8.f) PW Activity Report June 2014
Public Works Activity Report
June 1 through June 30, 2014
Tim Kieffer, Public Works Director
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
Potholed roads
Disc and graded gravel roads before dust control
Brought in gravel to repair Quint Av. and 197th St.
Removed fallen trees from roadway
Picked up debris along roadway
Worked with contractor to replace culvert on Maxwill Av.
Worked with contractor to reshape ditches
Mowed ditches
Sewer:
Read pump run times at all of the lift stations
Worked with contractor to raise two access covers on the Bliss System
Mowed drainfields and lift stations
Replaced two pumps and one control panel on the 201 System
Park and Recreation:
Mowed and weed whipped City owned property
Worked with contractor to install overflow pipe and two rain guardians at Lilleskogen Park
Water:
Read water meters for Uptown system
Equipment and Building:
Performed monthly OSHA inspections
Repaired leaky toilet at the Community Center
Changed oil in Ford F-250 and F-550 (103-11, 104-13)
Miscellaneous:
Seasonal staff attended safety training
Located City utilities
2
Management tasks
Street:
Inspected patch work
Inspected gravel resurfacing project
Corresponded with resident about a driveway permit
Scheduled culvert and ditch improvements with contractor
Sewer:
Scheduled septic tank improvements with contractor
Park and Recreation:
Worked with watershed and water conservation district on the Lilleskogen Rain Garden
Inspected concrete work
Equipment and Building:
Scheduled annual A/C maintenance
Scheduled contractor to raise alarm float for the Fire Hall/Public Works holding tank