Loading...
8.e) Public Works �'� Council Report September 2011 Steve Thorp Scandia Building Official/Nlaintenance Supervisor BUILDING INFORMATION: # Permits issued: Septembei= 15 YTD=87 #New residential units: 1 YTD=4 Totals for September 2411 Valuation=$327,275.00 YTD=$2,096,977.00 Permit Fees=$2,675.90 YTD=$21,229.35 Plan Review Fees=$1,182.70 YTD=$9,799.55 Other Fees=$200 YTD=$2,000.00 Total Fees Generated= $4,058.60 YTD=$32,748.90 CODE ENFORCEMENT/ZONING ACTIONS: TOTAL ENFORCEMENT ACTIONS: 130 1. court action: 0 2. actively pursuing: 39 3. closed cases: 89 13 Exterior Storage violations, 18 potentially dangerous dog ordinance violations and 10 miscellaneous cases. New cases: 2 for the month of September. PUBLIC WORKS EQUIPMENT: • The new plow/dump truck has been received by Towmaster and they will be installing the hardware required for snow plowing. They have been very busy and it is possible that the delivery date to Scandia may be some time in December. STREETS: • The catch basins for the Mayberry Trail drainage issue are on order. We will be ditching Pilar Road and using the material as fill for the Mayberry project. The intent will be to improve the drainage of Pilar and utilize the fill on Mayberry. City trucks will be used to transport the fill to the new location and the contractor has agreed to dig out the ditches. SAFETY: • Weekly meetings as well as monthly Safety committee meetings to attain OSHA compliance are ongoing and we have no accident reports. • The mock OSHA inspection performed by Safe Assure came back with very minor corrections that have since been taken care of. We feel pretty confident that we are OSHA compliant for Public Works. The League of MN Cities, our insurance carrier, will be conducting an inspection of the Public Works facility this month. SEWER/WATER: • Another well will be abandoned at the Bliss 201 system as well as a dry well. This is required by the MPCA which permits the system and will be carried out by our Contractor for the system. This is required to be accomplished by the end of October 2011. BUILDINGS: • Work has started to improve the ventilation of the Community Center attic. PARKS/PARK MAINTENANCE: • Tree trimmings were removed from Lilleskogen park. COMMUNITY DEVELOPMENT PLANNING/ZONING: • Tii Gavo is nearing completion. A site visit was conducted and the City Engineer will be bringing the project in for finalization soon. ENGINEERING: • Nothing to report. DAILY ACTIVITIES • Building and Zoning inspections; • Coordinating projects for Public Works and filling in as needed (tree trimming after high winds, patching roads); • Review of permits for the excavation into the ROW by Utility companies. • Resident interaction including phone calls, emails and in person regarding zoning, planning and building issues as well as calls regarding street maintenance; • Continuing education to maintain certifications for Wetland Conservation Act, Building Official, Water Operator, MPCA Septic certification and other licenses that September be required; • Training for the implementation of the sign reflectivity requirements ongoing; • Safety training per the League of MN Cities Insurance Trust. City of Scandia � Code Official's Report September 2011 PERMITS Permit# Date Address Owner Work Valuation 11-073 9/9/2011 19275 Oxboro Ave Winta furnace $3,950.00 11-074 9/9/2011 20060 Olinda Traii N Scott reroof $5,000.00 11-075 9/12/2011 19241 Orwell Ave N Erickson reroof $7,000.00 11-076 9/14/2011 14768 Oakhill Rd Hardin furnace $3,500.00 11-077 9/19/2011 20680 St Croix Tr DiBardini house addition $8,500.00 11-078 9/21/2011 19880 Quinnell Ave Carlisle orch $6,750.00 11-079 9/16/2011 10700 185th St N Okeefe sidin $7,000.00 11-080 9/20/2011 13170 Scandia Tr Fee windows $6,975.00 11-081 9/21/2011 11805 Ma ber Tr Hoxmeier reroof $13,737.00 11-082 9/28/2011 23249 St Croix Tr Clark deck/sidin $12,000.00 11-083 9/28/2011 12160 Scandia Tr Verizon Wire antenna on cell tower $20,000.00 11-084 9/29/2011 16650 199th St Schoeller new construction IRC-1 $214,000.00 11-085 9/22l2011 22880 Meadowbrook Ave Lothenbach reroof $8,463.00 11-086 9/27/2011 22959 Olinda Tr U hoff sidin $8,000.00 11-087 9/28/2011 13987 236th St N Mohr windows $2,400.00 15 FEES Permit Fee Plan Review Fee Other Total Permit# 11-073 $99.50 $99.50 11-074 $99.50 $99.50 11-075 $99.50 $99.50 11-076 $45.00 $45.00 11-077 $167.25 $108.50 $275.75 11-078 $139.25 $90.50 $229.75 11-079 $99.50 $99.50 11-080 $99.50 $99.50 11-081 $99.50 $99.50 11-082 $199.00 $199.00 11-083 $321.25 $208.80 $530.05 11-084 $1,192.15 $774.90 $200.00 $2,167.05 11-085 $5.00 $5.00 11-086 $5.00 $5.00 11-087 $5.00 $5.00 $2,675.90 $1,182.70 $200.00 $4,058.60 City of Scandia Code Official's Report September 2011 Letters of Credit Name Purpose Date issued Initial amount Current balance Expiration Tii Gavo construction 6/28/07 $ 1,514,344.00 $ 65,000.00 6/28/2011 auto-renewal Tii Gavo landsca e 6/28/07 $ 177,687.00 $ 120,000.00 6/28/2011 auto-renewal American Tower Cell tower 5/2/11 $ 150,000.00 $ 150,000.00 4/26/2012 auto-renewal Childers variance 12/6/05 $ 30,000.00 $ 5,000.00 6/6/2011