8.c)3) Water System Interconnection Meeting Date: 11/15/2011
Agenda Item: �i``� �.� � ;
City Council Agenda Report
City of Scandia
14727 209`h St. North
Scandia, MN 55073 (651) 433-2274
Action Requested: Receive an engineering feasibility report on the possible
interconnection of the City water system and the private Hilltop water
system.
Deadline/Timeline: N/A
Background: • The City of Scandia currently supplies water to the Community
Center, Warming House, Gammelgarden Museum and Elim
Church and its former parsonage, via the well located within the
Warming House. The city's system is classified by the Health
Dept. as a"nontransient noncommunity"public water supply.
• The Hilltop Water Company is a private community waters system
serving 26 homes and businesses in the Village area of Scandia.
Their well is on the old "water tower barn"property located on
Olinda Lane.
• The Health Department has made recommendations to the owners
of both systems that they look for a possible connection to another
water source that could be accessed in case of emergencies.
• The Hilltop Water Company approached the city last year to see if
there was interest in exploring a connection between the two water
systems.
• At the August 16, 2011 meeting, the City Council authorized the
City Engineer to prepare a feasibility report. The Hilltop Water
Company agreed to contribute half(up to $1,500) of the estimated
$2,970 cost.
• A copy of the report has been provided to Hilltop's representative.
Recommendation: The Council should receive the report.
Attachments/ • Letter from Ryan Goodman, PE dated November 7, 2011.
Materials provided:
ContaCt(s): Ryan Goodman, PE (651) 967-4616
Greg Benson, Hilltop Water Company
(651) 433-2646
Prepared by: Anne Hurlburt, Administrator
(Water connection feasibility report)
Page 1 of 1
11/08/11
Stantec Consulting Services Inc.
�� 2335 Highway 36 West
St. Paul MN 55113
Tel: (651)636-4600
_;;,/� Fax:(651)636-1311
$�n� �Bonestroo
November 7, 2011
Ms. Anne Hurlburt, Administrator
City of Scandia
14727 209`�'Street North
Scandia, MN 55073
Re: Water System Connection Report
Client Name: City o#Scandia
Stantec Project No.: 193800570
Dear Ms. Hurlburt:
The City of Scandia requested a preliminary investigation into a potential emergency connection between the
Hilltop Water Company and the City operated water system.The Hilltop Water Company requested the City
consider an interconnection between the two systems to provide water supply redundancy for each system.
Background
7he City of Scandia operates a small water system, often referred to as the Uptown Well system,which
supplies water to the City offices/community center,ice rink warming house, Elim Lutheran Church, and
Gammelgarden.Throughout this letter,the City operated water system will be referred to as the City water
system.
The City water system is supplied by a single 400 foot deep groundwater well.The 70 gallon per minute
{gpm)well pump was installed when the well was drilled in 1996. Four 119 gallon pressure tanks provide
pressure to the water system when the well is off and provide water storage.The water system provides
water system pressures of approximately 45—70 pounds per square inch (psi)to the water system as
measured at the warming house mechanical room.
The Hilltop Water Company is a private water system which serves roughly 25 homes and businesses in the
village center.The Hilkop water system well is approximately 275 feet deep and was constructed in 1972.
The well pump is assumed to have a design capacity of approximately 50 gpm and two 82 gallon pressure
tanks provide water storage. Ground elevations in the Hilltop water system are approximately 40 feet above
the City of Scandia facilities.The water system is set to maintain water system pressures between
40—60 psi.
Regulation
Both the City water system and Hilftop Water Company are regulated Class E public water systems.The City
water system is classified as a non-transient, non-community water system.The Hilltop Water Company is a
non-transient,communiry water system.The d'rfference between community and non-community is the lack of
primary residences on the City water system.A Class E water system in the State of Minnesota is any system
comprised of a groundwater source with no treatment other than treatment devices not used for compliance
with federal law.
S�7D�C
November 7,2011
Anne Hurlbert,City of Scandia Administrator
Page2of2
Reference: Water System Connection Report
The addition of an emergency interconnection between the two systems does not change the system
classifications and subsequent regulations. According to the Minnesota Depariment of Health (MDH), if an
emergency interconnection is installed; current system requirements will not change.The MDH recommends
all community water systems have a redundant water supply.
Water System Emergency Connection
A small interconnection between two near points of the two water systems would physically connect the water
systems. However,the benefits of a small diameter connection would be limited. The City water system
supplies water to the Elim Lutheran Church through a copper pipe assumed to be 1%z inch diameter.The
Hilltop Water Company supplies businesses and residence across Oakhill Road from the church.Although a
connection at this location would be the least costly connection, but it would provide a very limited capacity
between the water systems due to hydraulic losses and would not supply the needs of either water system.
The recommended emergency interconnection between the City and Hilltop water systems includes an
approximately 4-inch water main directly between the two wells.A three or four inch water main would be
required for the City well to pump to the Hilltop water system.A supply of 50 gpm could be provided across
the interconnection while maintaining normal water system pressures.An interconnection would likely be
directional drilled aiong Olinda Trail to connect to the warming house mechanical room and Hilltop water
system vault.The recommended interconnection is estimated to cost approximately$70,000 which includes a
10%contingency.
Summary
A 4-inch emergency interconnection between the City and Hilltop water systems would provide a sufficieM
backup water supply for both water systems.An interconnection would meet the MDH recommendation for
backup water supply for the Hilltop Water Company and would not change existing system requirements of
either water system.
BONESTROO, now STANTEC
,�Q""'
Ryan Goodman, PE
City Engineer
{651)967-4616
Enclosure
Copy: Mark Rolfs, Stantec
Jason K. Bordewyk, Stantec
� � �: � '���`` ' �_,, . .�. ._, -- '�w .! � 1?'° —�- E �.�r _ ._ �..._.
' .,�.� s..T°' ���, ,41.�., +,r��y,� '�3� ' � , .. .,.w, � _ !f'� , .
� '3.., '�a,• � ._ . ^ ,:s -
ytF. "'�" ��Y � p "�,'+r.. ���F'`"— -�—,� ,:. ... - .r . . �T . 1 f�Q�� � � ,
.4 �1` f1u.Yr.. . .
'Y � y . E` �'. ... ' a� ' __ . � (
� ����� �,i� 6 "�,e�R,�" s"��- -' ^- z�M"+r`:;- �.e"` �a
_,
.4� � �''. � , - - '
_ �. �. n X,�` ,��„'�-, �� � ,
� r i.. .L.w' • , ,
"�� *` � '��,' —"' �11,,, ��. -, '.4 � �,,� � q -X � �. _� � � . ',
J" r�y, ,*. f'�if�'�. �� .�.�; C, """�
�'.. �.Ai �.Q M�aY'f l�I�� s i�3° ,��, �,��" �`'�Y�.�^ y � .
4�. 'l.i•`�� � '"�':3�`+r�^� �"'�x.�_ ,:,. ���?��,, r `'
,ia'"' �`e ;w�
�,.�R �`,_ �r ���� ����'� .�,a,���1�. � �+ ,1" `7 �� 11L, �
.�� �
�� �' .,�� vl,%'t�h'''�' a"1 + 1 � �, '� a�.����� �
��r��� �1' ���.".� �� ��1-� ,.e►��_ � . + i� . � ' � � �. I
1i'i�� . �'�. *v,r•rs, ��r .^�'��� �`°+s .� � '� o'�
� �� ���.• fis ����� +�'_����•::w�����4'k ►� ,��� � • . s s R",
f�t :=4��* ^i,y. h �j ������ , ' �W ' ��� ±� � +. .� �.
�.� �", � �'t�+4*T�`��"� " �� ''^ � �, !�
. .
:t ` .,^' ;.� f" ` � �'" ' `�- � �..� �` ' ��.7!'
.
, . _
► . s, � Y �'� �� ' ��:..
�b
� ~ � �-"' ' ,. HI�L P�WATER ';.� �` : ��.,- �
r ' r -
' � t, ., - , ,.
" ( ' , '^� i � �;MPANYWEL� ��- �� ti
, ti�� ��;,�,� �� .�. �^�— �: �,�,, s* �..
��y � ` . �+�. . . ' � `. � � . k , y��,�.� ��Il"r� " 1� "' _.
�^� �� �� � e, ..«.
�'�' �� ti h�`„„ � �5,•, .I , ^ ). � � ��-;"�,� , � " �;�,.'�,�:„ ��
� I . 1 �-. r r ����
k •s�" • ��t' ^,` �`.. " �� '
f' . " '�', ,., .�� � '" �, ... f�
f ' ,�"'�`°"_ ' " '� �
�
'�: PROPOSED � . _, ' ,---, � ��;"� >. �� ��r; ��= . .:• �,,� �
�,,;.� +14� o �VIIATER MAIN ! . : ,,,� , � �. -� � � �
r ,,,, � �� '�d '�"� �:_ �
,,I�'+� � G .� r ��l�.)T;F7 � �� •*��r, r�. q � +y��� . ��. i�...�
F��• �" }���O�T. � ��. ' v ~_t � `� �.�M�
f S7k ( Y*s'. ��^�` ��:.
� � ��
I . .�fi• ��/`... f�� .:�.- ,
�� �„ ' �, � oo�F-r '� - A����
ti,000F� ,� .�o, ,
� �'�"' S ,. � ,,.��-; .+4'_�:_:} `
, . 1 ;r
�F^ �
� !4 '. F: �.. �'...
3 y.'�"�� i. � O R`O �,+�i
, ,s CITY OF SCANDIA� � �
� � �'�� WECL �- `S ;
F �.
i M��- �� <� '� r-�
. y' -- ¢� �•p '�'� ��i
(�� � . . � &-' �� �� ...- � �i. '^- e'� �� r
s �
_?�,�`� �A 4 ♦�
�C�j . • ��� Z�`�j° '�`
•?' a
�.4r;,�:,� � p,� � � Or'�
� �Zo'" �P� T - "+;;t� ' �'�'�- •#'� ��:�!
�.00FT o�'NOp,'� = . � '��'!�,r' __�:
�
, „
, . , �� N
LEGEND
� PUBLIC WELL APPROXIMATE PARCELS SERVED BY
HILLTOP WATER COMPANY 0 10� 200 300 400 500
10 FT CONTOUR
CITY OF SCANDIA
FEET
FIGURE 1
WATER SYSTEM CONNECTION REPORT `�
CITY OF SCANDIA � !���
568-11420 NOV 2011