8.d)1) Sewage Treatment System Expansion Meeting Date: 12/20/2011 Agenda Item: f �� '} �,� � � City Council Agenda Report City of Scandia 14727 209th St. North Scandia, MN 55073 (651) 433-2274 Action Requested: Authorize the City Engineer to proceed with a study of the possible expansion of the Anderson-Erickson portion of the 201 Wastewater Treatment System. Deadline/Timeline: Study would start in January, 2012 and be complete within 60 days. Background: • At the December 13 meeting the Council requested that the City Engineer prepare a scope of services for a study of whether the drainfield/treatment capacity can be expanded within the existing site. • The cost of the project would not exceed $4,000. Funds are available within the 201 Sewer Fund to pay for the study. Recommendation: The Council should authorize the engineer to proceed. Attachments/ • Stantec proposal dated December 15, 2011 Materials provided: Contact(s): Ryan Goodman, PE (651) 967-4616 Prepared by: Anne Hurlburt, Administrator (Anderson Erickson study) Page 1 of 1 12/15/11 `_ Stantec Consuiting Services Inc. ,v 2335 Highway 36 West � St.Paul MN 55113 � Tel: {651)636-4600 Fax:(651)636-1311 $�n� �Bonestroo December 15,2011 Anne Huriburt, City Administrator City of Scandia 1 4727-209th Street North Scandia, MN 55073 Re: Letter Proposal for Anderson-Erickson Study of Existing Site Only City of Scandia, MN Stantec Project No.: 568-11000-0 Dear Ms. Hurlburt: Thank you for the opportuniry to provide a proposal to complete a study on the Anderson/Erickson Wastewater System in the City of Scandia for the existing drainfield site. Our team of licensed Engineers and Specialists has the experience and qualifications to complete a study for the Anderson/Erickson Wastewater System's existing drainfield sfte that will provide written recommendations to the City Council of what improvements can be made to the existing drainfield site to increase capacity. The Anderson/Erickson Wastewater is an important system that provides wastewater collection and treatment for the homes along the east side of Big Marine Lake and Norell Avenue. Our proposed scope of work to complete a study of the existing drainfield site will be organized into three project tasks. We have organized our tasks into the following phases: review of existing collection and treatment system, recommendations for drainfield expansion, and provide financial cost of recommended improvements. SCOPE OF SERVICES TASK 1 -COLLECTION AND TREATMENT SYSTEM REVIEW • A site visit will be conducted with the City and Washington County to physically walk the drainfield site, complete hand-auger soil borings in the residual treatment area,and verify the treatment system site conditions. • A review of the current operations, maintenance practices,and records managemerns will be conducted. • Upon the system review we will provide comment on operational procedures and relatively simple system repairs/upgrades that would improve the system performance and extend the drainfield's life. . Also upon review of the system and soil conditions in the residual treatment area,we will make recommendations for soil treatment system expansion or pretreatment options that would allow additional connections to the system over the defined service area. TASK 2- DRAINFILED EXPANSION RECOMMENDATIONS • We will provide recommendations on expanding the existing drainfield and/or adding pretreatment to serve all properties in the desired area to be defined by the City. S�i�C December 15,2011 Anne Hurlburt,City Administrator Page 2 of 2 Reference: Letter Proposal for Anderson-Erickson Study of Exlsting Site Only TASK 3-PREPARE FINANCIAL COSTS OF IMPROVEMENTS • We will provide financial costs for system maintenance,system repair,and system expansion on the existing drainfield site. PROJECT SCHEDULE If authorized by the City,we could begin the project in January of 2012 and complete it within 60 days. If seasonal limitations such as frozen ground,very deep snow or excessively cold weather interfere with accurate field work, it may be necessary to delay certain tasks until spring. PROJECT DELIVERABLES • 10 printed copies of the final master document of the Anderson/Erickson drainfield. • An electronic(PDF) copy of the final master document. COST PROPOSAL TASK 1 -Collection and Treatment System Review $2,500 TASK 2- Drainfield Expansion Recommendations $400 TASK 3- Prepare Financial Costs of Site Im�rovements $1,100 Project 7ota1 $4,000 Our proposal is to complete the work on an hourly basis, not,to-exceed the total project cost listed above. Please#eel free to contact me at 651-967-4616 if you have any questions about this proposal. Sincerely, STANTEC,formerly BONESTROO � �d• .�.�....1 Ryan J. Goodman, PE