3. Review of Draft 2011 Budget and 2011-2015 Capital Improvement Program ��: - ��)
.,.�.-` <,�� �)F /
'r `"`� r . �� \\� a' /�'� �\
� .\�' v'�...♦ •�'�. � / tJ
`��
��.�9���T�'�.
Memo �
To: City Council Members
From: Anne Hurlburt,City Administrator
Date: August 25,2010
Re: 2011 Draft Budget and 2011-2015 Capital Improvement Plan
Additional Information for August 30,2010 Meeting
Attached are several items prepared in response to questions raised at the August 23, 2010 work session on
the 2011 Draft budget:
1. Worksheet showing city employee FTEs(full time equivalents)
This worksheet shows all positions by type and department as included in the 2011 draft budget,
with FTEs as well as the total number of employees. For some positions,it was necessary to make
estimates of FTEs because the employees are paid a flat amount for the day they work(such as the
Community Center Cleaner and Attendant)or compensation is paid in more than one form. For
example,firefighters are paid by the hour(at varying rates) and officers receive monthly sripends
that are not tied to the number of hours worked. In the case of the fire department,the total budget
for wages was divided by$12.00 per hour to estimate the FTEs(1 FTE equals 2,080 hours per year.)
2. Estimate of Replacement Cost, 1997 Ford Dump Truck with Plow Replacement
The next replacement of a plow truck is currently scheduled for 2012. There is some concern that
the useful life of this truck may be shorter than the 15 years(until the replacement cycle was
lengthened 2 years ago, a 12-year life cycle had been assumed.) Please see the attached memo about
our update of the cost estimate for the plow truck replacement.
3. Budget Impacts of Zavoral Mining and Reclamation Project EIS(Environmental Impact
Statement)
Staffwas asked to calculate the impact of the EIS project on the city's 2010 and 2011 budgets. A
worksheet is attached comparing the 2010&2011 budgets with those of the previous years,with
and without the EIS. It is important to note that the city is reimbursed by the proposer for all out-of-
pocket costs, as well as staff time, for this project.
4. Health Insurance Premium Increase
We have received the renewal rate for health insurance benefits. The 2011 premium increase for the
current plan will be 20%(compared to 18%assumed in the draft budget.) Staffwill provide some
additional information on this topic at the August 30 meeting.
1
City of Scandia, 2011 Draft Budget
Personal Services
Employee FTEs (Full Time Equivalents) Excluding City Council
1 FTE = 2,080 hours
Department
41000 51410 41910 42200 43000 45000 45180
Admin 8� Planning/ Fire 8 Public Comm. Total Number of
Position Finance Elections Bldg Rescue Works Parks Ctr FTEs Employees
Regular Employees, FT
City Administrator/Clerk+ 1.000 1.000 1
Building Official/Maintenance Supervisor+ 1.000 1.000 1
Maintenance Worker, FT 2.000 2.000 2
Subtotal 1.000 0.000 1.000 0.000 2.000 0.000 0.000 4.000 4
Regular Employees, PT
Deputy Clerk 0.750 0.750 1
Treasurer 0.330 0.330 1
O�ce Assistant 0.300 0.300 1
Maintenance Worker, PT 0.250 0.200 0.250 0.700 1
Recreation Coordinator 0.096 0.096 1
Community Center Cleaner' 0.060 0.060 1
Community Center Attendant* 0.034 0.034 1
Subtotal 1.380 0.000 0.000 0.000 0.250 0.296 0.344 2.271 7
Paid-on-Call Firefighters'* 3.926 3.926 27
Seasonal/Temporary Employees
Election Judges""" 0.000 0
Skating Supervisor 0.048 0.048 1
Ice Rink Maintenance 0.096 0.096 2
Ice Rink Attendant 0.288 0.288 5
Recreation Program Instructor 0.010 0.010 1
Maintenance, On-Call 0.053 0.053 2
Subtotal 0.000 0.000 0.000 0.000 0.053 0.442 0.000 0.496 11
All Employees 2.380 1.000 3.926 2.303 0.738 0.344 10.693 49
+ salaried employee
' paid per day;FTE based on$14 per hr
"" all wages(hourly+officer stipends)/$12 per hr
*"" non-election year
Rr�ai�n�n _�
• � ,
w _ `1
C, �
� ��t.
�"�� �`` R �, �%_-~ �` �
,, �r .����' ._...> �
.�^;
��J����
Memo �
To: City Council Members
From: Anne Hurlburt,City Administrator
Date: August 25,2010
Re: Estimate of Replacement Cost, 1997 Ford Dump Truck with Plow Replacement
The City's"fleet"of equipment for snow removal consists of two dump trucks with plows,two pick-up
trucks with plows,and a small tractor equipped with a snow blower. With 90 miles of roads to plow,plus
parking lots and sidewalks, all of this equipment must be in service in order to remove a typical snowfall
within a reasonable time period.
The two plow trucks are currently scheduled in the CIP to be replaced in 2012 (a 1997 Ford) and 2014(a
2002 Sterling.) Originally,the Ford had been scheduled for replacement in 2009(a 12-year life cycle)but
that was lengthened to 15 years. (The Sterling is still listed with a 12-year service life.) The replacement
cost estimate($140,000 for each truck) is several years old.
Staff obtained an updated cost estimate based on state contract pricing. The total cost(fully equipped and
excluding sales tax)in 2011 is expected to be approximately$194,000 for a tandem-�le truck, and about
$174,000 for a single axle truck. Sales tax would bring the cost up to about$207,800 and$186,400,
respectively. Dealers will take trade-ins,the value of which may be around$15,000.
The current plow trucks are both single a�cle trucks. When the replacement schedule was initially created,
the then-Maintenance Supervisor recommended against a tandem truck due to a concern about turning in
narrow streets and cul-de-sacs. However,our plowing practices have evolved to using two pick-ups with
plows in tighter turning situations. The current staff now believes that replacing one of the two single-axle
vehicles with a tandem truck would be advantageous. It would carry almost double the load of sand and
gavel,which would be useful in both the winter and summer months and sa�e stafftime in the long run.
If the replacement of the plow truck is moved from 2012 to 2011,it could be financed without new debt by
increasing contributions to the Equipment Replacement Fund and possibly supplementing it with cash in the
Capital Improvement Fund.
1
Budget Impacts
Zavoral Mining and Reclamation Project EIS
2009 2010 2010 2011 2011
Adopted Adopted Adopted Proposed Proposed
Plannin & Buildin (41910) Budget With EIS No EIS With EIS No EIS
Expense Budget $ 200,327 $ 401,929 $ 165,681 $ 273,122 $ 133,122
Change from Previous Year 100.64% -17.29% -32.05% -66.88%
2009 2010 2010 2011 2011
Adopted Adopted Adopted Proposed Proposed
General Fund Budget, all Depts. Budget With EIS No EIS With EIS No EIS
Expense Budget $1,776,632 $1,951,805 $1,728,006 $1,883,546 $1,743,546
Change from Previous Year 9.86% -2.74% -3.50% -10.67%
\\SERVER\SharedDocs\Departments\Finance\Budget\Worksheetslmisc worksheets anne 8/25/2010
August 23, 2010
A special meeting of the Scandia City Council was held on the above date. Mayor Dennis
Seefeldt called the meeting to order at 6:36 p.m. Council members present: Pete Crum, Connie
Amos, Dolores Peterson and Mayor Dennis Seefeldt. Council member absent: John Lindell.
Staff present: Administrator Anne Hurlburt and Treasurer Colleen Firkus. Guests present were
council candidates: Mike Harnetty, Tom Krinke, Jim Schneider, Randy Simonson and Sally
Swanson.
The purpose of the meeting was to discuss the draft budget for 2411. Hurlburt presented an
overview of the budget process and timeline pointing out that the city must adopt a maximum
levy by September 15. The levy information then goes on the property tax statements. The final
budget can be adopted at a later date,but the levy amount cannot be increased. The final levy is
then certified at the last council meeting in December.
Hurlburt explained the levy limit to which the city is subject, and went over the levy history and
how much is used for operations. How the city categorizes funds and departments was looked at
next,with Contractual Services being the largest expense category at 49% and Personal Services
being next at 24%. Harnetty asked how many full-time employees were on staff. Hurlburt said
she would prepare a worksheet for the next meeting that would reflect all employees and the total
Full Time Equivalents (FTEs).
The Expense assumptions were covered on page 6 that showed no increase in salaries or wages,
except for the City Council which has an ordinance based increase based on the CPI as reported
in November. Any action to change the increase must take place prior to the election in
November. Other expense assumptions included the increase in health insurance, PERA,
property and liability insurance, worker's compensation, fuel and utilities. Assumptions for
Revenue and Capital Projects were also outlined.
Staff also proposed to add one part-time (.7 FTE) position to replace the part-time seasonal
position in the 2010 Parks budget. The new position would be split between 3 departments:
Public Works (.25 FTE), Community Center(.25 FTE), and Parks (.2 FTE). A staff of two full-
time maintenance positions is not adequate to maintain the city's infrastructure, buildings and
parks, especially during peak mowing and plowing months. The average work week on an
annual basis would be 28 hours, to avoid the additional cost of health insurance benefits.
Pages 11, 12 and 13 contain a summary of expenses and revenues by fund and departments and a
history of expenses. Section 2 with the individual deparhnent expenses will be covered at the
next budget meeting.
Section 3 —Capital Improvement Plan (CIP) was reviewed next. Hurlburt gave an explanation of
a CIP and how it is required by law to have capital expenditures planned and budgeted in order
to make those purchases. The CIP is updated each year at budget time. There are two changes to
the CIP that affect spending in 2010.
August 23, 2010
City Council Budget
Page 2
Harnetty asked about the pickup truck that was replaced two years ago. The city ended up
keeping the 1995 GMC pickup to plow snow in parking lots, cul-de-sacs and other small areas.
This truck is now falling apart and needs to be replaced. It is more efficient to have two plow
pickup trucks clearing snow and keeping the big plow trucks on the main roads. Hurlburt
explained that the state contract allows us to buy trucks at the lowest price.
The Street Maintenance Program is also part of the CIP. To fully fund the pavement management
study's recommendation would require $600,000. The Capital Improvement Committee
recommended that the budget for contractual road maintenance and repairs be increased to
$300,000 in 2011, from $200,000 in 2010.
Another major recommendation of the CIP is to fund an Equipment Replacement Fund with
transfers from departments that will require equipment purchases. The budgets for?U08 and
2009 were $40,000 each, and the budgets for 2010 and 2011 are$80,000 each. Even so, the fund
will be at a deficit and require the city to borrow some of the cost of some major equipment
purchases. The appendix contains the detail of the CIP sorted by departments and funding
sources with additional detail on each project.
Section 4 contains the Pavement Management Plan. Section 5 contains information on the
Statewide Volunteer Firefighter Retirement Plan, which will be discussed at the next meeting.
The last part of contains tax rate information.
The next meeting is scheduled for Monday,August 30, at 6:30 p.m. A motion to adjourn was
made by Peterson and seconded by Amos. The meeting adjourned at 8:20 p.m.
Respectfully submitted,
��t ;
Colleen Firkus
Treasurer
�: ,�n:_.
,������,;
y�nX.�i.: �
��
City of Scandia
Blue Cross/ Blue Shield Health Insurance Plan
Southwest Service Cooperative
2007 Monthly Rates
Single Family($741.40)
City Share City Share Employee
Monthly Premium $231.50(100%) $593.20(80%) $14830(20%)
HSA Contribution $91.70 $100.00
Total $323.20 $69320 $148.30
Annual Deductible: $1,375 $2,750
2008 Monthly Rates ��'
Single Family($872.00)
City Share City Share Employee
Monthly Premium $272.00(100%) $697.60(80%) $174.40(20%)
HSA Contribution $100.00 $100.00
Total $372.00 $797.60 $174.40
Annual Deductible: $1,450 $2,825
2009 Monthly Rates
Single Family($948.50)
City Share City Share Employee
Monthly Premium $296.00(100%) $758.80(80%) $189.70(20%)
HSA Contribution $105.00 $105.00
Total $401.00 $863.80 $189.70
Annual Deductible: $1,450 $2,900
2010 Monthly Rates
Single Family($1,124.00)
��� City Share City Share Employee
_-
Monthly Premium $351.00(100%) $899.20(80%) $224.80(20%)
HSA Contribution $105.00 $140.00
Total $456.00 $1,03920 $224.80
Annual Deductible: $1,450 $2,900
2011 Proposed Monthly Rates
Single Family($1,349.00)
City Share City Share Employee
Monthly Premium $421.00(100%) $1,079.20(80%) $269.80(20%)
HSAContribution $105.00 $140.00
Total $526.00 $1,219.20 $269.80
Annual Deductible: $1,600 $3,200
08/3U/10
�� Bluetross BlueShield Cit of Scandia
►.� � of Minnesota y
• � M�����-����^� Health Savings Account
Deductible Health Plan $1,600
Effective Date: 1/1/2011
w.4`h quarter deductible carryover
THIS IS ONLY A SUMMARY AND IS SUBJECT TO THE TERMS OF THE CONTRACT**
IN-NETWORK PROVIDERS OUT-OF-NETWORK PROVIDERS
. . � -. .
. .•. . -�
: � � � . � �_� f _ $1,600 Single $3,200 Family
. _��
a
' ' �' ' "' Medicaf and Prescriotion Medical and Prescription
" � • • • ' $1,600 Single $3,200 Family $6,400 Single $12,000 Family
. .�.
. . -� . . ,- � � . �-
- � . . _. : . �� �
:E. . - . . ,��.; -
� Deductible then 100°/a coinsurance. Deductible then 80%coinsurance.
If non-participating provider services are
Payment for Participating Network covered, you are responsible for the
Providers as described. Most payments difference between the billed charges and
are based on allowed amount. allowed amount. Most payments are
based on allowed amount.
�- '- Unlimited.
� - .- .- . :.- . . . .. . . - � ..
COVERED CHARGES
Preventive Care
- . . . :�-
100°/a Deductible then 80°/a coinsurance.
'. ..- � . �-
t .-
- •- • 100% Deductible then 80%coinsurance.
�. _ . : . .
� . .
Ph sician Services
� � . 'f .
�: : � � _ Deductible then 100%coinsurance. Deductible then 80°/a coinsurance.
.. :. : : -
� � ` k � Deductible then 100%coinsurance. Deductible then 80%coinsurance.
.- - -�
� �- = :� : � Deductible then 10Q%coinsurance. Deductible then 80%coinsurance.
- � � : . .- Deductible then 100%coinsurance. Deductible then 80%coinsurance.
Other Professional Services
Deductible then 100%coinsurance.with Deductible then 80%coinsurance.with
t� Blue Select provider extended network providers. No coverage
with non artici atin roviders.
. - -_ , Deductible then 100%coinsurance. Deductible then 80%coinsurance.
_. r e. .
"� `� "� Deductible then 100%coinsurance. No Coverage
IN -NETWORK PROVIDERS OUT-OF-NETWORK PROVIDERS
. .
. ,. . -.` . - Deductible then 100%coinsurance. Deductible then 80%coinsurance.
..- � ..
Out atient Hos ital Services
� .. .
- �. . . . Deductibie then 100%coinsurance. Deductible then 80%coinsurance.
.. _ �
� .� � �.. . . .�
�. �. � � �-
'` Deductible then 100%coinsurance. Deductible then 80%coinsurance.
. - � .
-� -. � �. ._
. - .- - -.
.- . � - F_ -� Deductible then 100%coinsurance. Deductible then 80%coinsurance.
Erner enc Care
- �: -.. Deductible then 100%coinsurance. �
. . � �- Deductible then 100%coinsurance. Deductible then 100%coinsurance
� ' � Deductible then 100%coinsurance.
:. - ,. . - - -
_� _ �F - Deductible then 100%coinsurance.
Behavioral Health Care Mental Health and Chemical De endenc Care
.. - Deductible then 100%coinsurance. Deductible then 80%coinsurance.
� .. - Deductible then 100%coinsurance. Deductible then 80%coinsurance.
- • - . . Deductible then 100%coinsurance. Deductible then 80%coinsurance.
Prescri tion Dru s
.. Deductible then 100%coinsurance.
Patient will pay difference if brand name is selected when a generic is available.
No covera e for dru s outside formula list.
•�._ � :i e. Deductible then 100%coinsurance.
- : . -: �- � �- = No coverage for drugs outside formufary list.
"'This is only an outline of plan benefits. The contract and certificate include complete details of what is and isn't covered.Services not
covered include items primarily used for non-medical purposes, over-the-counter drugs/nutritional supplements, services that are
complementary,experimental, not medically necessary,or covered by workers'compensation or no-fault auto insurance. We feature a
large network of health care providers. Each provider is an independent contractor and is not our agent. Nonparticipating providers do
not have contracts with Blue Cross and Blue Shield of Minnesota. Blue Cross and Blue Shield of Minnesota is an independent licensee
of the Blue Cross and Blue Shield Association.
06/28/2010