8.f) PW Activity Report July 2014Public Works Activity Report
July 1 through July 31, 2014
Tim Kieffer, Public Works Director
(651) 433-5223 t.kieffer@ci.scandia.mn.us
Maintenance tasks
Street:
Sewer:
Potholed roads
Brought in gravel to repair washouts on Pilar Rd. and 205th St.
Removed fallen trees from roadway
Mowed ditches
Repaired street sign
Repaired broken gate valve on Odell Av.
Inspected catch basins in Wyldewood Acres
SCANDIA
Read pump run times at all of the lift stations
Worked with electrician to restore power to a STEP control panel on the Bliss system
Took test samples at the Bliss drainfield
Worked with EcoCheck to measure septic tanks
Worked with contractor to pull a pump at Bliss Lift Station 1
Raised manhole on the Anderson/Erickson system
Park and Recreation:
Water:
Mowed and weed whipped City owned property
Performed safety inspection on playground equipment
Mowed path off Oxboro Av. for the Fat Cat Triathlon
Read water meters for Uptown system
Equipment and Building:
Performed monthly OSHA inspections
Miscellaneous:
Located City utilities
Management tasks
Street:
Sewer:
Corresponded with resident about a driveway permit
Scheduled seal coat project
Corresponded with the County on a sign agreement
Met with resident about easement agreement
Met with Automatic Systems to review final plans for the 201 control panels
Scheduled septic tank improvements with contractor
Scheduled septic tanks to be pumped with contractor
Researched testing equipment
Worked with contractor to cap service on the Bliss system
Park and Recreation:
Scheduled with Free Church to spread woodchips at various locations
Equipment and Building:
Met with contractor and electrician to install projector at the Community Center
Met with electrician to install speakers at the Warming House
Worked with contractor to seal attic doors and insulate at the Community Center