8.f April Public Works ReportMay 15th, 2018
Public Works Staff Report – March 2018
Roads and Right – of – way
ROW Brush clearing – 181st, 182nd, Maple, W/ Tractor brushing head
– Trimming around ballfields, play areas, and City Hall by hand
ROW - 1 dead deer removal
ROW – 2 - trees on road calls
ROW – sod damage - 5 calls – basic repairs done
Snow – 3 – full scale plows 17” total snow plowed ; Blew and broomed
walks
Gravel roads: Grading began on Pillar and Old Marine/ 185th
Patching – 230th, 228th, 199th, Oxboro, Oakhill, Mayberry,
Meadowbrook
Snow plowing – 4-15,16,17-18; 17” total snow accumulation \ 4-26-18;
Plows summarized and put away for the year.
Brush pile burning x 2
Sewer – Water:
April ‘18 - sewer samples were taken at Bliss
201 – March monthly DMR completed and Quarterly, Ground water
samples taken
Pump readings
Washington Co. sewer report completed
SSTS – Training for Jeff – for the mound septic systems
Uptown - Monthly water meter readings completed
201 – 4 alarms – 1- power loss lift #2, 3 – power losses lift #3 –
Gopher chewed through the power service – Our electrician had to
service.
12 Gopher One call requests
Parks:
Monthly safety checks done on playgrounds
Working on additional trail signage for WIP Preserve
Hockey mats rolled up and stored
Dragging Ballfields
Skate Park equipment out
Other:
New light battery Fire station
Drinking fountain-maintained Fire station
New garage door safety switches – 1- PW, 1- Fire station, 1 – door
cable PW - contracted
Chairs fixed - City Hall council chambers
Council work station repairs
Repairs being made to the tandem – wing broken
Grader used to plow snow on gravel roads during the 17’snow fall –
250 gallons of fuel used
Monthly building checks