' �� , � ` ��,� . � � .� �� i ., . . y��,,y +.�, . � �� '>• / '� '.R91�i `� `� `�_ 4 # .Af .� '1+A4 ., 7 ., M�`w� �! . � �S'�{' �_ � . *� ',.. I / �/� /�� � �-`� y�� F 1 � � P.• i• * + (� �j Li 4���„ � . 'lE �,�� . ' � � Jl � � '�/" \\`���\��'� ,t�'1 ir s►�� , �' � , � _ C �Z t.r 'v iS.�� �i % / _f� v,� r� \�\`\� a a;: �r �� � y,� .�� ,�,1}�� , ! : =z �� ,�,,.� � � :�� ` Y ?� n � . � i �' � 1 ` � -�. �,�e. �i �t * ��� '�.. y� � N � ,� �'. , ►.•- � � � i � � t � � ;� °� ,. � m �� r i �, r. � 1t ��� '� �`.F �t: , r �1 y� -'�' �4 '"��� i�l^ ♦ti \.� � C 3 0 Y �� , � ,.'. l `;�M1 <.� \ `� .* � °, � ,� \ � • � i I ` ` '�� ;�,.. � • �a "*�'',[�� � ' �� � 1 � � �' ` ^� + �"�a 4' ' '�?�:� y� •� � � �< . y !.k�w�,,. � '/ '`� 4 �y t��• W �,„" .p� � . i y� �2 • w ' � � �• „�n � Y �'.�•� . ` � , , ' � � .. . �. '*pF��. ��h.� �„t T �.n+'1'�� '�,� f .�'•�1Wr„_ � � C Z 2 � \ , � � .�"�� .f (,��'• . , , � � \ \, .�'� . •�" � ~f� �' . r �'PoY �t � Z� 'i!_'�, . i 1�0 \ ' � � .�.` �r ry w�.� p O � •�► i f� `�. � �� ,; `� ` �.,' ' i � �� ��# ��Y u �` `�� � �Q ��a � a o �Z ��'. v. �-� � . � i � \ � j-" „�,��•� ;�` �`�" �.� �� �� `� J � -� . � `�.,,, J� .'�."!�- ��'- , \ '��"�' '+a o :�• '�- '. �">' � *J . t .r. • '-4� ,y�.. ���� r 3 r' .y � I'�. .� ��� O u • i� � . ,i ` lr- .t.� � <• ° *�" . � '� � " ►+. . 1 �� .-!. . , �. r .. .. � • . , I�i �` ,;;�,y�,�= ��'��., {M�i�. � • �1 , \ * ,'t . .�II'���` w�„�',� � 'r� ';,�. . � � ., . �, m � C � *., , �... � . . ... .t' "�. � '� ' ! jI ' . >4 :+� " %��� � �.� '�';� '`.� .�r.� I ! � 1 j � 4 � � , x,,�����. .� .* '}. �+ . . � -a�-� ��^ * � � :�'�� u„ � � I t�•+ „ y�.. . � � j II� i ��� �y ��14: � '�� X � ' . � 1 1 \'. , y*'^'t �' ,:��'+ •�„ �:. � � . � , :.� �'r�'�.%�� .�.!�- � . ' % j 1 �� 11 ��� �. ..1'� � �M1 .a� 1 l'� Y �. � . � � �'�4. 1 �. � r ���.' y:�,., . `�r' :; ' � . . � i ..V. t ;. . . ' ,, � �� � '� �����6 ��% , : , r . '�'" i , , � � �, �� . , `' . , . . , � . . . � ; ._ �., -� •�x,•, }'�' . . ' � � i '. ,�'i� i � « � .�s . . ` C � � i � I ,. . , / 1 � � y � �� , '\ �« �'. �" a . • ' � � � E / � �'. �� � `�" ,j� r. �• , ..�` .�. .,. . }' �� - w 3 . .� . - �: . :�-, � ' � �. Y. i♦ . i - • - . , - . . . , , , . i � . i� • . " ' y � ' • ' "'..,� �+r.-.r d ' / /'� � ��. .,.I '�r ���` ..x.� . . � ��/ �� � �' / ,�` �''� e' �;,' ,'�: . ��� , . i i . , - � � . _ � � ,,' , �'`' +�` .. . �'. � � ,'+��y�, fa �. .� . . '�f'�,�4�f f' 1�,�.�+: � � 4�,^�.� a � � , . _d' ! k / � i+ t _ t � �« v � » �c .� �, �t . �: /, � . 1 � °r.` �. ; � i �,. �ir � . � ;. •/ I � •,R+� �` • � . � , � �,r"�.., .a , ; I � '� 1 �.�� , � � � . � . - s � �� , � c� ; • � � � . x;; r ,�. 's L �x � ! i ����' ` ,�. �� , i � . � � � > �s � ► �, � .;� ; - � , ,: � ;` , 5 � j1 4 • / / � , „ • �� ,. % / + .V� ',� r. c:.yMi f. � ���: ' �� � / `�b' � . '��, , �, .. � � ,� � � I '' � � � ,���'� i y �" .. �, .F � / / r � R ,: � *� � .� ;�� • "�►� ''�' � , _ , . �"�"' 'd � . . � . � � � ; �---._____�._...i i -, - , ��`,� ,. « �. - � ` i �y « ,_ ~'�',1, y '�' �"` ' � S� `y � ` d1 ,� _ � . ,:�• � . - � � •� . i -C , � y� v ` •� _ � , �� . � ���''r.� �! a�y��, �'� r', '�+y�1 `.�`�t I d t' 1 � ��l� .�' 'ry �. - �„�,� � :7v'I!' . .. ��5�. .'�+T U! . � .1�y, _ � Z t ,f� , =; ,�;; 1, -�,,,, _ . � , � :�. �: , , . . . .�.. �.;. . . .r, . . . / �,�:�;v j �,,: ;. �c 4., � :, • ��'' • � d� :.;, � ' � / � � � i � � � - l► , . i , . ,/� at. � �' � � �"� , '�� '�. . , �. � , . . /� , � '; l � .}� ,, � �;,� ,', � �+ .x. �r , J,. ,, . ,, ` -----�" ,, � ��' '; ,: . �: ;,,� �, , 1 - ' ��'" —�' /�4 I ! ' � � � ,� °�;,, �► .,- , ,�`;'�t J � /' ,�' ' � ; �_—�.r% _��- , � � � � o i ! / j � � / �.. /�' j� ,f �,�', .� A'' /� � �' � . � / ��... . . .. n � �t �� � � , i � � Y / t �y � .. � � . . . A. �"- ,. � � � , f I ; � , _a , ,,. r �" . ' . �` k' �, �('�:` � 'bK�" � ' o E .� / r ,- I� y, /� < < �y� / / \��� .�''� '�1a Y`''�' •`� :'�1 (1'� � ' �-Y I 1f/ / • .�^*M'� . � �, � � v �/ �� J�� ♦.� I.k ..� � �r � � N " 4 / '/.-- 'N/� .�' �t' � . ♦ ,�, // / I� o / � / , .l .- • ._ . / , H:.`;. ':.•�. . i. � / / �/ ^ � � . / o ,.� �/ ��,.���` ...�'..,i�,Y�Ay il � -- � � . . 4 > .I" v' \ J _ , `` ��� { � / s� � � . LI� $a s�' \ '�r 9 . �' � r t �� / .�, � \ \ � , , . �_ ' ,�"��'� « - ; �,` � � .��, � �: ,i,; � �� .�'�� \ ' . ` � � X `'�'' �r ,� ,'�--' :�,c �: � �� 4 � � . � . - .�. �,�.. � ; . ��� _ �,�,�, � , ' ,(-� ��� � � , .r--. � �( a ,1;� ''` � ' •"� J° /,t r. i, f'� �=� +•. , T � ``1 ; �� ;. � � �+i t � �� t .� �►;: �� � � J n�� � ~ � �'L�- ` � . , � . �.. � -.L����h� } � � ��} � / , �` / �*��� r � °� : ' ' ,> ,' � ��p, y %�t -�• �� �,: •� �''" \� ="� �. �� • • • . • • • . • • • • � • . • • • . • . � � • • • • • • � • • • . • • • • . • • • • . � � � � � � , � � � � � � � r � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �, _�.� �. I �p ' �'�,� .�P► i' � �., �� ,� �- t i � � � � � { r'�' ` �:x. `�- _ �. � ; � � ��` r �.. ,,;;' _-�_, ` � `" r�` ` �, ,; � � �� --- -4�-��_------��.::;,. � � �/r�f / r�' � �':I � � 4 --��\ / 1 j�.' .. '�'+I 9�'-' n � '��• `�i� \ f/ Z . y '�� .. � 'wl� . �' / \\ , S. \` �.1% J� " Z � .,.ti.. ` �t�w"�Ys� % : \� ` ��, ��.-�---- `` J �"�• a � 1 �.+� ,s ��++�t"Y,�,�----"-'�f • /� ':'�> / \\ '^)� �---_— _--- =� /� d' C7 � , �� t } �.. ��-�-^���'-�`✓" _ '^\ �`f � ___/ Z W ,r. � � �-�'-� �y� v � .� �" � � � ;'r i � � ,,i�• `', `�\\ �� � �'� � I � I- �\ `��` "1� ���/�F`' ---=�� , / g Q ; ' `` �� .f� `�?"+�; �"'y'i' ;'_ \ �"",j'"" ,.�� ;� / 0 � C5 ....''�, �- _� : �` K *� . �� \ ---� �_�.-�' � � �3 , ; � , --�� �. }i�` �,,� �.�i � \��- v�i � � ` �, �- ��',. � � r,J ` ---.�.� � 'iti�,���i�,�� ,,���, � .,:, \ ) �,� � a , ,� �'.', �a „,�. � „ ,,� � + o i � ` ;��tC , A -� i 33WF w I +�1 f� /` •`\ ^~ i ��4 � � � �f� ���.'".'_� '� � "��� „ � � ��'*^ , � -r � �'�`� �•, '�. ! V 3 � , + ,;+ ' _ � „ . � � ~ �� -- .:.> �-j ' ; ', + '' r � � _ s •� � �� • �' . ' ���i. . � ,` � ?� � � ��� s \..{�'�'' _�,�� t� ..N � � � ' � '������ {� � ��' ,�; ,�\� �' V j �t � *iy,� .. .n^. �.,*� t. , ,_ _ r r�:.��• �'• . � . /'� \ ?�` � / i .�' t �� . i .�Y• '��'1� ,�f ��� } + � � 1 Y / � ,1 L ` .�� -� ',��{ � � �� � _ a �t'1t1 ��� � \ �,e.��f�� ti7��f`�,�7�^ ��.�S���.��t^-� � i�...�� a '�.��'+��} +1�� s ``\� %' \ r'' .�`.'--�, \ � i .� Y �. �., � �"j.' ' . �1��_, +5t. `' � i �� t�.c � \ 1 �' �) � , -_� ",�'.�. � ,� . � v �` s* '� ` �\,�` , !�.,�hf . ' .- . s.. � , _ ,__"._.----'..._' — x ..� .� r ��/' � � A.,� _�_'�""1� _'--✓�` . �i , � ��+� �'�` z `� `� i�� 1 �' �-�. C�,.� ' i'' �^t� ti � � � � � \, � / y�,.� �1, ^�y'/"�y'"�-�''! ��'. � ; ` .. / .�t � 4,� +�• +�,v' .r�'.• U S .t� \ ' ( , �.�--"' � t � , /ri �.. �.; Z ��r 1 / ' ` 'S;/r�'�/ � �� 1 � ,�� � -�` f f f-- ..�,��� � ��� ,/ �,,-• '"�� o �i , J /��� � _� ,��¢� � ��'�,, ° '� `� � 1,\� ��' , .-----_ _.-"''� �'�'�-�y� , ,� Y z =_ � , ; \�• _..-- ------- �`+"`� ° /�f "*�;f ��� Z ' �� S , ` �, •.`` � �`�.� ..� � � r� �',: � � �m � Rf�� �r 1 `1, �1 �.\ j �\\\ ~``���J���' ,. S . �.�.� �`.. �\ � ,� ���. � +�� � �O 1 .I 3 �j ��y� - , / f C �7o� �\\� i i1 , �� � � . , . �,��'T � I �� .�P /�• ��� �S, C � �i i, , U�,�'�p , . �' - , � w.. R f 'k.�� �rl�','.,''i�, � y� �3 � lu`K� � ,� � :.,. t� w .� �.-^-'rro. r '�',:►' z �, s I i ; '' � i���.� ` �# � � � i'�`�, �` �� ! :'; �� :�.b. Z � �Z r = � � . ,. ''' � �� , l � � � =t: , * �� ` . # .or . � ` � / � ;' � 1'� ��` . ' �� �.�%/ /f D O � �� t .j+� � ► ' ' � . \� �---.-_ � ; � 1 � , ' �"M : � �/ {�_ ti ` � � '� ti �-.,,1 �� i 'i �/' ` Gf� '� � .r .�' J i� , � f ; ` .�;;�. , ( ,�-,rr, '�. � � - � f; 4 1 � �; '*�- ,, . ti �,, � `� i .:. � .�,.• , ,�' �� ;.; Q �� �, �.� �� � � � �- - ` �' � � � '�,-�r ;� �- :,, ��A, m �U 1 ' � ` 1`r� t ' �; ` / / �' .��°r ,. .. " ti'� i ' � �� 1 l.> /^` I � / f � ,���" .r '.� ' ��� s � ''�'�' � � � � / /\ i i��;; _�t�� / � � 1� ;p'�.. J�" r,. ,, ` ,� � ` �p;i � , .�% � . ,. �;. ,, ,, '�� � � E �� . �„s y ., >.�d ,, wy =i ' \� _ ',t �,� y.�•�+"�. � . � i '. . r.�X, �r , rJ �Jr � . ��.� , Sv ;� 1 ( � ! � �--�--j'S • t �� � j ;�,j ,!f{, � `;r` 4 /t.i�� . ; � � 1 � , . � � �. } (! ��_ : .:,. � .� r� ,t � � a t �• 1i �� ` ~, / � r `�S�r .f � � c ' ' :r � / �,�f'� 1 i ! � / � , , r � r ., f , ' � � i R ( r J� �� � � ! w,,�il/ � � ,;r' ( �� 1.�, x �`'y � 4,`" �� r•'f:� �� rJ�f rj I i� � �1 �f i � '�`r�!;,�/ �t,,'. , �1" �', � �� '�;+. . /� �i% r 1 � ti ,5�.•-' ; i ;; ` _f ��- „' �'`�': j , ,,r���'�� ' �'., 1 ... � � � :t. ( �`f ,. '�,�. / . . �,,y+ry- .,. , . • .;Y. � j ( �` 1 �� \ JIr � � '#/r ' f -,/.� �`F^r� .� R� �r ���� `� (� \ � �� � `��� ! J ' f � ,�;' r ' I',.. ' . i , ,• � ' t ` � * t . . .� � , ` ''� � .j� :i �� I I�,IL �.w► r f { � i � . �'• , , `� _ - ,, ;� . �i. ��, U . . . j , � � J , _ � .. .r�c � _ � ,..� ,_ � � � . � • ; ' �,(. : � .. I ` `I � `� _l ,�-.�_,� �,_ ",,,� 1 � '� t, +� ' f ,/ ..�i 1 '`.` � , t � ``. "� , / � J a' '.r .�.:� . ''� '�_,.�,t . , ,_\`\`� � , i �` ` � ..,,,� � ; , '�r�,� , �, '',` ''i � .�':`�;�� �,,�;,. J 4;�' . � � � . 1�i � ' r�. � 1" �I��r �.r.✓ }� �r . `� \ �� i ti� i �:,F � `�� ��� � �� •� •"i'.. �� a'.�L+'�� �+Ii-i r � �1 � 1 '�:�;• •r: � ,' ��' :n JJ( ' r � - �;\\" ., `\ ti 1�� � � � ```!���` j .!r��.i tI �- lt ,�y"i� �i:li : } ' r ��. . Rl I � , •�,(,.` r,: � �; . , , s;- j .;,�y .r.�..c. / 1 ��. ( `� � � i x, t4i- i r� �,yi(. � ,S r.r . 1 ''.%. ' ,';5�, , 1 � i ^ , , � 1 •. ,'� t _---� �'�.� . � �1 ., '; �. ,T:�. -'� � , r�-�r= / �p � l ` §_ �. t 1_, � .r '� �s�,-,� �j �-� '� �' j � �<� �;,'�s�'' ,'; .�,--'''' • ------- V���,I� , f_ �'�'°��� � �'+ t��-�.,r ��% � ' ti. �`,._- _ ---- ----' � �' :� : ' / . �-' � � --- --------- � __, , • � ;° �,. ,1��i' �-�.z , �� � '� � , _ � ; �.,���, . "� , �``���r_,,._,'. ,-- _ �� �'`� �:`�. � ♦ .�, r � � �.''F.t: _r"'' _ �j . �`�' � �� `� ,�1_ +�� . ��. +?�`X"�_:%,i" / � ^� -�f - ��`_, ��'�.,� -,��r..—, .��.�if'�,i a r��'�---- r fj.i _-.'��. • ` \`.Y' ~ ; / � `�.�~�..� .,. � .;' i'; � \`�, } �'"�4i� ` � � ( .�" `\ `` `\ `:�� � ;� � �. �=�., � ,`'.,�� � ',f � � i , . � �!, • �_�. / �� �, �� �X � -_ __ `\ \`\ ``\ � a.�(�• \ � j / � \ `� • `. f_ . ` •' } � �Tr 1� ' � ^�`� �`��`� ,� �� � i � .:na-�a " � '�� �"r�.^— .5 ��� �`ti � ,� •.,, � � . :� �+� ;; � � , , � �,,J ; N , ,� � ; % �� ��\ '� '� � �p`�` 1' f/ �� � i v� � 4�, ,,� ' ��. _� � ,\ �.. � .'tl `� ` �f . `fy` \ C�, ``\ $ a , - .� , f � (� �,� .��., / � '�t \ � � •\�1�, `�., .•� ��.� '� i �� � ���',�'1 � � 1� � ���� �� ��.:� ���` �\`�� � � n �; � - ` , ` . J � \ \ � `��;� `-�� o e�,,;���;' � � � `'�_�f � j � I� �, >> �� ��'' r � '�,''*�,�(,� � I� � , � �.\\ \ ��� �'`. ,� �_ ,� _ ��►,, .. ;�t.,� .�.,,� � '� � `, � � ` �''� - . _ . .,.7'�' -._�._ ,.,�'�,, m `� ` I', ;r .'� --_`l '�'�` �.�; j� \ � J � \ Y� .,� � ^ • ' y , � :z i '� '',�` ' - I;� . � � ! � , ; .� \ ` �� ,� P ' t ` ! ' ' �; \� �m �.. � ' � t / 4 � t ` �o : �� � `� � � � � ` �� � *4 "� � � 1 j. f, ( � I t; � 111� �•` , ';�• "U , � , j �' .� '.. � 1 i i '� ��� t ` � ��:. yo +;� f 1 1 � � � 1 � � '� 1 s� ,. �. � .,, � �4 _., i� 1 I , ;� ;`-�: - b4 �. -'- 1'����� + ��f� a.. f � � I ` � � ``I �`� �� . . • • . . • • • • • • � • • . . � • • • • • • • • • • • • • • • • • • • • • • • • • . • • • • • • � • • • • � • • • • • • � � • • • • • s • • • • • • • • • • � • • e • • • `�_ `.� � i�� �� �!' , �}f . .•t I � � J ��� � 'r � �� � • �< � .� � ��� S � . .� � �„ ` i +� * ����; �` � {� *� , � ` :�, �-,_ � , ` � ' y�; �"�. � � � � � ,,,' ! : `Klp''�., , ,'t:_ � 1 �'iltt� . �..` ' . ; . ''��;*� . _ - �." 1 % � g r � �\• .� �i �.� .. �-- � `,• -� t d •�� � r?,� � �, ���'� �` �•` '�2.Si '4'�` ,�' �, •b- �~ .f `` _ ' .� -i� � �. ¢ , ��''- t, "�:��r� } `'``�__- �'�1 � � � ' �T�� � `_ w. .�:-�-�, � ,; z ,� � �; ,� `. .�a: . ' ��t,� ' � � x� -.=' ` '-------_- � ' � � x � ��.. % � ,f�� "��J'�'.K, M ,s`�`�:. �� `/ �i� � . a . . , k .. . :� . . t�r e t ����py� ` �� '�;. � �`' "4�..�� , Y. 4 t . m\ ♦���� -�l f ..� ' -'�~ �` � �Z ��•�� ^V ,�r�.�;` \�� �� �� �I������'--`+ 7''__ �� � s •� �� \ � !� J.�`.� ` � N} Q �.� ^+ � - -- � --- �l 1-' � '` N � ✓ ' ,.-.+ �.i� .�,. • • . . _ U 1 . �- .y�- . � _'�r_ • f ___ ----� � , r,l. �1C� '.,,f�� \ ,�. (n � � . � �� •.�?�'� f�� __ *C �_+' `^ � �_, 'v�,w.� '_ � ' ` ' � �,.r o O Q � ��"—' --�--��=� ,f.�. .� ,� �;�'� ,.� .ir . �....� � �. � , � . a ,�- ,:: ., , ..- _ ,� � , � . , � . � �`�' .� t �+ � ' , J ` ' ` � d `'X': ' t �. wt� . ` '�` . "'., �4 ,('� ,'��A.r i�� � ��"- �� �k •�; Z � ` . r . � �� .. �v . , ���� {' ---' - �` +�".,r �r y_ '4 , ��� ..,-" �,,�� '---- ,,\ .�, , ; � 3 0 r�:�i. r�� '���"� `"' !/r/- _ �r'� _ �� ' `� '� %�� � ' � Z a � '� -�'���� �% `,� ' _..� � '��'--- _�' ; � { 3 � N ^��.�!^`_ �`� .. __ ` , 'T.� .� ��'�Cc -\� '4`.T•. `\•\ l.\ , ► .�!'�- � ���.x F1��;-t��r ,• �: rr�.�-- �� " '*� �7 ✓•�� � ` ���,� � „ ' _ . _ `' .� ' . � '_� Y- y • ' , .� , ..= '�, jy,��� 'JI-�..s" . � . ' �_ \ i R t� ` ,� �try �.t '-,---C� �.`.,, • .4"`4 ,,,,,f�+°'� ` 1 , 'u�` �� r�.�..� .` �•\ "� ; � . � � rt� `�.�r � � \ �-+.. g''� `�j- ft�� ' � ^T'�'t- �. ���..rh-."�'r� i�� �l���A `.V`.``~ �� �'! �,� � �'� ��. \��,� � ` ~ ___ _ '' �; ••_��� i: �� ` ♦ � .�� `� LSu. \ �, � E ��,.. _���L:._�,_ '_\ -- j' �--�.� �„``` , ,\ « `�_` /. \` �`���, '1 : ♦ `,\� \ \` . . -�!�` '_ .1' �Yr�Sr . .�� ��.. ,�♦ � ?` ��� �," �a �.�+� \: �\ ��� � . � , � --�—_ �� .` / � /� , 1 � � 1�, < �. " � , ' �r.\ + ��\�j % � _� ,. �f • r - 9!��� . ` `� ���� \ � � `�-• '"'��.�l r .�� � �. � ``\. . �� `� ;``. i\ \`\ , . �•�a, • +� ' . __�C�, � -; � .� � '� `� ``` �, I U z _�_ i � , ts `�`\ � .Pr .��4 ,,.,� w,� � ,w �'/-'-' �\"w`'� 1`; �,-�� 'i ` ,�','�lIE'� 7 �� �� 1 t '� / ����� L �n . �j- �.�,. � � � �;,. ��� ._, .� ; . �� . � �� .� . • �, �,:�,. � ` . •� t , � � c �_ " � , � 1 ��`, ` �` �, Y � � � � � � � � :� \_� ' � - '�. w11- `, .. '-� , � Z t �z � � • ,r.,. i tr ' � � � �c; - �:� , `\ --�,� , I ' '^ // � =� �'`' � ��� !� � ' ` �1 i ! W � �_ `� � /r�? . \ `�•,.- ��1 ;�'=r ,y'h _/ �/ � 1 f � � � ��r o �T� � ,� >~a ��r y ��; � �• y \ ,` i ' � G, � . � . , �.,� � . � � 1l �` � �1 �� °� W �� � � \ � 1, • r� 1 1 � �_ t'f � \ � '�.:, ,/,r+� . j I I p Z= c � .\ � � - . � ' .�� ;� 0 � $� � i . / I � l � "c � ~`�� \ `�� , 1 �� f/� � ' � � V �`Z - � r � �,: � ^ . , ; , � �� �I j � � ! ` � � ,� t �• � � ,+ � � 0 �� f � ��`'S;,y.� OZ Yl,' � �� ` ���V � � j�`�m � i� %' ! �� � � Z V � f� ) ' �� � � �,�. � � i � �r .�, , � 1 ,, , ` � ��; ,� , � � - , , ; -�.� „ � . !� � ,. � �.���_� �: 1 . � 1 �/ � �.' r ' 1 ,.� J % .a'� .� . . �t;. �� \ �/ �, j .._ ��/` •" � , � �'� i .`. ,; I'I/ J I i� I I � � � J/� - � , • � � _ , � ' , t� ,'� � ` `'\ � j/Ij a � 4 / }:F�� ♦ � - •�� ! ,�,� � I�l +�t� . �� , -•I ; l I t J �.� r ,� ,:/�:=i''� � �� � 1 �N •��► t� 1� Ij ' � Y �r �` /, ' �� � � JfI !� t i , Cy . :; % •! � • . i . �, w+., • : ' ;� >� � . . � i �' f �--------- : ,.___.'-`�,e%� �► / � 1 .�----q— :.�, t ' � , i , .� __� ,\ ; f ' �' / � J '` ' -------� �� r r :i\ j � ` '�'-1- !r �� _' ... %�, 1 , � I ; �� ' ,�!. `• '�� 1j � ` T . ���`\ .i �ti � �=__ ��(t�•� '� I r � j ; �---- .���.`�, S` -_ 44 . . �� •i / � . ♦ ♦ i ! �{ rr,. .. ���-:� -�: � �� r , � I �_,. ,�� • . z;-:: � -; , ; ' _ . � � � � �� , �.}�. ;�� � * . . . , , , � ; , ,,,�,� s �, ,,t. , � . _-� . . I ,' �`j ,i ��p � �1 `�`�`./� .. �,,, 1, - ' ,! . r /�"'—�s-'-- v0�; ..,y � �, •' • � • t �'� I - : � _� / y ,•�� . � � - � � - _-_'_` D . � �1 � l, � � ���1 � �,' ' ' '% -`�� • `�, � .I - .. i . J;. I � � l �---__------� � � . , � � `- --�---_--�_-- � �' � � • 1 j �I � � j �, -���� �� , -- � ; �� � _ �; . �:. r. ��!,l- f �� 1 . r� ,. �. � �����—;=-- _-.,;, ii�`� �� � �� __ '"" �� Y�� , �s , , , '� , i• �1 l. I % -�l ., Z;- _ � , � � , �. � ; (- / ; i , � � � : �, i �'- ..�. _- � _�� � . � . ,. . r. .�.. . ;. ., ;,.�*� ,, � .�� ���` �. . . . . � r. , ; . , . ..�- � , ::. ��.�� � � �� , ; • . . � ,; �- ; - ��- ; �� �p:�� F � :� �� � . ��� .. . _ �_ , � -,. �� � Y �� . . � ; , �� . � , . . t ! , .�� ,;�_ �, � v� ; � .;�• � � , `; ,i ' � �� , �-�:�;,i -, .--� � � ` .� � , 'l ,/% � ,, � � . � � � �; �,. �,� -� ,, +s ,. ,; � ,,• ;i i ! ; ��"/" ,`,�.-�' � .:��_ , , , ,, ��+. �, . .�. � . , - !,I l; � ; ; _�;_ � • , ''b � " `7 , . . �-�- `�-- _ ,��- l !� � ll - l/' 1%� ' - / � `�� �., �; ' , , : �>. �. ��� � . . . } � ; -i - ;� � , � ;--�=. ,�. ��C� _ , - . � I I/ , � l; , �. ; � r ; �� � � ,��4,,; � . � '. « ' �•�i- � ;� ' f, ! �. I � i. . _ . , ; �4� , i �'�\ � , : , � � . ' . / - �j, �j � � - ��' ` , , � Q. . .r;� , , ; , x �� . . . ; �_ . . ,___ .. . . . - ;_ a . � � .a1" �, o� �. _` , . - ' f f. �, f l� . � ; � ', ,�"� , o r � � `��� `�` r � �' �� 1, '�� � ; { � --,`` N � ' '\ �'� � / --. --,;'=-� � • � I ; /T '�`, '-=1 �—"� / h ! �l - � I 1 ' ♦ �. ''► ��� . ;_, "--.- ��`�``. � „� /"� � I �l l, � , l/l" .'� � _�� �� ' /�� `•`�"'�-��`�r`� �_-�, � _,. � ^ ♦ /� (l I '�f�l' / � l / ,� '•' •.,. � g , i `�a�,_ o �.�� ,t•. 1 �-'-" "' ' . "_--"�` -,�.�-"_"" ,/ / :� ' � �" ``��� '" - " ----_""'„_.�.-- , � J � �`. � `"".- • ~ �� `��_� `�- / %i H �.q\\,. '4. "'�__�, ` `�.... '�.,```` •._,�,'�.r,._l""r-� � /�1.� tl�,/ 4 !.�'�.`.y` �'� ^ - � � --- "''--•.<. �"-�... �'"'-"y J '/ /� � / �` o " f� , � l ^ � �k.. - ' "'_``�-�-"' •�'."--4,54"' � i �I ' �"' / �..: / ( � , � 4; �� `�",,, ,__,_�`.. "'-r"�-�._ �� ��/ �/.� / �� '� �' � . �•_'.�"''- `�-____-`_"�-___ ----- '�J /�, �/ - / � , � � . , , . ,`_"_ -�,�r / / o" -� ' �..iy� . l r• "_-_"_' '�"_-__ %-' ,/ / v , L� . •. -�- `"_ .I .! "�-._'_� / :1 � _ '�'��-n r_ '!^-��� tF"�•,�_ ��+� _ .�%/ '�% . � , _ 7,t,` � t . . �Y�u „^.� . .� / ... i ' �� .,a„"� ` . . ' ._ , . ""'. � � ..��_+ / � ��lay : . ='�t� + � �� � � ;�. 1 1 `,,. +�'>. � �. � ..� � / i ���' � ♦ a , � � ,,.-�k, � • �*' � •�.. "�,a ay �— i ' � r � _ � �t. '�"� �'``"' 'l'. ,<�' t� / � (. �'. .�M, � �A���+: n C ��� � �Y �����.. �: ��� •r � � � \\° a i \`• `�, � � � ,� ���'1 1\ ! • �•. \ ' ' •. �_�~\,.;� �, """ • � � � •� w .. \ \ � ' �. �,:� � '� �-, � I � ���" , � . `a ry� .. . . � ,w.,. r y o `�``� L r�..'�� \ *' > '(� � '..� / �'� �` � � ' , ' / '�� � ��` r� „- ' ``��' � ''�`� "�, f �."�y' j 1 i „ . / rp��- 1 ;� --� �. �`Y� � � / • /r,. 7 ,`' ' � I �_ • • • • • • • • • r • • • • � � • • • • • • • • • • i ! • • • ! i • • • • • • • • • • � � • • • • • • ! • • • ir • � • ! i • • • • • • • • • • • • • • • • � • • • • • • • • • � � ,� � . � ��, ' .'t! Y ,'�: . � � ,� ..t+ ' �II P� �, • !s*��u� ' . . .i =" M• . ��, i�� l�.�• . �'j • it�� `q ° ���` � � � „ r . �,�,. . .. ' � ; ,, 1� • � i��M ' �,y�' ..� � _ �� • _ + ���� ,✓� `\����^�t���. l '• . � . . ?�,. �'�4 ��� �\ �`, ' � , �,� �� - : t r"x� ,»ti'. � � _ ��u �.� , `, • . .. �`,, ,r,`�'- , .� • . '� °'� . . _ r . , . . _ .. —- - a . � �. . . . , . �. .: � �^ "�' ,• • ��-'. � . w. f '�•��,:y"�'+'l-� ^r � ` • %'��" "� `'�� . y{ � J ' . ,�. .• ; •� ' r ( 1 / . � <' , �,�:'- ~ �', �� . j - � i ! '� ; * . � •,.�Y i�'S-f" , � 1 ( � `rh . , -. • t � '' � ' i . � � � .ro �t � , `t- u,�c�� 5? . •� � � . � , , � .�w . . . \ \ ; �.,__, - . t ,. „ \ � -. � �. , , �t` � . ' '� ' '� , _ - ` . . . . � � � �'� ti•� , f ' � � ;�1. � �.`..;`�. k. . �, � . _ �, . . ' � \� �� , ''. .� �-` . �' \ :.,...... �&, . � + �r- �...�[ ``•►� '• �.c `�� �,Y �.. ..� � \ y ., \` . l �`�iJ�4a � . J �V� � '�, . ' - . " . `, ` ` \ `_r''�^`\ ._`\ �.�\ . `. �.,` "�` /`� t j� .`,.r' .`.` •�."^}a�.,.y� �; �_._ �- ��t �,7� ,���r� �� r-____—__ • '' ''``. ;1 •\ ``��_� `�--� ��, i \ 's�y `��e-'y-- .'�,t' "_�_ y ,.t � . � . �� . � �� : • ' _ ; �� `�� � `� ` \ .�, � . ���-� ' ,/^ � � \'1r�,� • � � ' ` �~ � � .�` .� ----�''-_�---- _.��_______-�--� • -�.�i `\ � � `,��` ` \` �•�.` � �.�-�—�---- '� i�"'- ' ��� �` ��� .�".`` �_.� \ , - ��' --___--- ��_i . ��"".--�- ��� �J l'� ��, \ �` _ '•�, '�. --_��' _.—�-_ • r ••� \ '", '�.- �/ \ \ ��t � ` � . ' �` \ � 'R' . __ ✓' . _.��'~�� !-��I i�"�'-�- . '_ ^ \ �'�._.._. ^ e. '. rl��--"'� -��� .tir.Y`- -____._�__� " f� �. _�� � �` `\` ` � �_'_ � `\ I` l- _ j• �„�' i'��i i ` ���� � �.�` 11' y�� "�-- ._`�, J� � �%'� �-- ' • l / � 1 �\�_ � �.. ' "� -- �"�- "- - ��` ❑f / -�� / � �a ,` `` �, , > _ '•�.� -_•"�__.`�` � �`—`��-_.___ �,.�-f~� I ..�� -`1�� � ___ ' �.i. „�.�" / > > ` , � �>9y,� . ' � #.. . , 1 . , s"'mik��'-^.,.a. >. � - -� -r""� � ------_____--__— ,,.� • •, ��, � � 1 + •c. �� '� ,�'..j� `"-�` . -__ _�"`�-T i'/ --i--' � ��� w`a `�'�_ � �•�� �-� , �;�,�,i �. �. t . ¢. --------�_ _�� -'e��,: � , ' ��' ' . -- ___% � _.._ _ -'- . .. . , . ,. _� , , �t ; . .� � �,�`. . �_ _ = �\. :�-�% ,---�--------' �\. . —.._.. . . ,� . . , , . , . , ,, s •a . .� � es `�� � .�_+�. � � . - .. � . _i '`� \ ` . rS- � .r" ��� .% • ..y �. .. . _ - � � - . .� . , : .' , x-� � . . , .' ' �' .',�- \.\ ' �� .� r' r',.;.'p .� # i f-- ��� f ,J�.- ',-i/ '� � s' �:j • `��.. .._ ) . ` .,, i w ..-.. . `" f/� . {�rj:. , /� ,•{/s�"' „# ,r.•-� ,i_-_�% ,•�--"'� 71' ."'�.�, i u ..� . ..,� ",`�s:� � i�,_ ._: � . � ��� ..�_r-���� .�/'� ' �� . � �`� • �_. . .. �.f, �M ,. . . -'_.' ; �1�� !c� ���'_ /�i•�� ' 'c«T..;: �'1 � r� �` � .. i� _ �s� � --, 1.�.�_�_�.-!� _ + / � � ,� �. ' � _� . . ' ` � . ` `. � '-- ' � - i --f:_, __ . . �� � ..�- - • x ---_ . ,,� , { __, . � r -� �.;� ., \ �.� . , � ,, • r�f��o , � �_�' "` '� =-_------- �"' '"'�-' �' y S, �� .-��� " r� _ . � . . . � . .\ , � .� :- - � .. ,.. r.•. „ �- ,_ --��•. .. .. ., ��. � ' .¢, 1 ` ��:- �i ;• � � -�` � -" �� � . . ' '�ry' � � � � �. { . i�' � }1 �. ♦ --' ' f �'..� ' �' � �� ,� /'�} �' t --,_-- ,� � �• /� r v� � � '/� .���}...,� �, �t ' s♦ �''�t y�� �\` ,` � _ �. / �. t.... v ` : � , � . • ., • . .�_ �_.:�,,,`... � �; �''s -, �" g' 'ti. :�- �-�, i���� �,.'.- *,.- " -- -- .-."'J=r- Y � �i ��;--�'t � � .,3:,. ` *�+i� - ' } • ;�.. r i� �J � ' ' / � ' � r ��" �� #. � ' ��< i3'f �4• ��. . ry . y� . ��\ . . '���� . �� . ~\ \ � ° �`� �� � � ... •� 4r+�. ' �a '�� ��' � �`,`` "�'�`�\ _„\ ,.�Y �'��`- f� —� '6'.zt .'r �._ � // . ''/'�� �'���'��%/� . . . - _ _ , • `` ., . ` � " ! �. . � ' ' �e s \ � � � � .'- - ! - �`` - � ` . � . ( _� ,, - . . � � . ' � r = S � � '"� . . / �!� >�� . . ,., , - ' �_. � ;, \l. ``` �� r�`. " �� , " -... .<' , ��ri t"� ` �F. . 'Jy ;.� t�� ''�'.' �' • . . ' . ' . \ • � 1��`\`}'. ` ` �"' " ` \�\ 1. ;. ' .' '., ....,�• � �\` �\ -t } � ,�Y. �:��/ � �� �� 4 � �a • 1 , \ -� . ��� •: . . -�' ... --�� �� `� ✓ ,� �,� --_._ ,�'�;��. ,� . . ; : � t � ,� ��� � �,'< ' ' . : * '.�i�. p �"+� t „ . . .. , . _ : . _ r . �r • J y�y. �'�. `,.:- ;��.,�Q �+ � `�"�� ",# • •l T '`e ,/ .�� '°� f=>.�.. i j' •.P'A . ��� '. _ ��. . , ��� �. T�ti a � .�., , '�� . �' �/. � I /�. . ., , T� . . i. � � � � ", f �... :� �..�; . _ �K�i� �� �� 'ir¢ - ,� �� � � �,. � ,� if . . , j • .' �s � ,�i,�" �� �l,a S' �. �£� . _4'a' 'i,� � ,r�`�. . , _ b � r, - � yr' ,�j � • - �- . ,� tL�_"R. ,��+� � �� . {,~`� - ��� . .dY r �.+�.a Jy�'�j,',�� d..-:�t '.�*�. ]- .. • � . - , '� � �F.��r-,�V., .. '" /, ��'*'� �..*. '�" '^• t ��� �� . : �� �' � x �' / �� �yj � ����� � �� �` �II t/ u _ _ 2 � � �( . • - ". ... . �."ry /. , � . �' � . .< , 5 ,/J . 1;r.- ` *y �l �! y ) .�` ����� `�`�j�',< .JF. ��',: y�.7i*'lA��� r . � 1,� f �� .5.��,7�. ���� . . . . � � � . . . _' . . , , � , r , �,. .. .� � � . , , , 1�' . � • � f� �,�,. ,�'�' ' • � �.. A . ^�"� � �, r.�' '/ r+ �•�� ,� - r. . • • " .. „ ; . .. ., ,,� r .«..-__ � , a�;. - '"s'}� . 1� • ' 4,'�T� y� ,,,, r`i�y ,,,.P `"3' �, + �ti� i. r x . . . � s�Y� . .� t � ' - - i �� • . _:` . . _, ���'� `:3f r ��O���s . "��' ♦ �f� '�"� ��j� i�• Yr ��f ,�' Ar {{ � � � , � �. • � - y . .. .r , � . � , � � ..,, �� �Ji' �, u.�.�. � _ �.��,t � ��� � �� �;.. ; ' � �' a6 , Ifi ' ,�� * 1 �.0..- '� ` '�;q �, .�.M,, _,/ ` .,� _ • .`"4. � '� .�' � " '� '�ej�. /y�A { ��,1!' `- ��y T�'k � � i� � �` �".� . 1 s i. • � 6• . � � `'F������.(J . /�,� A �`. � M�. 'wr� _ ^�'� . � ,�`. , ,f. . sP". y - � j t . "9[ i •7 r d�' ' . �.. �. '1� ����i' .ti i� ,{��j.�, � �� � ��' ; �"�".`- ''�� ��`�►� �, ;� �. �'� ; . r �j�:•�s � �� � ��.� �; ''� �s �`t _ .�: � �:__:.� � � `l�: ` ` : ��•� r � - . , , . I • .- , . . - _ w�- . , ,� �.' . • �{ ' , . . - ��� , � !• •,��� , +cs �a P. -i . M ';r.. ��'�.- ' � � / r� '' � + - � _ •�. i ♦ • , . - w f 'f� ^ � ;�;v , . , ti.. , . . . , . . - . ,w ,� _ �; - r, ' _ �. - , , , � � �,► .. I' , ,� , s . , ,.• ...�. .r. ,r . � ..., .v � .. � . < V� ,�( y ,' : . .�; , ` �` , .� ";� .qc ,r • , _ � . + y • ,, ... , -�.� ., , .. •�. .. ' + � y •'y� < ..�, �„'a .;fiw � • , � 1 �p„3 ���� - �I�M¢� � — ti � . , . , � � w,' ' ` �., :-� �'' .x ',�/ � � ��ti -� r � +.+� �`� �� "• . ._ .✓� � �,,' � =�A! • B O LTO N 8� M E N K, I N C. R`"� �` CITY OF SCANDIA, MN �"E�' . 0 40 80 ConsuMiny Enyin��rs d� Surv�yors UPTOWN WASTEWATER SYSTEM MASTER PLAN 5 • scuE FEEf MANKATO,MN FAIR►qM,NN SLEEPYEYE,MN WILLMAR.I�N BURNSYILLE,MN DRAINFIELD AREA IMPROVEMENTS OBolton dt Nmk.Int.2011.AN Rghta Resanw CWl9(/�MN RAMSEY,MN MAPLEWOOD,MN BRNNERD,MN AMES,IA H: SCND N71103386 Cod 103388 Draft Mwter Plon C u ea.dw 7 1} 77 3:11 a • • � • • • • • • • • • • • a • • • • • • • • • ! • • • • • • • • • • • � • • • • • • • • •