Loading...
8.f) PW Activity Report July 2014Public Works Activity Report July 1 through July 31, 2014 Tim Kieffer, Public Works Director (651) 433-5223 t.kieffer@ci.scandia.mn.us Maintenance tasks Street: Sewer: Potholed roads Brought in gravel to repair washouts on Pilar Rd. and 205th St. Removed fallen trees from roadway Mowed ditches Repaired street sign Repaired broken gate valve on Odell Av. Inspected catch basins in Wyldewood Acres SCANDIA Read pump run times at all of the lift stations Worked with electrician to restore power to a STEP control panel on the Bliss system Took test samples at the Bliss drainfield Worked with EcoCheck to measure septic tanks Worked with contractor to pull a pump at Bliss Lift Station 1 Raised manhole on the Anderson/Erickson system Park and Recreation: Water: Mowed and weed whipped City owned property Performed safety inspection on playground equipment Mowed path off Oxboro Av. for the Fat Cat Triathlon Read water meters for Uptown system Equipment and Building: Performed monthly OSHA inspections Miscellaneous: Located City utilities Management tasks Street: Sewer: Corresponded with resident about a driveway permit Scheduled seal coat project Corresponded with the County on a sign agreement Met with resident about easement agreement Met with Automatic Systems to review final plans for the 201 control panels Scheduled septic tank improvements with contractor Scheduled septic tanks to be pumped with contractor Researched testing equipment Worked with contractor to cap service on the Bliss system Park and Recreation: Scheduled with Free Church to spread woodchips at various locations Equipment and Building: Met with contractor and electrician to install projector at the Community Center Met with electrician to install speakers at the Warming House Worked with contractor to seal attic doors and insulate at the Community Center 2