8.f) Maintenance Superintendent U '
Public Works Activity Report -
� -
� � � �
luly 1 through July 31, 2012 � � �
Tim Kieffer, Maintenance Superintendent ��1���
(651) 325-5218 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
• Patchedroads
• Scraped curb line on Norell Av.and 188t"St.
• Removed five trees along roadside
• Put up additional signage at Copas and Goose Lake landings
• Graded Copas and Goose Lake landings
• Shouldered along roadside in various locations
• Reshaped ditch along 182"d St.
• Replaced culvert on 235th St.
Park&Recreation:
• Mowed and weed whipped all parks and building properties
• Removed a tree at the T-ball field
• Inspected all playground equipment
Sewer:
• Read pump run times at all of the lift stations
• Replaced two pumps on the Anderson/Erickson system
• Replace pump#1 at Bliss lift station#1
• Replaced UPS at Anderson/Erickson lift station
Water:
• Read water meters for Uptown system
Equipment and Building:
• DOT the 1997 Ford dump truck(201-97)
• Replaced caliper,front brakes, and turned rotors on the F-350(102-08)
• Performed OSHA required inspections
• Replaced 3 batteries in emergency exit lights
• Replaced 1 emergency exit light
• Patched around the back door at the Community Center
• Replaced the battery and pads for the AED at the Community Center
• Replaced 3 ballasts and 2 light bulbs at the Community Center
• Fixed rear tire on the John Deere tractor(302-99)
Management tasks
Street:
• Held pre-con meeting for seal coat and patching
• Supervised the cut out patching
• Talked with resident about the gravel area on 237`h St.
• Set up the rental of the roller and paver for Melanie Tr.
� Compared the cost of stripping
• Inspected culvert on Newberry Av.
• Met with contractor about tree trimming services
Park and Recreation:
• Inquired about the porta-potty at the T-ball field
• Work on issues at Goose Lake landing
• Got quotes on a total reconstruction of the tennis courts
Sewer:
• Corresponded with engineer about the Uptown system
• Met with county to review the Anderson/Erickson lift station and dialer
• Met with county to review the 201 drain fields
• Met with Gammelgarden to discuss caps and risers for their tanks
• Met with Elim Church about the Uptown system improvements
• Met with engineers to test at the Anderson/Erickson drain field
• Got quotes on pumps for the 201 system
• Ordered stickers for the lift stations
• Met with EcoCheck for transition of Uptown and Anderson/Erickson systems
• Ordered more locks for the 201 sy5tem
• Met with Xcel to provide power to the Uptown drain field
Water:
• Had the RPZ repaired and test and the warming house
Equipment and Building:
• Organize the shop with shelving and racking
• Worked on the 2013 CIP
• Awarded bid to have the Public Works/Fire Hall crack filled around the building
• Had mock OSHA inspection with SafeAssure
• Had 5 overhead doors fixed
• Ordered numbers for the vehicles
• Ordered a desk for the office at Public Works
Miscellaneous:
• Met with resident about an issue on Lofton Ct
• Met with resident about the installation of a dala horse
• Worked on the 2013 budget
2